Automatic tunnel construction ventilation and cooling device
Through the automation system of the monitoring frame and air duct, precise ventilation and cooling of the tunnel construction area is achieved, and the problems of difficult to reduce the concentration of harmful gases and dust and low degree of automation of environmental temperature adjustment are solved, which improves construction efficiency and workers' health protection.
Patent Information
- Application Number
- CN202420238513.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-31
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2034-01-31
AI Technical Summary
During the tunnel construction process, the concentration of harmful gases and dust in the construction area is difficult to reduce uniformly, and the degree of automation of ambient temperature adjustment is low, which affects construction efficiency and personnel health.
An automated tunnel construction ventilation and cooling device is used with a monitoring frame and a wind cylinder. Through dust concentration and ambient temperature monitoring sensors, laser monitoring instruments and nozzles, accurate ventilation and cooling of different areas of the tunnel excavation palm surface can be achieved. Automatically adjust the ventilation direction and water spray method.
Accurate ventilation and cooling of the area near the palm surface of the tunnel excavation has been achieved, construction ventilation efficiency has been improved, workers' health has been ensured, and energy waste and labor costs have been reduced.
Smart Images

Figure CN221957614U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of tunnel construction ventilation and cooling, in particular to an automatic tunnel construction ventilation and cooling device. Background Art
[0002] During the tunnel construction process, various pollutants are generated in the construction area near the tunnel excavation face due to factors such as face drilling, explosive blasting, and the release of harmful gases from the strata, such as carbon monoxide, nitrogen oxides, sulfur dioxide and other harmful gases and dust. Since the tunnel has not been completed during the construction period and is in a semi-closed state, it is difficult and inefficient to discharge pollutants. In addition, the tunnel excavation face is located deep in the surrounding rock, the ambient temperature during construction is high, and the tunnel working environment is harsh, which seriously affects the health of tunnel construction workers and the construction efficiency of tunnel excavation. Therefore, how to reduce the concentration of harmful gases, dust and ambient temperature in the construction area near the tunnel excavation face, improve the tunnel construction working environment, and improve the effect and efficiency of tunnel construction ventilation and cooling are the key points and difficulties that need to be solved in the current tunnel construction process.
[0003] At present, the commonly used ventilation modes for tunnel construction include forced ventilation, exhaust ventilation, mixed ventilation and tunnel ventilation. Although there are differences in the various modes of tunnel construction ventilation, the basic idea is to transport fresh air outside the tunnel to the excavation face and discharge harmful gases and dust near the construction area of the excavation face out of the tunnel. Therefore, no matter which construction ventilation mode is used, a combination of fan + air duct will be used. Common types of fans include axial flow fans and jet fans. Axial flow fans are usually arranged outside the tunnel entrance to provide fresh air to the excavation face through air ducts; jet fans are usually arranged inside the tunnel to discharge harmful gases and dust near the construction area of the excavation face out of the tunnel by generating high-speed airflow. Common types of air ducts include flexible air ducts and rigid air ducts. Flexible air ducts have advantages such as light weight, long pipe sections, few joints, and easy installation, but they also have disadvantages such as low strength, poor fatigue resistance, and inability to withstand negative pressure. The advantages of rigid air ducts are small friction resistance, good impact resistance and wear resistance, ability to withstand negative pressure, and not easy to deform. Its disadvantages are heavy weight, short pipe sections, many joints, and cumbersome transportation and installation. Considering the construction progress and construction cost, most tunnel projects currently use a combination of axial flow fans + flexible air ducts.
[0004] The existing tunnel construction ventilation mode can easily meet the requirements of the wind speed at the duct outlet by using fans of different powers, but the wind direction of the duct outlet is often unable to change and is often consistent with the direction of the duct. This leads to uneven wind reception at the tunnel excavation face, and harmful gases and dust are easily gathered on the side of the face away from the duct outlet. It usually takes a long time for the concentration of harmful gases and dust to be reduced to a safe value, and even the concentration of harmful gases and dust at the edge of the face cannot be reduced to a safe value. In addition, in gas formations or other harmful gas formations, in most cases, the harmful gas sources are not evenly distributed at the tunnel excavation face, and the distribution of harmful gas sources at different sections of the entire tunnel is also different. When the duct outlet always maintains the same wind direction, it is obviously unable to meet the complex and changeable construction conditions, which greatly reduces the effect and efficiency of construction ventilation. In the actual tunnel construction process, if complex and changeable construction ventilation conditions are encountered, the method of increasing the fan power and thus increasing the wind speed at the duct outlet is often adopted, which also causes serious energy waste.
[0005] At the same time, the cooling measures currently taken for tunnel construction include: ventilation cooling, low-temperature cold water cooling, water sprinkling cooling, ice cooling, laying cooling pipes on the outside of the lining, individual protection to strengthen personnel safety and health management, and adding low-temperature rest rooms. Among them, ventilation cooling, water sprinkling cooling, and ice cooling are widely used in the prevention and control of heat damage in high-temperature tunnels.
[0006] The cooling measures currently adopted in tunnel construction can play a certain role in reducing the ambient temperature of the tunnel construction area, but they often require additional construction techniques and require more construction technicians to handle, resulting in a waste of labor. In most cases, the ambient temperature of the tunnel construction area will continue to change with the excavation mileage and burial depth of the tunnel excavation face. The commonly used tunnel construction cooling measures are difficult to adjust the cooling effect according to the ambient temperature of the tunnel construction area, and the degree of automation is low.
[0007] Therefore, the inventor provides an automated tunnel construction ventilation and cooling device, which realizes precise ventilation of different areas of the tunnel excavation face by combining a monitoring frame with a wind duct. At the same time, the wind duct integrates multiple nozzles, which can effectively reduce the ambient temperature near the tunnel excavation face. Utility Model Content
[0008] The purpose of the utility model is to provide an automated tunnel construction ventilation and cooling device, which realizes accurate ventilation of different areas of the tunnel excavation face by matching a monitoring frame with a wind duct. At the same time, the wind duct integrates multiple nozzles, which can effectively reduce the ambient temperature near the tunnel excavation face.
[0009] The purpose of this utility model is achieved through the following technical solutions:
[0010] An automated tunnel construction ventilation and cooling device, comprising a monitoring frame, a ventilation component, a cooling component and a host computer;
[0011] The monitoring frame is located in front of the tunnel excavation face, the ventilation component and the cooling component are located on the side of the monitoring frame away from the tunnel excavation face, the monitoring frame includes a detachable support frame and a monitoring component, a plurality of the monitoring components are fixed on the detachable support frame, the monitoring component includes a dust concentration monitoring sensor, an ambient temperature monitoring sensor and a reflector, and the monitoring component is electrically connected to the host computer;
[0012] The ventilation assembly includes a rotating seat, a wind tube located above the rotating seat, and a laser monitoring instrument, wherein the laser monitoring instrument is adapted to the reflector, and the wind tube determines the ventilation direction through the laser monitoring instrument and the reflector;
[0013] The cooling component includes a refrigerator and a nozzle, and the nozzle is fixed on the air cylinder;
[0014] The ventilation component and the cooling component are electrically connected to the host computer respectively.
[0015] Furthermore, a support seat is provided at the bottom of the wind tube, the wind tube is movably connected to the support seat, a rotating motor is provided in the rotating seat, the support seat is rotatably connected to the rotating seat, and the support seat is turned by the rotating motor.
[0016] Furthermore, a hydraulic rod is provided on the support seat, a cylinder body of the hydraulic rod is hinged to the support seat, and an end of a piston rod of the hydraulic rod is connected to the air cylinder.
[0017] Furthermore, the refrigerator is located at one side of the ventilation assembly, a water tank is provided in the refrigerator, the water tank is connected to the nozzle through a water pipe, and a water pump is provided on the water pipe.
[0018] Furthermore, a solenoid valve is provided at the end of each of the nozzles, and the solenoid valve is electrically connected to the host computer.
[0019] Furthermore, the laser monitoring instrument is fixed above the air outlet of the wind duct, and the plurality of nozzles are evenly arranged in the circumferential direction of the air outlet of the wind duct and do not interfere with the laser monitoring instrument.
[0020] Furthermore, a pulley is provided at the bottom of the detachable support frame, and the detachable support frame includes a steel pipe and bolts.
[0021] Furthermore, the host computer is located on a side away from the tunnel face.
[0022] The beneficial effects of the utility model are:
[0023] 1) Through the combination of monitoring frames and wind tubes, accurate ventilation of different areas of the tunnel excavation face is achieved, which improves the construction working environment in the area near the tunnel excavation face and ensures the health of tunnel construction workers.
[0024] 2) The integration of ventilation components and cooling components can provide targeted ventilation and dust reduction for areas with high concentrations of harmful gases and dust on the tunnel face, greatly improving the efficiency of tunnel construction ventilation and effectively reducing the ambient temperature near the tunnel excavation face. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a schematic diagram of the ventilation component and the cooling component in the utility model;
[0026] Figure 2 It is a schematic diagram of the monitoring frame in the utility model;
[0027] Figure 3 for Figure 2 The enlarged schematic diagram of point A in the middle;
[0028] In the figure, 1-monitoring frame, 101-monitoring component, 102-steel pipe, 103-bolt, 104-pulley, 2-ventilation component, 201-air duct, 202-laser monitoring instrument, 203-support seat, 204-rotating seat, 205-hydraulic rod, 3-cooling component, 301-refrigeration machine, 302-nozzle, 303-water pipe, 304-water pump. DETAILED DESCRIPTION
[0029] The following will be combined with the embodiments to clearly and completely describe the technical solution of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the utility model.
[0030] See also Figure 1-Figure 3 , the utility model provides a technical solution:
[0031] like Figure 1-Figure 3 As shown, the monitoring frame 1 includes a detachable support frame and a monitoring component 101, wherein the detachable support frame is composed of a steel pipe 102 and a bolt 103, and can be flexibly assembled according to the shape of the tunnel excavation face and the number of monitoring components 101 to be arranged. At the same time, the monitoring component 101 can be quickly moved to the front of the tunnel excavation face through the pulley 104 at the bottom of the detachable support frame.
[0032] After the detachable support frame is arranged, multiple groups of monitoring components 101 are flexibly arranged according to monitoring needs. Dust concentration monitoring sensors and ambient temperature monitoring sensors are used to monitor the dust concentration and ambient temperature in different areas respectively. The monitoring data are fed back to the host computer for analysis and processing. At the same time, the host computer is kept away from the tunnel excavation face to prevent dust and ambient temperature from affecting the operation of the host computer.
[0033] After a monitoring component 101 detects that the dust concentration or harmful gas exceeds the standard, the reflector in the monitoring component 101 sends a signal. At this time, the laser monitoring instrument 202 above the wind tube 201 receives the signal and focuses on the reflector there. The upper computer controls the ventilation component 2 to face the area. Specifically, the support seat 203 and the wind tube 201 are driven to rotate to the target area by the rotating motor, and then the pitch angle of the wind tube 201 is adjusted by the hydraulic rod 205. The laser monitoring instrument 202 and the reflector are used to ensure accurate ventilation of the wind tube 201 until the monitoring data of the area is lower than the standard value. Automatic ventilation and targeted ventilation of the wind tube 201 can reduce the dust concentration and harmful gas concentration in the local area to a limited extent, improve the construction environment in the area near the tunnel excavation face, ensure the health of tunnel construction workers, and greatly improve the efficiency of tunnel construction ventilation.
[0034] In another embodiment, the location information of multiple monitoring components 101 is entered into the host computer in advance. After the host computer receives the monitoring data sent back by the monitoring components 101, when the dust concentration or harmful gas in a certain area exceeds the standard, the host computer controls the movement of the ventilation component 2 so that the air duct 201 is facing the area, and then improves the ventilation accuracy by focusing the laser monitoring instrument 202 and the reflector.
[0035] Furthermore, since the nozzle 302 is fixed on the wind tube 201, the nozzle 302 moves with the movement of the wind tube 201. The water in the water tank is pumped out by the water pump 304 and the water pipe 303 and sprayed out from the nozzle 302 to reduce the high-concentration dust in the target area, which can further improve the treatment effect of dust and harmful gases.
[0036] In another embodiment, when the dust concentration meets the standard but the temperature is too high, the ambient temperature sensor in the monitoring component 101 detects that the temperature is too high, and the host computer controls the air cylinder 201 to face the target area, thereby driving the nozzle 302 to start spraying water toward the target area. At the same time, according to the different monitored temperatures, different numbers of nozzles 302 can be selectively opened by controlling the solenoid valve of the nozzle 302 to improve the cooling effect.
[0037] Furthermore, when all the nozzles 302 are turned on to spray water, the temperature in the target area has not dropped below the standard value. At this time, the host computer starts the refrigerator 301 to cool the water in the water tank, and sprays the cooled water through the nozzle 302 to complete the cooling of the target area. The cooling component 3 can automatically cool down, and the multi-stage cooling method can effectively reduce the temperature in the tunnel and save costs. At the same time, the integration of the cooling component 3 and the ventilation component 2 can effectively reduce the dust concentration in the local area, and can ventilate and cool down at the same time.
[0038] The above is only a preferred embodiment of the utility model. It should be understood that the utility model is not limited to the form disclosed herein, and should not be regarded as excluding other embodiments, but can be used in various other combinations, modifications and environments, and can be modified within the scope of the concept described herein through the above teachings or the technology or knowledge of the relevant field. The changes and modifications made by those skilled in the art do not deviate from the spirit and scope of the utility model, and should be protected by the claims attached to the utility model.
Claims
1. An automated tunnel construction ventilation and cooling device, characterized in that: The invention comprises a monitoring frame (1), a ventilation component (2), a cooling component (3) and a host computer; the monitoring frame (1) is located in front of a tunnel excavation face, the ventilation component (2) and the cooling component (3) are located on a side of the monitoring frame (1) away from the tunnel excavation face, the monitoring frame (1) comprises a detachable support frame and a monitoring component (101), a plurality of monitoring components (101) are fixed on the detachable support frame, the monitoring component (101) comprises a dust concentration monitoring sensor, an ambient temperature monitoring sensor and a reflector, and the monitoring component (101) is electrically connected to the host computer; The ventilation assembly (2) comprises a rotating seat (204), a wind tube (201) located above the rotating seat (204), and a laser monitoring instrument (202), wherein the laser monitoring instrument (202) is adapted to the reflector, and the wind tube (201) determines the ventilation direction through the laser monitoring instrument (202) and the reflector; The cooling component (3) comprises a refrigerator (301) and a nozzle (302), wherein the nozzle (302) is fixed on the air cylinder (201); The ventilation component (2) and the cooling component (3) are electrically connected to the host computer respectively.
2. The automated tunnel construction ventilation and cooling device according to claim 1, characterized in that: A support seat (203) is provided at the bottom of the wind tube (201); the wind tube (201) is movably connected to the support seat (203); a rotating motor is provided in the rotating seat (204); the support seat (203) is rotatably connected to the rotating seat (204); and the support seat (203) is turned by the rotating motor.
3. The automated tunnel construction ventilation and cooling device according to claim 2 is characterized in that: A hydraulic rod (205) is provided on the support seat (203); a cylinder body of the hydraulic rod (205) is hinged to the support seat (203); and a piston rod end of the hydraulic rod (205) is connected to the air cylinder (201).
4. The automated tunnel construction ventilation and cooling device according to claim 1, characterized in that: The refrigerator (301) is located on one side of the ventilation assembly (2). A water tank is provided in the refrigerator (301). The water tank is connected to the nozzle (302) via a water pipe (303). A water pump (304) is provided on the water pipe (303).
5. The automated tunnel construction ventilation and cooling device according to claim 1, characterized in that: A solenoid valve is provided at the end of each of the spray heads (302), and the solenoid valve is electrically connected to the host computer.
6. The automated tunnel construction ventilation and cooling device according to claim 1, characterized in that: The laser monitoring instrument (202) is fixed above the air outlet of the wind tube (201), and the plurality of nozzles (302) are evenly arranged in the circumferential direction of the air outlet of the wind tube (201) and do not interfere with the laser monitoring instrument (202).
7. The automated tunnel construction ventilation and cooling device according to claim 1, characterized in that: A pulley (104) is provided at the bottom of the detachable support frame, and the detachable support frame comprises a steel pipe (102) and bolts (103).
8. The automated tunnel construction ventilation and cooling device according to claim 1, characterized in that: The host computer is located at a side away from the tunnel face.
Citation Information
Cited By
Tunnel face perpendicularity detection device and detection method
CN119413148A
