Building waste treatment device
By introducing fan, hose and rail-type chain lifting platform designs into the construction waste treatment device, the problems of low cleaning efficiency and dust in the existing technology are solved, centralized collection of dust and semi-automatic loading are realized, and treatment efficiency is improved. Security.
Patent Information
- Application Number
- CN202323541280.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-25
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2033-12-25
AI Technical Summary
The existing construction waste treatment equipment is inefficient in cleaning, has high labor intensity, and is prone to dust during the treatment process, affecting the health of the air and personnel.
A construction waste treatment device including fan, hose, groove, mesh plate, rail-type chain lifting platform and transfer bucket is designed to reduce dust and labor intensity through fan vacuuming, semi-automatic loading and protection design.
It realizes centralized collection of dust and environmental protection, reduces dust pollution and labor intensity, and improves the efficiency and safety of waste treatment.
Smart Images

Figure CN221965448U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of waste treatment, in particular to a construction waste treatment device. Background Art
[0002] During the construction process, a large amount of construction waste will be generated. Most of these construction wastes are unused or scrapped building materials, including metals and non-metals. These construction wastes need to be processed and cannot be piled up somewhere at will, otherwise it will cause environmental pollution. Therefore, waste treatment equipment is needed to treat them.
[0003] Although the existing construction waste treatment device can have a good cleaning ability for construction waste, its cleaning efficiency will be affected by labor. Since the waste usually needs to be transported by porters and then put into the device, the manpower investment of the porters is large, the labor intensity is high, and it is impossible to always maintain high-efficiency cleaning, resulting in low overall cleaning efficiency. In addition, the waste is very easy to generate dust during the treatment process, which has an adverse effect on the air and the health of construction workers, and has poor practicality.
[0004] In view of the technical problems existing in the prior art, the utility model provides a construction waste treatment device to solve the above problems. Utility Model Content
[0005] The utility model aims to solve the shortcomings in the prior art and proposes a construction waste treatment device.
[0006] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0007] A construction waste processing device comprises a body, four pillars are fixedly installed at the bottom end of the body, a slot is opened on the inner wall of the body, a mesh plate is covered at the opening of the slot, a fan is fixedly installed on the outer wall of the body, an air suction port of the fan is connected with the slot, two crushing rollers are rotatably connected between the two inner walls of the body, the two crushing rollers are located in the same plane, a protective box is fixedly installed on the outer wall of the body, a guide rail chain lifting platform is fixedly installed on the guide rail chain lifting platform, a transfer bucket is fixedly installed on the guide rail chain lifting platform, and the top surface of the transfer bucket is consistent with the top surface of the body.
[0008] Preferably, the rotating shafts of the two crushing rollers penetrate the side wall of the machine body and are rotatably connected to the inner wall of the protective box, and the rotating shafts of the two crushing rollers are fixedly mounted with transmission wheels located in the protective box.
[0009] Preferably, the two transmission wheels are covered with a same transmission belt, a motor is fixedly mounted on the outer side wall of the protection box, and the output shaft of the motor is fixedly connected to the rotating shaft of one of the crushing rollers.
[0010] Preferably, a buffer pad is provided at the edge of the top surface of the transfer bucket, and the groove is located above the two crushing rollers.
[0011] Preferably, a hose is fixedly installed at the air outlet of the fan, and a collection bucket is fixedly connected to the end of the hose.
[0012] Preferably, a discharge pipe is provided on the bottom of the machine body and is located directly below the two crushing rollers, and a guide plate is provided in the discharge pipe.
[0013] Compared with the prior art, the utility model has the following beneficial effects:
[0014] 1. The utility model can timely suck the dust generated by the crushed waste by setting the fan, hose, slot, mesh plate and collection bucket, collect the dust centrally, and prevent the dust from leaving the machine body and becoming dust, polluting the environment and endangering the health of the staff. The mesh plate can prevent waste such as plastic bags from entering the fan;
[0015] 2. The utility model realizes semi-automatic loading by setting a guide rail chain lifting platform and a transfer bucket, which reduces the difficulty of loading. When the transfer bucket moves to the top of the machine body, it can cover the machine body, block dust, and assist the fan to absorb dust. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 The utility model is a structural schematic diagram of a construction waste treatment device.
[0017] Figure 2 This is a side view of a construction waste treatment device proposed by the utility model.
[0018] Figure 3 This is a top view of a construction waste treatment device proposed by the utility model.
[0019] In the figure: 1 body, 2 fan, 3 hose, 4 crushing roller, 5 discharge pipe, 6 guide plate, 7 support, 8 slot, 9 mesh plate, 10 motor, 11 protection box, 12 transmission belt, 13 transmission wheel, 14 guide chain lifting platform, 15 transfer bucket, 16 collection bucket. DETAILED DESCRIPTION
[0020] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0021] Reference Figure 1-Figure 3 , a construction waste treatment device comprises a body 1, four pillars 7 are fixedly installed at the bottom end of the body 1, a slot 8 is opened on the inner side wall of the body 1, the slot 8 is rectangular, and the opening is relatively large to facilitate better dust suction, and the opening of the slot 8 is covered with a mesh plate 9, which is used to block waste such as plastic bags from entering the fan 2, reducing the probability of the fan 2 being stuck, and a fan 2 is fixedly installed on the outer side wall of the body 1, and the air suction port of the fan 2 is connected to the slot 8, and a hose 3 is fixedly installed at the exhaust port of the fan 2, and a collection bucket 16 is fixedly connected to the end of the hose 3, and the hose 3 is easy to extend and can better dock with the collection bucket 16, and two crushing rollers 4 are rotatably connected between the two inner side walls of the body 1, and the slot 8 is located above the two crushing rollers 4. When dumping and processing waste, dust can be sucked at the first time, which can effectively reduce dust, and the two crushing rollers 4 are located at the same In one plane, a protection box 11 is fixedly installed on the outer wall of the body 1. The protection box 11 contains the main transmission parts, which need to be isolated from dust to avoid damage to the parts. A guide rail chain lifting platform 14 is fixedly installed on the outer wall of the body 1 away from the fan 2. The guide rail chain lifting platform 14 is a hydraulic lifting platform, which consists of a hydraulic lifting part, a guide rail and a loading platform. It can carry heavy objects with a large weight and can be used to transport waste materials well. A transfer bucket 15 is fixedly installed on the guide rail chain lifting platform 14. A buffer pad is provided at the edge of the top surface of the transfer bucket 15. Because the transfer bucket 15 will rotate when it moves to the top, the buffer pad can reduce the collision between the transfer bucket 15 and the body 1, thereby extending the service life of the body 1. The top surface of the transfer bucket 15 is consistent with the top surface of the body 1, so that the transfer bucket 15 can cover the body 1 after rotation to prevent dust from floating out.
[0022] In the utility model, the rotating shafts of the two crushing rollers 4 penetrate the side wall of the body 1 and are rotatably connected to the inner wall of the protective box 11. The rotating shafts of the two crushing rollers 4 are fixedly mounted with transmission wheels 13 located in the protective box 11. The two transmission wheels 13 are sleeved with the same transmission belt 12. A motor 10 is fixedly mounted on the outer wall of the protective box 11, and the output shaft of the motor 10 is fixedly connected to the rotating shaft of one of the crushing rollers 4.
[0023] In the utility model, a discharge pipe 5 is provided at the bottom of the machine body 1 and is located directly below the two crushing rollers 4. A guide plate 6 is provided in the discharge pipe 5 to guide the discharge of waste materials to prevent the waste materials from falling directly under the machine body 1, and to slow down the movement speed of the waste materials and reduce dust.
[0024] The detailed working process of the utility model is as follows:
[0025] Pile the construction waste into the transfer bucket 15, start the rail chain lifting platform 14, move the transfer bucket 15 to the top of the machine body 1, and rotate the transfer bucket 15, throw the construction waste into the machine body 1, and make the transfer bucket 15 cover the top surface of the machine body 1, start the motor 10, and the output shaft of the motor 10 drives the rotating shaft of one of the crushing rollers 4 to rotate, and the rotating shaft is driven by the meshing transmission of the transmission wheel 13 and the transmission belt 12 to rotate the other crushing roller 4, so as to crush the construction waste. A large amount of dust will be generated in the process of dumping and processing the waste. The dust is sucked into the collection bucket 16 by starting the fan 2, and the dust is sucked into the collection bucket 16 through the slot 8 and the hose 3 to avoid dust generation, thereby reducing the harm of dust. When the current waste is processed, the rail chain lifting platform 14 is started to pour the transfer bucket 15 back to the ground for loading.
[0026] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A construction waste treatment device, comprising a body (1), characterized in that: Four pillars (7) are fixedly installed at the bottom end of the body (1), a slot (8) is opened on the inner wall of the body (1), and a mesh plate (9) is installed to cover the opening of the slot (8). A fan (2) is fixedly installed on the outer wall of the body (1), and the air intake of the fan (2) is connected to the slot (8). Two crushing rollers (4) are rotatably connected between the two inner walls of the body (1), and the two crushing rollers (4) are located in the same plane. A protective box (11) is fixedly installed on the outer wall of the body (1). A guide rail chain lifting platform (14) is fixedly installed on the outer wall of the body (1) away from the fan (2), and a transfer bucket (15) is fixedly installed on the guide rail chain lifting platform (14). The top surface of the transfer bucket (15) is consistent with the top surface of the body (1).
2. A construction waste treatment device according to claim 1, characterized in that: The rotating shafts of the two crushing rollers (4) both pass through the side wall of the machine body (1) and are rotatably connected to the inner wall of the protective box (11). The rotating shafts of the two crushing rollers (4) are both fixedly mounted with a transmission wheel (13) located in the protective box (11).
3. A construction waste treatment device according to claim 2, characterized in that: The two transmission wheels (13) are covered with a same transmission belt (12); a motor (10) is fixedly mounted on the outer wall of the protection box (11); and an output shaft of the motor (10) is fixedly connected to a rotating shaft of a crushing roller (4).
4. The construction waste treatment device according to claim 1, characterized in that: A buffer pad is provided at the edge of the top surface of the transfer bucket (15), and the slot (8) is located above the two crushing rollers (4).
5. The construction waste treatment device according to claim 1, characterized in that: A hose (3) is fixedly installed at the air outlet of the fan (2), and a collection bucket (16) is fixedly connected to the end of the hose (3).
6. The construction waste treatment device according to claim 1, characterized in that: A discharge pipe (5) is provided on the bottom of the machine body (1) and is located directly below the two crushing rollers (4). A guide plate (6) is provided in the discharge pipe (5).