Air cushion adjusting device for ballast tank test of floating dock
By designing an air cushion adjustment device that includes a manhole cover and an adjustment valve, the problems of difficult operation and safety hazards in adjusting the air cushion height of the floating dock ballast tank during sinking and floating tests were solved, achieving the effect of simplifying operation and reducing risks.
Patent Information
- Application Number
- CN202420327675.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-22
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2034-02-22
AI Technical Summary
The existing floating dock ballast tanks present difficulties and safety hazards in adjusting the air cushion height during buoyancy tests, and the procedures are cumbersome.
Design an air cushion adjustment device including a manhole cover, adjustment valves, and piping accessories. The height of the air cushion inside the ballast tank can be adjusted by opening and closing the valves, avoiding the need to open the manhole cover of the ballast tank, simplifying operation and reducing safety risks.
This simplifies the adjustment of air cushion height, reduces workload, lowers safety risks, and improves operational convenience and safety.
Smart Images

Figure CN221969676U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of marine engineering project construction, in particular to an air cushion regulating device for floating dock ballast tank testing. Background Art
[0002] In order to adjust the draft of the floating dock, ballast water needs to be injected into the dock ballast tank. When the ballast water is injected from the bottom of the ballast tank, an air pipe extending into the left and right dock walls is used to discharge the excess air. When the water level in the ballast tank is higher than the upper edge of the air inlet of the air pipe, the remaining air in the ballast tank cannot be discharged. The length of the air pipe directly affects the amount of ballast water that can be loaded in the ballast tank and affects the sinking depth of the floating dock. At present, when the air pipe of the floating dock air cushion ballast tank is first installed, a certain cutting margin is reserved for the part extending into the ballast tank. After the sinking and floating test, the required cutting length of the air pipe is calculated according to the test results, and the workers enter the deep water tank to cut off the excess air pipe. During the current floating dock ballast tank sinking and floating tests, the fastening bolts on the manhole cover are often loosened, and the gas in the ballast tank is discharged by opening and closing the manhole cover, so as to adjust the height of the air cushion in the ballast tank, and then calculate the influence of the air cushion on the ballast, and adjust the liquid level telemetry data accordingly. It is not easy to control the adjustment height of the air cushion and the operation is difficult. The process is cumbersome and there are installation risks. Utility Model Content
[0003] The purpose of the utility model is to solve the deficiencies in the above-mentioned prior art and to provide an air cushion regulating device for testing a ballast tank of a floating dock.
[0004] In order to solve the above technical problems, the technical solution adopted by the utility model is: an air cushion regulating device for testing the ballast tank of a floating dock, comprising a manhole cover, an adjusting valve and pipeline accessories, wherein the pipeline accessories include an upper pipeline and a lower pipeline; an air outlet is provided at the center of the manhole cover, and the lower pipeline is inserted in the air outlet by interference fit, and passes through the manhole cover from top to bottom, the lower end of the adjusting valve is installed on the upper end of the lower pipeline through a flange connection, and the upper end of the adjusting valve is installed on the upper pipeline through a flange connection, and they are connected in sequence; the upper pipeline is in an N-shaped structure, and its other end points to the upper surface of the manhole cover; the edge of the manhole cover is provided with bolt holes around it, and is sealed and fixed to the manhole seat ring of the ballast tank by bolts.
[0005] Furthermore, the size of the manhole cover plate is equal to the size of the manhole seat ring on the ballast tank, and a sealing strip is fixedly installed around its lower periphery.
[0006] Furthermore, the lower pipeline and the air outlet are sealed and connected.
[0007] Furthermore, the flange connection is sealed.
[0008] Furthermore, the port at the air outlet end of the upper pipeline is lower than the lower end of the regulating valve.
[0009] Furthermore, two mutually symmetrical handles are fixedly provided on the upper surface of the manhole cover.
[0010] Compared with the prior art, the utility model has the following beneficial effects: the utility model has a simple structure and is easy to operate. During the sinking and floating test, there is no need to open the manhole cover of the ballast tank. The height of the air cushion in the tank and the confirmation of the final height are only adjusted by opening and closing the valve on the manhole cover, which greatly shortens the workload of adjusting the air cushion on site, avoids gas blowing toward construction personnel, and reduces safety risks and adjustment difficulty. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0012] Figure 2 It is the front view of the structure of the utility model;
[0013] Figure 3 It is a right side view of the structure of the utility model;
[0014] Figure 4 It is a top view of the structure of the utility model;
[0015] In the figure: 1. Manhole cover, 2. Lower pipeline, 3. Adjustment valve, 4. Upper pipeline, 5. Handle, 6. Bolt hole. DETAILED DESCRIPTION
[0016] It should be noted that, in the description of the present invention, terms such as "upper", "lower", "left", "right", "front", "back", etc. indicating directions or positional relationships are based on the directions or positional relationships shown in the accompanying drawings. They are relational words determined only for the convenience of describing the structural relationships of the various components in the present invention. They do not specifically mean that any component in the present invention must have a specific direction, be constructed and operated in a specific direction, and cannot be understood as a limitation on the present invention.
[0017] In addition, in the description of the present invention, unless otherwise clearly specified and limited, the terms "install", "connect", "connect", "set", etc. should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be directly connected or indirectly connected through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0018] The specific implementation of the utility model is further described in detail below with reference to the accompanying drawings:
[0019] like Figures 1 to 4As shown, an air cushion regulating device for testing the ballast tank of a floating dock is fixedly installed on the manhole seat ring of the ballast tank, including a manhole cover plate 1, an adjusting valve 3 and pipeline accessories, wherein the pipeline accessories include an upper pipeline 4 and a lower pipeline 2. The size of the manhole cover plate 1 is equal to that of the manhole seat ring of the ballast tank, and an air outlet is provided at the center thereof. The lower pipeline 2 is inserted into the air outlet with an interference fit, and passes through the manhole cover plate 1 from top to bottom, and the two are relatively sealed and connected; the adjusting valve 3 is vertically arranged, and its lower end is installed on the upper end of the lower pipeline 2 through a flange seal connection, and the upper end of the adjusting valve 3 is also installed on the upper pipeline 4 through a flange seal connection, and they are connected in sequence. The upper pipeline 4 is an n-shaped structure, and its other end points to the upper surface of the manhole cover plate 1, and the port of the air outlet end is set at a position lower than the lower end of the adjusting valve 3 to prevent gas from blowing toward the construction personnel. The inner side of the edge of the manhole cover 1 is provided with a plurality of bolt holes 6 arranged equidistantly around it, and a sealing strip is fixedly installed on the peripheral edge of the lower surface of the manhole cover 1. The entire device is sealed and fixed to the manhole seat ring of the ballast tank by bolts passing through the corresponding bolt holes 6 to ensure the airtightness of the ballast tank.
[0020] As a further optimization, two mutually symmetrical handles 5 are fixedly provided on the upper surface of the manhole cover 1 for users to carry and use the entire device.
[0021] During the sinking and floating test, the height of the air cushion in the ballast tank is adjusted by adjusting the opening and closing of valve 3, so as to complete the cutting length of the adjustment pipe extending into the ballast tank in the on-site structure.
[0022] Of course, the above description is not a limitation of the present invention, and the present invention is not limited to the above examples. Changes, modifications, additions or substitutions made by technicians in this technical field within the essential scope of the present invention should also fall within the protection scope of the present invention.
Claims
1. An air cushion regulating device for floating dock ballast tank testing, characterized in that: It comprises a manhole cover, an adjusting valve and pipeline accessories, wherein the pipeline accessories comprise an upper pipeline and a lower pipeline; an air outlet is arranged at the center of the manhole cover, the lower pipeline is inserted into the air outlet by interference fit, and passes through the manhole cover from top to bottom; the lower end of the adjusting valve is connected and installed on the upper end of the lower pipeline through a flange, and the upper end of the adjusting valve is connected and installed on the upper pipeline through a flange, and they are connected in sequence; the upper pipeline is in an N-shaped structure, and the other end thereof points to the upper surface of the manhole cover; bolt holes are arranged around the edge of the manhole cover, and the manhole cover is sealed and fixed to the manhole seat ring of the ballast tank through bolts.
2. The air cushion regulating device for floating dock ballast tank testing according to claim 1, characterized in that: The size of the manhole cover plate is equal to that of the manhole seat ring on the ballast tank, and a sealing strip is fixedly installed on the circumference below the manhole cover plate.
3. The air cushion regulating device for floating dock ballast tank testing according to claim 1, characterized in that: The lower pipeline and the air outlet are sealed and connected.
4. The air cushion regulating device for floating dock ballast tank testing according to claim 1, characterized in that: The above flange connections are sealed.
5. The air cushion regulating device for floating dock ballast tank testing according to claim 1, characterized in that: The port at the gas outlet end of the upper pipeline is lower than the lower end of the regulating valve.
6. The air cushion regulating device for floating dock ballast tank testing according to claim 1, characterized in that: Two mutually symmetrical handles are fixedly provided on the upper surface of the manhole cover.