Temporary stair device for high-rise fabricated building

By designing a temporary staircase device for high-rise prefabricated buildings, the problem that traditional steel pipe frames cannot meet the requirements of complex engineering is solved, and higher load-bearing capacity, stability and safety are achieved, reducing safety risks at the construction site.

CN221957277UActive Publication Date: 2024-11-05CSCEC PERAL RIVER INT DEV CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420523371.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-18
Publication Date
2024-11-05
Estimated Expiration
2034-03-18

AI Technical Summary

Technical Problem

Traditional steel pipe frame construction methods cannot meet the increasingly complex engineering requirements in complex high-rise construction projects, and installation and disassembly are cumbersome, which poses safety risks.

Method used

A temporary staircase device for high-rise prefabricated buildings is designed, including main frame, oblique support, step steps and handrails. The formation of multiple triangular structures through welding to improve stability and load-bearing capacity, and is easy to install and use, and is suitable for recycling.

Benefits of technology

It improves the load-bearing capacity and stability of the device, simplifies the installation and use process, reduces the safety risks at the construction site, and adapts to complex engineering needs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221957277U_ABST
    Figure CN221957277U_ABST
Patent Text Reader

Abstract

The utility model discloses a temporary stair device for a high-rise fabricated building, and belongs to the technical field of building construction. Comprising a main body frame, inclined supports, stair steps and handrails, and the inclined supports are fixedly connected into the main body frame; the step steps are fixedly installed in the main body frame, and the step steps are arranged between two adjacent floor beams of the high-rise fabricated building in a matched mode; at least one handrail is fixedly arranged in the main body frame, and the handrail is located above the stair steps. Compared with a traditional steel pipe frame, the steel pipe frame has the advantages of being higher in bearing capacity, higher in stability, more convenient to use and install and beneficial to achieving recycling. And meanwhile, the safety is higher, and the safety risk of a construction site can be effectively reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to a temporary staircase device for high-rise assembled buildings. Background Art

[0002] Prefabricated buildings refer to buildings that are prefabricated in factories using advanced technologies such as standardized design, factory production, and assembly construction, and then transported to site for assembly. In general, prefabricated buildings are an efficient, energy-saving, environmentally friendly, and flexible construction method that is widely used in modern buildings.

[0003] In order to solve the problem of people going up and down the board before the prefabricated stairs are hoisted during the construction process, it is generally necessary to build a steel pipe rack. The steel pipe rack is a scaffolding system composed of steel pipes and fasteners. When building the steel pipe rack, it is necessary to select appropriate steel pipes and fasteners according to the actual situation of the project, and design and calculate according to relevant specifications to ensure the stability and safety of the steel pipe rack. When installing and disassembling the steel pipe rack, it is necessary to follow the operating procedures and safety requirements, and take necessary safety measures to prevent accidents.

[0004] The installation and disassembly process of steel pipe racks is cumbersome, and with the development of construction projects, various types of prefabricated high-rise buildings have emerged, resulting in the use of traditional steel pipe rack construction methods that can no longer meet increasingly complex engineering requirements. Utility Model Content

[0005] In order to solve the problem that traditional steel pipe rack construction methods can no longer meet increasingly complex engineering requirements, the purpose of the utility model is to provide a temporary staircase device for high-rise prefabricated buildings, which has higher load-bearing capacity, stronger stability, more convenient use and installation, and is conducive to recycling. At the same time, it is safer and can effectively reduce safety risks on construction sites.

[0006] The purpose of the utility model can be achieved through the following technical solutions:

[0007] A temporary staircase device for high-rise assembled buildings, comprising:

[0008] Main frame;

[0009] Oblique supports, a plurality of the oblique supports are fixedly connected to the main frame;

[0010] A stair step fixedly installed in the main frame, wherein the stair step is adapted to be located between two adjacent floor beams of the high-rise prefabricated building;

[0011] A handrail, at least one of which is fixedly disposed in the main frame, and the handrail is located above the step.

[0012] As a further solution of the utility model: the main frame includes a plurality of cross bars and a plurality of vertical bars, and the plurality of cross bars and the plurality of vertical bars are welded to each other to form the main frame.

[0013] As a further solution of the utility model: one end of the oblique support is fixedly connected to the cross bar, and the other end of the oblique support is fixedly connected to the vertical bar.

[0014] As a further solution of the utility model: the step comprises two side panels and a plurality of pedals, the two side panels are arranged in parallel in the main frame, and the plurality of pedals are evenly fixedly installed between the two side panels.

[0015] As a further solution of the utility model: the step tread also includes an end plate, and the end plate is fixedly installed on an end of the side plate away from the prefabricated staircase.

[0016] As a further solution of the utility model: some of the horizontal bars and some of the vertical bars are square steels of 50cm×50cm×3cm.

[0017] As a further solution of the utility model: the oblique support is a square steel of 40cm×40cm×3cm.

[0018] The utility model has the following beneficial effects:

[0019] The utility model first welds a plurality of horizontal bars and a plurality of vertical bars into a main frame according to the requirements of the drawings, and then welds a plurality of oblique supports into the main frame as required, and a plurality of oblique supports cooperate with a plurality of horizontal bars and a plurality of vertical bars to form a plurality of triangular structures in the main frame, thereby improving the stability and bearing capacity of the main frame, and facilitating loading and unloading; finally, the steps and handrails are welded into the main frame as required, and after the entire device is manufactured, the entire device is hoisted onto the corresponding prefabricated staircase and fixed, and can be put into use; compared with the traditional steel pipe frame, the utility model has a higher bearing capacity, stronger stability, more convenient use and installation, and is conducive to realizing recycling. At the same time, it is safer and can effectively reduce the safety risks of the construction site. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] The utility model is further described below in conjunction with the accompanying drawings.

[0021] Figure 1 This is a schematic diagram of the overall structure of a temporary staircase device for high-rise assembled buildings in the utility model;

[0022] Figure 2 This is a schematic diagram of the step structure of the utility model;

[0023] Figure 3The utility model is a structural schematic diagram of a temporary staircase device for a high-rise assembled building installed in a high-rise assembled building.

[0024] In the figure: 1. Main frame; 11. Horizontal bar; 12. Vertical bar; 2. Diagonal support; 3. Steps; 31. Side panels; 32. Pedals; 33. End panels; 4. Floor beams; 5. Handrails; 6. Prefabricated stairs. DETAILED DESCRIPTION

[0025] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0026] See also Figure 1 As shown, the embodiment of the utility model provides a temporary staircase device for high-rise assembled buildings, including a main frame 1, oblique supports 2, step treads 3 and handrails 5. A plurality of oblique supports 2 are fixedly welded in the main frame 1 to improve the stability and bearing capacity of the main frame 1, thereby improving the safety of the entire device; the step treads 3 are fixedly welded in the main frame 1, such as Figure 3 As shown, the step 3 is adapted between two adjacent floor beams 4 of a high-rise prefabricated building. Construction workers can walk from the floor beam 4 of the lower layer to the floor beam 4 of the upper layer through the step 3, solving the problem of people going up and down floor slabs before the prefabricated stairs 6 are hoisted during construction. The handrail 5 is fixedly welded in the main frame 1, and the handrail 5 is located above the step 3. The handrail 5 can be one or two. When there are two handrails 5, the two handrails 5 are symmetrically arranged above the step 3. Construction workers can climb the step 3 by holding the two handrails 5, which saves physical strength and can also improve the protection of construction workers and improve safety.

[0027] like Figure 1 As shown, in one embodiment of the utility model, the main frame 1 includes a plurality of cross bars 11 and a plurality of vertical bars 12, and the plurality of cross bars 11 and the plurality of vertical bars 12 are welded to each other to form the main frame 1. One end of the plurality of oblique supports 2 is fixedly connected to one of the cross bars 11, and the other end of the oblique supports 2 is fixedly connected to one of the vertical bars 12. The plurality of oblique supports 2 cooperate with the plurality of cross bars 11 and the plurality of vertical bars 12 to form a plurality of triangular structures in the main frame 1, thereby improving the stability and bearing capacity of the main frame 1 and facilitating loading and unloading.

[0028] like Figure 2As shown, in one embodiment of the utility model, the stair tread 3 includes two side panels 31 and a plurality of pedals 32, the two side panels 31 are welded in parallel in the main frame 1, and the plurality of pedals 32 are evenly fixedly installed between the two side panels 31. The stair tread 3 also includes an end plate 33, and the end plate 33 is fixedly installed at one end of the side panel 31 away from the prefabricated staircase 6. After the entire device is hoisted, the end plate 33 is overlapped on the floor beam 4 of the upper layer to facilitate the construction workers to walk.

[0029] It should be noted that, in the embodiment of the present utility model, the plurality of horizontal bars 11 and the plurality of vertical bars 12 are square steels of 50 cm×50 cm×3 cm, and the diagonal supports 2 are square steels of 40 cm×40 cm×3 cm.

[0030] When assembling the utility model, firstly weld a plurality of horizontal bars 11 and a plurality of vertical bars 12 made of 50cm×50cm×3cm square steel into a main frame 1 according to the requirements of the drawings, and then weld the oblique supports 2 made of 40cm×40cm×3cm square steel into the main frame 1 as required, and finally weld the step 3 and the handrail 5 into the main frame 1 as required. After the entire device is manufactured, the entire device is hoisted onto the corresponding prefabricated staircase 6 and fixed, and then it can be put into use.

[0031] The temporary staircase device for high-rise prefabricated buildings provided by the utility model is easy to process, simple to operate, and conducive to recycling; it has strong adaptability and is suitable for various types of prefabricated high-rise buildings; by assuming a temporary staircase device, the safety of on-site construction can be effectively improved, and it has a higher load-bearing capacity, stronger stability, and more convenient use and installation. At the same time, it has higher safety and can effectively reduce the safety risks on the construction site.

[0032] In the description of the present invention, it should be understood that the terms "up", "down", "left", "right", "front", "back", etc. indicating directions or positional relationships are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, and a specific direction structure and operation. Therefore, it should not be understood as a limitation on the present invention.

[0033] In addition, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", etc. should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this utility model can be understood according to specific circumstances.

[0034] The above detailed description of the preferred embodiments of the utility model should not be considered to limit the scope of implementation of the utility model. All equivalent changes and improvements made within the scope of application of the utility model should still fall within the scope of the patent coverage of the utility model.

Claims

1. A temporary staircase device for high-rise prefabricated buildings, characterized in that: include: Main frame (1); Oblique supports (2), a plurality of the oblique supports (2) are fixedly connected to the main frame (1); A stair step (3) fixedly installed in the main frame (1), wherein the stair step (3) is adapted to be located between two adjacent floor beams (4) of the high-rise prefabricated building; A handrail (5), wherein at least one of the handrails (5) is fixedly arranged in the main frame (1), and the handrail (5) is located above the step (3).

2. A temporary staircase device for high-rise assembled buildings according to claim 1, characterized in that: The main frame (1) comprises a plurality of cross bars (11) and a plurality of vertical bars (12); the plurality of cross bars (11) and the plurality of vertical bars (12) are welded to form the main frame (1).

3. A temporary staircase device for high-rise assembled buildings according to claim 2, characterized in that: One end of the oblique support (2) is fixedly connected to the cross bar (11), and the other end of the oblique support (2) is fixedly connected to the vertical bar (12).

4. A temporary staircase device for high-rise assembled buildings according to claim 1, characterized in that: The stair step (3) comprises two side plates (31) and a plurality of pedals (32); the two side plates (31) are arranged in parallel in the main frame (1); and the plurality of pedals (32) are evenly fixedly installed between the two side plates (31).

5. A temporary staircase device for high-rise assembled buildings according to claim 4, characterized in that: The step (3) further comprises an end plate (33), wherein the end plate (33) is fixedly mounted on an end of the side plate (31) away from the prefabricated staircase (6).

6. A temporary staircase device for high-rise assembled buildings according to claim 2, characterized in that: The plurality of horizontal bars (11) and the plurality of vertical bars (12) are square steels of 50cm×50cm×3cm.

7. A temporary staircase device for high-rise assembled buildings according to claim 1, characterized in that: The oblique support (2) is a square steel of 40cm×40cm×3cm.