Tower crane attachment fixing frame
By introducing quick clamping components and support components into the tower crane attachment frame, the problem of inconvenient installation of the attachment frame is solved, rapid clamping and improving the tower crane support effect are achieved, and the installation process is simplified.
Patent Information
- Application Number
- CN202420001881.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-02
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2034-01-02
AI Technical Summary
The existing tower rig attachment frame cannot be automatically clamped during installation, and requires a lot of manual operation, especially inconvenient when installed at high places.
A tower machine attachment fixing frame including a quick clamping assembly and a support assembly is designed. The fast clamping of the attachment frame is achieved through the coordination of push frame, fixing plate, worm gear and screw, and the installation of support rods and clamping plates is improved. Support range of tower crane.
It realizes rapid installation and stable clamping of the attachment frame, improves the support effect of the tower crane, simplifies the installation process, and reduces manual operation requirements.
Smart Images

Figure CN221955708U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of tower cranes, and in particular relates to an attachment fixing frame for a tower crane. Background Art
[0002] Standard section is the main structure of construction hoisting machinery such as tower crane and construction hoist. Generally speaking, the standard section load, structure and connection of equipment of different manufacturers and models are generally different and cannot be interchanged. For tower crane, the meaning of attachment device is: anchoring the tower body of tower crane to the supporting system on the building or foundation according to the requirements of a certain interval. The attachment device consists of attachment frame, attachment rod, embedded parts and connectors;
[0003] After checking, the public (announcement) number: CN203306945U discloses an attachment frame and a tower crane. This technology discloses "an attachment frame and a tower crane, which are sleeved on the outside of the standard section of the tower crane, the attachment frame includes four L-shaped frame beams sequentially spliced into a rectangular frame, the attachment frame includes four L-shaped frame beams, each L-shaped frame beam includes a frame beam body, a first section and a second section, the frame beam body connects the first section and the second section, the first section and the second section are at right angles, and the attachment frame and the tower crane are disclosed. The side cooling fan and the side motor can be provided, and the connection position of the first section and the second section can be changed by selecting the positions of the first through hole and the second through hole connected to each other, thereby changing the size of the attachment frame, improving the versatility of the attachment frame, so that the attachment frame can be applied to standard sections of different sizes, etc. Technical effects";
[0004] Although this design can change the size of the attachment frame, improve the versatility of the attachment frame, and make the attachment frame applicable to standard sections of different sizes, in actual use, the attachment frame cannot be automatically clamped during installation, so that the attachment frame needs a lot of manual installation during installation, and it is very inconvenient to install it at a high place.
[0005] In order to solve the above problems, the present application proposes a tower crane attachment fixing frame. Utility Model Content
[0006] To solve the problems raised in the above background technology, the utility model provides a tower crane attachment fixing frame, which can quickly clamp two attachment frames on the outside of the tower crane, fix the attachment frames, facilitate installation, and improve the supporting effect of the tower crane and the characteristics of the frame support range.
[0007] To achieve the above object, the utility model provides the following technical solutions: a tower crane attachment fixing frame, comprising an attachment frame body, and also comprising a quick clamping assembly installed on one side adjacent to two attachment frame bodies;
[0008] The quick clamping assembly includes a push frame installed on one adjacent side of the two attachment frame bodies, a fixed plate installed on the top of the push frame, and a worm gear rotatably connected to the top surface of the fixed plate. A bearing seat is symmetrically installed on the top surface of the fixed plate. The same worm is rotatably connected in the two bearing seats, and the worm is meshed with the worm wheel. A screw is spirally connected in the worm wheel. One end of the screw passes through the worm wheel and the fixed plate in turn, extends to the bottom surface of the fixed plate, and is rotatably connected to a pressure plate arranged on the bottom surface of the fixed plate. Two semicircular through holes matching the screw are opened on the surface of the screw plate, and the semicircular through hole is much larger than the diameter of the screw. Two bolts are spirally connected in the screw hole opened at the F-shaped structure of the pressure plate, and one end of the bolt passes through the fixed plate.
[0009] As a preferred tower crane attachment fixing frame of the utility model, the pressing plate is slidably connected to a side surface of the pushing frame, and the pressing plate is arranged in a U-shaped structure.
[0010] As a preferred embodiment of the tower crane attachment and fixing frame of the utility model, the surface of the attachment frame body is symmetrically provided with inclined grooves matching the push frame.
[0011] As a preferred tower crane attachment fixing frame of the utility model, the fixing plate is arranged in an F-shaped structure, the pushing frame is arranged in a J-shape, and an inclined surface is provided at the J-shaped structure of the pushing frame.
[0012] As a preferred tower crane attachment and fixing frame of the utility model, a support assembly is symmetrically installed on the surface of the attachment frame body, and the support assembly includes an L-shaped support rod hinged in a groove opened on the surface of the attachment frame body, an L-shaped clamping plate installed at one adjacent end of two support rods, and a limit rod slidably connected to a slide groove opened on the surface of the support rod, one end of the limit rod is installed with a spring, and one end of the spring is installed in the slide groove opened on the surface of the support rod.
[0013] As a preferred tower crane attachment fixing frame of the utility model, a blocking rod with a U-shaped structure is installed in the through hole opened on the surface of the clamping plate.
[0014] Compared with the prior art, the beneficial effects of the utility model are:
[0015] 1. On this basis, a quick clamping assembly is added. Before installation, first clamp the two push frames on the tower crane, and then clamp the two attachment frames on the push frames respectively. Through the combined effect of gravity and the screw, the screw will push the pressure plate, so that the pressure plate pushes the attachment frame body, so that the attachment frame body slides on the outside of the push frame through the inclined groove, so that the two attachment frame bodies can be clamped on the outside of the tower crane, and the two attachment frame bodies can always be kept in a clamped state;
[0016] 2. At the same time, a support component is added on this basis. After the attachment frame body is installed, the support rod is pushed so that the card plate on the support rod can be stuck at the corner of the tower crane, and then the U-shaped baffle is installed on the card plate, thereby increasing the support range of the support rod and the card plate for the tower crane and improving the supporting effect on the tower crane. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0018] Figure 1 It is a schematic diagram of the structure of the utility model;
[0019] Figure 2 It is a structural schematic diagram of the quick clamping assembly in the utility model;
[0020] Figure 3 It is a structural schematic diagram of the fixing plate and the pressing plate in the utility model;
[0021] Figure 4 It is a structural schematic diagram of the support assembly in the utility model.
[0022] In the figure:
[0023] 1. Attach the frame body;
[0024] 2. Quick clamping assembly; 201. Push frame; 202. Fixing plate; 203. Worm gear; 204. Bearing seat; 205. Worm; 206. Screw; 207. Pressing plate; 208. Bolt;
[0025] 3. Support assembly; 301. Support rod; 302. Clamp plate; 303. Limit rod; 304. Spring; 305. Stop rod. DETAILED DESCRIPTION
[0026] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0027] Example 1
[0028] like Figure 1-Figure 4 As shown;
[0029] A tower crane attachment fixing frame comprises an attachment frame main body 1.
[0030] In this embodiment: after checking the public (announcement) number: CN203306945U discloses an attachment frame and a tower crane, and this technology discloses "an attachment frame and a tower crane, which are sleeved on the outside of the standard section of the tower crane, the attachment frame includes four L-shaped frame beams sequentially spliced into a rectangular frame, the attachment frame includes four L-shaped frame beams, each L-shaped frame beam includes a frame beam body, a first section and a second section, the frame beam body connects the first section and the second section, the first section and the second section are at right angles, and the attachment frame and the tower crane are disclosed, which can be matched with the side cooling fan and the side motor by setting the position of the first through hole and the second through hole connected to each other, and the connection position of the first section and the second section can be changed by selecting the position of the first through hole and the second through hole connected to each other, thereby changing the size of the attachment frame, improving the versatility of the attachment frame, so that the attachment frame can be applied to standard sections of different sizes, etc. Technical effects";
[0031] Although this design can change the size of the attachment frame and improve the versatility of the attachment frame so that the attachment frame can be applied to standard sections of different sizes, in actual use, the attachment frame cannot be automatically clamped during installation, so that the attachment frame requires a lot of manpower to install it during installation, and it is very inconvenient to install it at a high place. Combined with actual use, this problem is obviously a real problem that exists and is difficult to solve. Therefore, in order to solve this technical problem, a quick clamping component 2 and a support component 3 are added to the application document.
[0032] According to the above content, in order to clamp the attachment frame body 1 on the tower crane and fix the tower crane, a quick clamping assembly 2 is also included which is installed on the adjacent side of the two attachment frame bodies 1; the quick clamping assembly 2 includes a push frame 201 installed on the adjacent side of the two attachment frame bodies 1, a fixed plate 202 installed on the top of the push frame 201, and a worm gear 203 rotatably connected to the top surface of the fixed plate 202, a bearing seat 204 is symmetrically installed on the top surface of the fixed plate 202, and the same worm 205 is rotatably connected in the two bearing seats 204, and the worm 205 and the worm gear 203 are rotatably connected. 3 are meshed, a screw rod 206 is spirally connected inside the worm wheel 203, one end of the screw rod 206 passes through the worm wheel 203 and the fixed plate 202 in sequence, and extends to the bottom surface of the fixed plate 202, and is rotatably connected to a pressure plate 207 arranged on the bottom surface of the fixed plate 202, two semicircular through holes matching the screw rod 206 are opened on the surface of the fixed plate 202 of the screw rod 206, the semicircular through holes are much larger than the diameter of the screw rod 206, two bolts 208 are spirally connected in the screw hole opened at the F-shaped structure of the pressure plate 207, and one end of the bolt 208 passes through the fixed plate 202.
[0033] In this embodiment: before installation, the two pushing frames 201 are symmetrically clamped on the tower crane, and the two attachment frames are clamped on the pushing frames 201 respectively. Then, the workers rotate the worm 205 on the building, so that the worm 205 drives the worm wheel 203 to rotate, and the worm wheel 203 drives the screw 206 to slide in the through hole in the fixed plate 202 and move downward. Then, through the combined action of gravity and the screw 206, the screw 206 will push the pressing plate 207, so that the pressing plate 207 pushes the attachment frame body 1, and presses the attachment frame body 1 downward, so that the attachment frame body 1 slides on the outside of the pushing frame 201 of the J-shaped structure through the oblique groove, and through the cooperation of the oblique groove on the attachment frame body 1, the two attachment frame bodies 1 can clamp the tower crane, so that the two attachment frame bodies 1 can be clamped on the outside of the tower crane, so that the two attachment frame bodies 1 are always kept in a clamped state, and the attachment frame body 1 can be quickly clamped on the outside of the tower crane, thereby improving the installation effect of the attachment frame body 1 and facilitating the installation of the attachment frame body 1.
[0034] In an optional embodiment: the pressing plate 207 is slidably connected to a side surface of the push frame 201, and the pressing plate 207 is arranged in a U-shaped structure.
[0035] In this embodiment, it is possible to prevent the screw rod 206 from bending due to the pressure on the pressing plate 207, thereby improving the stability of the pressing plate 207 and preventing the screw rod 206 from bending due to the pressure.
[0036] In an optional embodiment: the surface of the attachment frame body 1 is symmetrically provided with oblique grooves matching the push frame 201 .
[0037] In this embodiment, the attachment frame body 1 can slide on the outside of the push frame 201 through the inclined groove due to the action of gravity, so that the two attachment frame bodies 1 can approach each other.
[0038] In an optional embodiment: the fixing plate 202 is arranged in an F-shaped structure, the pushing frame 201 is arranged in a J-shaped structure, and an inclined surface is arranged at the J-shaped structure of the pushing frame 201.
[0039] In this embodiment, after being matched with the inclined grooves provided on the surface of the attachment frame body 1, they can approach each other and be clamped on the outside of the tower crane.
[0040] According to the above content, in order to prevent the tower crane from bending from the attachment frame body 1 when shaking, a support assembly 3 is symmetrically installed on the surface of the attachment frame body 1, and the support assembly 3 includes an L-shaped support rod 301 hinged in a groove opened on the surface of the attachment frame body 1, and an L-shaped structure clamping plate 302 installed at the adjacent end of the two support rods 301 and a limiting rod 303 slidably connected in a sliding groove opened on the surface of the support rod 301, one end of the limiting rod 303 is installed with a spring 304, and one end of the spring 304 is installed in the sliding groove opened on the surface of the support rod 301.
[0041] In this embodiment: after the attachment frame body 1 is installed, the support rod 301 is pushed so that the support rod 301 can rotate on the attachment frame body 1, and then after rotating ninety degrees, the limit rod 303 is loosened, so that the limit rod 303 is pushed into the insertion hole provided on the surface of the attachment frame body 1 by the elastic force of the spring 304, so that the clamping plate 302 on the support rod 301 can be clamped at the corner of the tower crane, and the U-shaped blocking rod 305 is installed on the clamping plate 302, thereby increasing the supporting range of the support rod 301 and the clamping plate 302 for the tower crane and improving the supporting effect on the tower crane.
[0042] In an optional embodiment: a U-shaped blocking rod 305 is installed in the through hole opened on the surface of the clamping plate 302 .
[0043] In this embodiment, the U-shaped blocking rod 305 is installed on the clamping plate 302 to prevent the clamping plate 302 from being stressed and causing the limit rod 303 to be deformed and broken, so that the support rod 301 and the clamping plate 302 can support the tower crane together, thereby improving the supporting effect on the tower crane.
[0044] The working principle and use process of the utility model are as follows: before installation, two push frames 201 are first symmetrically clamped on the tower crane, and two attachment frames are respectively clamped on the push frames 201. Then, the worker rotates the worm 205 on the building, so that the worm 205 drives the worm wheel 203 to rotate, and the worm wheel 203 drives the screw 206 to slide in the through hole in the fixed plate 202 and move downward. Then, through the combined action of gravity and the screw 206, the screw 206 will push the pressing plate 207, so that the pressing plate 207 pushes the attachment frame body 1, and presses the attachment frame body 1 downward, so that the attachment frame body 1 slides on the outside of the push frame 201 of the J-shaped structure through the inclined groove, and through the cooperation of the inclined groove on the attachment frame body 1, the two attachment frame bodies 1 can clamp the tower crane, so that the two attachment frame bodies 1 can clamp the tower crane. On the outside of the tower crane, the two attachment frame bodies 1 are always kept in a clamped state, and the attachment frame bodies 1 can be quickly clamped on the outside of the tower crane, which improves the installation effect of the attachment frame bodies 1 and facilitates the installation of the attachment frame bodies 1. After the attachment frame bodies 1 are installed, the support rod 301 is pushed so that the support rod 301 can rotate on the attachment frame bodies 1, and then after rotating ninety degrees, the limit rod 303 is released, so that the limit rod 303 is pushed into the jack opened on the surface of the attachment frame bodies 1 by the elastic force of the spring 304, so that the clamping plate 302 on the support rod 301 can be clamped at the corner of the tower crane, and the U-shaped blocking rod 305 is installed on the clamping plate 302, so that the support range of the support rod 301 and the clamping plate 302 on the tower crane can be increased, and the support effect on the tower crane can be improved.
[0045] Finally, it should be noted that the above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A tower crane attachment fixing frame, comprising an attachment frame body (1), characterized in that: It also includes a quick clamping assembly (2) installed on one adjacent side of the two attachment frame bodies (1); The quick clamping assembly (2) comprises a push frame (201) installed on one side adjacent to the two attachment frame bodies (1), a fixed plate (202) installed on the top of the push frame (201), and a worm wheel (203) rotatably connected to the top surface of the fixed plate (202), a bearing seat (204) symmetrically installed on the top surface of the fixed plate (202), a worm (205) rotatably connected in the two bearing seats (204), the worm (205) meshing with the worm wheel (203), a screw (206) helically connected in the worm wheel (203), the screw (206) One end passes through the worm wheel (203) and the fixed plate (202) in sequence, and extends to the bottom surface of the fixed plate (202), and is rotatably connected to a pressure plate (207) arranged on the bottom surface of the fixed plate (202). The surface of the fixed plate (202) of the screw rod (206) is provided with two semicircular through holes matching the screw rod (206), and the semicircular through holes are much larger than the diameter of the screw rod (206). Two bolts (208) are spirally connected in the screw holes provided at the F-shaped structure of the pressure plate (207), and one end of the bolt (208) passes through the fixed plate (202).
2. The tower crane attachment fixing frame according to claim 1, characterized in that: The pressing plate (207) is slidably connected to a side surface of the pushing frame (201), and the pressing plate (207) is arranged in a U-shaped structure.
3. The tower crane attachment fixing frame according to claim 1, characterized in that: The surface of the attachment frame body (1) is symmetrically provided with oblique grooves matching the push frame (201).
4. The tower crane attachment fixing frame according to claim 1, characterized in that: The fixing plate (202) is arranged in an F-shaped structure, the pushing frame (201) is arranged in a J-shaped structure, and an inclined surface is arranged at the J-shaped structure of the pushing frame (201).
5. The tower crane attachment fixing frame according to claim 1, characterized in that: A support assembly (3) is symmetrically mounted on the surface of the attachment frame body (1), and the support assembly (3) comprises an L-shaped support rod (301) hinged in a groove provided on the surface of the attachment frame body (1), an L-shaped clamping plate (302) mounted on adjacent ends of two support rods (301), and a limiting rod (303) slidably connected in a sliding groove provided on the surface of the support rod (301), a spring (304) being mounted on one end of the limiting rod (303), and one end of the spring (304) being mounted in the sliding groove provided on the surface of the support rod (301).
6. The tower crane attachment fixing frame according to claim 5, characterized in that: A U-shaped blocking rod (305) is installed in a through hole opened on the surface of the clamping plate (302).
