Climbing frame reserved construction elevator opening door opening type disconnection position protection device
By designing a closed protection device that reserves the opening-type disconnection position of the construction elevator through the design of a closed protection device, the protective frame and protective net form a fully enclosed obstruction, which solves the risk of sporadic material falling at the opening of the climbing frame and improves construction safety , does not affect the installation and upgrading of construction elevators, and is suitable for climbing frame door openings of different sizes.
Patent Information
- Application Number
- CN202420264597.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-31
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2034-01-31
AI Technical Summary
During construction, the open opening of the climbing frame is likely to cause the risk of sporadic material falling, resulting in safety hazards for falling objects at high places and high altitude operations. The existing technology only takes simple protection inside the floor.
Design a closed protection device with a construction elevator opening-type disconnection position reserved by a climbing frame, including a protective frame and a protective net. The protective frame consists of longitudinal and transverse support frames, connecting frames, cross bars, and foot panels to form a fully enclosed To cover, the protective net is installed on the crossbar to connect to form a fully enclosed cover, and the installation position of the construction elevator is staggered so as not to affect the elevator lift.
Effectively reduce the risk of falling objects at high altitude caused by floor construction, improve the safety of the disconnected position of the climbing frame, ensure the closure, and do not affect the installation and upgrading of the construction elevator. It can be used with the climbing frame, suitable for different sizes The crawler door opening has multiple reusability.
Smart Images

Figure CN221942022U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of building construction, and particularly relates to a climbing frame reserved construction elevator opening door opening type disconnection position protection device. Background Art
[0002] During the construction process, the guide rails and attachment, limit and other safety devices of the construction elevator should be at least half a floor higher than the elevator floor, and in order to allow the construction elevator to enter the second floor of the climbing frame, a two-story opening should be left on the climbing frame. The protective measures usually taken at the opening of the climbing frame are to use steel pipes and fasteners to build edge protection inside the floor corresponding to the opening of the climbing frame. Due to the removal of the support frame and floor cleaning inside the floor, the opening of the climbing frame is prone to the risk of scattered materials falling from the floor opening. Therefore, only simple protection is taken inside the floor, which is easy to cause the risk of falling objects and high-altitude operations. Utility Model Content
[0003] The purpose of the utility model is to overcome the deficiencies in the prior art and to provide a closed climbing frame with a reserved construction elevator opening door opening type disconnect position protection device, which can be lifted along with the climbing frame and does not block the installation and lifting of the construction elevator.
[0004] The technical solution of the utility model is a climbing frame reserved for construction elevator opening door opening type disconnected position protection device, including a protection frame, the protection frame including a first longitudinal support frame and a second longitudinal support frame fixedly mounted on the climbing frame sub-frame on both sides of the climbing frame disconnected position, a plurality of first transverse support frames are relatively vertically arranged on the first longitudinal support frame, a first connecting frame is fixedly arranged on one end of the first transverse support frame close to the structural beam, a plurality of second transverse support frames are relatively vertically arranged on the second longitudinal support frame, a second connecting frame is fixedly arranged on one end of the second transverse support frame close to the structural beam, a cross bar is connected between the first connecting frame and the second connecting frame, a foot plate is provided between the cross bar and the structural beam to block the gap between the cross bar and the structural beam, a protection net is provided at the disconnected position of the climbing frame, the protection net includes a first protection net installed on the cross bar and a second protection net installed on the climbing frame sub-frame, and the two ends of the first protection net are respectively connected with the second protection net to form a fully enclosed shielding at the disconnected position of the climbing frame.
[0005] In some embodiments, three of the first transverse support frames and the second transverse support frames are arranged at intervals, and the transverse bars are connected between the first transverse support frames and the second transverse support frames which are arranged opposite to each other.
[0006] In some embodiments, the first connecting frame and the second connecting frame are made of galvanized square tubes, the cross bar passes through the first connecting frame and the second connecting frame, and the length of the cross bar is greater than the distance between the first connecting frame and the second connecting frame.
[0007] In some embodiments, both ends of the cross bar are fastened together with the first connecting frame and the second connecting frame by first bolts.
[0008] In some embodiments, mounting holes for second bolts to pass through are provided at intervals on the crossbar, and the first protective net is fixed to the crossbar by the second bolts.
[0009] In some embodiments, the protective net is made of a rigid mesh with a mesh size of 10*10 mm.
[0010] In some embodiments, one end of the footboard is rotatably connected to the first connecting frame and the second connecting frame through a hinge, and the other end is placed on the structural beam.
[0011] In some embodiments, the gap between the cross bar and the structural beam is about 150 mm in the horizontal direction.
[0012] In some embodiments, the first longitudinal support frame, the second longitudinal support frame, the first transverse support frame, and the second transverse support frame are all made of galvanized angle steel.
[0013] Compared with the prior art, the utility model provides the following beneficial effects of the climbing frame reserved construction elevator opening door opening type disconnection position protection device:
[0014] ⑴ By installing a protective frame at the disconnection position of the climbing frame reserved for the elevator opening doorway, and installing a footboard and a protective net on the protective frame, a fully enclosed shielding is formed at the disconnection position of the climbing frame, thereby ensuring the closure of the disconnection position of the climbing frame, reducing the risk of falling objects caused by floor construction, and improving the safety of construction at the disconnection position of the climbing frame.
[0015] ⑵ By adopting the connection between the first longitudinal support frame and the first transverse support frame, the connection between the second longitudinal support frame and the second transverse support frame, and the connection between the cross bar and the first transverse support frame and the second transverse support frame, the protective device effectively staggers the installation position of the standard section of the construction elevator, thereby not affecting the installation of the standard section of the construction elevator. After the installation of the protective device, it will not block the lifting of the construction elevator, and the construction elevator can be installed in advance.
[0016] ⑶ This protective device can be used when the climbing frame is lifted to form a fully enclosed protection for the opening part of the climbing frame.
[0017] ⑷This protective device can be installed according to the size of the on-site climbing frame door opening, is not restricted by fixed size, and can be reused many times, which is green and environmentally friendly. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a schematic diagram of the inner facade structure of the utility model climbing frame reserved for the construction elevator opening door opening type disconnection position protection device;
[0019] Figure 2 yes Figure 1 Schematic diagram of the local structure;
[0020] Figure 3 yes Figure 2 A schematic diagram of the enlarged structure at B;
[0021] Figure 4 yes Figure 2 Schematic diagram of the structure in the AA direction;
[0022] Figure 5 yes Figure 4 A schematic diagram of the enlarged structure at C;
[0023] Figure 6 It is a structural schematic diagram of a protective net and a structural beam of the utility model.
[0024] Main component symbols:
[0025] Protective frame 1 The first longitudinal support frame 11 The second longitudinal support frame 12 First transverse support frame 13 First connection frame 131 Second transverse support frame 14 Second connection frame 141 Crossbar 15 Climbing frame 2 Climbing frame 21 Structural beam 3 Gap 4 Footboard 5 Hinge 51 Protection net 6 First Protection Network 61 Second protection net 62 First bolt 7 Second bolt 8 Construction Elevator Standard Section 9 DETAILED DESCRIPTION
[0026] The utility model will be further described below in conjunction with the accompanying drawings:
[0027] See also Figures 1 to 6As shown, the utility model provides a climbing frame reserved for construction elevator opening door opening type disconnected position protection device, including a protection frame 1, the protection frame 1 includes a first longitudinal support frame 11 and a second longitudinal support frame 12 fixedly arranged on the climbing frame sub-frame 21 on both sides of the disconnected position of the climbing frame 2, a plurality of first transverse support frames 13 are relatively vertically arranged on the first longitudinal support frame 11, a first connecting frame 131 is fixedly arranged on one end of the first transverse support frame 13 close to the structural beam 3, a plurality of second transverse support frames 14 are relatively vertically arranged on the second longitudinal support frame 12, and a second transverse support frame 14 is fixedly arranged on one end of the second transverse support frame 14 close to the structural beam 3 141, a cross bar 15 is connected between the first connecting frame 131 and the second connecting frame 141; by adopting the connection between the first longitudinal support frame 11 and the first transverse support frame 13, the connection between the second longitudinal support frame 12 and the second transverse support frame 14, and the connection between the cross bar 15 and the first transverse support frame 13 and the second transverse support frame 14, the climbing frame reserved construction elevator opening door opening type disconnection position protection device effectively staggers the installation position of the construction elevator standard section 9, thereby not affecting the installation of the construction elevator standard section 9, and after the installation of this protection device, it will not block the lifting of the construction elevator, and the construction elevator can be installed in advance.
[0028] See also Figures 4 to 6 As shown, a footboard 5 is provided between the crossbar 15 and the structural beam 3 to block the gap 4 between the crossbar 15 and the structural beam 3, and a protective net 6 is provided at the disconnected position of the climbing frame 2. The protective net 6 includes a first protective net 61 installed on the crossbar 15 and a second protective net 62 installed on the climbing frame sub-frame 21. The two ends of the first protective net 61 are respectively connected with the second protective net 62 to form a fully enclosed shielding at the disconnected position of the climbing frame 2. By installing a protective frame 1 at the disconnected position of the climbing frame reserved for the construction elevator opening doorway, and installing a footboard 5 and a protective net 6 on the protective frame 1, a fully enclosed shielding is formed at the disconnected position of the climbing frame, thereby ensuring the closure of the disconnected position of the climbing frame, reducing the risk of falling objects from high altitudes caused by floor construction, and improving the safety of construction at the disconnected position of the climbing frame.
[0029] It is worth mentioning that the outer side of the structural beam 3 of the floor corresponding to the disconnection position of the climbing frame reserved for the construction elevator opening and doorway is installed with the protective device for the disconnection position of the climbing frame reserved for the construction elevator opening and doorway provided by the utility model to ensure the closedness of the disconnection position of the climbing frame on the corresponding floor.
[0030] In some embodiments, see Figure 3 , Figure 5As shown, three first transverse support frames 13 and three second transverse support frames 14 are arranged at intervals, and cross bars 15 are connected between the first transverse support frames 13 and the second transverse support frames 14 arranged opposite to each other. By arranging three first transverse support frames 13, the second transverse support frames 14 and the cross bars 15, the connection between the first protective net 61 and the cross bars 15 is increased, so that the first protective net 61 is installed more firmly.
[0031] See also Figures 2 to 3 As shown, the first connecting frame 131 and the second connecting frame 141 are made of galvanized square tubes, and the cross bar 15 passes through the first connecting frame 131 and the second connecting frame 141. The length of the cross bar 15 is greater than the distance between the first connecting frame 131 and the second connecting frame 141 to prevent the cross bar 15 from escaping from the first connecting frame 131 or the second connecting frame 141.
[0032] For further information, see Figures 4 to 5 As shown, the first connecting frame 131 and the second connecting frame 141 are both provided with through holes for the first bolts 7 to pass through, and both ends of the cross bar 15 are fastened together with the first connecting frame 131 and the second connecting frame 141 by the first bolts 7 .
[0033] See also Figure 2 As shown, mounting holes for the second bolts 8 to pass through are provided at intervals on the cross bar 15 , and the first protection net 61 is fixed to the cross bar 15 by the second bolts 8 .
[0034] In some embodiments, the protective net 6 uses a rigid mesh with a mesh size of 10*10 mm for all-round enclosed protection to prevent high-altitude objects from falling and ensure the safety of construction workers.
[0035] In some embodiments, see Figure 5 As shown, one end of the footboard 5 is rotatably connected to the first connection frame 131 and the second connection frame 141 through a hinge 51, and the other end is placed on the structural beam 3 to close the gap 4 between the crossbar 5 and the structural beam 3, thereby preventing objects from falling from the bottom and avoiding the risk of falling objects from high altitude. When the climbing frame 2 is lifted, the footboard 5 is rotated so that it can be used along with the lifting of the climbing frame 1.
[0036] In one example, the gap 4 between the cross bar 15 and the structural beam 3 is about 150 mm in the horizontal direction.
[0037] In some embodiments, the first longitudinal support frame 11, the second longitudinal support frame 12, the first transverse support frame 13 and the second transverse support frame 14 are all made of galvanized angle steel.
[0038] The installation steps of the climbing frame reserved construction elevator opening door opening type disconnection position protection device provided by the utility model are as follows:
[0039] ⑴ The first longitudinal support frame 11 and the second longitudinal support frame 12 are fixedly connected in parallel to the climbing frame sub-frame 21 on both sides of the climbing frame disconnection position. The first longitudinal support frame 11 and the second longitudinal support frame 12 both use 50*3mm galvanized angle steel with a length of 1200mm as the supporting points of the protective device.
[0040] (2) Three first transverse support frames 13 are welded on the first longitudinal support frame 11 at intervals, and three second transverse support frames 14 are correspondingly welded on the second longitudinal support frame 12. The first transverse support frame 13 and the second transverse support frame 14 are both made of 50*3mm galvanized angle steel with a length of 350mm, and are welded and fixed in a direction perpendicular to the 1200mm long 50*3mm galvanized angle steel.
[0041] ⑶ The first connecting frame 131 is welded to one end of the first transverse support frame 13 close to the structural beam 3, and the second connecting frame 141 is welded to one end of the second transverse support frame 14 close to the structural beam 3. The first connecting frame 131 and the second connecting frame 141 are both made of 70*50*3mm galvanized square tube.
[0042] (4) The cross bar 15 is passed through the first connection frame 131 and the second connection frame 141. The first connection frame 131 and the second connection frame 141 are both provided with through holes for the first bolts 7 to pass through. Both ends of the cross bar 15 are fastened together with the first connection frame 131 and the second connection frame 141 by the first bolts 7. The cross bar 15 is a 40*40*3mm galvanized square tube with a length of 5000mm. The cross bar 15 passes through the middle of the 70*50*3mm galvanized square tube, and the length of both ends of the cross bar 15 extending from the first connection frame 131 and the second connection frame 141 is 150mm.
[0043] ⑸ A plurality of mounting holes for mounting bolts are arranged at intervals on the cross bar 15. The first protective net 61 is fixedly connected to the cross bar 15 by M16mm bolts. The first protective net 61 adopts a rigid protective net with a size of 1200*1800mm and a mesh size of 10*10mm; a second protective net 62 is installed on the climbing frame sub-frame 21 on both sides of the disconnected position of the climbing frame. The second protective net 62 also adopts a rigid protective net with a size of 1200*1800mm and a mesh size of 10*10mm. The two ends of the first protective net 61 are respectively connected to the second protective net 62 to form a fully enclosed shielding at the disconnected position of the climbing frame 2.
[0044] (6) One end of the footboard 5 is rotatably connected to the first connecting frame 131 and the second connecting frame 141 through the hinge 51, and the other end of the footboard 5 is placed on the structural beam 3. The footboard 5 is made of 400*600*2mm steel plate to close the 150mm gap 4 between the cross bar 5 and the structural beam 3 to prevent objects from falling from the bottom.
[0045] The climbing frame provided by the utility model has a reserved construction elevator opening door opening type disconnection position protection device, which forms a continuous fully enclosed closed system at the climbing frame disconnection position and does not block the lifting of the construction elevator. The protection device is arranged at the position where the construction elevator does not open to the opening and close to one side of the structural beam, effectively staggering the installation position of the standard section of the construction elevator, and does not affect the installation of the standard section to the opening position. After the protection device is installed, it will not block the lifting of the construction elevator, and the construction elevator can be installed in advance. To ensure the installation and protection of the standard section of the construction elevator, and at the same time ensure that the objects on the floor construction will not cause the risk of falling objects from high altitude.
[0046] The above description is only a preferred embodiment of the present invention. All equivalent changes and modifications made within the scope of the claims of the present invention shall fall within the scope of the claims of the present invention.
Claims
1. A climbing frame reserved for construction elevator opening door opening type disconnection position protection device, including a protection frame, characterized in that: The protection frame includes a first longitudinal support frame and a second longitudinal support frame fixed on the climbing frame sub-frame on both sides of the climbing frame disconnection position, a plurality of first transverse support frames are relatively vertically arranged on the first longitudinal support frame, a first connecting frame is fixedly arranged on the end of the first transverse support frame close to the structural beam, a plurality of second transverse support frames are relatively vertically arranged on the second longitudinal support frame, a second connecting frame is fixedly arranged on the end of the second transverse support frame close to the structural beam, a cross bar is connected between the first connecting frame and the second connecting frame, a footboard is provided between the cross bar and the structural beam to block the gap between the cross bar and the structural beam, a protection net is provided at the climbing frame disconnection position, the protection net includes a first protection net installed on the cross bar and a second protection net installed on the climbing frame sub-frame, both ends of the first protection net are respectively connected with the second protection net to form a fully enclosed shielding at the climbing frame disconnection position.
2. The climbing frame reserved construction elevator opening door opening type disconnection position protection device according to claim 1 is characterized in that: The first transverse support frame and the second transverse support frame are each provided with three cross bars at intervals, and the cross bars are connected between the first transverse support frame and the second transverse support frame which are arranged opposite to each other.
3. The climbing frame reserved construction elevator opening door opening type disconnection position protection device according to claim 1 is characterized in that: The first connecting frame and the second connecting frame are made of galvanized square tubes, the cross bar passes through the first connecting frame and the second connecting frame, and the length of the cross bar is greater than the distance between the first connecting frame and the second connecting frame.
4. The climbing frame reserved construction elevator opening door opening type disconnection position protection device according to claim 3 is characterized in that: Both ends of the cross bar are fastened together with the first connecting frame and the second connecting frame by first bolts.
5. The climbing frame reserved construction elevator opening door opening type disconnection position protection device according to claim 1 is characterized in that: The cross bar is provided with mounting holes for second bolts to pass through at intervals, and the first protection net is fixed to the cross bar by the second bolts.
6. The climbing frame reserved construction elevator opening door opening type disconnection position protection device according to claim 1 is characterized in that: The protective net is made of a rigid mesh with a mesh size of 10*10mm.
7. The climbing frame reserved construction elevator opening door opening type disconnection position protection device according to claim 1 is characterized in that: One end of the footboard is rotatably connected to the first connecting frame and the second connecting frame through a hinge, and the other end is placed on the structural beam.
8. The climbing frame reserved construction elevator opening door opening type disconnection position protection device according to claim 1 is characterized in that: The gap between the cross bar and the structural beam is about 150 mm in the horizontal direction.
9. The climbing frame reserved construction elevator opening door opening type disconnection position protection device according to claim 1 is characterized in that: The first longitudinal support frame, the second longitudinal support frame, the first transverse support frame and the second transverse support frame are all made of galvanized angle steel.
