Anti-tearing device for ash discharging pipe of return feeder

By designing a reinforced fixing and heat buffering device in the feeder pipeline, weld tear and ash blockage caused by temperature changes are solved, ensuring the stability of the boiler recharge cycle and avoiding furnace shutdown accidents.

CN221944239UActive Publication Date: 2024-11-01QINGDAO WEST COAST UTILITIES GRP ENERGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420430484.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-06
Publication Date
2024-11-01
Estimated Expiration
2034-03-06

AI Technical Summary

Technical Problem

The existing feeder pipes have caused the weld tip torn due to the high temperature during the ash release, and the ash is blocked from the air induced system, resulting in boiler shutdown.

Method used

A tear-proof device including a top-down ash pipe and a bottom-down ash pipe is designed. By strengthening the fixing device and a heat buffering device, the expansion stress caused by temperature changes is buffered, and the ash material is blocked by the air cloth plate and the filter plate partition structure. .

Benefits of technology

Effectively prevent weld tear and ash blockage, improve the stability of boiler return cycle, and avoid furnace shutdown accidents.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221944239U_ABST
    Figure CN221944239U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of ash discharging pipes of return feeders, and particularly discloses an anti-tearing device for ash discharging pipes of return feeders, which comprises a mounting wall fixedly connected with a mounting plate, and an upper reinforcing rib connected below the mounting plate fixes the upper half section of an upper ash discharging pipe. Meanwhile, a lower reinforcing rib fixedly connected with the connecting rib and the mounting wall fixes the lower half section of the upper ash discharging pipe, the upper section and the lower section of the upper ash discharging pipe are fixed at the same time, and two waveform compensators arranged on the middle section of the upper ash discharging pipe buffer expansion stress caused by the temperature difference generated by waste residues in the upper ash discharging pipe and external air; the stability of the upper ash discharging pipe is greatly improved through the reinforcing fixing device and the heat buffering device arranged on the upper ash discharging pipe, the two waveform compensators are also arranged on the middle section of the lower ash discharging pipe, expansion stress caused by temperature difference is buffered, and the problems that when an existing return feeder pipeline discharges ash, due to the fact that the temperature is too high, heating expansion is caused, and the ash discharging efficiency is poor are solved. And welded junction tearing is caused, boiler material returning circulation is terminated, and furnace shutdown accidents are caused.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of ash placing pipes of return material machines, in particular to an anti-tearing device for ash placing pipes of return material machines. Background Art

[0002] During the operation of the boiler, ash or slag will accumulate on the heated surfaces of the boiler's water-cooled walls, superheaters, flues and other components, which will not only reduce the boiler's heat transfer performance and thermal efficiency, but may also lead to unexpected shutdowns in severe cases, causing significant economic losses. Therefore, most boilers are equipped with ash discharge pipes to remove ash or slag to ensure boiler operation.

[0003] At present, when the existing return feeder pipeline is discharging ash, there will be problems such as thermal expansion and tearing of the weld due to the internal temperature of the ash discharge pipe being too high and the external temperature being too low. Ash leakage will block the induced draft system, resulting in the termination of the boiler return cycle and causing a shutdown accident. Utility Model Content

[0004] 1. Technical issues to be resolved

[0005] In view of the deficiencies in the prior art, the utility model provides an anti-tearing device for the ash discharge pipe of a returner, which solves the technical problems that the existing returner pipe may expand due to heat due to excessive temperature when discharging ash, causing the weld to tear, and the ash material to block the induced draft system, resulting in the termination of the boiler return material circulation and causing a shutdown accident.

[0006] (II) Technical solution

[0007] In order to achieve the above objectives, the present invention is implemented through the following technical solutions:

[0008] A tear-proof device for an ash discharge pipe of a return material feeder comprises a mounting wall, which is fixedly connected to a mounting plate, a return material feeder body is mounted above the mounting plate, a return material feeder body is fixedly provided with a return material feeder pipe on the side of the return material feeder body, an inner wall of the return material feeder body is fixedly connected to an air distribution plate, a filter plate is provided above the air distribution plate, the air distribution plate divides the inner wall of the return material feeder body into two parts, the upper half of the return material feeder body separated by the air distribution plate is connected to the return material feeder pipe, and the lower half of the return material feeder body separated by the air distribution plate is provided with a return material air chamber, an upper ash discharge pipe is fixedly connected to the middle part of the air distribution plate, a reinforcing fixing device and a heat buffer device are provided in the middle section of the upper ash discharge pipe, a lower ash discharge pipe is further connected below the upper ash discharge pipe, and a heat buffer device is also provided in the middle section of the lower ash discharge pipe, the reinforcing fixing device and the heat buffer device connected to the upper ash discharge pipe are located below the mounting plate, and the reinforcing fixing device connected to the upper ash discharge pipe is connected to the mounting wall and the mounting plate.

[0009] Preferably: the reinforcing fixing device includes an upper reinforcing rib, which is fixedly connected to the bottom of the mounting plate, and the upper reinforcing rib is fixedly connected to the upper middle section of the upper ash placing pipe. A connecting rib is also connected to the bottom of the mounting plate, and the end of the connecting rib away from the mounting plate is fixedly connected to a lower reinforcing rib, and the lower reinforcing rib is fixedly connected to the lower middle section of the upper ash placing pipe. The same end of the upper reinforcing rib, the connecting rib and the lower reinforcing rib are all fixedly connected to the mounting wall.

[0010] Preferably: two corrugated compensators are fixedly installed in the middle part of the upper ash pipe and located below the upper reinforcing rib and in a section above the lower reinforcing rib; one end of the upper ash pipe away from the air distribution plate is fixedly connected with a connecting flange group; one end of the connecting flange group away from the upper ash pipe is fixedly connected with a lower ash pipe; two corrugated compensators are fixedly installed in the middle section of the lower ash pipe; the two corrugated compensators connected in the middle section of the upper ash pipe and the two corrugated compensators connected in the middle section of the lower ash pipe form a heat buffer device.

[0011] Preferably: the portion where the outer wall of the upper ash placing pipe contacts the air distribution plate is fully welded on both upper and lower surfaces, and the upper ash placing pipe passes through the mounting plate, the upper reinforcing rib and the bottom surface of the return material device body.

[0012] Preferably: the upper ash placing pipe passes through the air distribution plate toward the filter plate and extends 120MM.

[0013] Preferably, the upper ash pipe is 30MM away from the filter plate.

[0014] (III) Beneficial effects

[0015] 1. The upper reinforcing rib connected below the mounting plate fixes the upper half of the upper ash pipe, and the lower reinforcing rib fixedly connected to the connecting rib and the mounting wall fixes the lower half of the upper ash pipe. The upper and lower sections are fixed at the same time, which strengthens the stability of the upper ash pipe. The two corrugated compensators arranged in the middle section of the upper ash pipe buffer the expansion stress caused by the temperature difference between the waste slag in the upper ash pipe and the external air. The reinforcing fixing device and the heat buffer device arranged on the upper ash pipe greatly improve the stability of the upper ash pipe. The middle section of the lower ash pipe is also provided with two corrugated compensators, which also buffer the expansion stress caused by the temperature difference, and solve the technical problem that the existing return feeder pipeline will expand due to the high temperature during ash discharge, causing the weld to tear, resulting in the termination of the boiler return cycle and causing shutdown accidents.

[0016] 2. After the filtered waste slag is accumulated on the air distribution plate, it is blown by the return air directed from the return air chamber to the top of the air distribution plate and discharged from the upper ash pipe. The upper ash pipe is 120MM higher than the air distribution plate, and the top surface of the upper ash pipe is 30MM away from the filter plate, so that it will not be accumulated and blocked when too much waste slag falls at the same time. The parts of the upper ash pipe in contact with the air distribution plate are welded, and the waste slag will not enter the return air chamber from the gap, which solves the technical problem that the existing return feeder pipeline has ash blocking the induced draft system, resulting in the termination of the boiler return cycle and causing a shutdown accident. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The above description is only an overview of the technical solution of the utility model. In order to more clearly understand the technical means of the utility model and implement it according to the contents of the specification, the following is a detailed description of the preferred embodiments of the utility model in conjunction with the accompanying drawings.

[0018] Figure 1 This is a side view of the overall structure of the device of the utility model;

[0019] Figure 2 This is a semi-disassembled front view of the overall structure of the device of the utility model;

[0020] Figure 3 It is a side structural diagram of the reinforcing fixing device and the heat buffer device of the utility model;

[0021] Figure 4 This is a structural diagram of the ash discharge pipe of the utility model.

[0022] Legend: 1. Installation wall; 2. Return material machine body; 3. Upper reinforcing rib; 4. Connecting rib; 5. Upper ash pipe; 6. Connecting flange group; 7. Corrugated compensator; 8. Lower ash pipe; 101. Installation plate; 201. Return material pipe; 202. Filter plate; 203. Air distribution plate; 204. Return material air chamber; 401. Lower reinforcing rib. DETAILED DESCRIPTION

[0023] The embodiment of the present application provides a tear-proof device for the ash discharge pipe of a returner, thereby effectively solving the problem that the existing returner pipe may expand due to heat due to excessive temperature during ash discharge, causing the weld to tear, and the ash material may block the induced draft system, resulting in the termination of the boiler return material circulation and causing a shutdown accident.

[0024] like Figure 1 , Figure 2 , Figure 3 and Figure 4 As shown, the technical solution in the embodiment of the present application effectively solves the technical problems that the existing return pipe will expand due to heat when discharging ash, causing the weld to tear, and the ash material blocks the induced draft system, resulting in the termination of the boiler return cycle and causing the shutdown accident. The overall idea is as follows:

[0025] In view of the problems existing in the prior art, the utility model provides an anti-tearing device for the ash discharge pipe of a return material device, comprising a mounting wall 1, the mounting wall 1 is fixedly connected with a mounting plate 101, a return material device body 2 is installed above the mounting plate 101, a return material device body 2 is fixedly provided with a return material pipe 201 on the side of the return material device body 2, an inner wall of the return material device body 2 is fixedly connected with an air distribution plate 203, a filter plate 202 is provided above the air distribution plate 203, the air distribution plate 203 divides the inner wall of the return material device body 2 into two parts, and the upper half of the return material device body 2 separated by the air distribution plate 203 is connected to the return material device body 2. Return pipe 201, a return air chamber 204 is provided in the lower half of the returner body 2 separated by an air distribution plate 203, an upper ash placing pipe 5 is fixedly connected to the middle of the air distribution plate 203, a reinforcing fixing device and a heat buffer device are provided in the middle section of the upper ash placing pipe 5, a lower ash placing pipe 8 is also connected below the upper ash placing pipe 5, a heat buffer device is also provided in the middle section of the lower ash placing pipe 8, the reinforcing fixing device and the heat buffer device connected to the upper ash placing pipe 5 are located below the mounting plate 101, and the reinforcing fixing device connected to the upper ash placing pipe 5 is connected to the mounting wall 1 and the mounting plate 101.

[0026] The reinforcing and fixing device includes an upper reinforcing rib 3, which is fixedly connected to the bottom of the mounting plate 101. The upper reinforcing rib 3 is fixedly connected to the upper middle section of the upper ash placing pipe 5. A connecting rib 4 is also connected to the bottom of the mounting plate 101. The end of the connecting rib 4 away from the mounting plate 101 is fixedly connected to a lower reinforcing rib 401. The lower reinforcing rib 401 is fixedly connected to the lower middle section of the upper ash placing pipe 5. The same end of the upper reinforcing rib 3, the connecting rib 4 and the lower reinforcing rib 401 are all fixedly connected to the mounting wall 1.

[0027] Two corrugated compensators 7 are fixedly installed in the middle part of the upper ash placing pipe 5 and located below the upper reinforcing rib 3 and above the lower reinforcing rib 401. The end of the upper ash placing pipe 5 away from the air distribution plate 203 is fixedly connected with a connecting flange group 6. The end of the connecting flange group 6 away from the upper ash placing pipe 5 is fixedly connected with a lower ash placing pipe 8. Two corrugated compensators 7 are fixedly installed in the middle section of the lower ash placing pipe 8. The two corrugated compensators 7 connected in the middle section of the upper ash placing pipe 5 and the two corrugated compensators 7 connected in the middle section of the lower ash placing pipe 8 form a heat buffer device.

[0028] The part where the outer wall of the upper ash placing pipe 5 contacts the air distribution plate 203 is fully welded on both the upper and lower surfaces. The upper ash placing pipe 5 passes through the mounting plate 101, the upper reinforcing rib 3 and the bottom surface of the returner body 2. The upper ash placing pipe 5 passes through the air distribution plate 203 toward the filter plate 202 and extends 120MM. The upper ash placing pipe 5 is 30MM away from the filter plate 202.

[0029] The upper ash placing pipe 5 is 120MM higher than the air distribution plate 203, and the top surface of the upper ash placing pipe 5 is 30MM away from the filter plate 202, so that it will not be accumulated and blocked when too much waste slag falls at the same time, and the parts of the upper ash placing pipe 5 that contact the air distribution plate 203 are all welded, and the waste slag will not enter the return air chamber 204 through the gap. The upper reinforcing rib 3 connected to the bottom of the mounting plate 101 fixes the upper half of the upper ash placing pipe 5, and the lower reinforcing rib 401 fixedly connected to the connecting rib 4 and the mounting wall 1 fixes the lower half of the upper ash placing pipe 5. The upper and lower sections are fixed at the same time, which strengthens the stability of the upper ash placing pipe 5. The two corrugated compensators 7 arranged in the middle section of the upper ash discharge pipe 5 buffer the expansion stress caused by the temperature difference between the waste slag in the upper ash discharge pipe 5 and the external air. The reinforcing fixing device and the heat buffer device arranged on the upper ash discharge pipe 5 greatly improve the stability of the upper ash discharge pipe 5. The middle section of the lower ash discharge pipe 8 is also provided with two corrugated compensators 7, which also play a role in buffering the expansion stress caused by the temperature difference, and solve the problem that the existing return feeder pipeline will expand due to heat due to excessive temperature during ash discharge, causing the weld to tear, and the ash material blocks the induced draft system, resulting in the termination of the boiler return cycle and causing a shutdown accident.

[0030] Working principle:

[0031] In the first step, when the casting material is transferred from the boiler to the return material body 2, the filter plate 202 filters the waste slag associated with the casting material, and the filtered casting material enters the next working process from the return material pipe 201. After the filtered waste slag is accumulated on the air distribution plate 203, it is blown by the return material wind guided out from the return material air chamber 204 to the top of the air distribution plate 203, and discharged from the upper ash pipe 5. The upper ash pipe 5 is 120MM higher than the air distribution plate 203, and the top surface of the upper ash pipe 5 is 30MM away from the filter plate 202, so that it will not be accumulated and blocked when too much waste slag falls at the same time, and the parts of the upper ash pipe 5 that contact the air distribution plate 203 are all welded, and the waste slag will not enter the return material air chamber 204 from the gap.

[0032] In the second step, the upper reinforcing rib 3 connected below the mounting plate 101 fixes the upper half of the upper ash pipe 5, and the lower reinforcing rib 401 fixedly connected to the connecting rib 4 and the mounting wall 1 fixes the lower half of the upper ash pipe 5. The upper and lower sections are fixed at the same time, which reinforces the stability of the upper ash pipe 5. The two corrugated compensators 7 arranged in the middle section of the upper ash pipe 5 buffer the expansion stress caused by the temperature difference between the waste slag in the upper ash pipe 5 and the external air. The reinforcing fixing device and the heat buffer device arranged on the upper ash pipe 5 greatly improve the stability of the upper ash pipe 5. The middle section of the lower ash pipe 8 is also provided with two corrugated compensators 7, which also play a role in buffering the expansion stress caused by the temperature difference.

[0033] Finally, it should be noted that: Obviously, the above embodiments are only examples for clearly explaining the present invention, and are not intended to limit the implementation methods. For ordinary technicians in the relevant field, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived from this are still within the scope of protection of the present invention.

Claims

1. A tear-proof device for an ash discharge pipe of a return material feeder, comprising a mounting wall (1), the mounting wall (1) being fixedly connected to a mounting plate (101), a return material feeder body (2) being mounted above the mounting plate (101), a return material feeder pipe (201) being fixedly arranged on the side of the return material feeder body (2), an air distribution plate (203) being fixedly connected to the inner wall of the return material feeder body (2), a filter plate (202) being arranged above the air distribution plate (203), the air distribution plate (203) dividing the inner wall of the return material feeder body (2) into two parts, the upper half of the return material feeder body (2) separated by the air distribution plate (203) being connected to the return material feeder pipe (201), the lower half of the return material feeder body (2) separated by the air distribution plate (203) being provided with a return material air chamber (204), the middle part of the air distribution plate (203) being fixedly connected to an upper ash discharge pipe (5), characterized in that: The middle section of the upper ash placing pipe (5) is provided with a reinforcing fixing device and a heat buffer device, and a lower ash placing pipe (8) is also connected below the upper ash placing pipe (5), and the middle section of the lower ash placing pipe (8) is also provided with a heat buffer device; Wherein, the reinforcing fixing device and the heat buffer device connected to the upper ash placing pipe (5) are located below the mounting plate (101); The reinforcing fixing device connected to the upper ash placing pipe (5) is connected to the mounting wall (1) and the mounting plate (101).

2. The anti-tearing device for the ash discharge pipe of the return device according to claim 1, characterized in that: The reinforcing and fixing device comprises an upper reinforcing rib (3), the upper reinforcing rib (3) being fixedly connected to the bottom of the mounting plate (101), the upper reinforcing rib (3) being fixedly connected to the upper middle section of the upper ash placing pipe (5), a connecting rib (4) being further connected to the bottom of the mounting plate (101), the connecting rib (4) being fixedly connected to a lower reinforcing rib (401) at one end of the connecting rib (4) away from the mounting plate (101), the lower reinforcing rib (401) being fixedly connected to the lower middle section of the upper ash placing pipe (5), and the same end of the upper reinforcing rib (3), the connecting rib (4) and the lower reinforcing rib (401) being fixedly connected to the mounting wall (1).

3. The anti-tearing device for the ash discharge pipe of the return device according to claim 2, characterized in that: Two corrugated compensators (7) are fixedly installed in the middle of the upper ash placing pipe (5) and located below the upper reinforcing rib (3) and above the lower reinforcing rib (401); one end of the upper ash placing pipe (5) away from the air distribution plate (203) is fixedly connected to a connecting flange group (6); one end of the connecting flange group (6) away from the upper ash placing pipe (5) is fixedly connected to a lower ash placing pipe (8); two corrugated compensators (7) are fixedly installed in the middle section of the lower ash placing pipe (8); the two corrugated compensators (7) connected in the middle section of the upper ash placing pipe (5) and the two corrugated compensators (7) connected in the middle section of the lower ash placing pipe (8) constitute a heat buffer device.

4. The anti-tearing device for the ash discharge pipe of the return device according to claim 3, characterized in that: The portion of the outer wall of the upper ash placing pipe (5) in contact with the air distribution plate (203) is fully welded on both the upper and lower surfaces, and the upper ash placing pipe (5) passes through the mounting plate (101), the upper reinforcing rib (3) and the bottom surface of the return material device body (2).

5. The anti-tearing device for the ash discharge pipe of the return device according to claim 1, characterized in that: The upper ash placing pipe (5) passes through the air distribution plate (203) toward the filter plate (202) and is extended by 120 mm.

6. The anti-tearing device for the ash discharge pipe of the return device according to claim 1, characterized in that: The upper ash placing pipe (5) is 30 mm away from the filter plate (202).