Divided-flow glue filling device
Through the diverted glue filling device, the single-time glue filling and automatic stop functions of multiple material pipes are realized, which solves the problem of frequent operations and inconsistent glue filling volume of workers in the prior art, and improves work efficiency and product consistency.
Patent Information
- Application Number
- CN202420253039.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-01
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2034-02-01
AI Technical Summary
In the existing adhesive filling process, workers need to frequently switch pipe installation and pipe extraction operations, resulting in high working strength, low efficiency, and inconsistent glue filling amount.
A diverting glue filling device is designed, including a diverting plate, a lifting seat and a guide column. The glue that forms a glue kettle is diverted to multiple finished material pipes through the diverting plate. The lifting seat gradually moves with the increase in the amount of glue in the material pipe, achieving multiple completions at one time. The glue is filled in the material pipe and the glue is automatically stopped by the limit parts to ensure the consistent amount of glue filling.
The switching frequency of pipe installation and pipe extraction is reduced, the work efficiency of workers is improved, the consistency of glue filling amount is ensured, workers' monitoring needs for the glue filling process are reduced, and the consistency of products is improved.
Smart Images

Figure CN221951577U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of glue making equipment, in particular to a flow-dividing glue pouring device. Background Art
[0002] Adhesive is a substance that connects objects by bonding the surface through adhesion and cohesion, and is widely used in various industries. A glue kettle is usually used in the production process of adhesives. After the final adhesive is formed in the glue kettle, workers usually connect the finished material tube used for dispensing the adhesive to the glue outlet tube of the glue kettle, and then start the glue filling process so that the adhesive is poured into the finished material tube. During this process, workers need to visually observe the glue filling amount, stop the glue filling after reaching the predetermined glue filling amount, remove the finished material tube and cover it, and you can get a marketable adhesive product that can be directly used by downstream industries; among them, the finished material tube has a small capacity, one end is a glue outlet nozzle, and the other end is open. There is also a piston in the tube. Before glue filling, the piston is close to the glue outlet nozzle, and as the adhesive enters, the piston moves toward the open end.
[0003] With the current glue filling process, only one finished material tube can be filled with glue at a time. After filling the full amount, the worker needs to remove the cover of the material tube and then install another material tube. The single glue filling time is short, which causes the workers to frequently switch between the two operations of installing and removing the tube. They cannot get away to do other work during the glue filling process, which results in high work intensity and low work efficiency. In addition, the workers' visual estimation of the glue filling amount will also lead to poor product consistency.
[0004] Therefore, the prior art needs to be improved. Utility Model Content
[0005] In view of this, the utility model provides a split-flow glue pouring device, which is used to solve the problem in the prior art that workers need to frequently switch between pipe loading and pipe removal operations during the adhesive pouring process.
[0006] In order to achieve one or part or all of the above-mentioned purposes or other purposes, the utility model proposes a diversion glue pouring device, including a diversion plate, a lifting seat, and two or more guide columns, the guide columns pass through the lifting seat and the diversion plate in sequence, and the lifting seat and / or the diversion plate can slide along the guide columns; the diversion plate is provided with a glue pouring inlet, a plurality of glue pouring outlets and a diversion hole, the diversion hole connects the glue pouring inlet and the glue pouring outlet, the glue pouring inlet is used to connect the glue outlet pipe of the glue kettle, and the glue pouring outlet is used to connect the glue outlet nozzle of the finished material pipe and pour glue into the finished material pipe; the lifting seat is provided with a plurality of material pipe positioning columns, and the material pipe positioning columns correspond to the glue pouring outlets one by one; the material pipe positioning column is used to insert the end of the finished material pipe away from the glue outlet nozzle to position and install the finished material pipe, and gradually withdraw from the finished material pipe as the lifting seat slides during the glue pouring process.
[0007] Preferably, the lifting seat includes a base and a slide, the base is sleeved on the guide column, a slide groove is provided on the base, the slide can be plugged in the slide groove, and the material tube positioning column is fixedly installed on the slide.
[0008] Preferably, the number of the slides is more than two, and the more than two slides are switched and assembled on the base in turn.
[0009] Preferably, a handle is provided on the slide.
[0010] Preferably, the flow-dividing glue-filling device further includes one or more tension springs, and two ends of the tension springs are fixedly connected to the flow-dividing plate and the base respectively.
[0011] Preferably, the number of the tension springs is equal to the number of the guide pillars, and each guide pillar passes through one tension spring.
[0012] Preferably, the diverter plate is fixedly connected to the guide column.
[0013] Preferably, the diverter glue filling device also includes a first limit member and a second limit member, the first limit member is fixedly installed at one end of the guide column, the second limit member is fixedly installed at the other end of the guide column or is integrally formed with the guide column, and the diverter plate and the lifting seat are both located between the first limit member and the second limit member.
[0014] Preferably, the first limiting member is a nut, the guide column includes a threaded section, the nut is threadedly connected to the threaded section, and the position of the nut on the threaded section is adjustable.
[0015] Preferably, the glue pouring inlet is provided with an internal thread for being connected with the glue outlet pipe thread of the glue kettle.
[0016] Implementing the embodiments of the present utility model will have the following beneficial effects:
[0017] 1. The glue coming out of the glue kettle is diverted by the diverter plate, and multiple finished material tubes are positioned and placed by the lifting seat. The lifting seat can gradually move as the amount of glue in the finished material tube increases, so that multiple finished material tubes can be filled with glue at one time, reducing the switching frequency of tube loading and unloading work, reducing the labor intensity of workers, and improving the work efficiency of workers; in addition, it can also ensure that the amount of glue filled in multiple finished material tubes is the same;
[0018] 2. In the preferred solution, the maximum distance that can be reached between the manifold and the lifting seat is limited by the first limiter and the second limiter. When the distance between the manifold and the lifting seat reaches the maximum distance, the lifting seat can no longer move, so that the glue filling stops automatically when the glue filling is in place and no glue filling is performed. The glue filling amount is the same each time, and workers do not need to pay attention to the glue filling process all the time, while improving the consistency of the product;
[0019] 3. In the preferred solution, the lifting seat is divided into a non-detachable base and a pluggable slide, which reduces the difficulty of taking out and installing the finished material pipe;
[0020] 4. In a further preferred solution, one base is equipped with multiple slides, so that the glue pouring and the taking and placing of the finished material tubes can be carried out simultaneously, further improving the glue pouring efficiency;
[0021] 5. In the preferred embodiment, a tension spring is also installed in the diverter plate and the base to provide a pulling force between the diverter plate and the base, which can ensure that the material tube positioning column can always support the piston in the finished material tube. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0023] in:
[0024] Figure 1 This is a schematic diagram of the three-dimensional structure of a flow-dividing glue-filling device according to an embodiment of the utility model;
[0025] Figure 2 This is a three-dimensional exploded structural diagram of a flow-dividing glue-filling device according to an embodiment of the utility model;
[0026] Figure 3 It is a schematic diagram of the front cross-sectional structure of a flow-dividing glue-filling device according to one embodiment of the utility model.
[0027] The description of the accompanying drawings is as follows: 1. diverter plate; 11. glue pouring inlet; 12. glue pouring outlet; 13. diverter hole; 2. lifting seat; 21. base; 211. slide groove; 22. slide table; 221. material tube positioning column; 222. handle; 3. guide column; 4. tension spring; 5. first limit member; 6. second limit member; 100. finished material tube; 1001. piston. DETAILED DESCRIPTION
[0028] In order to facilitate understanding of the present application, the present application will be described more fully below with reference to the relevant drawings. Embodiments of the present application are provided in the drawings. However, the present application can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the disclosure of the present application more thorough and comprehensive.
[0029] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art to which this application belongs. The terms used herein in the specification of this application are only for the purpose of describing specific embodiments and are not intended to limit this application.
[0030] It is understood that the singular forms "a", "an" and "said / the" may also include plural forms, unless the context clearly indicates otherwise. It should also be understood that the terms "include / comprise" or "have" etc. specify the presence of stated features, wholes, steps, operations, components, parts or combinations thereof, but do not exclude the possibility of the presence or addition of one or more other features, wholes, steps, operations, components, parts or combinations thereof.
[0031] It should be noted that when an element is considered to be "connected" to another element, it can be directly connected to another element or there may be a centered element at the same time. The terms "vertical", "horizontal", "left", "right" and similar expressions used herein are for illustrative purposes only. In the present utility model, the orientation or positional relationship indicated by the terms "upper", "lower", "left", "right", "front", "back", "top", "bottom", "inside", "outside", "middle" and the like is based on the orientation or positional relationship shown in the accompanying drawings. These terms are mainly for better describing the present utility model and its embodiments, and are not used to limit the indicated devices, elements or components to have a specific orientation, or to be constructed and operated in a specific orientation. In addition, the above-mentioned part of the terms may be used to express other meanings in addition to being used to express orientation or positional relationship, for example, the term "upper" may also be used to express a certain dependency or connection relationship in some cases. For those of ordinary skill in the art, the specific meanings of these terms in the present utility model can be understood according to the specific circumstances.
[0032] In addition, the terms "disposed", "provided with", "connected", and "connected" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral structure; it can be a mechanical connection, or an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be an internal connection between two devices, elements, or components. For those of ordinary skill in the art, the specific meanings of the above terms in this utility model can be understood according to specific circumstances.
[0033] Reference Figures 1 to 3The utility model provides a flow-dividing glue-pouring device in one embodiment, comprising a flow-dividing plate 1, a lifting seat 2, and two or more guide pillars 3, wherein the guide pillars 3 sequentially pass through the lifting seat 2 and the flow-dividing plate 1, and the lifting seat 2 and / or the flow-dividing plate 1 can slide along the guide pillars 3; the flow-dividing plate 1 is provided with a glue-pouring inlet 11, a plurality of glue-pouring outlets 12, and a flow-dividing hole 13, wherein the flow-dividing hole 13 connects the glue-pouring inlet 11 with the glue-pouring outlet 12, and the glue-pouring inlet 11 is used for The glue outlet 12 is connected to the glue outlet pipe of the glue kettle, and is used to connect to the glue outlet nozzle of the finished material pipe 100 and inject glue into the finished material pipe 100; a plurality of material pipe positioning columns 221 are provided on the lifting seat 2, and the material pipe positioning columns 221 correspond to the glue injection outlet 12 one by one; the material pipe positioning columns 221 are used to be inserted into the end of the finished material pipe 100 away from the glue outlet nozzle to position and install the finished material pipe 100, and gradually withdraw from the finished material pipe 100 as the lifting seat 2 slides during the glue injection process.
[0034] When in use, the manifold 1 is fixedly connected to the glue outlet pipe of the glue kettle, and a plurality of finished material pipes 100 to be filled with glue are sleeved on the material pipe positioning column 221. The finished material pipe 100 has a piston 1001, and the piston 1001 is close to the glue outlet nozzle of the finished material pipe 100, and the material pipe positioning column 221 supports the piston 1001. After the finished material pipe 100 is placed, the glue outlet nozzle of the finished material pipe 100 is connected and fixed one-to-one with the glue outlet 12 on the manifold 1, and then the glue filling is started, and the glue flows out of the glue kettle. To the diverter plate 1, and then poured into the finished material pipe 100 from the glue pouring outlet 12. As the glue in the finished material pipe 100 increases, the piston 1001 is pushed open and pushes the material pipe positioning column 221 to slowly withdraw from the finished material pipe 100. The multiple material pipe positioning columns 221 move synchronously with the lifting seat 2 to complete the glue pouring operation of multiple finished material pipes 100 at one time, reducing the switching frequency of pipe loading and unloading work, reducing the labor intensity of workers, improving the work efficiency of workers, and at the same time ensuring that the glue pouring amount in multiple finished material pipes 100 is the same.
[0035] In some optional embodiments, such as Figures 1 to 3 As shown, the lifting seat 2 includes a base 21 and a slide 22, the base 21 is sleeved on the guide column 3, a slide groove 211 is provided on the base 21, the slide 22 can be plugged and installed in the slide groove 211, and the material pipe positioning column 221 is fixedly installed on the slide 22. The slide 22 can be plugged and installed, and after being removed, the finished material pipe 100 is placed on the material pipe positioning column 221, which is easy to install the finished material pipe 100, avoiding the problem that the distance between the diverter plate 1 and the lifting seat 2 needs to be pulled large enough to install the finished material pipe 100 in direct installation.
[0036] In some optional embodiments, such as Figures 1 to 3As shown, the number of the slides 22 is more than two, and the more than two slides 22 are switched and assembled on the base 21 in turn. By switching and using multiple slides 22, the worker can place the finished material pipe 100 on another slide 22 after starting the glue pouring, and after the glue pouring is completed, remove the slide 22 on the base 21 and the finished material pipe 100 on the slide 22, and directly install another slide 22 on the base 21 to continue the glue pouring, so that the glue pouring efficiency is further improved.
[0037] In some optional embodiments, such as Figures 1 to 3 As shown, a handle 222 is provided on the slide 22 to facilitate taking and placing the slide 22.
[0038] In some optional embodiments, such as Figures 1 to 3 As shown, the flow dividing glue filling device also includes one or more tension springs 4, and the two ends of the tension springs 4 are respectively fixedly connected to the flow dividing plate 1 and the base 21. The tension springs 4 provide a pulling force between the flow dividing plate 1 and the base 21, which can ensure that the material tube positioning column 221 can always support the piston 1001 in the finished material tube 100.
[0039] In some optional embodiments, such as Figures 1 to 3 As shown, the number of the tension springs 4 is equal to the number of the guide pillars 3 , and each guide pillar 3 passes through one tension spring 4 .
[0040] In some optional embodiments, such as Figures 1 to 3 As shown, the flow-dividing glue-filling device also includes a first stopper 5 and a second stopper 6, wherein the first stopper 5 is fixedly mounted on one end of the guide column 3, and the second stopper 6 is fixedly mounted on the other end of the guide column 3 or is integrally formed with the guide column 3, and the flow-dividing plate 1 and the lifting seat 2 are both located between the first stopper 5 and the second stopper 6; the maximum distance that can be reached between the flow-dividing plate 1 and the lifting seat 2 is limited by the first stopper 5 and the second stopper 6, and the distance is designed according to the required glue filling amount. After reaching the maximum distance, the lifting seat 2 cannot move anymore, that is, it is ensured that no glue is filled when the glue filling is in place, and the glue filling amount is the same each time, and there is no need for workers to subjectively judge whether the predetermined glue filling amount is reached. Further, the first stopper 5 is a nut, and the guide column 3 includes a threaded section (not shown in the drawings), and the nut is screwed on the threaded section, and the position of the nut on the threaded section is adjustable, so that the maximum distance that can be reached between the flow-dividing plate 1 and the lifting seat 2 can be adjusted according to different finished material pipes 100, and the compatibility is high. The above is only one optional embodiment of the present invention. In some other optional embodiments, compared with the above embodiment, the second limiter 6 is not included, and the splitter plate 1 is fixedly connected to the guide column 3.
[0041] In some optional embodiments, the glue pouring inlet 11 is provided with an internal thread for forming a threaded connection with a glue outlet pipe of the glue kettle.
[0042] In some optional embodiments, the glue pouring outlet 12 is provided with an internal thread for forming a threaded connection with the finished product pipe 100 .
[0043] The implementation of the flow-dividing glue-filling device provided by the embodiment of the utility model has the following beneficial effects:
[0044] 1. The glue coming out of the glue kettle is diverted by the diverter plate 1, and multiple finished material tubes 100 are positioned and placed by the lifting seat 2. The lifting seat 2 can gradually move as the amount of glue in the finished material tubes 100 increases, so that multiple finished material tubes 100 can be filled with glue at one time, reducing the switching frequency of tube loading and unloading work, reducing work intensity, and improving workers' work efficiency; in addition, it can also ensure that the amount of glue filled in multiple finished material tubes 100 is the same;
[0045] 2. In some preferred embodiments, the maximum distance that can be reached between the manifold 1 and the lifting seat 2 is limited by the first limiter 5 and the second limiter 6. When the distance between the manifold 1 and the lifting seat 2 reaches the maximum distance, the lifting seat 2 can no longer move, so that the glue filling stops automatically when the glue filling is in place and no glue filling is performed. This ensures that the glue filling amount is the same each time, and workers do not need to pay attention to the glue filling process all the time, while improving the consistency of the product;
[0046] 3. In some preferred embodiments, the lifting seat 2 is divided into a non-detachable base 21 and a pluggable slide 22, which reduces the difficulty of taking out and installing the finished material pipe 100;
[0047] 4. In a further preferred embodiment, a base 21 is equipped with a plurality of slides 22, so that the glue pouring and the taking and placing of the finished material tube 100 can be carried out simultaneously, further improving the glue pouring efficiency;
[0048] 5. In some preferred embodiments, a tension spring 4 is further installed in the diverter plate 1 and the base 21 to provide a pulling force between the diverter plate 1 and the base 21, thereby ensuring that the material tube positioning column 221 can always support the piston 1001 in the finished material tube 100.
[0049] The above disclosure is only a preferred embodiment of the present invention, and certainly cannot be used to limit the scope of rights of the present invention. Therefore, equivalent changes made according to the claims of the present invention are still within the scope covered by the present invention.
Claims
1. A flow-dividing glue-filling device, characterized in that: The invention comprises a diverter plate (1), a lifting seat (2), and two or more guide columns (3), wherein the guide columns (3) sequentially pass through the lifting seat (2) and the diverter plate (1), and the lifting seat (2) and / or the diverter plate (1) can slide along the guide columns (3); the diverter plate (1) is provided with a glue pouring inlet (11), a plurality of glue pouring outlets (12), and a diverter hole (13), wherein the diverter hole (13) connects the glue pouring inlet (11) and the glue pouring outlet (12), and the glue pouring inlet (11) is used to connect to a glue kettle. The glue outlet (12) is used to connect to the glue outlet of the finished material pipe (100) and inject glue into the finished material pipe (100); the lifting seat (2) is provided with a plurality of material pipe positioning columns (221), and the material pipe positioning columns (221) correspond to the glue outlet (12) one by one; the material pipe positioning columns (221) are used to be inserted into the end of the finished material pipe (100) away from the glue outlet to position and install the finished material pipe (100), and gradually withdraw from the finished material pipe (100) as the lifting seat (2) slides during the glue injection process.
2. The flow-dividing glue-filling device according to claim 1, characterized in that: The lifting seat (2) comprises a base (21) and a slide (22); the base (21) is sleeved on the guide column (3); a slide groove (211) is provided on the base (21); the slide (22) can be plugged in and installed in the slide groove (211); and the material tube positioning column (221) is fixedly installed on the slide (22).
3. The flow-dividing glue-filling device according to claim 2, characterized in that: The number of the slides (22) is more than two, and the more than two slides (22) are switched and assembled in the slide groove (211) in turn.
4. The flow-dividing glue pouring device according to claim 2, characterized in that: The slide platform (22) is provided with a handle (222).
5. The flow-dividing glue-filling device according to claim 2, characterized in that: The flow-dividing glue-filling device further comprises one or more tension springs (4), and two ends of the tension springs (4) are respectively fixedly connected to the flow-dividing plate (1) and the base (21).
6. The flow-dividing glue pouring device according to claim 5, characterized in that: The number of the tension springs (4) is equal to the number of the guide pillars (3), and each guide pillar (3) passes through one tension spring (4).
7. The flow-dividing glue pouring device according to claim 5, characterized in that: The diverter plate (1) is fixedly connected to the guide column (3).
8. The flow-dividing glue-filling device according to claim 1, characterized in that: The flow-dividing glue-filling device further comprises a first limiter (5) and a second limiter (6); the first limiter (5) is fixedly mounted on one end of the guide column (3); the second limiter (6) is fixedly mounted on the other end of the guide column (3) or is integrally formed with the guide column (3); the flow-dividing plate (1) and the lifting seat (2) are both located between the first limiter (5) and the second limiter (6).
9. The flow-dividing glue pouring device according to claim 8, characterized in that: The first limiting member (5) is a nut, the guide column (3) comprises a threaded section, the nut is threadably connected to the threaded section, and the position of the nut on the threaded section is adjustable.
10. The flow-dividing glue pouring device according to claim 1, characterized in that: The glue pouring inlet (11) is provided with an internal thread for forming a threaded connection with the glue outlet pipe of the glue kettle.
