Prefabricated building component hoisting skill practical operation equipment
By designing a practical equipment for lifting skills of prefabricated building components including base plate, fixed steel bars and hoisting rings, the problem of inconvenience in practical operation and installation of existing equipment is solved, convenient lifting and support of building components is achieved, and learning is improved Efficiency and practical ability.
Patent Information
- Application Number
- CN202420484174.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-13
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2034-03-13
AI Technical Summary
The existing practical equipment for lifting skills of prefabricated building components is inconvenient for practical operation and installation, resulting in inconvenient use.
A device including base plate, fixed steel bar, prefabricated shear wall inner wall plate and outer wall plate, hoisting ring and other components is designed to realize convenient lifting and support of building components through slots and hoisting rings, and use base blocks and support columns. Adjust the height and length of the connecting barrel to meet the competition assessment and training requirements.
This equipment makes the lifting and support of building components more convenient, improves learning efficiency and practical ability, and meets the needs of competition and training.
Smart Images

Figure CN221946629U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of practical training equipment, in particular to a practical training equipment for hoisting skills of assembled building components. Background Art
[0002] With the continuous development of science and technology, building components are the elements that make up a building. Steel structure components are the elements that make up a building. If a building is regarded as a product, then building components refer to the parts of this product.
[0003] An existing assembly method and equipment for prefabricated building components can refer to the Chinese utility model patent with the authorization announcement number CN219418297U, which discloses an assembly method and equipment for prefabricated building components, "including a foundation structure and an assembly structure, the lower end of the steel frame is connected to the foundation, the upper end of the steel frame is placed on a two-story concrete raft, a corner of the second-story concrete raft is provided with an assembly notch, and a staircase is arranged on one side of the steel frame to connect the foundation and the second-story concrete raft; the assembly structure includes an exterior wall hanging panel, a shear wall exterior wall panel and a prefabricated The upper end of the floor slab and the exterior wall hanging plate are pre-buried with anchors and bolted to the steel structure beams, and the lower end of the exterior wall hanging plate is pre-buried with corbels to support the frame corbels; the shear wall exterior wall panels are L-shaped and hoisted on the second-floor concrete raft slab; the prefabricated floor slabs are set in the assembly gap, including truss reinforced concrete composite slabs and PK slabs, both of which are placed on the steel structure beams and supported by the foundation through vertical supports. This utility model can be repeatedly disassembled and assembled for training, combined with micro-courses, and theoretical and practical training at the same time, which not only cultivates the overall engineering application ability of students, but also trains practical skills. "
[0004] When the above device is in use, it is supported by the foundation through vertical support. The utility model can be repeatedly disassembled and assembled for training, combined with micro-courses, and theoretical and practical training at the same time, which not only cultivates the overall engineering application ability of students, but also trains practical skills. When the above device is used, it is not convenient to operate the device, and it is not convenient to install the building components after hoisting, and thus it is not convenient to use. For this reason, we propose a practical equipment for hoisting skills of assembled building components. Utility Model Content
[0005] In view of the deficiencies in the prior art, the utility model provides a skill operation equipment for the lifting of prefabricated building components, which has the advantages of strong practicality, good stability, easy installation and support for building components. It solves the problem that traditional skill operation equipment for the lifting of prefabricated building components is not convenient for the installation, not convenient for the installation of building components after lifting, and thus not convenient for use.
[0006] The utility model provides the following technical solution: a kind of practical operation equipment for lifting skills of assembled building components, comprising a base plate, the top of the base plate is fixedly connected with fixed steel bars, the outer wall of the fixed steel bars is sleeved with a prefabricated shear wall inner wall panel, the top of the base plate is installed with a prefabricated shear wall inner wall panel and a prefabricated shear wall outer wall panel, the two sides of the prefabricated shear wall inner wall panel are fixedly connected with connecting steel bars, the bottom of the prefabricated shear wall inner wall panel is provided with a slot, the top of the prefabricated shear wall inner wall panel is rotatably connected with a first lifting ring, the top of the prefabricated shear wall inner wall panel is placed with a prefabricated composite panel, and the top of the prefabricated composite panel is provided with a second lifting ring.
[0007] As a preferred technical solution of the utility model, a bottom block is provided on the top of the bottom plate, a support column is fixedly connected to the top of the bottom block, a connecting tube is slidably connected to the outer wall of the support column, and a first rotating block is threadedly connected to the outer wall of the support column.
[0008] As a preferred technical solution of the utility model, a first fixed block is placed on the top of the base plate, a rectangular groove is opened on the top of the first fixed block, a first fixed column is fixedly connected to the inner wall of the rectangular groove, and a connecting column is rotatably connected to the outer wall of the first fixed column.
[0009] As a preferred technical solution of the utility model, the top of the connecting column is fixedly connected to a fixing plate, the outer wall of the connecting column is sleeved with a fixing cylinder, the inner wall of the fixing cylinder is provided with a limiting groove, and the inner wall of the limiting groove is slidably connected to a fixing plate.
[0010] As a preferred technical solution of the utility model, the inner wall of the fixed cylinder is rotatably connected with a second fixed column, and both ends of the second fixed column are fixedly connected to the inner wall of the second fixed block.
[0011] As a preferred technical solution of the utility model, the outer wall of the connecting column is rotatably connected to a second rotating block, and the second rotating block is rotatably connected to the bottom of the fixed cylinder.
[0012] As a preferred technical solution of the utility model, the number of the first lifting rings is two, the two first lifting rings are rotatably connected to the top of the inner wall panel of the prefabricated shear wall, and the two first lifting rings are on the same straight line.
[0013] Compared with the prior art, the utility model has the following beneficial effects:
[0014] 1. The practical equipment for lifting skills of prefabricated building components is used in conjunction with a base plate and fixed steel bars. Prefabricated shear wall inner wall panels and prefabricated shear wall outer wall panels are used to enable the installation of prefabricated shear wall inner wall panels and prefabricated shear wall outer wall panels through the opened slots. The installed first lifting ring and second lifting ring facilitate the lifting of prefabricated shear wall outer wall panels and prefabricated composite panels, thereby meeting the requirements of competition assessment and practical training. The equipment can help users quickly master the lifting technology of prefabricated building components, thereby improving learning efficiency.
[0015] 2. The practical equipment for lifting skills of prefabricated building components, through the coordinated use of the bottom block and the supporting column, uses the first rotating block to facilitate the adjustment of the height of the connecting tube, so that the top of the connecting tube can support the prefabricated composite plate, so that it is fixed after lifting. By using the first fixed block, a rectangular groove is opened on the top of the first fixed block, and then the first fixed column is fixedly connected to the inner wall of the rectangular groove. The outer wall of the first fixed column is rotatably connected with the connecting column. Since a fixing plate is welded on the top of the connecting column, it is convenient for the fixing plate to be slidably connected to the inner wall of the limiting groove opened on the inner wall of the fixing tube, so that the second rotating block can adjust the length of the fixing tube when rotating. At the same time, the second fixed column and the second fixed block are used to facilitate the support of the inner wall panel of the prefabricated shear wall, so that the position of the inner wall panel of the prefabricated shear wall is fixed after lifting, so as to facilitate practical operation. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 This is a schematic diagram of the front structure of the utility model;
[0017] Figure 2 This is a schematic diagram of the cross-sectional structure of the utility model;
[0018] Figure 3 This is a schematic diagram of the explosion structure of the utility model;
[0019] Figure 4 For this utility model Figure 3 Schematic diagram of the local enlarged structure at A.
[0020] In the figure: 1. bottom plate; 2. fixed steel bars; 3. prefabricated shear wall inner wall panel; 4. prefabricated shear wall outer wall panel; 5. slot; 6. first lifting ring; 7. prefabricated composite plate; 8. second lifting ring; 9. connecting steel bars; 10. bottom block; 11. support column; 12. connecting tube; 13. first rotating block; 14. first fixed block; 15. rectangular groove; 16. first fixed column; 17. connecting column; 18. fixed plate; 19. fixed tube; 20. limit groove; 21. second fixed column; 22. second fixed block; 23. second rotating block. DETAILED DESCRIPTION
[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0022] See also Figure 1-4 , a kind of assembly type building component hoisting skill operation equipment, comprises a bottom plate 1, the top of the bottom plate 1 is fixedly connected with a fixed steel bar 2, when the bottom plate 1 is used, the top of the bottom plate 1 is welded with the fixed steel bar 2, so that it is convenient to insert the prefabricated shear wall inner wall panel 3 and the prefabricated shear wall outer wall panel 4 on the outer wall of the fixed steel bar 2, so that when the prefabricated shear wall inner wall panel 3 and the prefabricated shear wall outer wall panel 4 are hoisted, the prefabricated shear wall inner wall panel 3 and the prefabricated shear wall outer wall panel 4 can be fixed, and the outer wall of the fixed steel bar 2 is sleeved with a prefabricated The shear wall inner wall panel 3 and the prefabricated shear wall outer wall panel 4 are installed on the top of the bottom plate 1, the two sides of the prefabricated shear wall inner wall panel 3 are fixedly connected with connecting steel bars 9, the bottom of the prefabricated shear wall inner wall panel 3 is provided with a slot 5, the top of the prefabricated shear wall inner wall panel 3 is rotatably connected with a first lifting ring 6, a prefabricated composite panel 7 is placed on the top of the prefabricated shear wall inner wall panel 3, and the top of the prefabricated composite panel 7 is provided with a second lifting ring 8, and at the same time, due to the second lifting ring 8, it is easy to hook up the prefabricated composite panel 7, thereby facilitating the use of the device.
[0023] A bottom block 10 is provided on the top of the base plate 1. When the bottom block 10 is used, the bottom block 10 can be fixed to the top of the base plate 1 by bolts. The top of the bottom block 10 is fixedly connected with a support column 11. At the same time, due to the support column 11, a sliding connection tube 12 is performed on the outer wall of the support column 11. The outer wall of the support column 11 is slidably connected with the connection tube 12. The outer wall of the support column 11 is threadedly connected with a first rotating block 13. When the first rotating block 13 is used, the first rotating block 13 can drive the connection tube 12 to move when it rotates, so that the top of the connection tube 12 can support the prefabricated composite plate 7, making it convenient to use the device.
[0024] A first fixed block 14 is placed on the top of the base plate 1. The first fixed block 14 placed on the top of the base plate 1 allows a rectangular groove 15 to be opened on the top of the first fixed block 14, so that a first fixed column 16 is welded on the inner wall of the rectangular groove 15, so that the outer wall of the first fixed column 16 is rotatably connected to the connecting column 17, thereby facilitating the adjustment of the angle of the connecting column 17, so as to facilitate the support of the prefabricated shear wall inner wall panel 3 so that it can be better used. A rectangular groove 15 is opened on the top of the first fixed block 14, and the inner wall of the rectangular groove 15 is fixedly connected to the first fixed column 16, and the outer wall of the first fixed column 16 is rotatably connected to the connecting column 17.
[0025] A fixing plate 18 is fixedly connected to the top of the connecting column 17. Due to the fixing plate 18 fixed to the top of the connecting column 17, the fixing plate 18 can be slidably connected to the inner wall of the fixing tube 19, so that the fixing plate 18 is slidably connected to the inner wall of the limiting groove 20. Therefore, when the connecting column 17 is rotatably connected to the inner wall of the fixing tube 19, the limiting groove 20 can limit the fixing tube 19 so that the fixing tube 19 can only be raised and lowered but not rotated, thereby facilitating the adjustment of the length to support the side of the inner wall panel 3 of the prefabricated shear wall. The outer wall of the connecting column 17 is sleeved with the fixing tube 19, and the inner wall of the fixing tube 19 is provided with a limiting groove 20, and the inner wall of the limiting groove 20 is slidably connected with the fixing plate 18.
[0026] The inner wall of the fixed cylinder 19 is rotatably connected to a second fixed column 21, and both ends of the second fixed column 21 are fixedly connected to the inner wall of the second fixed block 22. Since the inner wall of the second fixed block 22 is fixedly connected to the second fixed column 21, the second fixed column 21 can drive the fixed cylinder 19 to rotate, thereby facilitating the adjustment of the angle, so as to support the prefabricated shear wall inner wall panel 3.
[0027] The outer wall of the connecting column 17 is rotatably connected to a second rotating block 23, and the second rotating block 23 is rotatably connected to the bottom of the fixed cylinder 19. When the second rotating block 23 is used, the second rotating block 23 can drive the fixed cylinder 19 to rise and fall when it rotates, thereby facilitating the adjustment of the length of the device.
[0028] There are two first lifting rings 6, and the two first lifting rings 6 are rotatably connected to the top of the prefabricated shear wall inner wall panel 3, and the two first lifting rings 6 are on the same straight line. Due to the number of first lifting rings 6, it is convenient to hook the prefabricated shear wall inner wall panel 3, and then it is convenient to use the device to drive the prefabricated shear wall inner wall panel 3 to move, so as to facilitate the actual operation of the device.
[0029] Working principle: When working, the bottom plate 1 and the fixed steel bar 2 are used in combination, and the prefabricated shear wall inner wall panel 3 and the prefabricated shear wall outer wall panel 4 are used to install the prefabricated shear wall inner wall panel 3 and the prefabricated shear wall outer wall panel 4 through the opened slot 5. The installed first lifting ring 6 and the second lifting ring 8 make it convenient to lift the prefabricated shear wall outer wall panel 4 and the prefabricated composite panel 7, thereby meeting the requirements of competition assessment and practical training. Therefore, the equipment can help users quickly master the lifting technology of prefabricated building components, thereby improving learning efficiency. Through the coordinated use of the bottom block 10 and the support column 11, and the use of the first rotating block 13, it is convenient to adjust the height of the connecting tube 12, and then the top of the connecting tube 12 can support the prefabricated composite panel 7. The first fixing block 14 is used to support the first fixing block 14, so that it can be fixed after hoisting. By using the first fixing block 14, a rectangular groove 15 is opened on the top of the first fixing block 14, and then the first fixing column 16 is fixedly connected to the inner wall of the rectangular groove 15. The outer wall of the first fixing column 16 is rotatably connected with a connecting column 17. Since a fixing plate 18 is welded on the top of the connecting column 17, it is convenient for the fixing plate 18 to be slidably connected to the inner wall of the limiting groove 20 opened on the inner wall of the fixing tube 19, so that the second rotating block 23 can adjust the length of the fixing tube 19 when rotating. At the same time, the second fixing column 21 and the second fixing block 22 are used to facilitate the support of the prefabricated shear wall inner wall panel 3, so that the position of the prefabricated shear wall inner wall panel 3 is fixed after hoisting, which is convenient for practical operation.
[0030] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "including one..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0031] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A skill-based equipment for hoisting prefabricated building components, comprising a base plate (1), Features: The top of the base plate (1) is fixedly connected to a fixed steel bar (2), the outer wall of the fixed steel bar (2) is sleeved with a prefabricated shear wall inner wall panel (3), the top of the base plate (1) is installed with a prefabricated shear wall inner wall panel (3) and a prefabricated shear wall outer wall panel (4), both sides of the prefabricated shear wall inner wall panel (3) are fixedly connected to connecting steel bars (9), the bottom of the prefabricated shear wall inner wall panel (3) is provided with a slot (5), the top of the prefabricated shear wall inner wall panel (3) is rotatably connected to a first hanging ring (6), a prefabricated composite panel (7) is placed on the top of the prefabricated shear wall inner wall panel (3), and a second hanging ring (8) is provided on the top of the prefabricated composite panel (7).
2. A practical equipment for hoisting skills of prefabricated building components according to claim 1, Features: A bottom block (10) is provided on the top of the bottom plate (1), a support column (11) is fixedly connected to the top of the bottom block (10), a connecting tube (12) is slidably connected to the outer wall of the support column (11), and a first rotating block (13) is threadedly connected to the outer wall of the support column (11).
3. A practical equipment for hoisting skills of prefabricated building components according to claim 1, Features: A first fixing block (14) is placed on the top of the bottom plate (1), a rectangular groove (15) is provided on the top of the first fixing block (14), a first fixing column (16) is fixedly connected to the inner wall of the rectangular groove (15), and a connecting column (17) is rotatably connected to the outer wall of the first fixing column (16).
4. A practical equipment for hoisting skills of prefabricated building components according to claim 3, Features: The top of the connecting column (17) is fixedly connected to a fixing plate (18), the outer wall of the connecting column (17) is sleeved with a fixing cylinder (19), the inner wall of the fixing cylinder (19) is provided with a limiting groove (20), and the inner wall of the limiting groove (20) is slidably connected to the fixing plate (18).
5. A practical equipment for hoisting skills of assembled building components according to claim 4, Features: The inner wall of the fixed cylinder (19) is rotatably connected to a second fixed column (21), and both ends of the second fixed column (21) are fixedly connected to the inner wall of a second fixed block (22).
6. A prefabricated building component hoisting skill practical equipment according to claim 3, Features: The outer wall of the connecting column (17) is rotatably connected to a second rotating block (23), and the second rotating block (23) is rotatably connected to the bottom of the fixed cylinder (19).
7. The assembly type building component hoisting skill practical equipment according to claim 1, Features: The number of the first hoisting rings (6) is two, and the two first hoisting rings (6) are rotatably connected to the top of the prefabricated shear wall inner wall panel (3), and the two first hoisting rings (6) are on the same straight line.
