Building device for house building foundation engineering construction

By designing a construction device for driving vibrating rods for power vehicles during construction foundations, using buffer and lifting mechanisms, cleaning and driving components and other components, the problem of difficulty for construction personnel to control vibrating rods is solved, and construction efficiency and accuracy are improved. Simplified concrete treatment process.

CN221941345UActive Publication Date: 2024-11-01SICHUAN TONGRUIDA CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323668317.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-29
Publication Date
2024-11-01
Estimated Expiration
2033-12-29

AI Technical Summary

Technical Problem

In the construction of building foundations, it is difficult for construction personnel to effectively control the vibrating rod in the prior art, resulting in low vibration accuracy and efficiency, and the concrete vibration and compaction process is difficult, affecting construction efficiency.

Method used

A construction device for building foundation engineering of a building foundation is designed, including a power vehicle, a vibrating rod, a temporary bucket, a buffer component and a lifting mechanism. The power vehicle drives the vibrating rod for vibrating, and uses a sliding sleeve and elastic parts to buffer it. , clean the components and clean the mud, lift the components to adjust the position of the vibrator, and press the plate and smoothing roller for concrete compaction and smoothing.

Benefits of technology

The vibration conduction of the vibrating rod is reduced through the buffer assembly, and the lifting mechanism facilitates the insertion and removal of the vibrating rod. The cleaning component improves the service life of the vibrating rod, the lifting and driving parts improves the vibration accuracy and efficiency, and the downward pressure plate and smoothing roller simplify concrete treatment. , reduce construction difficulty and improve construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221941345U_ABST
    Figure CN221941345U_ABST
Patent Text Reader

Abstract

The utility model discloses a building device for house building foundation engineering construction, and relates to the technical field of building construction.The building device comprises a motor vehicle and a vibrating rod, the vibrating rod is arranged on the motor vehicle, and the motor vehicle is provided with a temporary storage hopper and a buffer assembly; the motor vehicle is provided with a lifting assembly for vertically lifting the vibrating rod, the buffering assembly comprises a sliding sleeve and an elastic piece, the sliding sleeve is arranged on the vibrating rod in a sleeving mode, one end of the elastic piece is connected with the sliding sleeve, the other end of the elastic piece is connected with the vibrating rod, and the sliding sleeve is connected with the motor vehicle. The device has the effects that the working difficulty of constructors is reduced, and the working efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of building construction, and in particular to a construction device for a building foundation engineering construction. Background Art

[0002] At present, the foundation is mainly made of concrete, which is an artificial stone material that is made of cementitious materials, aggregates, water, and admixtures and additives added in a certain proportion when necessary. It needs to be mixed evenly and cured and hardened. When building the foundation, it is necessary to pour concrete and vibrate the concrete at the same time.

[0003] During pouring, in order to ensure the strength of concrete, it is necessary to use a tamping device to vibrate the concrete to remove the air in the concrete and make the aggregates in the concrete slide and rearrange each other, so as to compact the concrete. In the prior art, a manually operated vibrator is usually used to vibrate the poured concrete. During the vibration process, the vibrator is difficult for the worker to hold and is easy to drop from the worker's hand, making it difficult for the worker to control the vibration accuracy. After the vibration is completed, the concrete needs to be compacted and smoothed. During this process, the construction workers have a certain degree of difficulty in construction, and the construction efficiency is not high. Utility Model Content

[0004] In order to solve the problem that construction workers have certain difficulties in construction and the construction efficiency is low, the present application provides a construction device for the foundation engineering construction of a building.

[0005] The present application provides a construction device for a building foundation engineering, which adopts the following technical solution:

[0006] A construction device for a building foundation engineering project comprises a power vehicle and a vibrating rod, wherein the vibrating rod is arranged on the power vehicle, the power vehicle is provided with a temporary storage bucket, the power vehicle is provided with a buffer assembly, the power vehicle is provided with a lifting assembly for vertically lifting the vibrating rod, the buffer assembly comprises a sliding sleeve and an elastic member, the sliding sleeve is sleeved on the vibrating rod, one end of the elastic member is connected to the sliding sleeve, the other end of the elastic member is connected to the vibrating rod, and the sliding sleeve is connected to the power vehicle.

[0007] By adopting the above technical scheme, the power vehicle drives the temporary storage bucket, and the temporary storage bucket unloads concrete. When the concrete is vibrated, the power vehicle drives the vibrating rod to move, and the vibrating rod vibrates the concrete below. During the movement, the vibrating rod is adjusted by the lifting mechanism to facilitate the insertion and removal of the vibrating rod from the concrete. During the vibration process, the sliding sleeve and the buffer assembly prevent the vibration of the vibrating rod from causing the power vehicle to vibrate to a certain extent, thereby reducing the work difficulty of construction personnel and increasing construction efficiency.

[0008] Furthermore, a protective tube is provided on the inner wall of the sliding sleeve, the protective tube is sleeved on the vibrating rod, one end of the elastic member is connected to the protective tube, one end of the elastic member is connected to the replacement sliding sleeve, and a cleaning assembly is provided at the bottom end of the protective tube.

[0009] By adopting the above technical solution, when the vibrating rod is inserted into the concrete, the sliding sleeve is easily fixed due to its adhesion to the concrete, and at the same time, it will adhere to the elastic member to a certain extent, resulting in a weakening of its buffering performance.

[0010] Furthermore, the cleaning assembly includes a cleaning ring, which is sleeved on the vibrating rod, and a plurality of bristles are arranged on the inner wall of the cleaning ring.

[0011] By adopting the above technical solution, when the vibrating rod is taken out after vibrating the mud, the bristles on the inner wall of the cleaning ring clean the vibrating rod, which to a certain extent prevents the mud attached to the outer wall of the vibrating rod from being brought into the sliding sleeve. At the same time, after the vibrating rod is cleaned, the solidified mud can be prevented from existing on the outer wall of the vibrating rod when the vibrating rod is used for the second time.

[0012] Furthermore, the power vehicle is provided with a telescopic rod, one end of the telescopic rod is ball-jointed with the power vehicle, and the other end of the telescopic rod is fixedly connected with a sliding sleeve, and the sliding sleeve is vertically arranged.

[0013] By adopting the above technical solution, when vibrating the mud, it is convenient to adjust the position of the vibrating rod. At the same time, the lifting mechanism adjusts the vibrating rod in the vertical direction, which prevents the vibrating rod from deviating to a certain extent, thereby achieving vibration of the concrete.

[0014] Furthermore, the lifting assembly includes a first hydraulic cylinder, the first hydraulic cylinder is arranged on the power vehicle, and the output rod of the first hydraulic cylinder is connected to the vibrating rod.

[0015] By adopting the above technical solution, when the vibrating rod is adjusted up and down, the output rod of the first hydraulic cylinder drives the vibrating rod to move vertically to vibrate the concrete.

[0016] Furthermore, the power vehicle is provided with a first driving member for driving the vibrating rod to move along the length direction of the power vehicle, and the power vehicle is provided with a second driving member for driving the vibration to move along the width direction of the power vehicle.

[0017] By adopting the above technical solution, the position of the vibrating rod is adjusted by the first driving member and the second driving member, so as to vibrate different places and realize the control of the horizontal position of the vibrating rod.

[0018] Furthermore, a lower pressure plate is provided at the bottom of the power vehicle, and a driving element for driving the lower pressure plate to move in a vertical direction is provided at the bottom of the power vehicle.

[0019] By adopting the above technical solution, after vibrating the concrete, the concrete needs to be compacted, and the driving element is used to drive the lower pressing plate to move forward, exerting pressure on the concrete to achieve compaction of the concrete.

[0020] Furthermore, a smoothing roller is arranged on the side of the lower pressure plate away from the vibrating rod, and the smoothing roller is rotatably connected to the power vehicle.

[0021] By adopting the above technical solution, after the power vehicle compacts the concrete, the power vehicle drives the smoothing roller during the process of moving forward, and the smoothing roller smoothes the concrete.

[0022] Furthermore, a tip is provided at one end of the vibrating rod away from the power vehicle, and the tip is detachably connected to the vibrating rod.

[0023] By adopting the above technical solution, when the vibrating rod is inserted into the mud, the tip at one end of the mud rod facilitates the insertion of the mud rod into the mud.

[0024] In summary, the present application includes at least one of the following beneficial technical effects:

[0025] 1. The present application is provided with a buffer component. When the vibrating rod vibrates, the buffer component buffers the vibrating rod, thereby preventing the vibrating rod from falling off due to the vibration to a certain extent.

[0026] 2. The present application uses a lifting device to lift the vibrating rod during the process of vibrating the concrete, so that the vibrating rod can be inserted into and pulled out of the concrete.

[0027] 3. The present application provides a pointed end, which facilitates the insertion of the vibrating rod into concrete. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the present application;

[0029] Figure 2 It is a schematic diagram of the structure of the lifting assembly and the vibrating rod of the embodiment of the present application;

[0030] Figure 3 It is a schematic diagram of the structure of the temporary storage bucket and the material discharge chute of the embodiment of the present application;

[0031] Figure 4 It is a schematic diagram of the structure of the telescopic tube and the buffer assembly of the embodiment of the present application;

[0032] Figure 5 It is a schematic diagram of the structure of the protection tube and the cleaning assembly of the embodiment of the present application;

[0033] Figure 6 yes Figure 5 A magnified schematic diagram of part A;

[0034] Figure 7 It is a schematic diagram of the structure of the lower pressure plate and the smoothing roller in the embodiment of the present application.

[0035] Description of reference numerals: 1, power car; 2, vibrating rod; 21, tip; 3, temporary storage bucket; 31, valve; 32, discharge door; 33, discharge chute; 34, discharge port; 4, buffer assembly; 41, spring; 411, square plate; 42, sliding sleeve; 43, first arc plate; 44, second arc plate; 45, bolt; 46, protection tube; 47, clamp; 48, slider; 49, mounting groove; 5, cleaning assembly; 51, cleaning ring; 52. Bristles; 53. Slots; 54. Ring plate; 55. Limiting plate; 6. Telescopic rod; 61. First rod; 62. Second rod; 7. Lifting assembly; 71. First hydraulic cylinder; 72. Adapter plate; 73. Connecting column; 74. First cylinder; 75. Second cylinder; 76. Sliding plate; 77. Connecting rod; 78. Limiting groove; 79. T-slot; 8. Lower pressure plate; 81. Second hydraulic cylinder; 9. Smoothing roller; 91. Connecting rod. DETAILED DESCRIPTION

[0036] The following is combined with Figure 1-7 This application is described in further detail.

[0037] The embodiment of the present application discloses a construction device for a building foundation engineering construction.

[0038] Reference Figure 1 as well as Figure 2 A construction device for a building foundation engineering construction comprises a power vehicle 1 and a vibrating rod 2, the vibrating rod 2 is arranged on the power vehicle 1, the power vehicle 1 is provided with a temporary storage bucket 3, the power vehicle 1 is provided with a buffer assembly 4, the power vehicle 1 is provided with a lifting assembly 7 for vertically lifting the vibrating rod 2, the buffer assembly 4 comprises a sliding sleeve 42 and an elastic member, the sliding sleeve 42 is sleeved on the vibrating rod 2, one end of the elastic member is connected to the sliding sleeve 42, the other end of the elastic member is connected to the vibrating rod 2, and the sliding sleeve 42 is connected to the power vehicle 1.

[0039] In this embodiment, the elastic member is configured as a spring 41, and the sliding sleeve 42 includes a first arc plate 43 and a second arc plate 44. One end of the first arc plate 43 is hinged to one end of the second arc plate 44, and the other ends of the first arc plate 43 and the second arc plate 44 are connected by bolts 45. The first arc plate 43 and the second arc plate 44 are both provided with a buffer assembly 4.

[0040] refer to Figure 1 as well as Figure 3A valve 31 is provided at the bottom of the temporary storage bucket 3, and a discharge door 32 is provided at the top of the temporary storage bucket 3. When the temporary storage bucket 3 needs to be discharged, the discharge door 32 is opened to discharge the material. During the forward movement of the power vehicle 1, the discharge door 32 is closed to prevent concrete from spilling. A discharge chute 33 is provided at the lower end of the temporary storage bucket 3, and a discharge port 34 is provided on the bottom wall of the discharge chute 33 along the length direction. The length of the discharge port 34 is consistent with the length of the discharge chute 33. When the temporary storage bucket 3 discharges concrete, the valve 31 is opened and the concrete begins to enter the discharge chute 33, and the discharge chute 33 discharges the concrete through the discharge port 34.

[0041] refer to Figure 2 , Figure 4 as well as Figure 5 The inner wall of the sliding sleeve 42 is provided with a protective tube 46, which is sleeved on the vibrating rod 2, one end of the elastic member is connected to the protective tube 46, and one end of the elastic member is connected to the sliding sleeve 42, and a cleaning assembly 5 is provided at the bottom of the protective tube 46. The cleaning assembly 5 includes a cleaning ring 51, which is sleeved on the vibrating rod 2, and a plurality of bristles 52 are provided on the inner wall of the cleaning ring 51.

[0042] refer to Figure 2 , Figure 4 as well as Figure 6 In this embodiment, the protective tube 46 is provided with a clamp 47, and the clamp 47 fixes the protective tube 46 to the vibrating rod 2. The buffer assembly 4 also includes a slider 48, which is fixedly arranged on the protective tube 46. The first arc plate 43 and the second arc plate 44 are both provided with a mounting groove 49. The two ends of the mounting groove 49 are closed structures. Springs 41 are fixedly arranged at both ends of the mounting groove 49. A square plate 411 is fixedly arranged at one end of the spring 41, and the square plate 411 abuts against the side wall of the slider 48. A slot 53 is provided at the upper end of the cleaning ring 51, and the cleaning ring 51 is provided with an annular plate 54. The annular plate 54 is slidably connected with the slot 53. A limit plate 55 is rotatably provided on the cleaning ring 51, and the limit plate 55 abuts against the lower end of the annular plate 54. The inner wall of the annular plate 54 is provided with bristles 52. The annular plate 54 and the slot 53 are provided to facilitate the replacement of the bristles 52.

[0043] refer to Figure 1 as well as Figure 2 The power car 1 is provided with a telescopic rod 6, one end of the telescopic rod 6 is ball-jointed with the power car 1, and the other end of the telescopic rod 6 is fixedly connected with the sliding sleeve 42, and the sliding sleeve 42 is vertically arranged. In this embodiment, two telescopic rods 6 are provided, and the telescopic rods 6 include a first rod 61 and a second rod 62, and the second rod 62 is slidably connected with the first rod 61. A first baffle is provided at one end of the first rod 61 close to the second rod 62, and a second baffle is provided at one end of the second rod 62 located in the slide groove, and the first baffle and the second baffle prevent the second rod 62 from falling off from the first rod 61. The first rod 61 is ball-jointed with the power car 1, and the second rod 62 is hinged with the sliding sleeve 42.

[0044] refer to Figure 1 as well as Figure 2 The lifting assembly 7 includes a first hydraulic cylinder 71, which is arranged on the power vehicle 1, and the output rod of the first hydraulic cylinder 71 is connected to the vibrating rod 2. In this embodiment, two first hydraulic cylinders 71 are provided, and the output rods of the two first hydraulic cylinders 71 are fixedly provided with a receiving plate 72, and the power vehicle 1 is provided with two connecting columns 73, which are slidably connected to the receiving plate 72, and the two first hydraulic cylinders 71 are respectively fixedly provided at one end of the receiving column.

[0045] refer to Figure 1 as well as Figure 2 The power vehicle 1 is provided with a first driving member for driving the vibrating rod 2 to move along the length direction of the power vehicle 1 , and the power vehicle 1 is provided with a second driving member for driving the vibration to move along the width direction of the power vehicle 1 . In this embodiment, the first driving member is set as the first cylinder 74, and the second driving member is set as the second cylinder 75. The first cylinder 74 is set along the length direction of the power vehicle 1, and the second cylinder 75 is set along the width direction of the power vehicle 1. The first cylinder 74 and the second cylinder 75 are set on the receiving plate 72, and the receiving plate 72 is slidably set on the sliding plate 76. The sliding plate 76 is provided with two connecting rods 77, and the two connecting rods 77 are both provided with limiting grooves 78. The first cylinder 74 and the second cylinder 75 are respectively slidably connected with the limiting grooves 78. The connecting rod 77 is provided with a T-block (not shown) near the side wall of the receiving plate 72, and the receiving plate 72 is provided with a T-slot 79. The T-slot 79 is slidably connected to the T-block. A vibrating rod 2 is fixedly connected above the sliding plate 76, and the vibrating rod 2 is penetrated through the receiving plate 72 and the sliding plate 76.

[0046] refer to Figure 1 as well as Figure 7 A lower pressing plate 8 is provided at the bottom of the power car 1, and a driving unit for driving the lower pressing plate 8 to move in the vertical direction is provided at the bottom of the power car 1. In this embodiment, the driving unit is set as a second hydraulic cylinder 81, and two second hydraulic cylinders 81 are provided, which are respectively located at both ends of the lower pressing plate 8. The second hydraulic cylinder 81 is fixedly provided on the power car 1, and the lower pressing plate 8 is horizontally provided on the power car 1.

[0047] refer to Figure 1 as well as Figure 7 A trowel roller 9 is provided on the side of the lower pressing plate 8 away from the vibrating rod 2, and the trowel roller 9 is rotatably connected to the power vehicle 1. In this embodiment, connecting rods 91 are rotatably provided at both ends of the trowel roller 9, and one end is connected to the power vehicle 1.

[0048] refer to Figure 1 as well as Figure 7 The end of the vibrating rod 2 away from the power vehicle 1 is provided with a tip 21, and the tip 21 is detachably connected to the vibrating rod 2. In the present embodiment, the tip 21 is threadedly connected to the vibrating rod 2, which is convenient for replacement when the tip 21 is damaged.

[0049] The implementation principle of a construction device for a building foundation engineering construction in an embodiment of the present application is as follows: while the power vehicle 1 moves forward, the temporary storage bucket 3 discharges concrete, and the concrete is discharged evenly through the discharge port 34 on the discharge trough 33. The first cylinder 74 and the second cylinder 75 adjust the position of the sliding plate 76, and the sliding plate 76 drives the vibrating rod 2 to adjust the position. At the same time, the first hydraulic cylinder 71 drives the receiving plate 72 to move downward, and the vibrating rod 2 is inserted into the concrete. At this time, the vibrating rod 2 starts to vibrate the concrete. At the same time, the spring 41 in the sliding sleeve 42 has a certain buffering effect on the vibration force of the vibrating rod 2, and to a certain extent prevents the vibration force of the vibrating rod from being transmitted to the power vehicle 1. After a certain period of time, the first hydraulic cylinder 71 drives the vibrating rod 2 to rise, so that it leaves the concrete surface.

[0050] During the forward movement of the power vehicle 1, the second hydraulic cylinder 81 drives the lower pressing plate 8 to press down the concrete, and the smoothing roller 9 smoothes the concrete, thereby reducing the difficulty of the construction workers' work and increasing the construction efficiency.

[0051] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A construction device for building foundation engineering, characterized in that: The invention comprises a power vehicle (1) and a vibrating rod (2), wherein the vibrating rod (2) is arranged on the power vehicle (1), the power vehicle (1) is provided with a temporary storage bucket (3), the power vehicle (1) is provided with a buffer component (4), and the power vehicle (1) is provided with a lifting component (7) for vertically lifting the vibrating rod (2); The buffer assembly (4) comprises a sliding sleeve (42) and an elastic member, wherein the sliding sleeve (42) is sleeved on the vibrating rod (2), one end of the elastic member is connected to the sliding sleeve (42), and the other end of the elastic member is connected to the vibrating rod (2), and the sliding sleeve (42) is connected to the power vehicle (1).

2. A building foundation construction device according to claim 1, characterized in that: The inner wall of the sliding sleeve (42) is provided with a protective tube (46), the protective tube (46) is sleeved on the vibrating rod (2), one end of the elastic member is connected to the protective tube (46), one end of the elastic member is connected to the sliding sleeve (42), and the bottom end of the protective tube (46) is provided with a cleaning assembly (5).

3. A building foundation construction device according to claim 2, characterized in that: The cleaning assembly (5) comprises a cleaning ring (51), the cleaning ring (51) is sleeved on the vibrating rod (2), and a plurality of bristles (52) are arranged on the inner wall of the cleaning ring (51).

4. A building foundation construction device according to claim 3, characterized in that: The power vehicle (1) is provided with a telescopic rod (6), one end of the telescopic rod (6) is ball-jointed with the power vehicle (1), the other end of the telescopic rod (6) is hinged with a sliding sleeve (42), and the sliding sleeve (42) is arranged vertically.

5. A building foundation construction device according to claim 4, characterized in that: The lifting assembly (7) comprises a first hydraulic cylinder (71), the first hydraulic cylinder (71) being arranged on the power vehicle (1), and the output rod of the first hydraulic cylinder (71) being connected to the vibrating rod (2).

6. A building foundation construction device according to claim 5, characterized in that: The power vehicle (1) is provided with a first driving member for driving the vibrating rod (2) to move along the length direction of the power vehicle (1), and the power vehicle (1) is provided with a second driving member for driving the vibrating rod (2) to move along the width direction of the power vehicle (1).

7. A building foundation construction device according to claim 1, characterized in that: A lower pressure plate (8) is arranged at the bottom of the power vehicle (1), and a driving element for driving the lower pressure plate (8) to move in a vertical direction is arranged at the bottom of the power vehicle (1).

8. A building foundation construction device according to claim 7, characterized in that: A smoothing roller (9) is provided on the side of the lower pressing plate (8) away from the vibrating rod (2), and the smoothing roller (9) is rotatably connected to the power vehicle (1).

9. A building foundation construction device according to claim 1, characterized in that: A tip (21) is provided at one end of the vibrating rod (2) away from the power vehicle (1), and the tip (21) is detachably connected to the vibrating rod (2).