Retaining wall structure for slope treatment

By introducing cavity and filtration systems into the retaining wall structure, the problems of increased soil pressure and drainage pipe blockage when the retaining wall displaces under the slope are solved, and higher support and drainage are achieved, which improves the The safety and service life of retaining walls.

CN221941418UActive Publication Date: 2024-11-01SHANDONG ZHENGYUAN CONSTR ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420078177.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-11
Publication Date
2024-11-01
Estimated Expiration
2034-01-11

AI Technical Summary

Technical Problem

The existing retaining walls have increased soil pressure during the displacement of the slope, which is prone to local fractures, and the drainage pipes are easily blocked and lead to the drainage blockage, which poses safety hazards.

Method used

A retaining wall structure for slope treatment is designed, including a cavity between the first wall and the second wall that is fixedly connected, and a filter layer, drainage pipe, filter pipe and brush are provided, and the brush can clean the filter. Tubes to keep drains clear and guide soil into the cavity through the inclined surface and guide plates to increase support.

Benefits of technology

It effectively increases the support force of the retaining wall, prevents soil from sliding down, ensures the unblocking of drainage pipes, reduces safety hazards, and improves the service life of the retaining wall.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221941418U_ABST
    Figure CN221941418U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of retaining walls, in particular to a retaining wall structure for slope treatment, which comprises a first wall body and a second wall body, and a cavity for accommodating soil is arranged between the first wall body and the second wall body. A drainage pipe perpendicular to the first wall body penetrates through the first wall body, one end of the drainage pipe is fixedly connected with a filter pipe, and a filter layer is arranged on the side, facing the slope soil body, of the first wall body; the top end of the filter pipe is fixedly connected with a sleeve, a rod body is arranged in the sleeve, a brush is arranged in the filter pipe, and the brush is fixedly connected with the rod body. And the second wall body is higher than the first wall body, so that the sliding soil body can be guided into the cavity when the soil body slides down and moves, the soil retaining height is increased, and the supporting force of the wall body is increased. The handle is rotated, the rod body can rotate to drive the brush to clean the filter pipe, the rod body is taken out to clean the brush, and smooth drainage can be kept.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of retaining walls, and more specifically, particularly to a retaining wall structure for slope management. Background Art

[0002] Masonry retaining walls are an effective support form for slope management. Retaining walls block the soil on the slope to prevent soil erosion. Drainage pipes perpendicular to the retaining wall are usually set inside the retaining wall to reduce the amount of water accumulated in the soil of the slope, thereby reducing the active earth pressure of the retaining wall. However, the existing retaining wall structure still has the following problems: First, the retaining wall with a fixed height is subjected to increasing soil pressure during the downward displacement of the slope soil, and the retaining wall is prone to local fracture; at the same time, when the slope soil increases, the soil and stones are prone to overflow from the retaining wall, posing a safety hazard. Second, the drainage pipes buried in the soil are easily blocked, which hinders drainage. Utility Model Content

[0003] In order to overcome the above-mentioned shortcomings, the utility model aims to provide a retaining wall structure for slope management, which can increase the retaining height and the supporting force of the wall; at the same time, a filtering structure and a cleaning component are arranged to keep the drainage unobstructed.

[0004] A retaining wall structure for slope management, comprising a first wall and a second wall, wherein the first wall and the second wall are fixedly connected, the top elevation of the second wall is higher than the top elevation of the first wall, and a cavity for accommodating soil is provided between the first wall and the second wall;

[0005] A drainage pipe perpendicular to the first wall is provided through the first wall, one end of the drainage pipe is fixedly connected to a filter pipe, a filter layer is provided on the side of the first wall facing the slope soil, and the filter pipe is provided in the filter layer;

[0006] The bottom end of the filter tube is fixedly connected to a baffle, the top end of the filter tube is fixedly connected to a sleeve, a rod body is arranged in the sleeve, a brush is arranged in the filter tube, and the brush is fixedly connected to the rod body.

[0007] Furthermore, the sleeve extends upward from the filter layer, the top end of the rod body is fixedly connected to a cover plate, and the cover plate is limited to the top end of the sleeve.

[0008] Furthermore, the bottom end of the cover plate is snapped onto the top side wall of the sleeve, and the top end of the cover plate is fixedly connected to the handle.

[0009] Furthermore, an inclined surface is provided on a side of the first wall body facing away from the slope soil body, and the second wall body is fixedly connected to the inclined surface.

[0010] Furthermore, the second wall is a vertical plate, and a guide plate is provided on the top of the second wall which is integrally formed therewith and inclined toward the first wall.

[0011] Furthermore, the top of the first wall is configured to be in an arc shape.

[0012] Furthermore, the other end of the drainage pipe extends out of the side wall of the first wall, and a drainage ditch is arranged on the side wall of the first wall. The top of the drainage ditch is detachably connected to a rainwater grate.

[0013] Under normal conditions, the first wall blocks the soil of the slope soil, and the accumulated water on the slope soil flows to the filter layer along its own slope, and then is discharged from the drainage pipe after being filtered by the filter tube and the brush. When the slope soil moves to the top of the first wall, the soil enters the cavity between the first wall and the second wall, increasing the load-bearing capacity of the first wall. When drainage is not smooth, the handle is turned, and the brush cleans the side wall of the filter tube, and the brush can be cleaned by taking out the rod.

[0014] Compared with the prior art, the beneficial effects of the utility model are:

[0015] ① Since the first wall and the second wall are set up, the cavity is set between the two, and the second wall is higher than the first wall, the sliding soil can be guided into the cavity when the soil slides down and moves, which further prevents safety hazards of the road, increases the retaining height, and increases the supporting force of the wall.

[0016] ② Due to the arrangement of the drain pipe, the filter layer, the filter tube and the brush, the accumulated water can be filtered, and the handle can be turned so that the rotation of the rod body can drive the brush to clean the filter tube. The rod body can be taken out to clean the brush. The operation is simple and easy to use, and the drain pipe can be kept unobstructed.

[0017] ③ The arc-shaped guide plate set on the top of the first wall and the guide plate set on the top of the second wall can guide the displaced soil into the cavity, allowing the soil or stones to enter the cavity more smoothly to increase the supporting force of the slope soil. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0019] Figure 1 It is a schematic diagram of the overall structure of the retaining wall structure for slope management in this embodiment.

[0020] Figure 2 It is a structural schematic diagram of the first wall and the second wall of the retaining wall structure for slope management in this embodiment.

[0021] Figure 3 It is a structural schematic diagram of the filter pipe of the retaining wall structure for slope management in this embodiment.

[0022] Figure 4 It is a schematic diagram of the structure of the rod body and brush of the retaining wall structure for slope management in this embodiment.

[0023] In the figure: 1. first wall; 2. second wall; 3. cavity; 4. drain pipe; 5. filter pipe; 6. slope soil; 7. filter layer; 8. baffle; 9. casing; 10. rod; 11. brush; 12. cover plate; 13. rotating handle; 14. inclined surface; 15. guide plate; 16. drain ditch; 17. rainwater grate. DETAILED DESCRIPTION

[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0025] This embodiment provides a retaining wall structure for slope management, such as Figure 1 As shown, it includes a first wall 1 and a second wall 2, the first wall 1 and the second wall 2 are fixedly connected, the top elevation of the second wall 2 is higher than the top elevation of the first wall 1, and a cavity 3 for accommodating soil is set between the first wall 1 and the second wall 2; when the slope soil 6 rises and reaches the top of the first wall 1, the soil passes through the first wall 1 and enters the cavity 3, the second wall 2 blocks the soil, and the soil is accumulated in the cavity 3, and works together with the first wall 1 to increase the supporting force of the slope soil 6.

[0026] A drainage pipe 4 is provided perpendicular to the first wall 1, and the drainage pipe 4 discharges the accumulated water in the slope soil 6 to reduce the soil pressure of the retaining wall and prevent the wall from being soaked by water and affecting its service life. One end of the drainage pipe 4 is fixedly connected to the filter pipe 5, see Figure 3The filter tube 5 is a cylindrical body, and a plurality of water-permeable holes are arranged on its side wall; a filter layer 7 is arranged on the side of the first wall 1 facing the slope soil 6, and the filter tube 5 is arranged in the filter layer 7. In this embodiment, pebbles or gravels are preferably used as the filter layer 7, so that the filter layer 7 performs preliminary filtration on the water in the soil and then enters the filter tube 5 for secondary filtration, and enters the drain pipe 4 through the filter tube 5 to discharge the accumulated water; the bottom end of the filter tube 5 is fixedly connected to the baffle plate 8, and the top end of the filter tube 5 is fixedly connected to the sleeve 9, which is a watertight pipe, and a rod body 10 is arranged at the center of the sleeve 9, see Figure 4 A brush 11 is arranged in the filter tube 5, and the brush 11 is fixedly connected to the rod body 10. The brush 11 abuts against the inner wall of the filter tube 5 and is arranged at the water inlet of the drain pipe 4. By rotating the rod body 10, the brush 11 can clean the filter tube 5 to reduce the clogging of the water-permeable holes in the tube wall; under normal conditions, the brush 11 arranged in the filter tube 5 can also filter the accumulated water for a third time to improve the drainage water quality in the drain pipe 4, and further avoid the clogging of the drain pipe 4. The other end of the drain pipe 4 extends out of the side wall of the first wall 1, and a drainage ditch 16 is arranged on the side wall of the first wall 1. The top of the drainage ditch 16 can be detachably connected to a rainwater grate 17, and the water in the drain pipe 4 is finally collected to the drain pipe 4 net through the rainwater grate 17.

[0027] The sleeve 9 extends upward from the filter layer 7, and the top of the rod body 10 is fixedly connected to the cover plate 12. The cover plate 12 is limited to the top of the sleeve 9, and the top of the sleeve 9 is covered by the cover plate 12 to prevent debris from entering the sleeve 9. The bottom end of the cover plate 12 is snapped on the top side wall of the sleeve 9, and the top of the cover plate 12 is fixedly connected to the handle. When the drainage pipe 4 is not draining smoothly, turn the handle 13, the cover plate 12 rotates on the sleeve 9, and the rod body 10 drives the brush 11 to clean the side wall of the filter tube 5. It is also possible to separate the cover plate 12 from the sleeve 9, lift the cover plate 12 upward, take out the rod body 10, and clean the brush 11, so that the accumulated water can be discharged smoothly.

[0028] like Figure 2 As shown, a base is provided at the bottom of the first wall 1 to increase the bottom support area; an inclined surface 14 is provided on the side of the first wall 1 facing away from the slope soil 6, and the second wall 2 is fixedly connected to the inclined surface 14. When cast in situ or prefabricated, the first wall 1 and the second wall 2 are integrally formed. The second wall 2 is a vertical plate, and a guide plate 15 is provided on the top thereof, which is integrally formed with it and inclined toward the first wall 1. The top of the second wall 2 guides the soil that has climbed over the first wall 1 into the cavity 3. The vertically arranged second wall 2 can also enhance the aesthetic effect on both sides of the road. Painting or decorating the second wall 2 can add a more beautiful view. The top of the first wall 1 is arranged in an arc shape, and the arc-shaped arrangement makes it easier for the soil to enter the cavity 3.

[0029] The working principle of the retaining wall structure for slope management in this embodiment is as follows: under normal conditions, the first wall 1 blocks the soil of the slope soil 6, and the accumulated water on the slope soil 6 flows to the filter layer 7 along its own slope, and then is filtered by the filter tube 5 and the brush 11 and discharged from the drain pipe 4. When the slope soil 6 moves to the top of the first wall 1, the soil enters the cavity 3 between the first wall 1 and the second wall 2, increasing the load-bearing capacity of the first wall 1. When the drainage is not smooth, turn the handle 13, the brush 11 cleans the side wall of the filter tube 5, and the brush 11 can be cleaned by taking out the rod 10.

[0030] In the retaining wall structure for slope management of this embodiment, since the first wall 1 and the second wall 2 are provided, a cavity 3 is provided between the two, and the second wall 2 is higher than the first wall 1, the sliding soil can be guided into the cavity 3 when the soil slides down and moves, further preventing the potential safety hazard of the road, increasing the retaining height, and increasing the supporting force of the wall. Since the drainage pipe 4, the filter layer 7, the filter pipe 5 and the brush 11 are provided, the accumulated water can be filtered, and the rotation of the handle 13 and the rod body 10 can drive the brush 11 to clean the filter pipe 5, and the rod body 10 is taken out to clean the brush 11. The operation is simple and easy to use, and the drainage pipe 4 can be kept unobstructed. The arc-shaped guide plate 15 provided on the top of the first wall 1 and the guide plate 15 provided on the top of the second wall 2 can guide the displaced soil into the cavity 3, so that the soil or stones can enter the cavity 3 more smoothly, so as to increase the supporting force of the slope soil 6.

[0031] In the description of the present invention, it should be understood that the terms "longitudinal", "lateral", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0032] Finally, it should be noted that the above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.

Claims

1. A retaining wall structure for slope management, characterized in that: The invention comprises a first wall (1) and a second wall (2), wherein the first wall (1) and the second wall (2) are fixedly connected, the top elevation of the second wall (2) is higher than the top elevation of the first wall (1), and a cavity (3) for accommodating soil is arranged between the first wall (1) and the second wall (2); A drainage pipe (4) is provided perpendicular to the first wall (1), one end of the drainage pipe (4) is fixedly connected to a filter pipe (5), a filter layer (7) is provided on the side of the first wall (1) facing the slope soil (6), and the filter pipe (5) is provided in the filter layer (7); The bottom end of the filter tube (5) is fixedly connected to a baffle (8), the top end of the filter tube (5) is fixedly connected to a sleeve (9), a rod body (10) is arranged inside the sleeve (9), a brush (11) is arranged inside the filter tube (5), and the brush (11) is fixedly connected to the rod body (10).

2. The retaining wall structure for slope management according to claim 1 is characterized in that: The sleeve (9) extends upward from the filter layer (7), the top end of the rod body (10) is fixedly connected to a cover plate (12), and the cover plate (12) is located at the top end of the sleeve (9).

3. The retaining wall structure for slope management according to claim 2 is characterized in that: The bottom end of the cover plate (12) is snap-fitted to the top side wall of the sleeve (9), and the top end of the cover plate (12) is fixedly connected to the handle.

4. The retaining wall structure for slope management according to claim 1, characterized in that: An inclined surface (14) is provided on the side of the first wall (1) facing away from the slope soil (6), and the second wall (2) is fixedly connected to the inclined surface (14).

5. The retaining wall structure for slope management according to claim 4 is characterized in that: The second wall (2) is a vertical plate, and a guide plate (15) is provided on the top thereof, which is integrally formed therewith and is inclined toward the first wall (1).

6. The retaining wall structure for slope management according to claim 5 is characterized in that: The top of the first wall (1) is arranged in an arc shape.

7. The retaining wall structure for slope management according to claim 6 is characterized in that: The other end of the drainage pipe (4) extends out of the side wall of the first wall (1), and a drainage ditch (16) is provided on the side wall of the first wall (1), and the top of the drainage ditch (16) is detachably connected to a rainwater grate (17).