AI Technical Summary
Existing building piles cannot be installed in combination, the single volume is large, the construction is troublesome, the stability after installation is poor, and the problem of looseness often occurs.
A civil engineering construction pile was designed, including adjustment grooves, sliding screws, sliders, connectors and support rods. The sliding screws drive the sliders and connectors to move, and the connectors drive the support rods to expand and insert soil to increase the piles. The friction resistance between the body and the ground is achieved through the transmission head and the transmission member to achieve the connection and transmission operation of multiple piles.
It realizes firm installation and convenient connection of building piles, enhances the stability and support effect of the pile body, and improves the efficiency and effect of construction.
Smart Images

Figure CN221972347U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of civil engineering tools, in particular to a civil engineering building pile. Background Art
[0002] At present, civil engineering generally refers to infrastructure engineering. Civil engineering is a general term for the science and technology of building various engineering facilities. Among them, building piles are common piles in civil engineering, and building piles are generally inserted into the ground. In the construction of infrastructure engineering, building piles are often used due to the need for load-bearing.
[0003] In the prior art, existing construction piles cannot be installed in combination, and the individual volume is large, which makes the construction more troublesome. At the same time, the overall stability of the construction piles after installation is weak, the supporting effect is poor, and looseness often occurs during construction. Therefore, this application proposes a civil engineering construction pile to solve this problem.
[0004] Currently, no effective solution has been proposed for the problems in the related technologies. Utility Model Content
[0005] The purpose of the utility model is to provide a civil engineering construction pile to solve the problems raised in the above background technology.
[0006] To achieve the above-mentioned purpose, the utility model provides a civil engineering construction pile, including a pile body, an adjusting groove is provided inside the pile body, a sliding rod is provided inside the adjusting groove, a sliding block is sleeved on one side of the sliding rod, connecting pieces are provided on both sides of the sliding block, a support rod is provided on one side of the connecting piece, an extension groove is provided on the outer side of the pile body, the support rod is located in the extension groove, a first connecting seat is provided at the top of the pile body, a connecting groove is provided on one side of the top of the first connecting seat, a transmission member is provided on the top of the first connecting seat, a transmission groove is provided on the top of the transmission member, the transmission member is fixedly connected with the sliding rod bolt, a second connecting seat is provided at the bottom end of the pile body, a connecting head is provided on one side of the bottom of the second connecting seat, and a transmission head is provided at the bottom center of the second connecting seat.
[0007] Preferably, the slider is movably connected to the adjustment slot, and the connecting piece is fixedly connected to the slider with bolts.
[0008] Preferably, one end of the support rod extends out of the pile body, and the support rod is connected to the connecting member shaft.
[0009] Preferably, the first connection seat is fixedly connected to the pile body by bolts, and the transmission member is connected to a bearing of the first connection seat.
[0010] Preferably, the second connection seat is fixedly connected to the pile body by bolts, the transmission head is connected to the second connection seat bearing, and the transmission head is fixedly connected to the sliding screw by bolts.
[0011] Preferably, the transmission head can be sleeved with the transmission groove of the next pile body.
[0012] Preferably, the connecting head is welded to the second connecting seat, and the connecting head can be sleeved with the connecting groove of the next pile body.
[0013] Compared with the prior art, the utility model has the following beneficial effects:
[0014] The utility model discloses a civil engineering construction pile, which is provided with a pile body, a threaded rod, a slider, a connecting piece and a supporting rod. The threaded rod drives the slider and the connecting piece to move downward along an adjusting groove, and the connecting piece drives the supporting rod to extend out of the groove and be inserted into the soil on both sides in a horizontal state, so that the pile body can be effectively supported, the contact friction resistance between the pile body and the ground is increased, the pile body is installed more firmly, and the effect of extending the support and reinforcing the pile body is achieved.
[0015] The utility model discloses a civil engineering construction pile, which is provided with a first connection seat, a second connection seat, a connection groove, a connection head, a transmission member and a transmission head. A plurality of pile bodies are connected to each other through the connection groove and the connection head. At the same time, the transmission head is sleeved with the transmission member and the transmission groove of the bottom pile body, which is convenient for transmission operation and plays the effect of facilitating transmission connection of the pile body. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0017] Figure 1 It is a structural schematic diagram of a civil engineering construction pile according to an embodiment of the utility model;
[0018] Figure 2 It is a schematic diagram of the internal connection structure of a civil engineering construction pile according to an embodiment of the utility model;
[0019] Figure 3 The utility model is a schematic diagram of the connection structure of a support rod and a sliding thread rod in a civil engineering construction pile according to an embodiment of the utility model.
[0020] Reference numerals:
[0021] 1. Pile body; 2. Adjustment groove; 3. Slide rod; 4. Sliding block; 5. Connecting piece; 6. Support rod; 7. Extension groove; 8. First connecting seat; 9. Connecting groove; 10. Transmission piece; 11. Transmission groove; 12. Second connecting seat; 13. Connecting head; 14. Transmission head. DETAILED DESCRIPTION
[0022] Below, in conjunction with the accompanying drawings and specific implementation methods, the utility model is further described:
[0023] See also Figure 1-3 According to an embodiment of the utility model, a civil engineering construction pile comprises a pile body 1, an adjusting groove 2 is provided inside the pile body 1, a sliding rod 3 is provided inside the adjusting groove 2, a slider 4 is sleeved on one side of the sliding rod 3, a connecting piece 5 is provided on both sides of the slider 4, a support rod 6 is provided on one side of the connecting piece 5, an extension groove 7 is provided on the outer side of the pile body 1, and the support rod 6 is located in the extension groove 7, a first connecting seat 8 is provided at the top of the pile body 1, a connecting groove 9 is provided on one side of the top of the first connecting seat 8, a transmission member 10 is provided on the top of the first connecting seat 8, a transmission groove 11 is provided on the top of the transmission member 10, and the transmission member 10 is bolted and fixedly connected with the sliding rod 3, a second connecting seat 12 is provided at the bottom end of the pile body 1, a connecting head 13 is provided on one side of the bottom of the second connecting seat 12, and a transmission head 14 is provided at the bottom center position of the second connecting seat 12, the utility model drives the support rod 6 to expand by the sliding rod 3, can support the pile body 1, and is sleeved by the transmission head 14 and the transmission member 10, which is convenient for transmission connection, not only has the effect of auxiliary support reinforcement, but also has the characteristics of transmission connection.
[0024] According to the above scheme of the utility model, the slider 4 is movably connected to the adjustment groove 2, the connecting piece 5 is fixedly connected to the slider 4 with bolts, one end of the support rod 6 extends out of the pile body 1, the support rod 6 is connected to the rotating shaft of the connecting piece 5, and the sliding screw 4 drives the slider 4 and the connecting piece 5 to move up and down, so that the support rod 3 can be stretched out to assist in supporting the pile body 1.
[0025] According to the above scheme of the utility model, the first connecting seat 8 is fixedly connected to the pile body 1 by bolts, the transmission member 10 is connected to the first connecting seat 8 by bearings, the second connecting seat 12 is fixedly connected to the pile body 1 by bolts, the transmission head 14 is connected to the second connecting seat 12 by bearings, the transmission head 14 is fixedly connected to the sliding screw 3 by bolts, and the transmission head 14 can be sleeved with the transmission groove 11 of the next pile body 1 for transmission connection.
[0026] According to the above solution of the utility model, the connecting head 13 is welded to the second connecting seat 12, and the connecting head 13 can be sleeved with the connecting groove 9 of the next pile body 1 to facilitate the limited connection.
[0027] During specific use, multiple pile bodies 1 are buried in the building pile groove, and the multiple pile bodies 1 are connected to each other through the connecting groove 9 and the connecting head 13. At the same time, the transmission head 14 is sleeved with the transmission member 10 and the transmission groove 11 of the bottom pile body 1, which is convenient for transmission operation and realizes the effect of convenient transmission connection of the pile body 1; after the pile body 1 is buried, the transmission member 10 and the transmission head 14 are driven to rotate by an external transmission device, thereby driving the sliding screw rod 3 to rotate, and the sliding screw rod 3 drives the slider 4 and the connecting member 5 to move downward along the adjustment groove 2, and the connecting member 5 drives the support rod 6 to extend out of the groove 7, and is inserted into the soil on both sides in a horizontal state, which can effectively support the pile body 1, increase the contact friction resistance between the pile body 1 and the ground, make the pile body 1 more firmly installed, and realize the effect of extending the support and reinforcing the pile body 1.
[0028] In the description of the present invention, it should be noted that the orientation or positional relationship indicated by the terms "top", "bottom", "one side", "the other side", "front", "back", "middle part", "inside", "top end", "bottom end", etc. is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation of the present invention; the terms "first", "second", and "third" are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance; in addition, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a communication between the two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0029] Finally, it should be noted that the above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein with equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A civil engineering construction pile, comprising a pile body (1), It is characterized in that The pile body (1) is provided with an adjustment groove (2) inside, a screw rod (3) inside the adjustment groove (2), a slider (4) is sleeved on one side of the screw rod (3), a connecting piece (5) is provided on both sides of the slider (4), a support rod (6) is provided on one side of the connecting piece (5), an extension groove (7) is provided on the outer side of the pile body (1), the support rod (6) is located in the extension groove (7), a first connecting seat (8) is provided at the top of the pile body (1), a connecting groove (9) is provided on one side of the top of the first connecting seat (8), a transmission member (10) is provided on the top of the first connecting seat (8), a transmission groove (11) is provided on the top of the transmission member (10), and the transmission member (10) is fixedly connected to the screw rod (3) by bolts, and a second connecting seat (12) is provided at the bottom end of the pile body (1), a connecting head (13) is provided on one side of the bottom of the second connecting seat (12), and a transmission head (14) is provided at the center of the bottom of the second connecting seat (12).
2. A civil engineering construction pile according to claim 1, It is characterized in that The slider (4) is movably connected to the adjustment slot (2), and the connecting piece (5) is fixedly connected to the slider (4) by bolts.
3. A civil engineering construction pile according to claim 2, It is characterized in that One end of the support rod (6) extends out of the pile body (1), and the support rod (6) is connected to the rotating shaft of the connecting member (5).
4. A civil engineering construction pile according to claim 1, It is characterized in that The first connecting seat (8) is fixedly connected to the pile body (1) by bolts, and the transmission member (10) is connected to the bearing of the first connecting seat (8).
5. A civil engineering construction pile according to claim 1, It is characterized in that The second connection seat (12) is fixedly connected to the pile body (1) by bolts, the transmission head (14) is bearing-connected to the second connection seat (12), and the transmission head (14) is fixedly connected to the sliding screw (3) by bolts.
6. A civil engineering construction pile according to claim 1, It is characterized in that The transmission head (14) can be sleeved into the transmission groove (11) of the next pile body (1).
7. A civil engineering construction pile according to claim 1, It is characterized in that The connecting head (13) is welded to the second connecting seat (12), and the connecting head (13) can be sleeved into the connecting groove (9) of the next pile body (1).