Blocking body top arch backfill grouting arrangement structure

By arranging multiple slurry inlet pipes and slurry-resisting steel plates at the top arch of the sealing body, the problem of gaps between the sealing body and the hole wall is solved, efficient backfill grouting is achieved, and the project safety and quality is ensured. Reduced costs.

CN221972397UActive Publication Date: 2024-11-08POWERCHINA HUADONG ENG CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420450880.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-08
Publication Date
2024-11-08
Estimated Expiration
2034-03-08

AI Technical Summary

Technical Problem

In water conservancy and hydropower projects, the backfill grouting measures for the top arch of the sealed body are limited by the cost and the installation location of the embedded pipe, and the backfill grouting work cannot be effectively completed, resulting in a gap between the sealed body and the hole wall, affecting structural stability and engineering safety.

Method used

A sealing body top arch backfill grouting arrangement structure is designed, including arranging a plurality of slurry pipes and slurry steel plates at different locations of the sealing body, and backfill the gaps through these slurry pipes, and use exhaust holes and external connections. The connecting structure of the short pipe ensures that the grouting material is fully filled and improves the sealing effect.

Benefits of technology

The fast and efficient backfill grouting of the sealed body arch is achieved, the sealing effect is improved, the construction operation is simplified, the project safety and quality is ensured, and the cost is controlled, which is maximized.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221972397U_ABST
    Figure CN221972397U_ABST
Patent Text Reader

Abstract

The utility model relates to a blocking body top arch backfill grouting arrangement structure which comprises a blocking body, a first slurry inlet pipe, a second slurry inlet pipe, a third slurry inlet pipe, two fourth slurry inlet pipes and a plurality of slurry stop steel plates. The first slurry inlet pipe is located in the middle of the top arch, the first slurry inlet pipe extends in the length direction of the plugging body, and a plurality of exhaust holes are formed in the first slurry inlet pipe in the length direction at intervals; the second slurry inlet pipe and the third slurry inlet pipe are arranged on the two radial sides of the first slurry inlet pipe and extend in the length direction of the plugging body. The two fourth slurry inlet pipes are located on the opposite sides of the second slurry inlet pipe and the third slurry inlet pipe and are close to the second slurry inlet pipe and the third slurry inlet pipe respectively. The multiple grout stopping steel plates are arranged on the first grout inlet pipe, the second grout inlet pipe, the third grout inlet pipe and the fourth grout inlet pipe at intervals and used for fixing the plugging bodies and the corresponding grout inlet pipes.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of water conservancy and hydropower engineering, and in particular to a sealing body top arch backfill grouting arrangement structure. Background Art

[0002] In the construction of water conservancy and hydropower projects, abandoned or rebuilt hydraulic tunnels are generally blocked with plugging bodies. During operation, the plugging body will be connected with the surrounding rocks or concrete to form a whole, and jointly bear the water pressure generated by the acting head. After the concrete of the plugging body is poured, due to the action of gravity and the shrinkage of concrete, a gap will be formed between the concrete of the plugging body and the rock of the tunnel wall or the concrete of the tunnel lining. Therefore, backfill grouting must be done well to make them tightly combined and bear the force together. Whether the backfill grouting work can be completed smoothly and in time is of great significance to the progress of the entire later project and the safe operation of the project. At present, there are many measures for backfill grouting of the top arch of the plugging body, but they all have various shortcomings. Due to the limitations of cost, installation position of embedded pipes and other conditions, the backfill grouting work cannot be completed well. Utility Model Content

[0003] The embodiment of the present application provides a sealing body top arch backfill grouting arrangement structure, which can quickly, efficiently, safely and stably complete the sealing body top arch backfill grouting work, thereby ensuring the structural stability of the sealing body and ensuring the smooth construction and operation of the project.

[0004] The plugging body top arch backfill grouting arrangement structure provided in the embodiment of the present application comprises: a plugging body, the plugging body is arranged in the tunnel, and the plugging body has an arc-shaped top arch;

[0005] A first slurry inlet pipe, the first slurry inlet pipe is located in the middle of the top arch, the first slurry inlet pipe extends along the length direction of the plugging body, and the first slurry inlet pipe is provided with a plurality of exhaust holes at intervals along the length direction;

[0006] A second slurry inlet pipe and a third slurry inlet pipe, wherein the second slurry inlet pipe and the third slurry inlet pipe are arranged on both sides of the first slurry inlet pipe in a radial direction, and the second slurry inlet pipe and the third slurry inlet pipe extend along the length direction of the plugging body;

[0007] Two fourth pulp inlet pipes, the two fourth pulp inlet pipes are located at opposite sides of the second pulp inlet pipe and the third pulp inlet pipe, and the two fourth pulp inlet pipes are close to the second pulp inlet pipe and the third pulp inlet pipe respectively;

[0008] A plurality of slurry-stopping steel plates are arranged at intervals on the first slurry inlet pipe, the second slurry inlet pipe, the third slurry inlet pipe and the fourth slurry inlet pipe, and the slurry-stopping steel plates are used to fix the blocking body and the corresponding slurry inlet pipes.

[0009] In addition, the sealing body top arch backfill grouting arrangement structure provided in the embodiment of the present application may also have the following additional technical features:

[0010] In an optional scheme, it also includes a fifth slurry inlet pipe, which is arranged on the radial side of the first slurry inlet pipe and close to the first slurry inlet pipe, and the fifth slurry inlet pipe extends along the length direction of the blocking body, and the length of the fifth slurry inlet pipe is less than the length of the first slurry inlet pipe, and the fifth slurry inlet pipe is provided with a plurality of exhaust holes at intervals along the length direction.

[0011] In an optional solution, the first slurry inlet pipe, the second slurry inlet pipe and the third slurry inlet pipe are substantially the same length as the solid section of the plugging body, and the length of the fourth slurry inlet pipe and the fifth slurry inlet pipe is 1 / 2 of the length of the first slurry inlet pipe.

[0012] In an optional solution, the first pulp inlet pipe, the second pulp inlet pipe, the third pulp inlet pipe, the fourth pulp inlet pipe and the fifth pulp inlet pipe are all The steel pipe has a wall thickness of 2.5 mm.

[0013] In an optional solution, the steel pipe includes a straight pipe section and at least two external short pipes, the external short pipes are connected to the straight pipe section via a right-angle elbow or a three-way joint, and the pipe opening of the external short pipe is close to the rock concave surface of the tunnel.

[0014] In an optional solution, the distances from the second slurry inlet pipe and the third slurry inlet pipe to the first slurry inlet pipe are equal, and the distances from the two fourth slurry inlet pipes to the first slurry inlet pipe are equal.

[0015] The beneficial effects of the embodiments of the present application are:

[0016] The plugging body arch backfill grouting arrangement structure in the embodiment of the present application backfills the gap between the plugging body and the tunnel through grouting pipes arranged at different positions of the plugging body, solving the problem of a gap between the plugging body concrete and the rock of the tunnel wall or the tunnel lining concrete due to gravity and concrete shrinkage, which makes it impossible to achieve a good plugging effect. The backfill grouting is efficient and of good quality. The overall pipeline structure is simple, easy to install, highly reliable, and highly stable, which further makes the backfill grouting construction operation simple, safe and rigorous, and controls costs and maximizes economic benefits while ensuring construction safety and quality.

[0017] It should be understood that the foregoing general description and the following detailed description are exemplary only and are not restrictive of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1The overall structural schematic diagram of the sealing body top arch backfill grouting arrangement structure provided in this application;

[0019] Figure 2 for Figure 1 A schematic diagram of the cross-sectional structure of the plugging body top arch backfill grouting arrangement structure at AA;

[0020] Figure 3 for Figure 1 A schematic diagram of the cross-sectional structure of the plugging body top arch backfill grouting arrangement structure at BB;

[0021] Figure 4 Schematic diagram of the connection structure of the straight pipe section and the external short pipe provided in this application.

[0022] Figure numerals: first slurry inlet pipe 1, second slurry inlet pipe 2, third slurry inlet pipe 3, fourth slurry inlet pipe 4, fifth slurry inlet pipe 5, blocking body 6, top arch 61, slurry stopping steel plate 7, steel pipe 8, straight pipe section 81, external short pipe 82, right-angle elbow 83, and three-way joint 84.

[0023] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application. DETAILED DESCRIPTION

[0024] In order to better understand the technical solution of the present application, the embodiments of the present application are described in detail below with reference to the accompanying drawings.

[0025] It should be clear that the described embodiments are only part of the embodiments of the present application, rather than all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.

[0026] The terms used in the embodiments of the present application are only for the purpose of describing specific embodiments, and are not intended to limit the present application. The singular forms "a", "said" and "the" used in the embodiments of the present application and the appended claims are also intended to include plural forms, unless the context clearly indicates other meanings.

[0027] It should be understood that the term "and / or" used in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.

[0028] It should be noted that the directional words such as "upper", "lower", "left", and "right" described in the embodiments of the present application are described at the angles shown in the accompanying drawings and should not be understood as limiting the embodiments of the present application. In addition, in the context, it is also necessary to understand that when it is mentioned that an element is connected to another element "upper" or "lower", it can not only be directly connected to another element "upper" or "lower", but also indirectly connected to another element "upper" or "lower" through an intermediate element.

[0029] like Figure 1-4 As shown, the embodiment of the present application provides a plugging body top arch backfill grouting arrangement structure, including a plugging body 6, a first slurry inlet pipe 1, a second slurry inlet pipe 2, a third slurry inlet pipe 3, two fourth slurry inlet pipes 4 and a plurality of slurry stopping steel plates 7, wherein the plugging body 6 is arranged in the tunnel, and the plugging body 6 has an arc-shaped top arch 61; the first slurry inlet pipe 1 is located in the middle position of the top arch 61, the first slurry inlet pipe 1 extends along the length direction of the plugging body 6, and the first slurry inlet pipe 1 is provided with a plurality of exhaust holes at intervals along the length direction; the second .... The slurry pipe 2 and the third slurry pipe 3 are arranged on both radial sides of the first slurry pipe 1, and the second slurry pipe 2 and the third slurry pipe 3 extend along the length direction of the plugging body 6; the two fourth slurry pipes 4 are located on the opposite sides of the second slurry pipe 2 and the third slurry pipe 3, and the two fourth slurry pipes 4 are close to the second slurry pipe 2 and the third slurry pipe 3 respectively; a plurality of slurry stopping steel plates 7 are arranged at intervals on the first slurry pipe 1, the second slurry pipe 2, the third slurry pipe 3 and the fourth slurry pipe 4, and the slurry stopping steel plates 7 are used to fix the plugging body 6 and the corresponding slurry pipes. The design of this structure can effectively carry out the backfill grouting of the top arch 61 of the plugging body 6, reduce loopholes and defects in the grouting work, and take into account the symmetry in the horizontal and vertical directions, making it more stable and balanced.

[0030] The plugging body arch backfill grouting arrangement structure in this embodiment backfills the gap between the plugging body 6 and the tunnel through the grouting pipes arranged at different positions of the plugging body 6, solving the problem that due to gravity and concrete shrinkage, gaps are formed between the plugging body 6 concrete and the rock of the tunnel wall or the tunnel lining concrete, and a good plugging effect cannot be achieved. The backfill grouting is efficient and of good quality. The overall pipeline structure is simple, easy to install, highly reliable, and highly stable, which further makes the backfill grouting construction operation simple, safe and rigorous, and controls costs and maximizes economic benefits while ensuring construction safety and quality.

[0031] like Figure 1-3As shown, in a specific embodiment, the plugging body top arch backfill grouting arrangement structure also includes a fifth grouting pipe 5, which is arranged on the radial side of the first grouting pipe 1 and close to the first grouting pipe 1, and the fifth grouting pipe 5 extends along the length direction of the plugging body 6, and the length of the fifth grouting pipe 5 is less than the length of the first grouting pipe 1, and the fifth grouting pipe 5 is provided with a plurality of exhaust holes at intervals along the length direction. The first grouting pipe 1 and the fifth grouting pipe 5 are arch top exhaust and grouting pipes, which not only perform grouting but also play the role of exhaust, ensuring that the grouting material is fully filled into every corner, making the concrete more compact, improving its mechanical properties and durability, and ensuring the grouting quality and work efficiency.

[0032] like Figure 1 As shown, in a specific embodiment, the first slurry inlet pipe 1, the second slurry inlet pipe 2, and the third slurry inlet pipe 3 are substantially the same length as the solid section of the plugging body 6, and the lengths of the fourth slurry inlet pipe 4 and the fifth slurry inlet pipe 5 are 1 / 2 of the length of the first slurry inlet pipe 1. In addition, the first slurry inlet pipe 1, the second slurry inlet pipe 2, the third slurry inlet pipe 3, the fourth slurry inlet pipe 4, and the fifth slurry inlet pipe 5 are all made of The steel pipe 8 has a wall thickness of 2.5 mm. In addition, the distances from the second pulp inlet pipe 2 and the third pulp inlet pipe 3 to the first pulp inlet pipe 1 are equal, and the distances from the two fourth pulp inlet pipes 4 to the first pulp inlet pipe 1 are equal.

[0033] It should be noted that the equality and same distance mentioned in this article may contain certain errors. For example, when the difference in the distance from the two fourth slurry inlet pipes 4 to the first slurry inlet pipe 1 is not greater than 10% of the distance, the distances between the two can be considered equal. The same logic can also be applied to the case where the lengths of the slurry inlet pipes are equal. Therefore, this article will not go into details.

[0034] When arranging the first slurry inlet pipe 1, the second slurry inlet pipe 2, the third slurry inlet pipe 3, the fourth slurry inlet pipe 4 and the fifth slurry inlet pipe 5, the first slurry inlet pipe 1 can be pre-buried at the central top of the plugging body 6, and the first slurry inlet pipe 1 has both the functions of slurry inlet and exhaust, and then the second slurry inlet pipe 2 and the third slurry inlet pipe 3 are symmetrically arranged on both sides of the central top at equal distances, and the two fourth slurry inlet pipes 4 are also symmetrically arranged on both sides near the second slurry inlet pipe 2 and the third slurry inlet pipe 3, and the fifth slurry inlet pipe 5 is laid close to the first slurry inlet pipe 1. All pipelines are arranged as close to the rock surface as possible and fixed with grout-stopping steel plates 7, so that the symmetry in the arrangement direction can be taken into account while ensuring the stability of the grouting arrangement structure, and the backfill grouting of the top arch 61 of the plugging body 6 can be effectively performed, reducing loopholes and defects in the grouting work, making it more stable and balanced.

[0035] like Figure 4As shown, in a specific embodiment, the steel pipe 8 includes a straight pipe section 81 and at least two external short pipes 82, and the external short pipe 82 is connected to the straight pipe section 81 through a right-angle elbow 83 or a three-way joint 84, and the pipe mouth of the external short pipe 82 is close to the rock concave surface of the tunnel. Specifically, two holes are opened on the pipelines of the first slurry inlet pipe 1, the fourth slurry inlet pipe 4 and the fifth slurry inlet pipe 5 and connected to the external short pipe 82 upward, and three holes are opened on the pipelines of the second slurry inlet pipe 2 and the third slurry inlet pipe 3 and connected to the external short pipe 82 upward. The hole positions can be appropriately adjusted according to the rock excavation situation, and the hole positions are evenly distributed on the pipelines. The long pipe hole positions are distributed on the pipelines of the second half of the deep plugging body 6. The slurry outlet holes are set on the rock concave surface as much as possible, and the slurry outlet holes of each section are distributed as evenly as possible to ensure full coverage of the backfill grouting area and improve the grouting efficiency.

[0036] The bifurcation of the straight pipe section 81 must be connected by a right-angle elbow 83 and a tee joint 84, and welding is not allowed. The right-angle elbow 83 and the tee joint 84 are relatively simple in structure and easy to install. They are usually made of high-strength materials and have high pressure resistance and corrosion resistance. Compared with welding, they are more conducive to maintaining the stability and safety of the pipeline.

[0037] The plugging body top arch backfill grouting arrangement structure in the above embodiment can be constructed according to the following construction method:

[0038] First, the pipeline is pre-buried before the concrete construction. The pipeline is pre-buried and numbered according to the above arrangement structure. According to the design requirements, the pipeline opening position is determined. The slurry outlet hole of the external short pipe 82 is set at the concave surface of the rock as much as possible. The slurry outlet holes of each section are distributed as evenly as possible, and appropriate adjustments can be made according to the actual situation of rock excavation.

[0039] Secondly, grasp the starting point of grouting construction. After the sealing concrete construction is completed, backfill grouting is carried out through the pre-buried grouting pipes after the sealing concrete reaches 70% of the design strength. Grouting is carried out for each pipe in the order of the grouting pipe numbers.

[0040] Then, always pay attention to whether there is slurry leakage during the grouting process. If slurry leakage occurs in other slurry inlet pipes and the slurry concentration is close to the inlet concentration, close the pipe affected by leakage. After the grouting is completed, grout the pipe affected by leakage again until the end standard is met.

[0041] Finally, the grouting is finished and the pipe openings are closed. When the return slurry concentration of the first slurry inlet pipe 1 and the fifth slurry inlet pipe 5 is close to the slurry inlet concentration, the exhaust pipe is closed. Then, under the design pressure, when the grouting hole stops absorbing slurry, the grouting can be finished after 5 minutes. The slurry inlet pipe openings are closed to ensure that the openings are tightly sealed. In the case of exposed pre-buried pipes, the exposed concrete surface is cut off with a cutting machine, and the surface concrete is polished flat.

[0042] The above are only preferred embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims

1. A plugging body top arch backfill grouting arrangement structure, characterized in that: include: A blocking body, the blocking body is arranged in the tunnel, and the blocking body has an arc-shaped top arch; A first slurry inlet pipe, the first slurry inlet pipe is located in the middle of the top arch, the first slurry inlet pipe extends along the length direction of the plugging body, and the first slurry inlet pipe is provided with a plurality of exhaust holes at intervals along the length direction; A second slurry inlet pipe and a third slurry inlet pipe, wherein the second slurry inlet pipe and the third slurry inlet pipe are arranged on both sides of the first slurry inlet pipe in a radial direction, and the second slurry inlet pipe and the third slurry inlet pipe extend along the length direction of the plugging body; Two fourth pulp inlet pipes, the two fourth pulp inlet pipes are located at opposite sides of the second pulp inlet pipe and the third pulp inlet pipe, and the two fourth pulp inlet pipes are close to the second pulp inlet pipe and the third pulp inlet pipe respectively; A plurality of slurry-stopping steel plates are arranged at intervals on the first slurry inlet pipe, the second slurry inlet pipe, the third slurry inlet pipe and the fourth slurry inlet pipe, and the slurry-stopping steel plates are used to fix the blocking body and the corresponding slurry inlet pipes.

2. The sealing body top arch backfill grouting arrangement structure according to claim 1 is characterized in that: It also includes a fifth slurry inlet pipe, which is arranged on the radial side of the first slurry inlet pipe and close to the first slurry inlet pipe. The fifth slurry inlet pipe extends along the length direction of the blocking body, and the length of the fifth slurry inlet pipe is less than the length of the first slurry inlet pipe. The fifth slurry inlet pipe is provided with a plurality of exhaust holes at intervals along the length direction.

3. The sealing body top arch backfill grouting arrangement structure according to claim 2 is characterized in that: The first slurry inlet pipe, the second slurry inlet pipe and the third slurry inlet pipe are substantially the same in length as the solid section of the plugging body, and the length of the fourth slurry inlet pipe and the fifth slurry inlet pipe is 1 / 2 of the length of the first slurry inlet pipe.

4. The sealing body top arch backfill grouting arrangement structure according to claim 2 or 3, characterized in that: The first pulp inlet pipe, the second pulp inlet pipe, the third pulp inlet pipe, the fourth pulp inlet pipe and the fifth pulp inlet pipe are all The steel pipe has a wall thickness of 2.5 mm.

5. The sealing body top arch backfill grouting arrangement structure according to claim 4 is characterized in that: The steel pipe comprises a straight pipe section and at least two external short pipes, the external short pipes are connected to the straight pipe section via a right-angle elbow or a three-way joint, and the pipe openings of the external short pipes are close to the rock concave surface of the tunnel.

6. The sealing body top arch backfill grouting arrangement structure according to any one of claims 1 to 3 or claim 5, characterized in that: The distances between the second slurry inlet pipe and the third slurry inlet pipe and the first slurry inlet pipe are equal, and the distances between the two fourth slurry inlet pipes and the first slurry inlet pipe are equal.