Material box purification mechanism and device and semiconductor equipment

By designing the material box purification mechanism of the bracket unit, the air intake unit and the air outlet unit, the problem of low material box purge efficiency in semiconductor equipment is solved, efficient batch purification and simplified operation are achieved, and manpower investment is reduced.

CN221960940UActive Publication Date: 2024-11-05成川科技(苏州)有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323304765.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-05
Publication Date
2024-11-05
Estimated Expiration
2033-12-05

AI Technical Summary

Technical Problem

In existing semiconductor equipment, the purge operation of material boxes is inefficient, requiring manual transfer and frequent loading and unloading, which increases the workload and investment of the operators.

Method used

A material box purification mechanism is designed, including a bracket unit, an air intake unit and an air outlet unit. The bracket unit is used to carry the material box. The air intake unit and an air outlet unit are replaced by docking to realize batch purification, simplify the process and reduce manpower investment. .

Benefits of technology

It realizes efficient batch purification of material boxes, simplifies the operation process, reduces the workload and investment of operators, and improves purification efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221960940U_ABST
    Figure CN221960940U_ABST
Patent Text Reader

Abstract

The utility model relates to a material box purification mechanism, device and semiconductor equipment, comprising a support unit, the support unit comprises at least one support assembly used for bearing a material box to be purified, the support assembly comprises a base, an accommodating groove arranged on the base, and a first air inlet and a first air outlet arranged on the base; one end of a gas inlet main pipe is connected to a gas source, the other end of the gas inlet main pipe is connected with the first gas inlet, and the gas inlet unit is used for introducing gas into the to-be-purified material box; and the air outlet unit comprises an air outlet main pipe, and the air outlet main pipe is connected with the first air outlet and communicated with the air inlet main pipe. The material box and the support assembly can be conveniently assembled, the use convenience is high, the purification device does not need to be frequently assembled and disassembled, only the material box to be purified needs to be placed at the designated position of the support unit, and the material box is moved away after purification is completed, so that the process can be simplified, and the investment of operators is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of semiconductor equipment, in particular to a material box purification mechanism, device and semiconductor equipment. Background Art

[0002] During the production process, material boxes are often used to store or transport materials. When a material box is used to load wafers, it plays the role of placing and transporting wafers as a wafer box in semiconductor production. In order to simplify transportation and minimize the risk of contamination, chip manufacturers usually use wafer boxes to transport and store wafers. In the prior art, semiconductor equipment includes a front-end module and a purge device. The front-end module has a microenvironment and is provided with a carrier for carrying a wafer box.

[0003] However, in the prior art, since the purge device and the wafer box are independent of each other, when purge is required, the wafer box needs to be transferred to a fixed position and the purge and transfer operations are performed manually, which is inefficient, making the entire process more cumbersome and increasing the workload and manpower input of the operators. Utility Model Content

[0004] To this end, the technical problem to be solved by the utility model is to overcome the deficiencies in the prior art and provide a material box purification mechanism, device and semiconductor equipment, which can realize batch purging of material boxes to achieve purification. At the same time, the utility model is easy to use, does not require frequent loading and unloading, can simplify the process, and reduce the input of operators.

[0005] In order to solve the above technical problems, the utility model provides a material box purification mechanism, comprising:

[0006] A bracket unit, comprising at least one bracket assembly for carrying a material box to be purified, the bracket assembly comprising a base, a receiving groove arranged on the base, and a first air inlet and a first air outlet arranged on the base, the material box to be purified is accommodated in the receiving groove, the first air inlet is connected to the air inlet of the material box to be purified, and the first air outlet is connected to the air outlet of the material box to be purified;

[0007] An air intake unit, comprising an air intake main pipe, one end of which is connected to an air source, and the other end of which is connected to the first air inlet, and the air intake unit is used to introduce gas into the material box to be purified;

[0008] The air outlet unit comprises an air outlet main pipe connected to the first air outlet and communicated with the air inlet main pipe. The air outlet unit is used to discharge the gas in the material box to be purified.

[0009] In one embodiment of the utility model, when there are two or more bracket assemblies, the air inlet unit also includes at least one air inlet branch pipe, and the air outlet unit also includes at least one air outlet branch pipe, and each of the bracket assemblies is configured to be connected to the air inlet branch pipe and the air outlet branch pipe, wherein the air inlet branch pipe is configured to be connected to the air inlet main pipe at one end and to the first air inlet port at the other end, and the air outlet branch pipe is configured to be connected to the air outlet main pipe at one end and to the first air outlet at the other end.

[0010] In one embodiment of the present invention, a positioning member for positioning the material box to be purified is further provided on the base.

[0011] In one embodiment of the utility model, the air intake unit further comprises an air source processing component disposed on the air intake main pipe, and the air source processing component comprises a first valve body for adjusting the air intake pressure.

[0012] In one embodiment of the present utility model, the air intake unit further comprises a first control valve disposed on the base, wherein the first control valve is connected to the first air intake port and controls the opening and closing of the first air intake port.

[0013] In one embodiment of the present invention, the air outlet unit further includes a second control valve disposed on the base, and the second control valve is connected to the first air outlet to control the opening and closing of the first air outlet.

[0014] In one embodiment of the present invention, a pressure sensor is further included. The pressure sensor is arranged on the base and is used to detect the pressure in the material box to be purified.

[0015] In one embodiment of the utility model, a humidity sensor is further included. The humidity sensor is disposed on the base and connected to the first air outlet. The humidity sensor is used to detect the humidity of the exhaust gas.

[0016] The utility model also provides a material box purification device, including a storage unit and the material box purification mechanism as described above, wherein the storage unit includes a frame and a plurality of placement portions for placing material boxes to be purified, the placement portions are arranged in an array on the frame in sequence along the length direction and the height direction of the frame, and the material box purification mechanism is disposed on the frame. When purification is required, the material box to be purified is transferred from the placement portion to the material box purification mechanism.

[0017] The utility model also provides a semiconductor device, comprising a wafer box and a material box purification device as described above, wherein the material box purification device carries the wafer box and purges the inside of the wafer box.

[0018] The above technical solution of the utility model has the following advantages compared with the prior art:

[0019] The utility model discloses a material box purification mechanism, which is provided with a bracket unit, an air inlet unit and an air outlet unit, wherein the bracket unit comprises at least one bracket assembly for carrying the material box to be purified, the bracket assembly comprises a base, a first air inlet and a first air outlet, wherein one end of the first air inlet is connected to the air inlet of the material box to be purified, and the other end is connected to the air inlet unit, one end of the first air outlet is connected to the air outlet of the wafer to be purified, and the other end is connected to the air outlet unit, so that the air inlet unit introduces gas for purging into the material box to be purified through the first air inlet, and after purging, the gas in the material box is discharged through the first air outlet, so as to replace the gas in the material box and achieve the purpose of dehumidification. When there are multiple bracket assemblies, each bracket assembly is equipped with a material box to be purified, so as to realize batch purification of the material boxes. Compared with the prior art, the structure of the utility model is convenient for assembling the material box and the bracket assembly, and is more convenient to use. There is no need to frequently load and unload the purification device. It is only necessary to place the material box to be purified at the designated position of the bracket unit and remove the material box after purification is completed. Therefore, the utility model can also simplify the process and reduce the input of operators. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] In order to make the content of the utility model easier to understand, the utility model is further described in detail according to the specific embodiments of the utility model in combination with the accompanying drawings, wherein:

[0021] Figure 1 It is a schematic diagram of the overall structure of the material box purification mechanism of the best embodiment of the utility model.

[0022] Figure 2 It is a partial structural schematic diagram of the bracket assembly of the best embodiment of the utility model.

[0023] Figure 3 It is a partial structural schematic diagram of the bracket assembly of the best embodiment of the utility model.

[0024] Figure 4 It is a partial structural schematic diagram of the gas source processing component of the best embodiment of the utility model.

[0025] Figure 5 It is a schematic diagram of the overall structure of the material box purification device of the best embodiment of the utility model.

[0026] Figure 6 It is a schematic diagram of the overall structure of a wafer box according to the best embodiment of the utility model.

[0027] Figure 7 It is a schematic diagram of the working process of the best embodiment of the utility model.

[0028] Explanation of the reference numerals in the accompanying drawings in the specification: 1. base; 10. first air inlet; 11. first air outlet; 12. positioning pin; 13. first control valve; 14. second control valve; 15. filter; 16. flow valve; 17. pressure sensor; 18. humidity sensor; 2. air inlet main pipe; 21. air inlet branch pipe; 3. air outlet main pipe; 31. air outlet branch pipe; 4. air source processing component; 41. first valve body; 42. air source processing triplex; 5. frame; 51. placement part; 6. wafer box; 61. air inlet hole; 62. air outlet hole; 63. positioning groove. DETAILED DESCRIPTION

[0029] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments so that those skilled in the art can better understand the present invention and implement it, but the embodiments are not intended to limit the present invention.

[0030] Embodiment 1

[0031] Reference Figures 1 to 7 As shown, the utility model discloses a material box purification mechanism, including a bracket unit, the bracket unit including at least one bracket assembly for carrying the material box to be purified. The bracket assembly includes a base 1, a receiving groove arranged on the base, and a first air inlet 10 and a first air outlet 11 arranged on the base 1, and the material box to be purified is accommodated in the receiving groove. The first air inlet 10 is connected to the air inlet of the material box to be purified, and the first air outlet 11 is connected to the air outlet of the material box to be purified;

[0032] The material box purification mechanism further includes an air intake unit, the air intake unit includes an air intake main pipe 2, one end of the air intake main pipe 2 is connected to the air source, and the other end is connected to the first air inlet 10, and the air intake unit is used to introduce gas into the material box to be purified;

[0033] The air outlet unit includes an air outlet main pipe 3 , the air outlet main pipe 3 is connected to the first air outlet 11 , the air outlet main pipe 3 is communicated with the air inlet main pipe 2 , and the air outlet unit is used to discharge the gas in the material box to be purified.

[0034] From this, it can be known that a material box purification mechanism to be protected by the utility model is provided with a bracket unit, an air inlet unit and an air outlet unit, the bracket unit includes at least one bracket assembly for carrying the material box to be purified, the bracket assembly includes a base, a first air inlet and a first air outlet, wherein one end of the first air inlet is connected to the air inlet of the material box to be purified, and the other end is connected to the air inlet unit, one end of the first air outlet is connected to the air outlet of the wafer to be purified, and the other end is connected to the air outlet unit, so that the air inlet unit introduces gas for purging into the material box to be purified through the first air inlet, and after purging, the gas in the material box is discharged through the first air outlet, thereby replacing the gas in the material box and achieving the purpose of dehumidification. When there are multiple bracket assemblies, each bracket assembly is equipped with a material box to be purified, so as to realize batch purification of the material boxes. Compared with the prior art, the structure of the utility model is convenient for assembling the material box and the bracket assembly, and is more convenient to use. There is no need to frequently load and unload the purification device. It is only necessary to place the material box to be purified at the designated position of the bracket unit and remove the material box after purification is completed. Therefore, the utility model can also simplify the process and reduce the input of operators.

[0035] Specifically, the projection area of ​​the receiving groove along the height direction is smaller than the projection area of ​​the base 1 along the height direction, and at the same time, the receiving groove can accommodate the material box to be purified.

[0036] As a preferred embodiment, an avoidance groove is provided in the middle of the base 1, so that the robot can grab the box of materials to be purified along the avoidance groove, which can facilitate grabbing and avoid interference.

[0037] Further, when there are two or more support assemblies, the air inlet unit further includes at least one air inlet branch pipe 21, and the air outlet unit further includes at least one air outlet branch pipe 31, and each of the support assemblies is configured to be connected to the air inlet branch pipe 21 and the air outlet branch pipe 31, wherein the air inlet branch pipe is configured to be connected to the air inlet main pipe 2 at one end and to be connected to the first air inlet port 10 at the other end, and the air outlet branch pipe 31 is configured to be connected to the air outlet main pipe 3 at one end and to be connected to the first air outlet port 11 at the other end. With such a configuration, batch purification of multiple material boxes to be purified can be achieved, thereby effectively improving the purification efficiency.

[0038] Specifically, in order to stably hold the material box to be purified on the base 1, a positioning member for positioning the material box to be purified is also provided on the base 1. As a preferred embodiment, the positioning member includes at least one positioning pin 12 provided on the base 1, and the location of the positioning pin 12 corresponds to the location of the positioning groove on the material box to be purified.

[0039] Furthermore, the air intake unit further includes an air source processing component 4 disposed on the air intake main pipe 3, and the air source processing component 4 includes a first valve body 41 for adjusting the air intake pressure. As a preferred embodiment, the first valve body 41 is an electric proportional valve, which can adjust the pressure more accurately and can achieve online adjustment when connected to the control end.

[0040] In detail, the air source processing component 4 also includes an air source processing triplet 42, which is arranged between the first valve body 41 and the air source. Specifically, the air source processing triplet 42 includes a hand valve, a pressure regulating valve, an oil mist separator and a pressure display, thereby controlling the on-off of the intake air and realizing oil mist removal and pressure regulation.

[0041] As a preferred embodiment, the air intake unit further includes a first control valve 13 disposed on the base 1, the first control valve 13 is connected to the first air intake port 10 and controls the opening and closing of the first air intake port 10. The first control valve 13 includes but is not limited to a solenoid valve.

[0042] In addition, the gas outlet unit further includes a second control valve 14 disposed on the base 1, and the second control valve 14 is connected to the first gas outlet 11 to control the opening and closing of the first gas outlet 11. The second control valve 14 includes but is not limited to a solenoid valve.

[0043] Furthermore, the air intake unit further includes a filter 15, and the filter 15 is disposed at the first air intake port 10 and located at the connection between the first air intake port 10 and the air intake branch pipe 21, so as to filter fine particles.

[0044] As a preferred embodiment, a flow valve 16 is further provided on the base 1. The flow valve 16 is arranged at the first air inlet 10 and is located at the connection between the first air inlet 10 and the air inlet branch pipe 21, so that the flow rate can be easily set.

[0045] Furthermore, the purification mechanism further includes a pressure sensor 17, which is disposed on the base 1 and is used to detect the pressure in the material box to be purified.

[0046] Furthermore, the purification mechanism further includes a humidity sensor 18 , which is disposed on the base 1 and connected to the first air outlet 11 , and is used to detect the humidity of the exhaust gas.

[0047] As a preferred embodiment, a first air nozzle is further provided at one end of the first air inlet 10 connected to the material box to be purified. The first air nozzle is made of soft material, so that it can easily fit the air inlet hole of the material box to be purified and has a good sealing effect.

[0048] Correspondingly, a second air nozzle is provided at one end of the first air outlet 11 connected to the material box to be purified. The second air nozzle is also made of soft material so that it can be easily fitted to the air outlet of the material box to be purified, thereby improving the sealing performance.

[0049] Embodiment 2

[0050] The utility model also discloses a material box purification device, comprising a storage unit and the material box purification mechanism as described in the first embodiment.

[0051] The storage unit includes a frame 5 and a plurality of placement portions 51 for placing material boxes to be purified, the placement portions 51 are arranged in an array along the length direction and height direction of the frame 5, and the material box purification mechanism is arranged below the frame 5. When purification is required, the material box to be purified is transferred from the placement portion to the material box purification mechanism by a robot or other conveying equipment.

[0052] As a preferred embodiment, the bracket unit in the material box purification mechanism is extended along the length direction of the frame 5. This makes it easy to take the material box to be purified above the frame 5 and place it in the purification mechanism for purification.

[0053] Specifically, for the sake of space saving and ease of implementation, the air inlet pipe 2 and the air outlet pipe 3 in the material box purification mechanism are extended along the height direction of the frame 5 .

[0054] Embodiment 3

[0055] A semiconductor device comprises a wafer box 6 and a material box purification device as described in the second embodiment, wherein the material box purification device carries the wafer box 6 and purges the inside of the wafer box 6.

[0056] Furthermore, the wafer box 6 includes a body, and an air inlet 61 and an air outlet 62 disposed on the body. A positioning groove 63 is disposed on the side of the wafer box 6 that contacts the base 1, and the positioning groove 63 can match the positioning pin 12 of the material box purification device to achieve positioning.

[0057] As a preferred embodiment, two air inlet holes 61 are provided, and two air outlet holes 62 are provided.

[0058] The working principle and process of the utility model are as follows:

[0059] First, the gas source enters, the pressure is adjusted, the oil mist is removed, and the electric proportional valve accurately adjusts the pressure online; then, the inlet and outlet solenoid valves are opened, and nitrogen is passed into the wafer box. The flow valve controls the branch flow according to the dehumidification process requirements, and the filter filters the fine particles in the front pipeline and gas path components. Then the pressure sensor detects the pressure in the wafer box during the inflation process to avoid pressure overload of the wafer box. The humidity of the outlet gas is detected by the humidity sensor. When the humidity does not meet the standard, the air can continue to be taken in. After the gas replacement in the wafer box is completed, the outlet solenoid valve is closed.

[0060] In the description of the embodiments of the present utility model, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present utility model can be understood according to specific circumstances.

[0061] In the description of the present utility model, it should be understood that the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of the present utility model, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0062] In the present invention, unless otherwise clearly specified and limited, the terms "install", "connect", "connect", "fix" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium; it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0063] Obviously, the above embodiments are merely examples for the purpose of clear explanation and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention of the utility model.

Claims

1. A material box purification mechanism, characterized in that: include, A bracket unit, comprising at least one bracket assembly for carrying a material box to be purified, the bracket assembly comprising a base, a receiving groove arranged on the base, and a first air inlet and a first air outlet arranged on the base, the material box to be purified is accommodated in the receiving groove, the first air inlet is connected to the air inlet of the material box to be purified, and the first air outlet is connected to the air outlet of the material box to be purified; An air intake unit, comprising an air intake main pipe, one end of which is connected to an air source, and the other end of which is connected to the first air inlet, and the air intake unit is used to introduce gas into the material box to be purified; The air outlet unit comprises an air outlet main pipe connected to the first air outlet and communicated with the air inlet main pipe. The air outlet unit is used to discharge the gas in the material box to be purified.

2. A material box purification mechanism according to claim 1, characterized in that: When there are two or more support assemblies, the air inlet unit further includes at least one air inlet branch pipe, and the air outlet unit further includes at least one air outlet branch pipe, and each of the support assemblies is configured to be connected to the air inlet branch pipe and the air outlet branch pipe, wherein the air inlet branch pipe is configured to be connected to the air inlet main pipe at one end and to be connected to the first air inlet port at the other end, and the air outlet branch pipe is configured to be connected to the air outlet main pipe at one end and to be connected to the first air outlet at the other end.

3. A material box purification mechanism according to claim 1 or 2, characterized in that: The base is also provided with a positioning member for positioning the material box to be purified.

4. A material box purification mechanism according to claim 1 or 2, characterized in that: The air intake unit further comprises an air source processing component arranged on the air intake main pipe, and the air source processing component comprises a first valve body for adjusting the air intake pressure.

5. A material box purification mechanism according to claim 1 or 2, characterized in that: The air intake unit further includes a first control valve disposed on the base, wherein the first control valve is connected to the first air intake port and controls the opening and closing of the first air intake port.

6. A material box purification mechanism according to claim 1 or 2, characterized in that: The air outlet unit further includes a second control valve disposed on the base, wherein the second control valve is connected to the first air outlet and controls the opening and closing of the first air outlet.

7. A material box purification mechanism according to claim 1 or 2, characterized in that: It also includes a pressure sensor, which is arranged on the base and is used to detect the pressure in the material box to be purified.

8. A material box purification mechanism according to claim 1 or 2, characterized in that: It also includes a humidity sensor, which is arranged on the base and connected to the first air outlet, and is used to detect the humidity of the exhaust gas.

9. A material box purification device, characterized in that: It comprises a storage unit and a material box purification mechanism as described in any one of claims 1 to 8, wherein the storage unit comprises a frame and a plurality of placement portions for placing material boxes to be purified, the placement portions are arranged in an array on the frame in sequence along the length direction and the height direction of the frame, and the material box purification mechanism is disposed on the frame, and when purification is required, the material box to be purified is transferred from the placement portion to the material box purification mechanism.

10. A semiconductor device, characterized in that: It comprises a wafer box and a material box purification device as claimed in claim 9, wherein the material box purification device carries the wafer box and purges the inside of the wafer box.