Track measurement-while-drilling exploring tube

By designing the partitioned drilling track measurement probe tubes, including plug-in grooves, drainage holes and arc-shaped water pipes, the problems of high-cost and cumbersome installation in the existing technology are solved, and rapid installation and efficient construction are achieved.

CN221957566UActive Publication Date: 2024-11-05BEIJING ZHONGKE MANIFESTO TECH CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420040320.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-08
Publication Date
2024-11-05
Estimated Expiration
2034-01-08

AI Technical Summary

Technical Problem

The existing geological exploration trajectory measurement and exploration pipes are costly and cumbersome to install and disassemble. The drill pipe water inlet pipeline is not considered, which increases the construction difficulty.

Method used

A drilling track measurement probe tube is designed, including the inner rear end pluggable groove and drainage hole of the measuring probe tube, the flange ring is installed on the surface, and the front end of the drill rod is connected to the arc-shaped water pipe, which is divided into positive and negative electrode installation areas and measurement The installation area and water inlet and drainage area of ​​the device parts adopt a detachable positive electrode seat and arc-shaped water pipe, simplifying the installation and disassembly process.

Benefits of technology

Through partition design and waterproof structure, pre-construction assembly and debugging are simplified, construction efficiency is improved, production costs are reduced, and on-site operation is simplified.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221957566U_ABST
    Figure CN221957566U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of geological exploration drilling equipment, and discloses a while-drilling track measurement probe. The while-drilling track measuring probe comprises a measuring probe body, an inserting groove is formed in the rear end of the interior of the measuring probe body, a drainage hole is formed in the portion, located below the inserting groove, of the rear end of the interior of the measuring probe body, and a first flange ring is fixedly installed on the surface of the rear end of the measuring probe body; a second flange ring is fixedly installed at the rear end of the first flange ring, a drill rod is fixedly installed in the second flange ring, a positive electrode seat is fixedly installed at the front end of the drill rod, and an arc-shaped water pipe is fixedly connected to the position, located under the positive electrode seat, of the front end of the drill rod. According to the device, the measuring probe tube is divided into three areas, namely an isolated waterway area, a detachable positive electrode seat area and a mounting area of a measuring device capable of being quickly mounted and adjusted. And a constructor can quickly mount and adjust before construction, so that the construction efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the technical field of geological exploration drilling equipment, and specifically relates to a while-drilling trajectory measurement probe. Background Art

[0002] In the process of geophysical exploration, measurement while drilling technology is often used. That is, measurement while drilling equipment is installed behind the drill bit to measure the geological parameters of the strata around the drill bit in real time, so as to identify complex oil and gas layers with industrial mining value and stop the drill bit in the required reservoir in time; at the same time, the drill bit position, drilling trajectory, well inclination, well diameter and vibration parameters are monitored to achieve real-time positioning and timely correction.

[0003] The geological exploration measurement while drilling equipment currently on the market is usually installed on the drill pipe at the rear end of the drill bit, and the measuring device is installed on the side wall or both ends of the probe short section. However, the production cost of the drilling trajectory measurement probe is relatively high, and the drill pipe water inlet pipeline is not taken into consideration, which makes the installation and disassembly more cumbersome and increases the difficulty of on-site construction. Utility Model Content

[0004] The purpose of this application is to provide a while drilling trajectory measurement probe to solve the problem that the production cost of the above-mentioned while drilling trajectory measurement probe is high and the drill pipe water inlet pipeline is not taken into consideration, resulting in cumbersome installation and disassembly and increased difficulty of on-site construction.

[0005] The technical solution adopted in the present application is as follows: a downhole trajectory measurement probe, comprising a measuring probe, a plug-in slot is provided at the inner rear end of the measuring probe, a drainage hole is provided at the inner rear end of the measuring probe and below the plug-in slot, a first flange ring is fixedly installed on the rear end surface of the measuring probe, a second flange ring is fixedly installed at the rear end of the first flange ring, a drill rod is fixedly installed inside the second flange ring, a positive electrode seat is fixedly installed at the front end of the drill rod, an arc-shaped water pipe is fixedly connected to the front end of the drill rod and directly below the positive electrode seat, a positive electrode seat is fixedly installed inside the plug-in slot, and an arc-shaped water pipe is fixedly installed inside the drainage hole.

[0006] By adopting the above technical solution, the measuring probe is the pipe body of the measuring probe, and three areas are set inside the measuring probe, namely the positive and negative electrode installation area, the measuring device parts installation area and the water inlet and drainage area. The plug-in slot and the negative electrode seat are located in the upper half of the inner area of ​​the measuring probe, wherein the plug-in slot is used to plug the positive electrode seat at the drill rod at the rear end of the measuring probe, and the negative electrode seat is used for the front end position of the plug-in slot. The water inlet is located at the rear end of the measuring probe, below the negative electrode seat. The water in the drill rod will enter from the front end of the measuring probe, and after being blocked by the front end of the negative electrode seat, it will enter the inside of the measuring probe from the water inlet. The water flows through the inside of the measuring probe and is discharged from the drainage hole, and then enters the arc water pipe in the drill rod at the rear end of the measuring probe, and finally discharged from the water outlet. The water flow is used to cooperate with the drill bit to clean the sand and gravel in the well. The first flange ring on the surface of the measuring probe is fixedly connected to the second flange ring on the surface of the drill rod by bolts.

[0007] In a preferred embodiment, a joint is fixedly connected to the rear end of the drill rod, and a water outlet is provided inside the joint.

[0008] By adopting the above technical solution, the joint is used to discharge the water in the drill pipe from the water outlet.

[0009] In a preferred embodiment, a negative electrode seat is fixedly installed inside the front end of the measuring probe and at the other end away from the plug-in slot, and a water inlet is opened inside the front end of the measuring probe and below the negative electrode seat.

[0010] By adopting the above technical solution, the negative electrode seat is fixed inside the front end of the measuring probe, and the positive electrode seat in the plug-in slot is detachable, which can be easily assembled and debugged before construction. It is convenient for installation and disassembly.

[0011] In a preferred embodiment, a threaded hole is provided on the surface of the measuring probe, and a mounting groove is provided inside the measuring probe and at a side end of the threaded hole.

[0012] By adopting the above technical solution, the installation groove is used to install the electronic components of the drilling trajectory measurement device, and the threaded hole is used to install a cover plate for protecting the installation groove.

[0013] In a preferred embodiment, a negative electrode seat is fixedly mounted at the front end of the mounting groove, and a positive electrode seat is fixedly mounted at the rear end of the mounting groove.

[0014] By adopting the above technical solution, the electronic components of the drilling trajectory measurement device are installed inside the installation groove, which can facilitate assembly before construction and can be connected with the negative electrode seat and the positive electrode seat.

[0015] In a preferred embodiment, a positioning hole is provided at a side end of the positive electrode seat, and a battery module is fixedly installed at the side end of the positioning hole and inside the mounting groove.

[0016] By adopting the above technical solution, the positioning hole is used to position the battery module in the installation slot, which facilitates the installation of the battery module. The battery module is used to provide electrical energy for the measurement device to work.

[0017] In a preferred embodiment, a slot is provided at a side end of the negative electrode seat, and a control module is fixedly installed inside the slot.

[0018] By adopting the above technical solution, the slot is inserted into the two ends of the negative pole seat and the positive pole seat, so as to measure the inclination angle, direction and position of the drill bit during the exploration process, and help engineers and operators understand the underground position of the drill bit and the drilling direction, so as to guide the drilling operation and improve the drilling efficiency and safety.

[0019] In a preferred embodiment, a mounting plate is fixedly mounted on the top of the threaded hole, and a cover plate is fixedly connected to the side end of the mounting plate.

[0020] By adopting the above technical solution, the slot is inserted into the two ends of the negative pole seat and the positive pole seat, so as to measure the inclination angle, direction and position of the drill bit during the exploration process, and help engineers and operators understand the underground position of the drill bit and the drilling direction, so as to guide the drilling operation and improve the drilling efficiency and safety.

[0021] In summary, due to the adoption of the above technical solution, the beneficial effects of this application are:

[0022] In the present application, the measuring probe is the pipe body of the measuring probe, and three areas are arranged inside the measuring probe, namely, the positive and negative electrode installation area, the measuring device parts installation area and the water inlet and drainage area. The plug-in slot and the negative electrode seat are located in the upper half of the inner area of ​​the measuring probe, wherein the plug-in slot is used to plug the positive electrode seat at the drill rod at the rear end of the measuring probe, and the negative electrode seat is used for the front end position of the plug-in slot. The water inlet is located at the rear end of the measuring probe, below the negative electrode seat, and the water in the drill rod will enter from the front end of the measuring probe, and after being blocked by the front end of the negative electrode seat, it will enter the inside of the measuring probe from the water inlet. The water flows through the inside of the measuring probe and is discharged from the drainage hole, and then enters the arc water pipe in the drill rod at the rear end of the measuring probe, and finally discharged from the water outlet. The water flow is used to cooperate with the drill bit to clean the sand and gravel in the well. The first flange ring on the surface of the measuring probe is fixedly connected to the second flange ring on the surface of the drill rod by bolts. The size of the arc water pipe is slightly smaller than the drainage hole, and the size of the positive electrode seat is slightly smaller than the plug-in slot. During assembly before construction, the cover plate can be opened, and the positive pole seat and arc-shaped water pipe at the front end of the drill pipe can be installed in the plug-in slot and the drain hole at the rear end of the measuring probe respectively. The drain hole and the arc-shaped water pipe adopt a waterproof structure to prevent water from entering the plug-in slot. Then the first flange ring and the second flange ring are fixed by bolts, and then the mounting plate is opened, and the measuring device and the power supply are connected to the two ends of the positive pole seat and the negative pole seat for testing. After the test is completed, the cover plate can be installed for use. This device divides the measuring probe into three areas, which are the isolated waterway area, the detachable positive pole seat area, and the installation area of ​​the measuring device that can be quickly installed and adjusted. It allows construction personnel to quickly install and adjust before construction, which improves the efficiency of construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 This is a schematic diagram of the overall structure of a while drilling trajectory measurement probe in this application;

[0024] Figure 2 This is a schematic diagram of the front and rear end structures of the drill pipe in this application;

[0025] Figure 3 This is a schematic diagram of the front and rear end structures of the measuring probe in this application;

[0026] Figure 4 This is a schematic diagram of the internal structure of the measuring probe in this application.

[0027] Markings in the figure: 1. Measuring probe; 2. First flange ring; 3. Second flange ring; 4. Drill rod; 5. Joint; 6. Water outlet; 7. Cover plate; 8. Positive electrode seat; 9. Arc water pipe; 10. Positioning hole; 11. Mounting plate; 12. Plug-in slot; 13. Drain hole; 14. Water inlet; 15. Negative electrode seat; 16. Threaded hole; 17. Battery module; 18. Slot; 19. Control module; 20. Mounting slot. DETAILED DESCRIPTION

[0028] In order to make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the technical scheme in the embodiments of the present application will be clearly and completely described below in combination with the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0029] Example:

[0030] Reference Figure 1-3 A probe for measuring trajectory while drilling includes a measuring probe 1, a plug-in slot 12 is provided at the rear end of the measuring probe 1, a drainage hole 13 is provided at the rear end of the measuring probe 1 and below the plug-in slot 12, a first flange ring 2 is fixedly installed on the rear end surface of the measuring probe 1, a second flange ring 3 is fixedly installed at the rear end of the first flange ring 2, a drill rod 4 is fixedly installed inside the second flange ring 3, a positive electrode seat 8 is fixedly installed at the front end of the drill rod 4, an arc-shaped water pipe 9 is fixedly connected to the front end of the drill rod 4 and directly below the positive electrode seat 8, a positive electrode seat 8 is fixedly installed inside the plug-in slot 12, and an arc-shaped water pipe 9 is fixedly installed inside the drainage hole 13. The measuring probe 1 is the pipeline body of the measuring probe, and three areas are arranged inside the measuring probe 1, namely, a positive and negative electrode installation area, a measuring device parts installation area, and a water inlet and drainage area. The plug-in slot 12 and the negative pole seat 15 are located in the upper inner half of the measuring probe 1, wherein the plug-in slot 12 is used to plug in the positive pole seat 8 at the drill rod 4 at the rear end of the measuring probe 1, and the negative pole seat 15 is used to plug in the front end of the slot 12. The water inlet 14 is located at the rear end of the measuring probe 1, below the negative pole seat 15. The water in the drill rod will enter from the front end of the measuring probe 1, and after being blocked by the front end of the negative pole seat 15, it will enter the inside of the measuring probe 1 from the water inlet 14. The water flows through the inside of the measuring probe 1 and is discharged from the drain hole 13, and then enters the arc-shaped water pipe 9 in the drill rod 4 at the rear end of the measuring probe 1, and finally is discharged from the water outlet 6. The water flow is used to cooperate with the drill bit to clean the sand and gravel in the well. The first flange ring 2 on the surface of the measuring probe 1 is fixedly connected to the second flange ring 3 on the surface of the drill rod 4 by bolts.

[0031] Reference Figure 1 and Figure 2 The rear end of the drill rod 4 is fixedly connected with a joint 5, and a water outlet 6 is provided inside the joint 5. The joint 5 is used to discharge the water in the drill rod.

[0032] Reference Figure 3 and Figure 4A negative electrode seat 15 is fixedly installed inside the front end of the measuring probe 1 and at the other end away from the plug-in slot 12, and a water inlet 14 is opened inside the front end of the measuring probe 1 and below the negative electrode seat 15. The negative electrode seat 15 is fixed inside the front end of the measuring probe 1, and the positive electrode seat 8 in the plug-in slot 12 is detachable, which can be quickly assembled and debugged before construction. Convenient installation and disassembly.

[0033] Reference Figure 4 A threaded hole 16 is provided on the surface of the measuring probe 1, and a mounting groove 20 is provided inside the measuring probe 1 and at the side end of the threaded hole 16. The mounting groove 20 is used to install electronic components of the while drilling trajectory measurement device, and the threaded hole 16 is used to install a cover plate 7 for protecting the mounting groove 20.

[0034] Reference Figure 4 The front end of the mounting groove 20 is fixedly mounted with a negative electrode seat 15, and the rear end of the mounting groove 20 is fixedly mounted with a positive electrode seat 8. The electronic components of the while drilling trajectory measurement device are installed inside the mounting groove 20, which can facilitate the assembly before construction and can be connected with the negative electrode seat 15 and the positive electrode seat 8.

[0035] Reference Figure 2 and Figure 4 A positioning hole 10 is provided at the side end of the positive electrode seat 8, and a battery module 17 is fixedly installed at the side end of the positioning hole 10 and inside the mounting groove 20. The positioning hole 10 is used to position the battery module 17 in the mounting groove 20, which facilitates the installation of the battery module 17. The battery module 17 is used to provide electrical energy for the measurement device to work.

[0036] Reference Figure 4 A slot 18 is provided at the side end of the negative electrode seat 15, and a control module 19 is fixedly installed inside the slot 18. The slot 18 is inserted into both ends of the negative electrode seat 15 and the positive electrode seat 8, and can measure the inclination angle, direction and position of the drill bit during the exploration process, helping engineers and operators understand the underground position of the drill bit and the drilling direction, thereby guiding the drilling operation and improving the drilling efficiency and safety.

[0037] Reference Figure 1 and Figure 4 The top of the threaded hole 16 is fixedly mounted with a mounting plate 11, and the side end of the mounting plate 11 is fixedly connected with a cover plate 7. The threaded hole 16 can facilitate the installation of the mounting plate 11, and the cover plate 7 is installed on the surface of the mounting groove 20 to protect the measuring device inside the mounting groove 20.

[0038] The implementation principle of the embodiment of the probe tube for measuring trajectory while drilling in the present application is as follows: the measuring probe tube 1 is the pipe body of the measuring probe tube, and three areas are arranged inside the measuring probe tube 1, namely, the positive and negative electrode installation area, the measuring device parts installation area and the water inlet and drainage area. The plug-in slot 12 and the negative electrode seat 15 are located in the upper area inside the measuring probe tube 1, wherein the plug-in slot 12 is used to plug the positive electrode seat 8 at the drill rod 4 at the rear end of the measuring probe tube 1, and the negative electrode seat 15 is used to plug the front end position of the slot 12. The water inlet 14 is located at the rear end of the measuring probe tube 1, below the negative electrode seat 15, and the water in the drill rod will enter from the front end of the measuring probe tube 1, and after being blocked by the front end of the negative electrode seat 15, it will enter the inside of the measuring probe tube 1 from the water inlet 14, and the water will pass through the inside of the measuring probe tube 1 and be discharged from the drainage hole 13, and then enter the arc water pipe 9 in the drill rod 4 at the rear end of the measuring probe tube 1, and finally be discharged from the water outlet 6. The water flow is used to cooperate with the drill bit to clean the sand and gravel in the drilling well. The first flange ring 2 on the surface of the measuring probe 1 is fixedly connected to the second flange ring 3 on the surface of the drill rod 4 by bolts. The size of the arc water pipe 9 is slightly smaller than the drainage hole 13, and the size of the positive pole seat 8 is slightly smaller than the plug-in slot 12. When assembling before construction, the cover plate 7 can be opened, and the positive pole seat 8 and the arc water pipe 9 at the front end of the drill rod 4 are respectively installed in the plug-in slot 12 and the drainage hole 13 at the rear end of the measuring probe 1. The drainage hole 13 and the arc water pipe 9 adopt a waterproof structure to prevent water from entering the plug-in slot 12. Then the first flange ring 2 and the second flange ring 3 are fixed by bolts, and then the mounting plate 11 is opened, and the measuring device and the power supply are connected to the two ends of the positive pole seat 8 and the negative pole seat 15 for testing. After the test is completed, the cover plate 7 is installed and it can be used. This device divides the measuring probe into three areas, which are the isolation waterway area, the detachable positive pole seat area, and the installation area of ​​the measuring device that can be quickly installed and adjusted. It allows construction personnel to quickly install and adjust before construction, which improves the efficiency of construction.

[0039] The above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application.

Claims

1. A measurement while drilling probe, comprising a measurement probe (1), Features: The measuring probe (1) is provided with a plug-in slot (12) at the rear end thereof, and a drainage hole (13) is provided at the rear end thereof and below the plug-in slot (12). A first flange ring (2) is fixedly mounted on the rear end surface of the measuring probe (1), a second flange ring (3) is fixedly mounted at the rear end of the first flange ring (2), a drill rod (4) is fixedly mounted inside the second flange ring (3), a positive electrode seat (8) is fixedly mounted at the front end of the drill rod (4), an arc-shaped water pipe (9) is fixedly connected to the front end of the drill rod (4) and directly below the positive electrode seat (8), the positive electrode seat (8) is fixedly mounted inside the plug-in slot (12), and an arc-shaped water pipe (9) is fixedly mounted inside the drainage hole (13).

2. A measurement while drilling probe as claimed in claim 1, Features: The rear end of the drill rod (4) is fixedly connected to a joint (5), and a water outlet (6) is provided inside the joint (5).

3. A measurement while drilling probe as claimed in claim 1, Features: A negative electrode seat (15) is fixedly mounted inside the front end of the measuring probe (1) and at the other end away from the plug-in slot (12). A water inlet (14) is provided inside the front end of the measuring probe (1) and below the negative electrode seat (15).

4. A measurement while drilling probe as claimed in claim 1, Features: A threaded hole (16) is provided on the surface of the measuring probe (1), and a mounting groove (20) is provided inside the measuring probe (1) and at the side end of the threaded hole (16).

5. A measurement while drilling probe as claimed in claim 4, Features: A negative electrode seat (15) is fixedly mounted on the front end of the mounting groove (20), and a positive electrode seat (8) is fixedly mounted on the rear end of the mounting groove (20).

6. A measurement while drilling probe as claimed in claim 1, Features: A positioning hole (10) is provided at the side end of the positive electrode seat (8), and a battery module (17) is fixedly installed at the side end of the positioning hole (10) and inside the mounting groove (20).

7. A measurement while drilling probe as claimed in claim 3, Features: A slot (18) is provided at the side end of the negative electrode seat (15), and a control module (19) is fixedly installed inside the slot (18).

8. A measurement while drilling probe as claimed in claim 4, Features: A mounting plate (11) is fixedly mounted on the top of the threaded hole (16), and a cover plate (7) is fixedly connected to the side end of the mounting plate (11).

Citation Information

Cited By

  • Mining measurement-while-drilling exploring tube device

    CN224606389U