Device for repairing and building partition wall of fire well of combustion chamber of internal combustion type hot blast stove

By designing the hanging frame and conveying structure for internal combustion hot air furnaces, the problem of low construction efficiency after the burning of the combustion chamber fire well partition wall is solved, the continuous and efficiency of construction is improved, the cost is reduced, and the construction is guaranteed. Safety and economic benefits.

CN221955669UActive Publication Date: 2024-11-05PANGANG GRP ENG TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420266109.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-02
Publication Date
2024-11-05
Estimated Expiration
2034-02-02

AI Technical Summary

Technical Problem

The repair construction efficiency of the internal combustion hot air furnace combustion chamber partition wall collapses, resulting in long construction time, extended construction period and waste of refractory materials.

Method used

A device including a hanging frame, lifting equipment, hanging disk and conveying structure is designed. The hanging frame is fixed on the top of the combustion chamber fire well. The hanging disk can be lifted and lowered, and the direct conveying of refractory bricks is realized through the feed hole to form a stable working platform. Adapt to repair needs at different heights and improve construction efficiency.

Benefits of technology

The continuity and efficiency of restoration construction have been improved, the cost of labor and materials has been reduced, the construction period has been shortened, and the safety and economic benefits of construction have been ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221955669U_ABST
    Figure CN221955669U_ABST
Patent Text Reader

Abstract

The utility model discloses a device for repairing and building a partition wall of a combustion chamber fire well of an internal combustion type hot blast stove, which relates to the field of maintenance equipment of the internal combustion type hot blast stove and comprises a hanging bracket fixedly erected at the top of the combustion chamber fire well, the hanging bracket is connected with lifting equipment, and the lifting end of the lifting equipment is connected with a horizontally arranged hanging scaffold. The outer contour of the hanging scaffold is matched with the horizontal section contour of the combustion chamber fire well, the lifting equipment drives the hanging scaffold to ascend and descend in the combustion chamber fire well, a feeding hole is formed in the hanging scaffold, a conveying structure for conveying refractory bricks vertically penetrates through the feeding hole, and the refractory bricks are conveyed to the upper end of the hanging scaffold from the lower portion of the hanging scaffold through the conveying structure. Through the supporting and fixing effects of the hanging bracket, the lifting equipment can stably lift the hanging scaffold in the fire well, so that a repair operator can work on the hanging scaffold, the height of the hanging scaffold in the fire well can be adaptively adjusted along with the change of the repair progress, the continuous construction state in the construction process is ensured, and the construction efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of internal combustion hot blast furnace maintenance equipment, in particular to a device for repairing and building partition walls of a fire well in a combustion chamber of an internal combustion hot blast furnace. Background Art

[0002] Hot blast furnaces, which are supporting equipment for iron-making blast furnaces, include external combustion type, internal combustion type, top combustion type and other models. Among them, the fire well partition wall of the combustion chamber of the internal combustion hot blast furnace is prone to collapse during the production process. At present, the repair construction of the fire well partition wall of the combustion chamber of the internal combustion hot blast furnace in the metallurgical industry after the collapse is mainly carried out by first removing the upper checker bricks of the heat storage chamber and then replacing the fire well partition wall refractory bricks. This will make the entire maintenance construction process require a lot of workload and a long construction time, and will require more technical labor, which will cause a waste of refractory materials. The long construction period may even affect the normal production of the blast furnace.

[0003] During the repair construction process of some manufacturers, scaffolding of different heights is set up in real time at the collapsed part of the combustion chamber fire well to carry out the repair work. However, as the repair progresses, it may be necessary to rebuild scaffolding of different heights to meet the height requirements of the repair, and generally refractory bricks and other materials need to be transported to the top of the combustion chamber fire well for transportation and use. The entire construction process may still have problems of low efficiency and long construction time. Utility Model Content

[0004] In order to overcome the shortcoming of low efficiency in the repair construction of collapsed fire well partition walls of combustion chambers of internal combustion hot blast furnaces in the prior art, the technical problem to be solved by the utility model is: how to improve the work efficiency of the repair construction process.

[0005] The technical solution adopted by the utility model to solve its technical problems is:

[0006] The device for repairing and building the partition wall of the fire well of the combustion chamber of an internal combustion hot blast furnace comprises a hanger fixedly mounted on the top of the fire well of the combustion chamber, the hanger is connected to a lifting device, the lifting end of the lifting device is connected to a horizontally arranged hanging plate, the outer contour of the hanging plate is adapted to the horizontal cross-sectional contour of the fire well of the combustion chamber, the lifting device drives the hanging plate to be lifted and lowered in the fire well of the combustion chamber, the hanging plate is provided with a feeding hole, a conveying structure for conveying refractory bricks is vertically penetrated in the feeding hole, and the refractory bricks are conveyed from the bottom of the hanging plate to the top of the hanging plate through the conveying structure; the lifting device can stably lift and lower the hanging plate in the fire well through the support and fixing effect of the hanger, so that the repair operator can stand and work on the hanging plate to form a stable working platform, and the height of the hanging plate in the fire well can be adaptively adjusted as the progress of the repair changes, so as to ensure the continuous construction state during the construction process and improve the construction efficiency, and the refractory bricks and other materials can be conveyed from the ignition port position at the bottom of the fire well to the upper end of the hanging plate in real time and continuously, so as to ensure the continuity of the repair and building work.

[0007] Furthermore, the above-mentioned hanger includes a support beam for fixing on the top of the combustion chamber fire well, the upper end of the above-mentioned support beam is connected with a connecting rib, the end of the above-mentioned connecting rib away from the above-mentioned support beam is connected with a mounting beam, and the above-mentioned lifting equipment is connected to the above-mentioned mounting beam. Through the connection of the mounting beam, the connecting rib and the support beam, the entire hanger can stably support the lifting equipment and the lifting plate, thereby ensuring stability, safety and stability.

[0008] Furthermore, the lifting device includes an electric winch arranged on the hanger, a steel rope extending downward is arranged at the driving end of the electric winch, and one end of the steel rope away from the electric winch is connected to the hanging plate. The electric winch acts on the hanging plate, so that the hanging plate can be stably lifted and lowered to ensure safety.

[0009] Furthermore, the above-mentioned hanging platform includes a steel frame and a support plate connected to the upper end of the above-mentioned steel frame. The arrangement of the steel frame and the support plate can ensure that the hanging platform as a whole has sufficient strength to bear the weight of operators and materials, thereby ensuring the stability and safety of the repair construction.

[0010] Furthermore, the steel frame includes a main beam arranged along the outer contour trajectory of the above-mentioned hanging plate, and a plurality of cross beams are arranged at intervals inside the main beam. The steel frame is arranged with a combined main beam and cross beam, which can facilitate the separation of components into a relatively narrow space for reassembly, thereby improving the convenience of the installation process.

[0011] Furthermore, the above-mentioned conveying structure includes a lifting device connected to the above-mentioned hanger, and the lifting end of the above-mentioned lifting device is horizontally connected with a storage box with an opening upward, and the above-mentioned storage box is adapted to the size of the above-mentioned feeding hole. The above-mentioned lifting device drives the above-mentioned storage box to be conveyed from the ignition hole position of the combustion chamber fire well upward through the above-mentioned feeding hole to the upper end of the above-mentioned hanging plate, which further limits the conveying structure. The mechanical lifting structure saves manpower and has high efficiency.

[0012] Furthermore, a safety rope is provided between the hanger and the hanging plate, thereby further improving safety.

[0013] The beneficial effects of the utility model are:

[0014] (1) The lifting equipment can be fixed and supported by the hanger, and the lifting equipment can realize the stable lifting movement of the hanger. During the work process, the repair masonry operator can continuously adjust the height of the hanging plate to realize the repair operation of the combustion chamber fire well partition wall, and continuously adjust the height of the hanging plate during the installation process to achieve continuous work, which can greatly improve work efficiency, reduce labor costs and material costs, and improve economic benefits.

[0015] (2) By setting up the feeding hole and the conveying structure, it is possible to directly convey refractory materials such as refractory bricks from the ignition port below the fire well of the combustion chamber to the top of the hanging plate. There is no need to transport refractory bricks and other materials to the manhole at the top of the fire well for material transportation, which saves manpower, material resources and time and improves work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the structure of the utility model;

[0017] Figure 2 This is a schematic diagram of the three-dimensional structure of the hanger of the utility model;

[0018] Figure 3 It is a schematic diagram of the steel frame of the utility model;

[0019] Figure 4 It is a schematic diagram of the cross section of the hanging plate of the utility model;

[0020] Figure 5 It is a schematic diagram of the feeding hole of the utility model;

[0021] Markings in the figure are: 1-hanging bracket, 2-electric winch, 3-hanging plate, 4-steel rope, 5-hoisting equipment, 6-storage box, 11-support beam, 12-connecting ribs, 13-installing beam, 31-main beam, 32-cross beam, 33-support plate, 34-feeding hole. DETAILED DESCRIPTION

[0022] The utility model is further described below in conjunction with the accompanying drawings.

[0023] according to Figure 1 As shown, the embodiment of the present application proposes a device for repairing and building a partition wall of a fire well in a combustion chamber of an internal combustion hot blast furnace, including a hanger 1 fixedly mounted on the top of the fire well in the combustion chamber, the hanger 1 is connected to a lifting device, and the lifting end of the lifting device is connected to a horizontally arranged hanging plate 3, and the outer contour of the hanging plate 3 is adapted to the horizontal cross-sectional contour of the fire well in the combustion chamber, and the lifting device drives the hanging plate 3 to be lifted and lowered in the fire well in the combustion chamber, and the hanging plate 3 is provided with a feeding hole 34, and a conveying structure for conveying refractory bricks is vertically penetrated in the feeding hole 34, and the refractory bricks are conveyed from the bottom of the hanging plate 3 to the top of the hanging plate 3 through the conveying structure, and the conveying structure and the lifting device work synchronously to enable the repair personnel to work on a stable work platform, and by directly conveying refractory bricks and other materials from the ignition hole position at the lower part of the fire well to the work platform where the hanging plate 3 is located, a continuous work process is accurately and stably realized, thereby greatly improving the work efficiency.

[0024] There is a small gap between the edge of the hanging plate 3 and the inner wall of the combustion chamber fire well, which ensures that the hanging plate 3 does not contact the outer wall of the combustion chamber fire well during the lifting process, and ensures the smoothness and stability of the lifting process. In addition, the above-mentioned lifting equipment can be a hydraulic device or a motor device, which can ensure that the hanging plate 3 can achieve stable horizontal lifting. However, in order to ensure convenient installation and reduce the overall volume and weight of the lifting equipment, and reduce the load-bearing capacity of the hanger 1, the above-mentioned lifting equipment includes an electric winch 2 evenly spaced on the above-mentioned hanger 1. The electric winch 2 can be multiple or single. The above-mentioned electric winch 2 is provided with a steel rope 4 extending downward. The end of the steel rope 4 away from the above-mentioned electric winch 2 is connected to the above-mentioned hanging plate 3. The connection points of the steel rope 4 are evenly spaced and connected to the hanging plate 3 to ensure that the hanging plate 3 will not tilt at will. The electric winch 2 is easy to install and control. Furthermore, in another embodiment, the electric winch 2 can also be replaced by a manual hoist or an electric hoist, which can further facilitate installation.

[0025] For the above-mentioned conveying structure, the conveying structure can be an electric lifting device installed at the lower end of the hanging plate 3 or other types of lifting devices, which can accommodate refractory bricks and can transport refractory bricks to the upper end of the hanging plate 3. Specifically, the above-mentioned conveying structure includes a lifting device 5 connected to the above-mentioned hanger 1, and the lifting end of the above-mentioned lifting device 5 is horizontally connected to a storage box 6 with an upward opening, and the above-mentioned storage box 6 is adapted to the size of the above-mentioned feeding hole 34. The above-mentioned lifting device 5 drives the above-mentioned storage box 6 from the ignition hole position of the combustion chamber fire well upward through the above-mentioned feeding hole 34. The holes 34 are conveyed to the top of the above-mentioned hanging plate 3, that is to say, the lifting equipment 5 drives the storage box 6 to realize lifting and lowering movement through the traction action, and can realize the stable movement of entering or passing through the feeding hole 34. When the operator above the hanging plate 3 needs refractory bricks, the lifting equipment 5 is controlled to drive the storage box 6 to move downward to the ignition port position of the fire well, and the refractory bricks are moved into the storage box 6 by the personnel below, so as to realize the transportation of refractory bricks. There is no need to transport a large number of refractory bricks to the manhole position at the top of the fire well, which can save manpower and time and improve work efficiency.

[0026] Moreover, the hoisting device 5 can be an electric hoist or a manual hoist, which is installed on the hanger 1, and the driving end extends vertically downward through the feeding hole 34, so the connection is stable and the safety is high.

[0027] For hanger 1, if Figure 2 As shown, the hanger 1 includes a support beam 11 for fixing on the top of the combustion chamber fire well, the upper end of the support beam 11 is connected with a connecting rib 12, the end of the connecting rib 12 away from the support beam 11 is connected with a mounting beam 13, the lifting equipment is connected to the mounting beam 13, the support beam 11, the connecting rib 12 and the mounting beam 13 are all I-beams, and in the actual installation process, a plurality of I-beams of preset length are transported to the top opening of the fire well, the support beam 11, the connecting rib 12 and the mounting beam 13 are connected and formed by welding or bolting, and the support beam 11 is fixed to the top of the fire well by a bolt structure or welding to prevent the entire hanger 1 from shifting relative to the fire well, and the required lifting equipment can be fixed at the position of the mounting beam 13 later to ensure the stability of the overall structure.

[0028] Synchronous, for the hanging plate 3, according to Figure 3 , 4The above-mentioned hanging pan 3 shown includes a steel frame and a support plate 33 connected to the upper end of the above-mentioned steel frame. The steel frame serves as a supporting skeleton to realize load-bearing and support, and the support plate 33 is a steel plate that facilitates the operator to stand and work and bear the load. Specifically, the above-mentioned steel frame includes a main beam 31 arranged along the outer contour trajectory of the above-mentioned hanging pan 3, and a plurality of cross beams 32 are arranged at intervals on the inner side of the above-mentioned main beam 31. The main beam 31 and the cross beam 32 are fixedly connected by bolts or welding. Specifically, before work, each main beam 31 and the cross beam 32 are transported to the top of the fire well, and are formed into a steel frame after assembly, and then the support plate 33 is connected to the upper end of the steel frame to form the entire hanging pan 3.

[0029] Specifically, the main beam 31 and the cross beam 32 are both I-beams, which have good compression and bending resistance, and the support plate 33 is a threaded steel plate, which ensures good support strength and anti-slip performance.

[0030] according to Figure 5 As shown, in the actual repair and masonry process of the combustion chamber fire well partition wall, it may be necessary to transfer refractory bricks or other materials. In order to facilitate the transportation of materials, the above-mentioned hanging plate 3 is provided with a feeding hole 34 for convenient feeding.

[0031] In order to further ensure the connection stability between the hanger 1 and the hanging plate 3 and reduce safety hazards, a safety rope is arranged between the hanger 1 and the hanging plate 3. During specific use, after the height of the hanging plate 3 is raised or lowered, the hanging plate 3 is fixed at a preset height position, and the safety rope is connected between the hanger 1 and the hanging plate 3 to improve safety.

[0032] The utility model proposes a device for repairing and building partition walls of a fire well in a combustion chamber of an internal combustion hot blast furnace, comprising a hanger 1 fixedly mounted on the top of the fire well in the combustion chamber, the hanger 1 being connected to a lifting device, the lifting end of the lifting device being connected to a horizontally arranged hanging plate 3, the outer contour of the hanging plate 3 being adapted to the horizontal cross-sectional contour of the fire well in the combustion chamber, the lifting device driving the hanging plate 3 to be lifted and lowered in the fire well in the combustion chamber, the hanging plate being provided with a feeding hole, a conveying structure for conveying refractory bricks being vertically penetrated in the feeding hole, the refractory bricks being conveyed from the bottom of the hanging plate to the upper end of the hanging plate through the conveying structure, thereby ensuring a continuous construction state during the construction process and improving the construction efficiency, and the entire mechanical structure is simple, convenient to install and disassemble, low in cost, and greatly improving the economic benefits.

Claims

1. Device for repairing and building partition walls of fire wells in combustion chambers of internal combustion hot blast furnaces. Features: The invention comprises a hanger (1) for being fixedly mounted on the top of a combustion chamber fire well, the hanger (1) being connected to a lifting device, the lifting end of the lifting device being connected to a horizontally arranged hanging plate (3), the outer contour of the hanging plate (3) being adapted to the horizontal cross-sectional contour of the combustion chamber fire well, the lifting device driving the hanging plate (3) to be lifted and lowered in the combustion chamber fire well, the hanging plate (3) being provided with a feeding hole (34), a conveying structure for conveying refractory bricks being vertically penetrated in the feeding hole (34), the conveying structure being used to convey refractory bricks from below the hanging plate (3) to above the hanging plate (3).

2. The device for repairing and building the partition wall of the fire well of the combustion chamber of the internal combustion hot blast stove according to claim 1, Features: The hanger (1) comprises a support beam (11) for fixing on the top of a combustion chamber fire pit, the upper end of the support beam (11) is connected to a connecting rib (12), the end of the connecting rib (12) away from the support beam (11) is connected to a mounting beam (13), and the lifting device is connected to the mounting beam (13).

3. The device for repairing and building partition walls of the fire well of the combustion chamber of an internal combustion hot blast stove according to claim 1, Features: The lifting device comprises an electric winch (2) arranged on the hanger (1), a driving end of the electric winch (2) is provided with a steel rope (4) extending downward, and an end of the steel rope (4) away from the electric winch (2) is connected to the hanging plate (3).

4. The device for repairing and building partition walls of the fire well of the combustion chamber of an internal combustion hot blast stove according to claim 1, Features: The hanging plate (3) comprises a steel frame and a support plate (33) connected to the upper end of the steel frame.

5. The device for repairing and building the partition wall of the fire well of the combustion chamber of the internal combustion hot blast stove according to claim 4, Features: The steel frame comprises a main beam (31) arranged along the outer contour track of the hanging plate (3), and a plurality of cross beams (32) are arranged at intervals inside the main beam (31).

6. The device for repairing and building partition walls of the fire well of the combustion chamber of an internal combustion hot blast stove according to claim 1, Features: The conveying structure comprises a hoisting device (5) connected to the hanger (1); a lifting end of the hoisting device (5) is connected to a material storage box (6) with an opening facing upward; the material storage box (6) is adapted to the size of the feeding hole (34); the hoisting device (5) is used to drive the material storage box (6) to be transported upward from the ignition hole position of the combustion chamber fire well through the feeding hole (34) to the top of the hanging plate (3).

7. The device for repairing and building partition walls of the fire well of the combustion chamber of an internal combustion hot blast stove according to claim 1, Features: A safety rope is also provided between the hanger (1) and the hanging plate (3).