Prefabricated bridge pier protective fence structure

By designing the prefabricated pier guardrail structure, the problem of traffic under the bridge during steel-concrete composite beam construction is solved, rapid installation and disassembly is achieved, construction costs and safety risks are reduced, and materials are effectively prevented from falling through L-shaped baffles. , protect the traffic below.

CN221972099UActive Publication Date: 2024-11-08THE GUANGDONG NO 3 WATER CONSERVANCY & HYDRO ELECTRIC ENG BOARD CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323481201.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-20
Publication Date
2024-11-08
Estimated Expiration
2033-12-20

AI Technical Summary

Technical Problem

During the construction of steel-concrete composite beams, conventional scaffolding installation and demolition have affected traffic under the bridge, workers have high labor intensity, high safety risks, and high costs, especially in the construction of cross-city traffic roads, which are closed for a long time. Roads have a great impact on vehicle traffic.

Method used

A prefabricated bridge pier guardrail structure is designed, including bridge support pier, bridge deck, protective bracket and L-shaped baffle. It can quickly install and disassemble through screw fixing and adjustment mechanism, providing good support effect and a safe and reliable flange plate combination. Structure, the bridge support pier is fixed with steel pipe tripods and rubber blocks, and the L-shaped baffle can be adjusted to prevent material from falling.

Benefits of technology

Improve the installation efficiency and disassembly and assembly convenience at the construction site, reduce the labor intensity and safety risks of workers, reduce costs, and effectively prevent the fall of sand and other materials through the L-shaped baffle, protect the pedestrians and vehicles below, and the adjustment mechanism can Depending on the scene, it is suitable for long-area support.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221972099U_ABST
    Figure CN221972099U_ABST
Patent Text Reader

Abstract

The utility model discloses a prefabricated bridge pier protective fence structure, which relates to the technical field of steel-concrete composite beams and comprises a bridge supporting pier 1 and a bridge floor, bridge piers are arranged on two sides of the bridge floor, a protective support is arranged between the bridge supporting pier and the bridge floor, one end of the protective support is connected with the bridge supporting pier, and the other end of the protective support is connected with the bottom of the bridge floor. The outermost end of the protective support is connected with an L-shaped baffle. The utility model is characterized in that; the lower portion of the steel pipe tripod is fixed to a bridge supporting pier through a square rubber block, a triangular space is defined by the flange plate supporting frame and the steel box girder, the operation mode is simple, bolting of the steel pipe tripod only needs several minutes, the field installation efficiency is improved to the maximum extent, dismounting and mounting are convenient and fast, time is saved, efficiency is high, and market application and popularization are facilitated. Sand can be prevented from falling to the ground through the telescopic L-shaped baffle, so that pedestrians or vehicles below are protected, the adjusting mechanism can be adjusted according to scenes, and falling objects are directly intercepted by the L-shaped baffle in the construction process, so that collection is convenient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of steel-concrete composite beams, in particular to a prefabricated bridge pier guardrail structure. Background Art

[0002] Steel-concrete composite beams have the advantages of both steel and concrete structures, and can give full play to the material properties of steel and concrete. During the construction process, steel beams can be used as formwork supports for cast-in-place concrete slabs to facilitate construction and save costs. Steel-concrete composite beams have been increasingly widely used in Chinese cities due to their superior characteristics. The application practice of steel-concrete composite beams in my country shows that they have significant technical, economic and social benefits, and are one of the main development directions of future structural systems.

[0003] During the construction process, conventional methods such as scaffolding are usually used to pour the concrete part of the steel-concrete composite beam, which will affect the traffic under the bridge, the labor intensity of the workers is high, the safety risk is high, and the installation and removal of the scaffolding requires a large number of people and is costly. At present, there is no working surface for the construction of the steel-concrete composite beam structure across the urban traffic road, and the bridge deck flange plate construction has no working surface. The bridge is under the original urban traffic trunk road, and the long-term road closure construction has a great impact on vehicle traffic.

[0004] Therefore, it is necessary to provide a flange plate combination structure that is quick to install, easy to assemble and disassemble, has good supporting effect, and is safe and reliable. Utility Model Content

[0005] In view of the deficiencies in the prior art, the utility model provides a prefabricated bridge pier guardrail structure, which solves the problems in the above-mentioned background technology.

[0006] To achieve the above objectives, the utility model is implemented through the following technical solutions: a prefabricated pier guardrail structure, including a bridge support pier 1 and a bridge deck, piers are arranged on both sides of the bridge deck, a protective bracket is arranged between the bridge support pier and the bridge deck, one end of the protective bracket is connected to the bridge support pier, and the other end is connected to the bottom of the bridge deck, and the outermost end of the protective bracket is connected to an L-shaped baffle.

[0007] Preferably, one end of the protective bracket is fixedly connected to the bridge supporting pier through a first fixing point, and the structure of the first fixing point is fixed by screws and iron plates.

[0008] Preferably, one end of the protective bracket is connected to the bottom of the bridge deck via a second fixing point, and the second fixing point is provided with a through hole, which is connected to a nut at the bottom of the bridge via a screw passing through the through hole.

[0009] Preferably, an adjustment mechanism is arranged between the protective bracket and the L-shaped baffle, and the adjustment mechanism has a pin, a first through hole of the L-shaped baffle and a second through hole of the protective bracket. The first through hole and the second through hole correspond to each other, and then are connected through a pin, and a nut is arranged under the pin.

[0010] Preferably, the L-shaped baffle is provided with a support plate, and the second through holes are provided in a plurality, and are fixedly connected to the first through holes through the plurality of second through holes to achieve greater stability.

[0011] Preferably, a support plate is provided between the upper portion of the protective support and the lower portion of the bridge deck, and the length of the support plate exceeds the bridge deck to form a step position, through which materials can be scattered.

[0012] Preferably, a wooden pier is provided between the support plate and the protective support, and the wooden pier is provided with an adjustment block.

[0013] The utility model provides a prefabricated bridge pier guardrail structure. Compared with the prior art, it has the following beneficial effects: multiple flange plates (and L-shaped baffles) and support frames, each flange plate support frame includes a steel tube tripod, M24 bolts and square rubber blocks, the upper part of the steel tube tripod is connected with the steel box beam flange plate by bolts, the bolts pass through the bracket and the reserved holes of the flange plate to connect the bracket with the flange plate, the sleeve is connected with the bolt from the flange plate, a gasket is placed in the middle, the lower part of the steel tube tripod is fixed on the bridge support pier through the square rubber block, and the flange plate support frame and the steel box beam enclose a triangular space.

[0014] It only takes a few minutes to bolt the steel pipe tripod, which maximizes the efficiency of on-site installation. Disassembly and assembly are also convenient and quick, saving time and efficiency, and facilitating market promotion and application. The retractable L-shaped baffle can prevent sand and stones from falling to the ground, thereby protecting pedestrians or vehicles below. The adjustment mechanism can be adjusted according to the scene. Objects that fall during construction are directly intercepted by the L-shaped baffle, which is convenient for collection. The L-shaped baffles set on the upper part of several brackets are relatively long, so they can support a very long area. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a structural schematic diagram of a prefabricated bridge pier guardrail structure;

[0016] Figure 2 A schematic diagram of a support adjustment mechanism for a prefabricated bridge pier guardrail structure;

[0017] Figure 3 A schematic diagram of the installation of a support plate for a prefabricated bridge pier guardrail structure;

[0018] Figure 4 This is a reference diagram of the telescopic state of a prefabricated pier guardrail structure.

[0019] Figure 5 This is a schematic diagram of an L-shaped baffle of a prefabricated pier guardrail structure.

[0020] In the figure: 1, bridge supporting pier; 2, bridge deck; 3, bridge pier; 4, protective bracket; 41, first fixing point; 42, second fixing point; 43, L-shaped baffle, 433, supporting plate; 44, adjusting mechanism; 441, first through hole; 442, second through hole; 443, pin, 5, support plate; 6, wooden pier; 7, adjusting block. DETAILED DESCRIPTION

[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0022] See also Figure 1-5 The utility model provides a prefabricated bridge pier guardrail structure, including a bridge support pier 1 and a bridge deck 2, bridge piers 3 are arranged on both sides of the bridge deck 2, a protection bracket 4 is arranged between the bridge support pier 1 and the bridge deck 2, one end of the protection bracket 4 is connected to the bridge support pier 1, and the other end is connected to the bottom of the bridge deck 2, the outermost end of the protection bracket 4 is connected to an L-shaped baffle 43, one end of the protection bracket 4 is fixedly connected to the bridge support pier 1 through a first fixing point 41, the structure of the first fixing point 41 is fixed with a screw and an iron plate, one end of the protection bracket 4 is connected to the bottom of the bridge deck 2 through a second fixing point 42, the second fixing point 42 is provided with a through hole, and is connected to the nut at the bottom of the bridge through the screw penetrating the through hole, and an adjustment is arranged between the protection bracket 4 and the L-shaped baffle 43. Mechanism 44, the adjustment mechanism has a pin 443, a first through hole 441 of the L-shaped baffle plate 43 and a second through hole 442 of the protective bracket 4, a support plate 433 is arranged below the L-shaped baffle plate 43, so that the first through hole 441 and the second through hole 442 of the support plate 433 correspond to each other, and then are connected through the pin 443, a nut is arranged below the pin 443, and the second through hole 442 is set to be several, and is fixedly connected to the first through hole 441 through several second through holes 442 to achieve greater stability, a support plate 5 is arranged between the upper part of the protective bracket 4 and the lower part of the bridge deck 2, the length of the support plate 5 exceeds the bridge deck 2 to form a step position, and materials can be scattered through the step position, a wooden pier 6 is arranged between the support plate 5 and the protective bracket 4, and the wooden pier 6 is provided with an adjustment block 7.

[0023] The working principle of the utility model is as follows: when making the bridge pier 3, it is necessary to make the template and the steel bars inside on the bridge deck, and then pour the concrete. When pouring the concrete, there will be excess concrete seeping out, or accidental concrete falling out. Because the work is done on the bridge, there are vehicles or pedestrians passing under the bridge, so it is necessary to take good protection, so a protective bracket 4 is provided. An L-shaped baffle 43 is provided on the protective bracket 4, and the concrete can be collected by this L-shaped baffle 43, so that it will not fall below. In addition, according to the needs, the bracket 4 and the bridge bottom bracket can be provided with a support plate 5, and the accidental concrete is collected by the support plate, so that multiple ways of collection are realized to prevent concrete from falling under the bridge. When disassembling, just remove the two fixed points of the bridge bottom and the bridge support pier 1 by screws, and the L-shaped baffle 43 can be removed by a small crane first, so that it is easier to disassemble and assemble the bracket 4.

Claims

1. A prefabricated bridge pier guardrail structure, comprising a bridge support pier (1) and a bridge deck (2), wherein bridge piers (3) are arranged on both sides of the bridge deck (2), characterized in that; A protective bracket (4) is provided between the bridge support pier (1) and the bridge deck (2); one end of the protective bracket (4) is connected to the bridge support pier (1), and the other end is connected to the bottom of the bridge deck (2); the outermost end of the protective bracket (4) is connected to an L-shaped baffle (43).

2. A prefabricated bridge pier guardrail structure according to claim 1, characterized in that; One end of the protective bracket (4) is fixedly connected to the bridge support pier (1) via a first fixing point (41), and the structure of the first fixing point (41) is fixed by screws and an iron plate.

3. The prefabricated bridge pier guardrail structure according to claim 1, characterized in that: One end of the protective bracket (4) is connected to the bottom of the bridge deck (2) via a second fixing point (42); the second fixing point (42) is provided with a through hole, and is connected to a nut at the bottom of the bridge via a screw passing through the through hole.

4. The prefabricated bridge pier guardrail structure according to claim 1, characterized in that: An adjustment mechanism (44) is provided between the protective bracket (4) and the L-shaped baffle (43), the adjustment mechanism comprising a pin (443), a first through hole (441) of the L-shaped baffle (43) and a second through hole (442) of the protective bracket (4), and the first through hole (441) and the second through hole (442) are aligned with each other and then connected through the pin (443), and a nut is provided below the pin (443).

5. A prefabricated bridge pier guardrail structure according to claim 4, characterized in that: The L-shaped baffle (43) is provided with a support plate (433), and the second through holes (442) are provided in a plurality, and are fixedly connected to the first through holes (441) through the plurality of second through holes (442), thereby achieving greater stability.

6. The prefabricated bridge pier guardrail structure according to claim 1, characterized in that: A support plate (5) is provided between the upper portion of the protective support (4) and the lower portion of the bridge deck (2); the length of the support plate (5) exceeds the bridge deck (2) to form a step position, through which materials can be scattered.

7. A prefabricated bridge pier guardrail structure according to claim 6, characterized in that: A wooden pier (6) is provided between the support plate (5) and the protective support (4), and the wooden pier (6) is provided with an adjustment block (7).