Construction operation device for building facade

By designing multiple columns and beam fixing components on the exterior facade of the building to fix them on the top floor slab, combined with counterweight blocks, flexible cables and embedded parts, the high cost and duration of scaffolding during the repair of the exterior facade of the high floor is solved. The problem has improved construction efficiency and safety and adapted to emergencies.

CN221957163UActive Publication Date: 2024-11-05SANY CONSTR TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323386879.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-12
Publication Date
2024-11-05
Estimated Expiration
2033-12-12

AI Technical Summary

Technical Problem

When restoring the exterior facade of the high floor, the installation and disassembly of the scaffolding is high and takes a long time, and the occupation of ground space affects construction activities and passage.

Method used

Design a construction work device for the facade of a building, fixing it to the top floor slab of the building through multiple columns and lifting beams and fixed components, setting up a working platform, and adding counterweights to the lifting beams to balance the weight, using a flexible cable Fixed with embedded parts, pads and support components are installed to disperse loads and increase the stability and safety of the working platform.

Benefits of technology

Reduce the cost and time of scaffolding installation and disassembly, improve construction efficiency, ensure the safety of staff, avoid safety hazards caused by weight imbalance and concentrated load, adapt to emergencies, and reduce the occupation of ground space by equipment and personnel. .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221957163U_ABST
    Figure CN221957163U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building construction, and discloses a construction operation device of a building facade, a building comprises a plurality of layers of floors arranged at intervals and facades arranged on the peripheral sides of the floors in a surrounding mode, the construction operation device comprises a plurality of stand columns, and every two adjacent stand columns are connected through a protection structure. An operation space suitable for construction is defined by the multiple stand columns and the protection structure, and an access channel is formed in the side, facing the outer vertical face, of the operation space; the pair of outriggers are oppositely arranged on the two sides of the access channel, one end of each outrigger is connected with the corresponding stand column, and the other end of each outrigger is suitable for being installed on a top floor of a building through a fixing assembly; and the working platform is arranged in the working space and is far away from one end of the cantilever beam. According to the utility model, the construction operation device is fixed on the top floor of the building through the cantilever beam and the fixing assembly, so that on one hand, the steel consumption during construction of the construction operation device can be reduced; and on the other hand, the floor space occupied by the construction operation device can be reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to a construction operation device for the exterior facade of a building. Background Art

[0002] In order to facilitate operators to carry out construction, maintenance or cleaning operations at height, a work platform suitable for operators to carry out high-altitude operations is generally built through scaffolding.

[0003] However, when it is necessary to repair or clean the higher floors, more poles and connectors will be needed, which will greatly increase the cost of building the scaffolding, and also increase the time consumed in the installation and subsequent disassembly of the scaffolding. Utility Model Content

[0004] In view of this, the utility model provides a construction operation device for the exterior facade of a building to solve the problem that the installation and disassembly of the scaffolding is costly and time-consuming when repairing the exterior facade of a high floor.

[0005] The utility model provides a construction operation device for the exterior facade of a building, wherein the building comprises multi-layered floor slabs arranged at intervals and exterior facades arranged around the floor slabs, and the construction operation device comprises:

[0006] A plurality of columns, wherein adjacent columns are connected by a protective structure, and the plurality of columns and the protective structure enclose a work space suitable for construction, wherein an inlet and outlet passage is provided on a side of the work space facing the facade;

[0007] A pair of cantilever beams, arranged oppositely on both sides of the access passage, one end of the cantilever beam being connected to the column, and the other end being suitable for being installed on the top floor of the building through a fixing assembly;

[0008] A working platform is arranged in the working space and away from one end of the cantilever beam.

[0009] Beneficial effects: Compared with building a scaffold from the ground, the utility model fixes the construction device on the top floor of the building through the cantilever beam and the fixing assembly. On the one hand, it can overcome the problem that when the scaffolding is far away from the damaged part of the high-rise facade, more steel needs to be used, which leads to high installation and disassembly costs and long time for the scaffolding; on the other hand, it can also overcome the problem that the scaffolding occupies the ground space, affecting the surrounding construction activities and the passage of operators. In addition, since the construction device of the building facade of the utility model can be completed in a shorter time than the scaffolding, the construction device of the building facade of the utility model can effectively respond to emergencies, thereby ensuring the personal safety of the staff.

[0010] In an optional embodiment, the fixing assembly includes at least one counterweight block, and the counterweight block is arranged at one end of a pair of cantilever beams away from the working space.

[0011] Beneficial effect: The utility model can balance the weight of multiple columns and protective structures by arranging a counterweight block at one end of a pair of cantilever beams away from the working space, avoiding safety hazards caused by weight imbalance, thereby ensuring that operators can carry out facade repair work normally in the working space.

[0012] In an optional embodiment, an annular boss is provided at one end of the counterweight block facing the cantilever beam; at least two spaced-apart connecting rods are provided between a pair of the cantilever beams, and a mounting portion suitable for mounting the annular boss is formed between adjacent connecting rods and the pair of cantilever beams.

[0013] Beneficial effect: The utility model provides an annular boss at one end of the counterweight block facing the cantilever beam, and provides a mounting portion compatible with it on a pair of cantilever beams. In this way, the firmness of the connection between the counterweight block and the cantilever beam can be improved, and the possibility of the counterweight block falling off the cantilever beam or the relative position of the counterweight block and the cantilever beam changing due to external factors (for example, vibration or human error) can be reduced, thereby ensuring that the entire construction operation device is always in a stable state, thereby ensuring the safety of operators and equipment.

[0014] In an optional embodiment, the fixing assembly includes a flexible cable and an embedded component, one end of the flexible cable is connected to a pair of the cantilever beams, and the other end is connected to the embedded component, and the embedded component is suitable for being fixed to one of the floor slabs of the building.

[0015] Beneficial effects: Compared with other fixing components, the flexible rope and embedded parts in the utility model are lighter in weight, so the operator can adjust the position of the flexible rope and embedded parts without the help of other large equipment, and fix the construction device at the same time, thus reducing the time consumed when installing or disassembling the construction device. In addition, since the flexible rope and embedded parts are commonly used parts, both the initial purchase cost and the subsequent maintenance cost are relatively low.

[0016] In an optional embodiment, a cushion block is provided between the cantilever beam and the top floor slab of the building.

[0017] Beneficial effects: The utility model can disperse the pressure exerted by the cantilever beam on the top floor slab by providing a pad between the cantilever beam and the top floor slab of the building, thereby reducing the risk of damage or deformation of the top floor slab. In addition, by providing a pad between the cantilever beam and the top floor slab of the building, the balance point between the cantilever beam and multiple columns can be artificially changed, thereby optimizing the load distribution on the construction device, avoiding a large load at the connection between the cantilever beam and the column, and ensuring the stability and safety of the overall structure of the construction device.

[0018] In an optional embodiment, a support assembly is provided between the floor adjacent to the top floor and the top floor, and the support assembly is arranged below the cantilever beam and the pad.

[0019] Beneficial effect: The utility model can disperse the load on the top floor slab by arranging the supporting components under the cantilever beam and the pad, thereby ensuring that the construction operation device can be stably fixed on the top floor slab.

[0020] In an optional embodiment, the working platform is mounted on the column via a pair of oppositely disposed fixing rods, one end of the fixing rod extends toward the direction of the entrance and exit passage and is suitable for abutting against the outer facade.

[0021] Beneficial effects: The utility model can increase the stability of the working platform by using a fixing rod to install the working platform on the column. Furthermore, by abutting one end of the fixing rod against the facade, the probability of the construction working device shaking in the air can be reduced, thereby improving the safety of the operator when repairing the facade.

[0022] In an optional embodiment, one end of the working platform facing the exterior facade is provided with a footboard rotatably connected thereto.

[0023] Beneficial effect: The utility model provides a footboard on one end of the working platform facing the outer facade, so that when the operator works on the working platform, the footboard can be leaned against the outer facade, thereby forming a protective structure between the working platform and the outer facade, reducing the possibility of the operator accidentally falling from the working platform.

[0024] In an optional embodiment, a limit stopper is provided on the outer side of the foot plate, and the limit stopper is arranged on the column.

[0025] Beneficial effect: The utility model provides a limit stopper on the outer side of the foot guard, thereby preventing the foot guard from excessive rotation, ensuring that it can fully play a protective role for the operator.

[0026] In an optional embodiment, a ladder is provided on the inner side of the column.

[0027] Beneficial effect: The utility model provides a ladder on the inner side of the column, so that the operator can enter or leave the working space surrounded by the columns through the ladder. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] In order to more clearly illustrate the specific implementation methods of the utility model or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0029] Figure 1 This is a schematic diagram of the structure of a construction device for a building facade according to an embodiment of the utility model;

[0030] Figure 2 It is a structural schematic diagram of another construction operation device for the exterior facade of a building according to an embodiment of the utility model;

[0031] Figure 3 for Figure 2 A schematic diagram of the structure of the construction work device on the building facade and another state of the building shown;

[0032] Figure 4 This is a schematic diagram of an assembly of a construction device for a building facade and a building according to an embodiment of the utility model;

[0033] Figure 5 for Figure 4 The construction work device of the building facade is shown and the assembly schematic diagram of the building from another perspective.

[0034] Description of reference numerals:

[0035] 1. Building; 101. External facade; 102. Floor; 2. Column; 201. Protective structure; 202. Working space; 203. Entrance and exit passage; 204. Ladder; 3. Cantilever beam; 301. Connecting rod; 302. Mounting part; 4. Fixing assembly; 401. Counterweight; 4011. Annular boss; 402. Flexible rope; 403. Embedded parts; 5. Working platform; 501. Toeboard; 6. Pad; 7. Support assembly; 8. Fixing rod. DETAILED DESCRIPTION

[0036] In order to make the purpose, technical solution and advantages of the embodiment of the utility model clearer, the technical solution in the embodiment of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiment of the utility model. Obviously, the described embodiment is a part of the embodiment of the utility model, not all the embodiments. Based on the embodiment of the utility model, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the utility model.

[0037] Aiming at the problem that the installation and disassembly of scaffolds is costly and time-consuming when repairing the facades of high floors, the utility model provides a construction operation device for the facades of buildings.

[0038] Combine the following Figures 1 to 5 , describing an embodiment of the utility model.

[0039] According to the embodiments of the present utility model, Figures 1 to 5 As shown, a construction work device for the exterior facade of a building is provided. The building 1 includes multi-layered floor slabs 102 and an exterior facade 101 surrounding the floor slabs 102, including: multiple columns 2, a pair of cantilever beams 3 and a work platform 5.

[0040] Specifically, adjacent columns 2 are connected by a protective structure 201, and multiple columns 2 and the protective structure 201 enclose a working space 201 suitable for construction. An entrance and exit passage 203 is provided on the side of the working space 202 facing the facade 101; a pair of cantilever beams 3 are relatively arranged on both sides of the entrance and exit passage 203, one end of the cantilever beam 3 is connected to the column 2, and the other end is suitable for being installed on the top floor 102 of the building 1 through a fixing component 4; a working platform 5 is arranged in the working space 202 and away from one end of the cantilever beam 3.

[0041] Compared to building a scaffold from the ground, the embodiment of the utility model fixes the construction device on the top floor 102 of the building 1 through the cantilever beam 3 and the fixing assembly 4. On the one hand, it can overcome the problem that when the scaffolding is far away from the damaged part of the high-rise facade 101, more steel is needed, which leads to high installation and disassembly costs of the scaffolding; on the other hand, it can also overcome the problem that the scaffolding occupies the ground space, affecting the surrounding construction activities and the passage of operators. In addition, since the construction device of the building facade of this embodiment can be built or disassembled in a shorter time than the scaffolding, the construction device of the building facade of this embodiment can effectively respond to emergencies, thereby ensuring the personal safety of the staff.

[0042] It should be noted that the shape of the working space 202 enclosed by the plurality of columns 2 and the protective structure 201 in this embodiment can be a triangular prism, a rectangular parallelepiped or a hexagonal prism, and no specific limitation is made here, as long as the working space 202 enclosed by the plurality of columns 2 and the protective structure 201 does not affect the normal operation of the operator. It is understandable that the shape of the working platform 5 located in the working space 202 can be adjusted accordingly with the shape of the transverse cross-section of the working space 202, so that the working platform 5 can be better adapted to the working space 202, reduce the gap between the working platform 5 and the columns 2, and improve the safety of the construction work device.

[0043] In addition, in some examples not shown, each column 2 in the construction work device includes at least two sub-columns 2 arranged side by side. In this way, on the one hand, it can avoid the size of a single column 2 being too large, which affects the operator's transportation and installation of the column 2; on the other hand, by setting up multiple columns 2, the structural safety of the construction work device can be further increased.

[0044] It should be noted that the protective structure 201 in this embodiment can be a plurality of connecting rods arranged between adjacent columns 2, or a metal protective net arranged between adjacent columns 2. The present invention does not make any specific limitation on this, as long as the protective structure 201 between adjacent columns 2 can prevent the operator from falling from the working platform 5. It is understandable that in order to reduce the manufacturing cost of the construction operation device, it is not necessary to completely cover the gap between two adjacent columns 2 with the protective structure 201, as long as the distance between adjacent protective structures 201 is not too large and the protective structure 201 can still play a protective effect on the operator.

[0045] Furthermore, in order to improve the adaptability of the construction device in this embodiment and facilitate the operator to repair different positions of the facade 101, the multiple columns 2 in this embodiment can be set as retractable columns 2, which can not only improve the adaptability of the construction device, but also improve the reusability of the construction device and reduce the waste of resources. In addition, the work platform 5 can be connected to the multiple columns 2 by sliding connection, so that the work platform 5 can slide up and down on the columns 2, thereby increasing the convenience of the operator when working.

[0046] According to one embodiment of the utility model, Figures 1 to 5 As shown, the fixing assembly 4 includes at least one counterweight block 401 , and the counterweight block 401 is arranged at one end of a pair of cantilever beams 3 away from the working space 202 .

[0047] The embodiment of the utility model can balance the weight of multiple columns 2 and the protective structure 201 by setting a counterweight block 401 at one end of a pair of cantilever beams 3 away from the working space 202, avoiding safety hazards caused by weight imbalance, thereby ensuring that the operator can carry out the repair work on the facade 101 normally in the working space 202.

[0048] It is understandable that if a counterweight 401 is used to balance the weight of multiple columns 2 and the protective structure 201, the weight of the counterweight 401 needs to be increased. In this way, not only can the number of times the counterweight 401 is moved be reduced, but also the counterweight 401 can be ensured to firmly fix the construction device on the top floor 102. If multiple counterweights 401 are used to balance the weight of multiple columns 2 and the protective structure 201, the weight of the counterweight 401 can be reduced or made into several different specifications. In this way, the operator can arrange different numbers of counterweights 401 on the cantilever beam 3 according to the load of the construction device, thereby improving the flexibility of the construction device in the force adjustment process. In addition, reducing the weight of the counterweight 401 or making the counterweight 401 into different specifications can not only reduce the difficulty of carrying the counterweight 401 and improve the efficiency of installation and disassembly, but also better meet the needs of construction equipment under different load conditions, avoid excessive use of the counterweight 401, and thus reduce waste of resources.

[0049] It should be noted that, whether one or multiple counterweight blocks 401 are used, a lifting ring can be provided on the upper side of the counterweight block 401, so that workers can carry the counterweight block through a lifting device, and then place the counterweight block 401 at a designated position on the cantilever beam 3. In addition, in order to ensure the accuracy of the placement of the counterweight block on the cantilever beam 3, scale lines can also be provided on the cantilever beam 3 to ensure that the construction device is balanced in force.

[0050] According to one embodiment of the utility model, Figure 3 As shown, an annular boss 4011 is provided at one end of the counterweight block 401 facing the cantilever beam 3; at least two spaced-apart connecting rods 301 are provided between a pair of cantilever beams 3, and a mounting portion 302 suitable for mounting the annular boss 4011 is formed between adjacent connecting rods 301 and a pair of cantilever beams 3.

[0051] The embodiment of the utility model provides an annular boss 4011 on one end of the counterweight 401 facing the cantilever beam 3, and provides a mounting portion 302 compatible with it on a pair of cantilever beams 3. In this way, the firmness of the connection between the counterweight 401 and the cantilever beam 3 can be improved, and the possibility of the counterweight 401 falling off the cantilever beam 3 or the relative position of the counterweight 401 and the cantilever beam 3 changing due to external factors (for example, vibration or accidental human contact) can be reduced, thereby ensuring that the entire construction operation device is always in a stable state, thereby ensuring the safety of operators and equipment.

[0052] According to one embodiment of the utility model, Figures 1 to 4 As shown, the fixing assembly 4 includes a flexible cable 402 and an embedded component 403 . One end of the flexible cable 402 is connected to a pair of cantilever beams 3 , and the other end is connected to the embedded component 403 . The embedded component 403 is suitable for being fixed on one of the floor slabs 102 of the building 1 .

[0053] Compared with other fixing components 4, the flexible rope 402 and embedded parts 403 in the embodiment of the utility model are lighter, so the operator can adjust the position of the flexible rope 402 and embedded parts 403 without the help of other large equipment, and fix the construction device at the same time, thus reducing the time consumed when installing or disassembling the construction device. In addition, since the flexible rope 402 and embedded parts 403 are commonly used parts, both the initial purchase cost and the subsequent maintenance cost are relatively low.

[0054] It should be noted that the building 1 involved in the utility model is a building under construction. Therefore, if the top floor 102 of the building 1 still needs to be fixed by a template (that is, the concrete is not completely solidified), in order to ensure the firmness of the connection between the embedded part 403 and the floor 102, it is necessary to first pass the flexible cable 402 through the top floor 102, and then fix the embedded part 403 to the lower floor 102 through fasteners (for example, bolts) (Note: the concrete of the floor 102 has been completely solidified). If the concrete of the top floor 102 has been completely solidified, the embedded part 403 can be directly fixed to the top floor 102 through fasteners. It can be understood that in this embodiment, the embedded part 403 is fixed to the floor 102 by fasteners. On the one hand, it is convenient for the operator to freely adjust the position of the embedded part 403 on the floor 102 according to actual needs; on the other hand, it can not only simplify the steps of installing and disassembling the embedded part 403, but also reduce the damage to the floor 102.

[0055] According to one embodiment of the utility model, Figures 1 to 5 As shown, a cushion block 6 is provided between the cantilever beam 3 and the top floor slab 102 of the building 1 .

[0056] The embodiment of the utility model can disperse the pressure exerted by the cantilever beam 3 on the top floor 102 by providing a cushion block 6 between the cantilever beam 3 and the top floor 102 of the building 1, thereby reducing the risk of damage or deformation of the top floor 102. In addition, by providing a cushion block 6 between the cantilever beam 3 and the top floor 102 of the building 1, the balance point between the cantilever beam 3 and the plurality of columns 2 can be artificially changed, thereby optimizing the load distribution on the construction device, avoiding a large load at the connection between the cantilever beam 3 and the columns 2, and ensuring the stability and safety of the overall structure of the construction device.

[0057] According to one embodiment of the utility model, Figure 4 As shown, a support assembly 7 is provided between the floor 102 adjacent to the top floor 102 and the top floor 102 , and the support assembly 7 is arranged below the cantilever beam 3 and the cushion block 6 .

[0058] The embodiment of the utility model is to dissipate the load on the top floor 102 by arranging the support assembly 7 below the cantilever beam 3 and the cushion block 6, thereby ensuring that the construction device can be stably fixed on the top floor 102.

[0059] It is understandable that if the top floor 102 of the building 1 still needs to be fixed by a template (i.e., the concrete is not completely solidified), in order to share the load on the top floor 102 generated by the counterweight block 401, the cushion block 6, the cantilever beam 3 and other structures, it is necessary to set a support assembly 7 between the top floor 102 and the floor 102 adjacent to the top floor 102. If the concrete of the top floor 102 has been completely solidified, it can be selected whether to set the support assembly 7 according to the situation.

[0060] It should be noted that the support assembly 7 in this embodiment includes a plurality of support rods arranged along the height direction of the building 1 and a plurality of diagonal rods. The plurality of support rods are arranged at intervals between the top floor 102 and the floor 102 adjacent to the top floor 102, and adjacent support rods are connected and fixed by diagonal rods.

[0061] According to one embodiment of the utility model, Figures 1 to 3 As shown, the work platform 5 is mounted on the column 2 through a pair of oppositely arranged fixing rods 8, one end of the fixing rod 8 extends toward the direction of the access passage 203 and is suitable for abutting against the facade 101. The embodiment of the utility model can increase the stability of the work platform 5 by using the fixing rod 8 to mount the work platform 5 on the column 2. Furthermore, abutting one end of the fixing rod 8 against the facade 101 can reduce the probability of the construction work device shaking in the air, thereby improving the safety of the operator when repairing the facade 101.

[0062] According to one embodiment of the utility model, Figures 1 to 3As shown, a footboard 501 is provided at one end of the working platform 5 facing the outer facade 101 and is rotatably connected thereto. In the embodiment of the utility model, by providing the footboard 501 at one end of the working platform 5 facing the outer facade 101, an operator can lean the footboard 501 against the outer facade 101 when working on the working platform 5, so that a protective structure 201 can be formed between the working platform 5 and the outer facade 101, thereby reducing the possibility of an operator accidentally falling from the working platform 5.

[0063] According to an embodiment of the present invention, a limit stopper (not shown) is provided on the outer side of the foot guard 501, and the limit stopper is provided on the column 2. The embodiment of the present invention provides a limit stopper on the outer side of the foot guard 501, so that the foot guard 501 can be prevented from excessively rotating, ensuring that it can fully play a protective role for the operator.

[0064] According to one embodiment of the utility model, Figures 1 to 3 As shown, a ladder 204 is provided on the inner side of the column 2. In the embodiment of the utility model, by providing the ladder 204 on the inner side of the column 2, it is convenient for operators to enter or leave the working space 202 surrounded by the column 2 through the ladder 204.

[0065] Although the embodiments of the present invention are described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.

Claims

1. A construction device for a building facade, wherein the building (1) comprises multiple layers of floor slabs (102) arranged at intervals and a facade (101) arranged around the floor slabs (102), characterized in that: The construction operation device comprises: A plurality of columns (2), adjacent columns (2) being connected via a protective structure (201), the plurality of columns (2) and the protective structure (201) enclosing a work space (202) suitable for construction, and an entrance and exit passage (203) being provided on a side of the work space (202) facing the exterior facade (101); A pair of cantilever beams (3) are arranged opposite to each other on both sides of the access passage (203), one end of the cantilever beam (3) is connected to the column (2), and the other end is suitable for being installed on the top floor (102) of the building (1) through a fixing assembly (4); A working platform (5) is arranged in the working space (202) and away from one end of the cantilever beam (3).

2. The construction device for the building facade according to claim 1, characterized in that: The fixing assembly (4) comprises at least one counterweight block (401), and the counterweight block (401) is arranged at one end of a pair of cantilever beams (3) away from the working space (202).

3. The construction work device for the building facade according to claim 2, characterized in that: An annular boss (4011) is provided at one end of the counterweight block (401) facing the cantilever beam (3); at least two spaced connecting rods (301) are provided between a pair of the cantilever beams (3); and a mounting portion (302) suitable for mounting the annular boss (4011) is formed between adjacent connecting rods (301) and a pair of the cantilever beams (3).

4. The construction work device for the building facade according to claim 1, characterized in that: The fixing assembly (4) comprises a flexible cable (402) and an embedded component (403); one end of the flexible cable (402) is connected to a pair of cantilever beams (3), and the other end is connected to the embedded component (403); the embedded component (403) is suitable for being fixed to one of the floor slabs (102) of the building (1).

5. The construction work device for the building facade according to any one of claims 1 to 4, characterized in that: A cushion block (6) is provided between the cantilever beam (3) and the top floor slab (102) of the building (1).

6. The construction device for the building facade according to claim 5, characterized in that: A support assembly (7) is provided between the floor slab (102) adjacent to the top floor slab (102) and the top floor slab (102), and the support assembly (7) is arranged below the cantilever beam (3) and the cushion block (6).

7. The construction work device for the building facade according to any one of claims 1 to 4, characterized in that: The working platform (5) is mounted on the column (2) via a pair of oppositely arranged fixing rods (8), one end of the fixing rod (8) extending in the direction of the access passage (203) and being adapted to abut against the outer facade (101).

8. The construction work device for the building facade according to any one of claims 1 to 4, characterized in that: One end of the working platform (5) facing the exterior facade (101) is provided with a footboard (501) rotatably connected thereto.

9. The construction work device for the building facade according to claim 8, characterized in that: A position-limiting stopper is provided on the outer side of the foot plate (501), and the position-limiting stopper is arranged on the upright column (2).

10. The construction work device for the building facade according to any one of claims 1 to 4, characterized in that: A ladder (204) is provided on the inner side of the column (2).