Pile pressing equipment for constructional engineering
By introducing shock absorbing components and worm transmission system driven by servo motors into pile pressing equipment for construction projects, the resonance problem caused by vibration transmission is solved, construction efficiency and equipment life are improved, and a safer construction process is achieved.
Patent Information
- Application Number
- CN202420260061.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-02
- Publication Date
- 2024-11-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing pile pressing equipment for construction projects will cause vibration transmission during pile pressing, causing resonance of the pile loading mechanism, affecting the construction efficiency and the service life of the equipment.
A pile pressing device including shock absorbing components is designed. The shock absorbing component consists of a fixed block, a support arm, a sliding block, a spring, a slide rod, a support platform and a damping shock absorber. The pile is realized by driving the worm and worm gear transmission by a servo motor. The stable loading of the body and the lifting and lowering movement of the support platform absorb vibration energy.
Effectively absorb vibration, improves the smoothness of the pile pressing process, extends the service life of the equipment, and improves construction safety and loading efficiency.
Smart Images

Figure CN221941333U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction machinery, in particular to a pile driving device for construction engineering. Background Art
[0002] A pile driver is a pile driving machine that uses static pressure to drive piles into the ground. It is used for pile driving in soft soil layers, such as pile foundation projects in city centers or densely built areas, and expansion projects of precision factories. There is no noise, vibration, or pollution during construction, and the disturbance to the surrounding environment is minimal.
[0003] For example, the invention patent with application number CN202010416124.3 discloses a pile driving device for construction engineering. The invention provides a pile loading mechanism for placing the pile body on both sides of the operating platform, which facilitates loading the pile body into the inner cavity of the pile driving through hole, avoids the swing of the pile body during the loading of the pile body and causes collision damage with the pile driving equipment, improves the safety of pile loading, and can be used in advance to load the next pile while one pile is being driven. The movement of the support platform is the interaction of the threads and the extension and retraction of the hydraulic cylinder. The movement accuracy is higher than the movement accuracy of the wheels, which facilitates the positioning of the next pile body and improves the work efficiency of pile driving during construction. However, the vibration during the pile driving operation will be transmitted to the overall equipment, causing resonance in the pile loading mechanism.
[0004] Therefore, in view of this, the existing structure and defects are studied and improved, and a pile driving device for construction engineering is proposed. Utility Model Content
[0005] The purpose of the utility model is to provide a pile driving device for construction engineering to solve the problems raised in the above background technology.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a pile driving equipment for construction engineering, comprising a body and a mounting frame, a shock absorbing assembly is installed on the top of the body, and the shock absorbing assembly comprises a fixed block, a support arm, a sliding block, a spring, a sliding rod, a support platform and a damping shock absorber, the surface of the fixed block is connected to the support arm through a rotating shaft, and the other end of the support arm is connected to the sliding block through a rotating shaft, springs are arranged on both sides of the sliding block, and a sliding rod is passed through the middle of the spring, support platforms are fixed at both ends of the sliding rod, and a damping shock absorber is arranged in the middle of the inner top end of the support platform, and the mounting frame is arranged on the top of the support platform.
[0007] Furthermore, the fixing blocks are symmetrically distributed about the top center position of the body, and two sliding rods are provided.
[0008] Furthermore, the sliding block and the sliding rod are slidably connected, and four of each of the fixed block, the support arm and the sliding block are provided.
[0009] Furthermore, a loading mechanism is installed on the top of the supporting platform, and two groups of loading mechanisms are provided.
[0010] Furthermore, the loading mechanism includes a servo motor, a worm and a first worm gear, and the output end of the servo motor is connected to the worm, and the first worm gear is arranged on the left side of the worm.
[0011] Furthermore, the loading mechanism also includes a second worm gear and a first transmission rod, and the second worm gear is arranged on the right side of the worm gear, and the first transmission rod is penetrated through the middle of the first worm gear.
[0012] Furthermore, the loading mechanism also includes a second transmission rod and a lifting frame, and the second transmission rod is passed through the middle of the second worm gear, and the lifting frame is provided at one end of the first transmission rod and the second transmission rod away from the mounting frame.
[0013] The utility model provides a pile driving device for construction engineering, which has the following beneficial effects:
[0014] 1. The vibration generated during the pile pressing process of the utility model will cause the support platform to move up and down, and then the vibration energy is absorbed by the damping shock absorber. The sliding block sliding on the slide rod squeezes the spring to improve the smoothness of the machine body during pile pressing, while extending the service life of the equipment and ensuring construction safety.
[0015] 2. The servo motor of the utility model drives the worm to rotate, and the worm drives the first worm wheel and the second worm wheel to drive the first transmission rod and the second transmission rod to rotate, so that the two lifting frames rotating in opposite directions can straighten the pile body and limit it to the middle opening of the supporting platform, thereby accelerating the loading efficiency and avoiding the pile body from swinging during the pile pressing process. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 This is a schematic diagram of the overall three-dimensional structure of a pile driving device for construction engineering of the utility model;
[0017] Figure 2 This is a schematic diagram of the top view of the support platform of a pile driving device for construction engineering of the utility model;
[0018] Figure 3 The utility model is a front view structural schematic diagram of a shock absorbing component of a pile driving device for construction engineering.
[0019] In the figure: 1. body; 2. shock absorbing assembly; 201. fixed block; 202. support arm; 203. sliding block; 204. spring; 205. slide bar; 206. support platform; 207. damping shock absorber; 3. mounting frame; 4. loading mechanism; 401. servo motor; 402. worm; 403. first worm gear; 404. second worm gear; 405. first transmission rod; 406. second transmission rod; 407. lifting frame. DETAILED DESCRIPTION
[0020] The following is a further detailed description of the implementation of the present invention in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but cannot be used to limit the scope of the present invention.
[0021] like Figure 1 and Figure 3 As shown, a pile driving device for construction engineering includes a body 1 and a mounting frame 3. A shock absorbing assembly 2 is installed on the top of the body 1, and the shock absorbing assembly 2 includes a fixed block 201, a support arm 202, a sliding block 203, a spring 204, a slide bar 205, a support platform 206 and a damping shock absorber 207. The surface of the fixed block 201 is connected to the support arm 202 through a rotating shaft, and the other end of the support arm 202 is connected to the sliding block 203 through a rotating shaft. Springs 204 are arranged on both sides of the sliding block 203. 4, and a slide bar 205 is passed through the middle of the spring 204, support platforms 206 are fixed at both ends of the slide bar 205, and a damping shock absorber 207 is arranged at the middle of the inner top of the support platform 206, the mounting frame 3 is arranged on the top of the support platform 206, the fixed blocks 201 are symmetrically distributed about the top center position of the body 1, two slide bars 205 are arranged, the sliding block 203 is slidably connected to the slide bar 205, and the fixed block 201, the support arm 202 and the sliding block 203 are respectively arranged in four.
[0022] The specific operation is as follows: the vibration generated during the pile driving process will cause the support platform 206 to move up and down, and then the vibration energy is absorbed by the damping shock absorber 207. The sliding block 203 sliding on the slide rod 205 squeezes the spring 204 to improve the smoothness of the machine body 1 during pile driving, while extending the service life of the equipment and ensuring construction safety.
[0023] like Figure 2As shown, a loading mechanism 4 is installed on the top of the supporting platform 206, and the loading mechanism 4 is provided with two groups, the loading mechanism 4 includes a servo motor 401, a worm 402 and a first worm gear 403, and the output end of the servo motor 401 is connected to the worm 402, the first worm gear 403 is provided on the left side of the worm 402, the loading mechanism 4 also includes a second worm gear 404 and a first transmission rod 405, and the second worm gear 404 is provided on the right side of the worm 402, the first transmission rod 405 is penetrated in the middle of the first worm gear 403, the loading mechanism 4 also includes a second transmission rod 406 and a lifting frame 407, and the second transmission rod 406 is penetrated in the middle of the second worm gear 404, and the lifting frame 407 is provided at the end of the first transmission rod 405 and the second transmission rod 406 away from the mounting frame 3.
[0024] The specific operation is as follows: the servo motor 401 drives the worm 402 to rotate, and the worm 402 drives the first worm wheel 403 and the second worm wheel 404 to drive the first transmission rod 405 and the second transmission rod 406 to rotate, so that the two lifting frames 407 rotating in opposite directions straighten the pile body and limit it at the middle opening of the supporting platform 206, thereby speeding up the loading efficiency and avoiding the pile body from swinging during the pile pressing process.
[0025] In summary, when the pile driving equipment for construction engineering is used, the pile body is first hoisted in the lifting frame 407 by a crane, and then the servo motor 401 is started to drive the worm 402 to rotate, and the worm 402 drives the first worm wheel 403 and the second worm wheel 404 to drive the first transmission rod 405 and the second transmission rod 406 on the mounting frame 3 to rotate, and the two lifting frames 407 rotating in opposite directions are used to straighten the pile body and limit it to the middle opening of the supporting platform 206, so as to avoid the pile body from colliding with the equipment due to swinging during the pile driving process;
[0026] As the pile driving work continues, the vibration generated by the pile driving will cause the support platform 206 to move up and down. During the lifting and lowering of the support platform 206, the supporting angle of the support arm 202 on the sliding block 203 will change immediately, which will cause the sliding block 203 to slide about the outside of the sliding rod 205 to squeeze the spring 204. According to the different vibrations received by the support platform 206, the vibrations generated are absorbed by the two damping shock absorbers 207 arranged at the front and rear, thereby improving the smoothness of the machine body 1 during pile driving, extending the service life of the equipment, and ensuring construction safety.
[0027] The embodiments of the present invention are provided for the purpose of illustration and description, and are not intended to be exhaustive or to limit the present invention to the disclosed forms. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiments are selected and described to better illustrate the principles and practical applications of the present invention, and to enable those of ordinary skill in the art to understand the present invention and thereby design various embodiments with various modifications suitable for specific uses.
Claims
1. A pile driving device for construction engineering, comprising a body (1) and a mounting frame (3), characterized in that: A shock absorbing assembly (2) is installed on the top of the machine body (1), and the shock absorbing assembly (2) comprises a fixed block (201), a support arm (202), a sliding block (203), a spring (204), a sliding rod (205), a support platform (206) and a damping shock absorber (207); the surface of the fixed block (201) is connected to the support arm (202) via a rotating shaft, and the other end of the support arm (202) is connected to the sliding block (203) via a rotating shaft; springs (204) are arranged on both sides of the sliding block (203), and a sliding rod (205) is passed through the middle of the spring (204); the support platform (206) is fixed at both ends of the sliding rod (205), and a damping shock absorber (207) is arranged in the middle of the inner top of the support platform (206); and the mounting frame (3) is arranged on the top of the support platform (206).
2. A pile driving device for construction engineering according to claim 1, characterized in that: The fixed blocks (201) are symmetrically distributed about the top center position of the machine body (1), and two sliding rods (205) are provided.
3. A pile driving device for construction engineering according to claim 1, characterized in that: The sliding block (203) and the sliding rod (205) are slidably connected, and four of each of the fixed block (201), the support arm (202) and the sliding block (203) are provided.
4. A pile driving device for construction engineering according to claim 1, characterized in that: A loading mechanism (4) is installed on the top of the support platform (206), and the loading mechanism (4) is provided in two groups.
5. A pile driving device for construction engineering according to claim 4, characterized in that: The loading mechanism (4) comprises a servo motor (401), a worm (402) and a first worm gear (403), wherein the output end of the servo motor (401) is connected to the worm (402), and the first worm gear (403) is arranged on the left side of the worm (402).
6. A pile driving device for construction engineering according to claim 5, characterized in that: The loading mechanism (4) further comprises a second worm gear (404) and a first transmission rod (405), wherein the second worm gear (404) is arranged on the right side of the worm gear (402), and the first transmission rod (405) is passed through the middle of the first worm gear (403).
7. A pile driving device for construction engineering according to claim 6, characterized in that: The loading mechanism (4) further comprises a second transmission rod (406) and a lifting frame (407), wherein the second transmission rod (406) is passed through the middle of the second worm gear (404), and a lifting frame (407) is provided at one end of the first transmission rod (405) and the second transmission rod (406) away from the mounting frame (3).
