High steel structure construction operation platform
By designing a high-altitude construction platform with fixed hoisting straps and wire rails in steel structure buildings, the problem of low efficiency in high-altitude operations during steel structure hoisting and welding was solved, enabling efficient cleaning and repair operations and improving construction quality and efficiency.
Patent Information
- Application Number
- CN202323518015.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-22
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2033-12-22
AI Technical Summary
Existing technologies for hoisting and welding steel structure buildings result in low efficiency for high-altitude operations, making continuous operation impossible and affecting construction quality and efficiency.
Design a high-altitude steel structure construction platform, including a fixed hoisting belt, steel wire rails, a support platform, and safety ropes. The steel wire rails are fixedly connected using steel structure columns, and the support platform is erected. Personnel can work at close range on the platform. By combining aluminum ladders and safety ropes, multiple rail settings can be implemented to improve space utilization and work efficiency.
This platform enables efficient cleaning, polishing, and repair operations within a limited space, improving construction quality and efficiency and meeting surface cleanliness acceptance requirements.
Smart Images

Figure CN221957170U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to an aerial work platform, in particular to an aerial work platform for subsequent cleaning, grinding, painting, repairing and the like of high-altitude steel structures and roofs. Background Art
[0002] Steel structure buildings are widely used in various industries due to their advantages such as light weight, high strength, large span and short construction period. They are especially used in equipment plants, transport trestles and other buildings in the chemical industry.
[0003] Due to the concentrated arrival of steel structures, large quantities and weights, in most cases, steel structure materials are piled up in the open air. During material transportation, multiple relocations, and natural wind, sun, and rain, it is very easy to cause dirt on the surface of the steel structure and damage the anti-corrosion layer. According to construction requirements, the surface cleanliness of the steel structure should be ensured before installation. However, due to the accelerated adjustment of the construction sequence and construction period, even if the side of the completed steel structure close to the ground cannot be cleaned, the steel structure will be hoisted first, accompanied by aerial welding of some nodes after hoisting. During acceptance, the cleanliness of the structure surface, the cleaning and anti-corrosion of welding slag at the welding nodes, and the overall anti-corrosion layer will be inspected and accepted.
[0004] When the outdoor space is relatively open and a crane position is allowed, the crane's extended arm and the hanging basket are used to send the workers to the specified height and keep them in one place. After the relevant work is completed, the position will be adjusted or the crane will be repositioned, which is not conducive to continuous work and has low construction efficiency. Indoor high-altitude work cannot be carried out due to the influence of equipment and environment. Summary of the invention
[0005] The technical problem to be solved by the utility model is to provide a high-altitude steel structure construction work platform to achieve the purpose of improving construction efficiency.
[0006] In order to solve the above technical problems, the technical solution adopted by the utility model is:
[0007] A high-altitude steel structure construction work platform comprises a fixed lifting belt, a wire track, a support platform and a safety rope; the fixed lifting belt is fixed to a steel structure column below a work area and connected to the end of the wire track; at least two wire tracks are provided, and the two ends of each wire track are respectively connected to two steel structure columns through the fixed lifting belt; one or more support platforms are set up between the wire tracks, and the support platform and the wire track are movably connected through a wire ring; the safety rope is provided on the upper part of the support platform, and the two ends of the safety rope are respectively connected to the steel structure columns.
[0008] Furthermore, an anti-retraction lifting belt or a wrapping rubber is fixedly provided on the steel structure column which fixes the lower end of the lifting belt.
[0009] Furthermore, the anti-retraction lifting belt comprises a first anti-retraction lifting belt and a second anti-retraction lifting belt in sequence from top to bottom, and the outer diameter of the second anti-retraction lifting belt is greater than that of the first anti-retraction lifting belt.
[0010] Furthermore, the safety rope is arranged above the center of every two steel wire rails or directly above each steel wire rail.
[0011] Furthermore, it comprises a plurality of anti-falling lifting belts arranged at intervals, and two ends of the anti-falling lifting belts are respectively connected to the steel wire track and the safety rope or steel structure just above the steel wire track.
[0012] Furthermore, the support platform is made of an aluminum ladder.
[0013] Furthermore, wire rings are provided at four points where the aluminum straight ladder contacts the wire track.
[0014] Furthermore, any one of the steel wire rails is formed by connecting two or more steel wires via turnbuckle bolts.
[0015] According to the working platform provided by the utility model, steel structure columns are used to fix and connect high wire rails, and a supporting platform is placed on the wire rails. Workers can perform close-range construction on the supporting platform. The solution provided by the utility model can be used to set up multiple cleaning rails in a limited space, which reduces the occupation of ground space and greatly improves construction efficiency. Close-range construction also ensures construction quality, and the surface cleanliness acceptance is successfully passed. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of the overall structure of the high-altitude steel structure construction work platform described in the utility model;
[0017] Figure 2 This is a top view of the high steel structure construction work platform;
[0018] Figure 3 It is the detail node diagram of one end of the steel structure column;
[0019] Figure 4 This is a top view of one end of the steel structure column.
[0020] In the figure, 1-steel structure column, 2-fixed lifting belt, 3-first anti-retraction lifting belt, 4-second anti-retraction lifting belt, 5-wire rope lock buckle, 6-support platform, 7-wire ring, 8-wire track, 9-safety rope, 10-basket bolt, 11.-anti-fall lifting lifting belt. DETAILED DESCRIPTION
[0021] like Figure 1As shown, a typical embodiment of the utility model provides a high-altitude steel structure construction work platform, including a fixed lifting belt 2, a steel wire track 8, a support platform 6 and a safety rope 9. The fixed lifting belt 2 is fixed to the steel structure column 1 below the working area and connected to the end of the steel wire track 8; at least two steel wire tracks 8 are provided, and the two ends of each steel wire track 8 are respectively connected to the two steel structure columns 1 through the fixed lifting belt 2; one or more support platforms 6 are set up between the steel wire tracks 8, and the support platform 6 and the steel wire track 8 are movably connected through a steel wire ring 7; the safety rope is provided on the upper part of the support platform, and the two ends of the safety rope are respectively connected to the steel structure column.
[0022] The high-altitude steel structure construction work platform provided in the above implementation method is used for cleaning, grinding, anti-corrosion and internal roof repair of high-altitude steel structures. At least two parallel steel wire ropes are set on the same horizontal plane between the steel structure columns, and an operating platform (aluminum alloy straight ladder or other lighter and stronger erection plate materials) is laid on the steel wire ropes. Personnel can complete related operations in the covered area on the steel wire track through the operating platform. Multiple tracks can be set on the same horizontal plane at the same time, and multiple people can walk towards each other at the same time and work in an orderly manner, which is better in space utilization and work efficiency.
[0023] In a relatively specific embodiment, for the setting of the steel wire track 8, a fixed lifting belt 2 is tightly wound around one end of the steel structure column 1, and the plastic-coated steel wire rope is inserted into the fixed lifting belt 2, and then the end of the steel wire rope is closed-loop fixed using multiple steel wire rope lockers 5. The other end of the steel wire rope is closed-loop fixed according to the distance between the steel structure columns and then hooked into the hook of the basket bolt 10; the other end of the steel wire track 8 is also fixed to the steel structure column 1 through the fixed lifting belt 2, and the steel wire rope is connected to the wire rope locker 5 and the basket bolt 10 and then closed-loop fixed. Other steel wire tracks 8 are also set using the above method.
[0024] The spacing and number of wire tracks are determined based on the clearance space at height. If large-scale cleaning is required on the top of the structure, the spacing of parallel wire ropes should be about 4m. If it is a local cleaning and does not need to be moved, the wire tracks can be set according to the cleaning location. As long as they are on the same horizontal plane and the length of the straight ladder is greater than the maximum spacing between the two tracks, there is no limit on whether the two tracks are parallel or between the track and the structure. The above-mentioned single plastic-coated wire rope can bear 4.5 tons.
[0025] Depending on the cleaning height, the end of the wire track 8 is likely to be set on the main structural column or the secondary supporting pipe structure, or even in the middle of the diagonal brace. In this way, the end point position can easily slide down due to the shaking of the wire track 8 and its own weight as the workers move. Therefore, anti-slip measures are needed.
[0026] After the position of the rail end is determined, the following operations can be performed: Wrap the first anti-retraction lifting belt 3 and the second anti-retraction lifting belt 4 (double anti-slip measures) or wrap rubber around the fixed lifting belt 2 and tie it with wire. The outer diameter of the ring formed by the fixed lifting belt 2, the first anti-retraction lifting belt 3, and the second anti-retraction lifting belt 4 increases from top to bottom, and at the same time, the first anti-retraction lifting belt 3 and the second anti-retraction lifting belt 4 are inserted into the hole of the fixed lifting belt 1 and connected to the upper safety rope 9 or the steel structure column 1.
[0027] Because the wire track 8 has a large span, in order to ensure the stability of the wire rope track and avoid the downward bending in the middle, 2 to 3 sets of anti-falling lifting belts 11 can be symmetrically set according to the length of the wire track. The two ends of the anti-falling lifting belts 11 are respectively connected to the wire track 8 and the safety rope 9 or steel structure directly above the wire track 8. This requires that a straight ladder be placed in each section of the wire track separated by the lifting measures to avoid the obstruction caused by the inability of a single ladder to pass through the lifting and hoisting. At the same time, operators with relatively small and light bodies should be selected to reduce weight and improve work efficiency. The method of "squatting forward and sitting for construction" is adopted.
[0028] Safety rope setting: It depends on the position of the steel structure in the area above the plane of the wire track 8. The best position is to set a safety rope 9 above the center of every two wire tracks 8. If there is no suitable position in the track space, considering that the distance between the wire tracks 8 is far, it can be set directly above the wire track 8. To ensure safety, only one person's safety belt hook is allowed to be hooked on each safety rope, and the number of safety ropes is arranged according to the track space. A small bucket can be hung on the safety rope 9, and tools such as rags and brushes can be placed in a carry-on diagonal tool bag. The tools are equipped with anti-fall ropes. When using the tools, first put the anti-fall rope on the wrist to prevent the tools from falling during construction.
[0029] Laying of aluminum alloy ladder: According to the 4m steel wire track width, an aluminum alloy ladder of about 6m (150kg load-bearing capacity, the length of the ladder can be adjusted according to the track width) can be selected and placed in the center. Steel wire rings 7 (200mm~250mm in diameter) are set at the four points where each ladder contacts the steel wire track 8, which can not only ensure that the aluminum alloy ladder does not leave the steel wire track 8, but also ensure that the construction workers can move the ladder forward alternately left and right. The aluminum alloy ladder can also be laid flat with a safety net wrapped on the bottom in advance. The steel wire ring 7 can be wrapped tightly with a strong Velcro to facilitate stepping and displacement, and also to facilitate replacement of the position.
[0030] Protection measures for the contact surface of steel structure: Both ends of the wire track 8 are fixed by fixing the steel structure with lifting belts. If there is direct contact with the steel structure through the steel wire rope, even if it is a plastic-coated steel wire rope, rubber pads or rubber blocks must be added between them to protect the surface of the steel structure while increasing friction.
[0031] Requirements for workers' clothing: Before construction, workers should be given detailed instructions and wear PPE, including rubber shoes. At the same time, workers with good physical and psychological qualities, strong safety awareness and rich experience should be selected.
[0032] A relatively specific embodiment is provided below to further clearly and completely explain the technical solution claimed for protection in the utility model. This embodiment is applied to the cleaning project of the steel structure roof steel structure of the monohydrate crystallization section and the bottom of the transfer station trestle of the Kazan alkali processing project in Turkey constructed by the applicant. The project consists of 5 single annual production capacity of 500,000 tons of soda ash production lines, 2 single annual production capacity of 100,000 tons of baking soda production lines and other auxiliary transfer facilities, among which the steel structure of the monohydrate crystallization plant is about 2,400 tons in total, the plant building height is 43m, the highest roof span is 30m, and the heights of the 1#~3# transfer stations are 41.7m, 42.5m, and 46.7m respectively, with a trestle connecting the middle.
[0033] Select personnel with rich experience in similar construction, wear PPE (work clothes, non-slip shoes, safety helmets, five-point safety belts), and the workers climb up to one end of the steel structure column 1 through a straight ladder. When moving, there is always a safety belt back hook hanging on the steel beam above its position. Start setting up the wire track at one end. The personnel connect the plastic-coated steel wire rope with the fixed lifting belt 2 tightly wrapped around the steel structure column 1. Rubber is placed between the fixed lifting belt 2 and the steel structure column 1. The steel wire rope passes through the lifting ports at both ends of the fixed lifting belt 2 and is locked with the wire rope lock buckle 5 to form a closed loop. In order to prevent the lifting belt on the diagonal brace from sliding down, an anti-fall lifting lifting belt 11 is set here to pass through the lifting port of the lifting belt on the diagonal brace and connect to the top steel structure or safety rope 9. At the same time, the first anti-retraction lifting belt 3 and the second anti-retraction lifting belt 4 or thick rubber are wrapped around the bottom of the fixed lifting belt 2 to play a supporting role and prevent the end of the steel track 8 from sliding down. The steel wire is connected through the basket bolt 10 to tighten the steel wire track, so that the steel wire rope does not shake when shaken by hand, and the sliding of the steel wire track 8 can also be reduced.
[0034] 2 to 3 anti-falling lifting belts 11 are evenly and symmetrically arranged on the wire track for lifting, and the anti-falling lifting belts 11 are connected to the upper steel structure or the safety rope 10.
[0035] In this embodiment, four steel wire tracks (single steel wire rope bears 4.55 tons) are arranged on the steel structure, which can be divided into three groups, and the span of each group of steel wire ropes is 4 meters. The number and spacing are changed according to the construction area.
[0036] Three safety ropes are set above the three sets of steel ropes. Only one operator is allowed to work on each set of tracks, so that the safety protection effect is maximized.
[0037] For a single-person construction on a single track, after fixing the aluminum alloy ladder to the steel track 8 and the aluminum alloy ladder to the feet, the ladder can be moved forward alternately along the track with the feet to perform cleaning work. Ladders should be placed separately in the areas separated by the anti-fall lifting belt 11. If three people want to work at the same time, follow the principle of "enter the corresponding track after there are no workers in the construction area", that is, according to the layout of three sets of tracks, people on both sides can work at the same time, and after moving forward for a distance, the middle group of people can enter the construction.
[0038] The construction workers sit on the aluminum alloy ladder (only one person goes up each aluminum alloy ladder), hang the safety belt on the upper safety wire rope 9, hang the bucket on the safety rope 9, and clean the roof with the rag in hand or the long pole with nylon brush. At the same time, wristbands should be set on various hand tools used. During construction, the tools should be inserted into the wrists before taking the tools, which can prevent the tools from falling from the hands of the construction workers to the ground when cleaning.
[0039] When the construction workers finish cleaning a place, they bend over and slide the aluminum alloy ladder forward alternately with their feet back and forth and left and right. The speed should not be too fast.
[0040] After the construction is completed, the construction platform should be dismantled step by step in sequence, and the surface should be checked for secondary damage, which should be dealt with during the dismantling process.
[0041] This embodiment uses a steel wire rope to build a construction platform, which can clean high-altitude steel structures over a large area, continuously and efficiently, with excellent results.
Claims
1. A high-altitude steel structure construction work platform, characterized by: It includes a fixed lifting belt, a wire track, a support platform and a safety rope; the fixed lifting belt is fixed on the steel structure column below the working area and connected to the end of the wire track; at least two wire tracks are arranged, and the two ends of each wire track are respectively connected to the two steel structure columns through the fixed lifting belt; one or more support platforms are set up between the wire tracks, and the support platform and the wire track are movably connected through a wire ring; the safety rope is arranged on the upper part of the support platform, and the two ends of the safety rope are respectively connected to the steel structure columns.
2. The high-altitude steel structure construction work platform according to claim 1 is characterized by: An anti-retraction lifting belt or a surrounding rubber is fixedly arranged on the steel structure column at the lower end of the fixed lifting belt.
3. The high-altitude steel structure construction work platform according to claim 2 is characterized by: The anti-retraction lifting belt comprises a first anti-retraction lifting belt and a second anti-retraction lifting belt in sequence from top to bottom, and the outer diameter of the second anti-retraction lifting belt is greater than that of the first anti-retraction lifting belt.
4. The high-altitude steel structure construction work platform according to claim 1 or 3, characterized in that: The safety rope is arranged above the center of every two steel wire rails or just above each steel wire rail.
5. The high-altitude steel structure construction work platform according to claim 4 is characterized by: The utility model comprises a plurality of anti-falling lifting belts which are arranged at intervals, and two ends of the anti-falling lifting belts are respectively connected to a steel wire track and a safety rope or a steel structure just above the steel wire track.
6. The high-altitude steel structure construction work platform according to claim 1 is characterized by: The supporting platform is made of aluminum straight ladder.
7. The high-altitude steel structure construction work platform according to claim 6 is characterized by: Steel wire rings are arranged at four points where the aluminum straight ladder contacts the steel wire track.
8. The high-altitude steel structure construction work platform according to claim 1 is characterized by: Any steel wire track is made up of two or more steel wires connected by turnbuckle bolts.