Preheating equipment for evaporation preheating hardness removal
By designing the evaporation preheating and hardening equipment of rough surface preheater plates in the evaporation system, the calcium and magnesium ion scale problem is solved, and the effect of hardening without agent is achieved, reducing operating costs and avoiding the introduction of impurities, improving the equipment practicality.
Patent Information
- Application Number
- CN202420058545.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-10
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2034-01-10
AI Technical Summary
The presence of calcium and magnesium ions in the existing evaporation system causes the evaporator to be scaled, affecting the heat exchange efficiency, and the existing hard-removing technology requires the addition of pharmaceuticals and filtration equipment, increase investment and operation costs, and may introduce impurities.
A preheating equipment for evaporation preheating and hardening removal was designed. Through the combination of a distilled water preheater and a steam-generating preheater, the surface of the preheater plate is made into a rough shape, reducing the solubility of calcium and magnesium ions and making it crystallized. The form is precipitated on the heat exchanger plate to achieve hardening effect without adding agents.
It effectively reduces operating costs, avoids the introduction of impurities in the agent, improves the practicality of the equipment, and achieves the hardening effect of calcium and magnesium ions.
Smart Images

Figure CN221944941U_ABST
Abstract
Description
Technical Field
[0001] The utility model specifically relates to a preheating device for evaporation preheating and hardness removal, belonging to the technical field of evaporation hardness removal. Background Art
[0002] In the evaporation system, the presence of calcium and magnesium ions can easily lead to scaling of the evaporator, which will eventually affect the heat exchange efficiency of the heat exchanger. Therefore, it is necessary to remove the calcium and magnesium ions in the material. However, the existing hardness removal technology mostly adds reagents, and at the same time, it is also necessary to add corresponding filtering equipment, which will increase the investment cost and operating cost, and the raw materials will introduce new impurities.
[0003] In view of this, the present utility model is proposed. Utility Model Content
[0004] The purpose of the utility model is to provide a preheating device for evaporation preheating and hardness removal in order to solve the above-mentioned problems. It has the advantages of being able to precipitate calcium and magnesium ions without adding reagents, thereby reducing operating costs. At the same time, it can avoid the problem of impurities introduced in the traditional process of adding reagents, and is more practical.
[0005] The utility model achieves the above-mentioned purpose through the following technical scheme: a preheating device for evaporation preheating and hardness removal, comprising a raw liquid pipeline, a distilled water preheater A and a distilled water preheater B, wherein the distilled water preheater A and the distilled water preheater B are respectively connected to the raw liquid pipeline through the first raw liquid inlet pipe and the second raw liquid inlet pipe, and the first raw liquid inlet pipe and the second raw liquid inlet pipe are respectively installed with the first raw liquid valve and the second raw liquid valve, the distilled water preheater A and the distilled water preheater B are respectively connected with the first raw liquid outlet pipe and the second raw liquid outlet pipe, and the first raw liquid outlet pipe and the second raw liquid outlet pipe are connected through the infusion The conduit is fixedly connected with the raw steam preheater A and the raw steam preheater B, the first raw liquid outlet pipe and the second raw liquid outlet pipe are respectively installed with the first infusion valve and the second infusion valve, the first pretreatment liquid outlet pipe and the second pretreatment liquid outlet pipe are respectively fixedly installed on the raw steam preheater A and the raw steam preheater B, the first pretreatment liquid outlet pipe and the second pretreatment liquid outlet pipe are respectively installed with the first pretreatment liquid valve and the second pretreatment liquid valve, and the surfaces of the preheater plates in the distilled water preheater A, the distilled water preheater B, the raw steam preheater A and the raw steam preheater B are all rough.
[0006] Furthermore, in order to discharge the raw liquid after the preheating treatment through the pretreatment liquid discharge pipe, the first pretreatment liquid outlet pipe and the second pretreatment liquid outlet pipe are fixedly connected with the pretreatment liquid discharge pipe.
[0007] Furthermore, in order to be able to control the opening and closing of the first distilled water inlet pipe and the second distilled water inlet pipe, the first distilled water inlet pipe and the second distilled water inlet pipe are respectively installed on the distilled water preheater A and the distilled water preheater B, and the first distilled water inlet pipe and the second distilled water inlet valve are respectively installed on the first distilled water inlet pipe and the second distilled water inlet valve.
[0008] Furthermore, in order to discharge the steam condensate in the steam condensate pipe into the first distilled water inlet pipe and the second distilled water inlet pipe, the first distilled water inlet pipe and the second distilled water inlet pipe are both connected to the steam condensate pipe.
[0009] Furthermore, in order to be able to control the opening and closing of the first distilled water outlet pipe and the second distilled water outlet pipe, the first distilled water outlet pipe and the second distilled water outlet pipe are respectively installed on the distilled water preheater A and the distilled water preheater B, and the first distilled water outlet pipe and the second distilled water outlet valve are installed on the first distilled water outlet pipe and the second distilled water outlet valve.
[0010] Furthermore, in order to discharge the steam distilled water, the first distilled water outlet pipe and the second distilled water outlet pipe are both connected to the steam condensed water discharge pipeline.
[0011] Furthermore, in order to be able to transport raw steam to the raw steam preheater A and the raw steam preheater B, the raw steam preheater A and the raw steam preheater B are installed with the first raw steam inlet pipe and the second raw steam inlet pipe, the first raw steam inlet pipe and the second raw steam inlet pipe are connected to the raw steam pipeline, and the first raw steam inlet pipe and the second raw steam inlet pipe are respectively installed with the first raw steam inlet valve and the second raw steam inlet valve.
[0012] Furthermore, in order to be able to discharge the raw steam from the raw steam preheater A and the raw steam preheater B, the raw steam preheater A and the raw steam preheater B are installed with the first raw steam outlet pipe and the second raw steam outlet pipe, the first raw steam outlet pipe and the second raw steam outlet pipe are connected to the raw steam exhaust pipeline, and the first raw steam outlet pipe and the second raw steam outlet pipe are respectively installed with the first raw steam outlet valve and the second raw steam outlet valve.
[0013] The technical effects and advantages of the utility model are as follows: by preheating the stock solution, the temperature of the raw materials is increased, so that the solubility of calcium, magnesium and other ions is reduced, and at the same time, the plates of the preheater are made into rough surfaces to provide better primary nucleation conditions for calcium and magnesium ions, so that calcium and magnesium ions can be precipitated on the heat exchanger plates in the form of crystals. The distilled water preheater and the raw steam preheater are designed to be used in one and reserved in the other, and they can be switched between each other, so that the precipitated scale can be cleaned in time to achieve the effect of removing hardness. Calcium and magnesium ions can be precipitated without adding chemicals, thereby reducing the operating cost. At the same time, the problem of impurities introduced in the traditional process of adding chemicals can be avoided, and the utility model is more practical. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a schematic diagram of the overall process of the utility model;
[0015] Figure 2 It is a schematic diagram of the overall structure of the utility model;
[0016] Figure 3 This is a schematic diagram of the connection structure of the distilled water preheater A and the distilled water preheater B of the utility model;
[0017] Figure 4 It is a schematic diagram of the connection structure of the raw steam preheater A and the raw steam preheater B of the utility model.
[0018] In the figure: 1, raw liquid pipeline; 2, distilled water preheater A; 3, distilled water preheater B; 4, first raw liquid inlet pipe; 5, second raw liquid inlet pipe; 6, first raw liquid valve; 7, second raw liquid valve; 8, first raw liquid outlet pipe; 9, second raw liquid outlet pipe; 10, infusion catheter; 11, raw steam preheater A; 12, raw steam preheater B; 13, first infusion valve; 14, second infusion valve; 15, first pretreatment liquid outlet pipe; 16, second pretreatment liquid outlet pipe; 17, first pretreatment liquid valve; 18, second pretreatment liquid valve; 19, pretreatment liquid discharge pipe; 20, first distilled water inlet pipe; 21, second Distilled water inlet pipe; 22, first distilled water inlet valve; 23, second distilled water inlet valve; 24, steam condensate water pipeline; 25, first distilled water outlet pipe; 26, second distilled water outlet pipe; 27, first distilled water outlet valve; 28, second distilled water outlet valve; 29, steam condensate water discharge pipeline; 30, first raw steam inlet pipe; 31, second raw steam inlet pipe; 32, raw steam pipeline; 33, first raw steam inlet valve; 34, second raw steam inlet valve; 35, first raw steam outlet pipe; 36, second raw steam outlet pipe; 37, raw steam discharge pipeline; 38, first raw steam outlet valve; 39, second raw steam outlet valve. DETAILED DESCRIPTION
[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0020] See also Figure 1-4 As shown, a preheating device for evaporation preheating and hardness removal includes a raw liquid pipeline 1, a distilled water preheater A2 and a distilled water preheater B3, the distilled water preheater A2 and the distilled water preheater B3 are connected to the raw liquid pipeline 1 through a first raw liquid inlet pipe 4 and a second raw liquid inlet pipe 5, respectively, and the first raw liquid inlet pipe 4 and the second raw liquid inlet pipe 5 are respectively installed with a first raw liquid valve 6 and a second raw liquid valve 7, and the distilled water preheater A2 and the distilled water preheater B3 are respectively connected with a first raw liquid outlet pipe 8 and a second raw liquid outlet pipe 9. The second raw liquid outlet pipe 9 is used to transport the raw liquid to the distilled water preheater A2 and the distilled water preheater B3 for steam distilled water preheating. The first raw liquid outlet pipe 8 and the second raw liquid outlet pipe 9 are fixedly connected to the raw steam preheater A11 and the raw steam preheater B12 through the infusion conduit 10. The first raw liquid outlet pipe 8 and the second raw liquid outlet pipe 9 are respectively installed with a first infusion valve 13 and a second infusion valve 14. The raw steam preheater A11 and the raw steam preheater B12 are respectively fixedly installed with The first pretreatment liquid outlet pipe 15 and the second pretreatment liquid outlet pipe 16 are respectively provided with a first pretreatment liquid valve 17 and a second pretreatment liquid valve 18, so as to transport the raw liquid to the raw steam preheater A11 and the raw steam preheater B12 for preheating. The distilled water preheater A2 and the distilled water preheater B3 and the raw steam preheater A11 and the raw steam preheater B12 are each provided with two groups, so as to realize the function of one for use and one for backup, and the precipitated scale can be cleaned in time to achieve the hardness removal effect. The surfaces of the preheater plates in the distilled water preheater A2, the distilled water preheater B3, the raw steam preheater A11 and the raw steam preheater B12 are all rough. When in use, in order to increase the temperature of the raw liquid, the solubility of calcium and magnesium ions is reduced. At the same time, the plates of the preheater are made into rough surfaces, so as to provide better primary nucleation conditions for calcium and magnesium ions, so that calcium and magnesium ions are precipitated on the heat exchanger plates in the form of crystals.
[0021] A pretreatment liquid discharge pipe 19 is fixedly connected to the first pretreatment liquid outlet pipe 15 and the second pretreatment liquid outlet pipe 16 to discharge the raw liquid after the preheat treatment.
[0022] The first distilled water inlet pipe 20 and the second distilled water inlet pipe 21 are respectively installed on the distilled water preheater A2 and the distilled water preheater B3. The first distilled water inlet pipe 20 and the second distilled water inlet pipe 21 are respectively installed with the first distilled water inlet valve 22 and the second distilled water inlet valve 23. The first distilled water inlet pipe 20 and the second distilled water inlet pipe 21 are both connected to the steam condensate water pipeline 24 to control the opening and closing of the first distilled water inlet pipe 20 and the second distilled water inlet pipe 21, so that the distilled water enters the distilled water preheater A2 and the distilled water preheater B3 respectively to preheat the raw liquid.
[0023] The distilled water preheater A2 and the distilled water preheater B3 are also respectively installed with a first distilled water outlet pipe 25 and a second distilled water outlet pipe 26, on which a first distilled water outlet valve 27 and a second distilled water outlet valve 28 are installed. The first distilled water outlet pipe 25 and the second distilled water outlet pipe 26 are both connected to a steam condensate discharge pipe 29 to discharge the steam condensate after preheating the raw liquid in the distilled water preheater A2 and the distilled water preheater B3.
[0024] The first live steam inlet pipe 30 and the second live steam inlet pipe 31 are installed on the live steam preheater A11 and the live steam preheater B12, and the first live steam inlet pipe 30 and the second live steam inlet pipe 31 are connected to the live steam pipeline 32, and the first live steam inlet pipe 30 and the second live steam inlet pipe 31 are respectively installed with the first live steam inlet valve 33 and the second live steam inlet valve 34, so as to transport the live steam to the live steam preheater A11 and the live steam preheater B12 to preheat the raw liquid in the live steam preheater A11 and the live steam preheater B12.
[0025] The first live steam outlet pipe 35 and the second live steam outlet pipe 36 are installed on the live steam preheater A11 and the live steam preheater B12, and the first live steam outlet pipe 35 and the second live steam outlet pipe 36 are connected to the live steam exhaust pipeline 37, and the first live steam outlet pipe 35 and the second live steam outlet pipe 36 are respectively installed with the first live steam outlet valve 38 and the second live steam outlet valve 39, so as to discharge the live steam from the live steam preheater A11 and the live steam preheater B12 after the live steam is preheated.
[0026] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.
[0027] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. A preheating device for evaporation preheating and hardness removal, comprising a raw liquid pipeline (1), a distilled water preheater A (2) and a distilled water preheater B (3), characterized in that: The distilled water preheater A (2) and the distilled water preheater B (3) are respectively connected to the raw liquid pipeline (1) through a first raw liquid inlet pipe (4) and a second raw liquid inlet pipe (5), and the first raw liquid inlet pipe (4) and the second raw liquid inlet pipe (5) are respectively installed with a first raw liquid valve (6) and a second raw liquid valve (7), the distilled water preheater A (2) and the distilled water preheater B (3) are respectively connected with a first raw liquid outlet pipe (8) and a second raw liquid outlet pipe (9), the first raw liquid outlet pipe (8) and the second raw liquid outlet pipe (9) are fixedly connected to a raw steam preheater A (11) and a raw steam preheater B (12) through a liquid infusion pipe (10), and the first raw liquid outlet pipe (11) and the second raw liquid outlet pipe (12) are fixedly connected to the raw steam preheater A (11) and the ... The first liquid infusion valve (13) and the second liquid infusion valve (14) are respectively installed on the first raw liquid outlet pipe (8) and the second raw liquid outlet pipe (9); the first pretreated liquid outlet pipe (15) and the second pretreated liquid outlet pipe (16) are respectively fixedly installed on the first raw steam preheater A (11) and the second raw steam preheater B (12); the first pretreated liquid outlet pipe (15) and the second pretreated liquid outlet pipe (16) are respectively installed on the first pretreated liquid outlet pipe (15) and the second pretreated liquid outlet pipe (16); the surfaces of the preheater plates in the distilled water preheater A (2), the distilled water preheater B (3), the raw steam preheater A (11) and the raw steam preheater B (12) are all rough.
2. The preheating equipment for evaporation preheating and hardness removal according to claim 1, characterized in that: The first pretreatment liquid outlet pipe (15) and the second pretreatment liquid outlet pipe (16) are fixedly connected with a pretreatment liquid discharge pipe (19).
3. The preheating equipment for evaporation preheating and hardness removal according to claim 1, characterized in that: The distilled water preheater A (2) and the distilled water preheater B (3) are respectively provided with a first distilled water inlet pipe (20) and a second distilled water inlet pipe (21); and the first distilled water inlet pipe (20) and the second distilled water inlet pipe (21) are respectively provided with a first distilled water inlet valve (22) and a second distilled water inlet valve (23).
4. The preheating device for evaporation preheating and hardness removal as claimed in claim 3, characterized in that: The first distilled water inlet pipe (20) and the second distilled water inlet pipe (21) are both connected to the steam condensate water pipeline (24).
5. The preheating equipment for evaporation preheating and hardness removal as claimed in claim 3, characterized in that: The distilled water preheater A (2) and the distilled water preheater B (3) are also respectively provided with a first distilled water outlet pipe (25) and a second distilled water outlet pipe (26), and the first distilled water outlet pipe (25) and the second distilled water outlet pipe (26) are respectively provided with a first distilled water outlet valve (27) and a second distilled water outlet valve (28).
6. The preheating device for evaporation preheating and hardness removal as claimed in claim 5, characterized in that: The first distilled water outlet pipe (25) and the second distilled water outlet pipe (26) are both connected to the steam condensate water discharge pipe (29).
7. The preheating equipment for evaporation preheating and hardness removal according to claim 1, characterized in that: The live steam preheater A (11) and the live steam preheater B (12) are provided with a first live steam inlet pipe (30) and a second live steam inlet pipe (31); the first live steam inlet pipe (30) and the second live steam inlet pipe (31) are connected with a live steam pipeline (32); and the first live steam inlet pipe (30) and the second live steam inlet pipe (31) are provided with a first live steam inlet valve (33) and a second live steam inlet valve (34), respectively.
8. The preheating equipment for evaporation preheating and hardness removal as claimed in claim 7, characterized in that: The live steam preheater A (11) and the live steam preheater B (12) are provided with a first live steam outlet pipe (35) and a second live steam outlet pipe (36); the first live steam outlet pipe (35) and the second live steam outlet pipe (36) are connected to a live steam discharge pipeline (37); and the first live steam outlet pipe (35) and the second live steam outlet pipe (36) are provided with a first live steam outlet valve (38) and a second live steam outlet valve (39), respectively.
