Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

81results about How to "Simple construction operation" patented technology

Full-recovery prestressed square pile and latticed column combined upright pile construction method

The invention discloses a fully-recycled prestressed square pile and latticed column combined stand column pile construction method, and belongs to the technical field of green foundation pit supporting. According to the construction method of the fully-recycled prestressed square pile and latticed column combined stand column pile, the prestressed square pile serves as the lower section of the stand column pile and is organically combined with the latticed column, the stand column pile can be pressed into the designed elevation through static pressure equipment, and the construction method has the advantages of being low in construction cost, high in construction efficiency, free of pollution and the like; the stand column piles are integrally pressed into a soil body, the foundation pit soil body is excavated layer by layer, concrete supports and surrounding purlins on the periphery of a foundation pit are supported layer by layer through self-servo hydraulic converters and supporting cross beams, foundation pit construction operation is easy and efficient, and construction is safer and more stable; moreover, after a bottom plate and structural floor slabs of all layers are built, the stand column piles can be recycled by 100%, zero emission is truly achieved, the low-carbon, environment-friendly and green construction effects are achieved, in addition, sensors can be arranged in the pile sections of the prestressed square piles, and foundation pit full-section monitoring and deformation control are achieved.
Owner:JIANGSU JIANYUAN CONSTR CO LTD +1

Modified phosphogypsum lightweight thermal insulation building block and preparation method thereof

The invention discloses a modified phosphogypsum lightweight thermal insulation building block and a preparation method thereof, and relates to the technical field of building materials. The building block is prepared from the following raw materials in parts by weight: 86 to 120 parts of modified phosphogypsum primary material, 1.5 to 2 parts of sodium silicate, 4 to 5 parts of quick lime, 35 to 45 parts of water, 25 to 35 parts of cement, 0.15 to 0.3 part of polyaluminum chloride, 0.2 to 0.3 part of calcium formate, 0.01 to 0.02 part of rubber powder, 0.03 to 0.05 part of cellulose ether, 0.2 to 0.3 part of sodium hydroxide, 0.2 to 0.3 part of water reducing agent and 0.06 to 0.08 part of aluminum powder paste. The indexes of the prepared modified phosphogypsum lightweight thermal insulation building block meet the related requirements of GB / T11968-2020, the product strength is high, the heat conductivity coefficient is low, heat transfer can be effectively prevented, the thermal insulation performance effect is more prominent, the modified phosphogypsum is adopted as the main raw material, the utilization rate of the phosphogypsum is increased, and the cost is reduced. Air entraining foaming is achieved, the volume weight is reduced, light texture is achieved, resource utilization of industrial waste residues is achieved, environmental pollution is effectively reduced, low carbon and energy saving are achieved, and the production efficiency is high.
Owner:GUIZHOU TEMEIDA TECHNOLOGY BUILDING MATERIALS CO LTD

Precast hanging plate for pouring type asphalt concrete

The utility model provides a prefabricated hanging plate for pouring type asphalt concrete, and relates to the technical field of reservoir danger removing and reinforcing engineering, the prefabricated hanging plate comprises a concrete plate and structural steel bars arranged on the concrete plate, the structural steel bars are arranged on the concrete plate, and the dam body connecting ends of the structural steel bars extend out of the concrete plate to be connected with a reservoir dam body; the concrete slabs are fixedly assembled through the structural steel bars so that casting gaps can be formed between the concrete slabs and the reservoir dam body, the multiple concrete slabs are fixedly assembled through the structural steel bars to form a wall plate matched with the upstream face of the reservoir dam body, the multiple casting gaps between the wall plate and the reservoir dam body form an asphalt concrete pouring area, and asphalt concrete is poured into the asphalt concrete pouring area. Therefore, construction procedures are reduced, construction efficiency is improved, and construction cost is saved. And the concrete prefabricated hanging plate and the poured asphalt concrete are combined into a whole, so that the anti-seepage and reinforcing effects are improved, and various objects in the reservoir are also prevented from directly damaging the asphalt concrete anti-seepage layer.
Owner:SINOHYDRO BUREAU 6 CO LTD

A method for solidifying dredged sludge using biocarbonized activated magnesium oxide technology

The present invention discloses a method for solidifying dredged sludge by using biological carbonization activated magnesium oxide technology, and belongs to the technical field of soil solidification. In the present invention, urease-producing bacteria are first used to prepare a pre-hydrolyzed urea solution, and then the pre-hydrolyzed urea solution and an activated magnesium oxide solidifying agent are separately and evenly mixed into dredged sludge with a certain water content according to a certain dosage, stirred to form a slurry, and the slurry is filled in a designated site or model and fully maintained. The present invention greatly reduces the construction cost and improves the feasibility and efficiency of solidification treatment of dredged sludge with high water content by introducing the technology of carbonization of urea solution pre-hydrolyzed by urease-producing microorganisms and activated magnesium oxide solidifying agent.
Owner:NANJING UNIV

Self-cleaning concrete surface strengthening material and preparation method thereof

The invention discloses a self-cleaning concrete surface strengthening material and a preparation method thereof. The strengthening material is a microspheric configuration emulsion with a water-in-oil-in-water three-layer structure. An internal water phase is a mixed solution composed of fluosilicate, nano oxide, silicate, sulfate and a cosolvent; the oil phase is a trifluoromethyl phenylsilane pyrazole azo compound; and the outer water phase consists of a penetration enhancer and a dispersing agent. The preparation method comprises the following steps: mixing the reinforcing component of the internal water phase, the azoic compound of the oil phase and the emulsifier, and shearing and emulsifying through a high-pressure homogenizer to obtain a primary W1 / O emulsion; and carrying out secondary emulsification on the primary emulsion and the outer-layer water phase through a micro-fluidic emulsification technology to obtain a dual W1 / O / W2 emulsion, namely the self-cleaning type concrete surface strengthening material. The reinforcing material can be demulsified under a light-triggered condition, effective components of the reinforcing material can block concrete gaps, and the surface performance of concrete is remarkably improved; and the photosensitive material can form a durable coating on the surface of the concrete, so that the concrete has a self-cleaning function.
Owner:JIANGSU CHINA RAILWAY ARIT NEW MATEIRALS CO LTD

Bridge profile steel expansion joint maintenance construction method based on novel formwork system

The invention discloses a bridge section steel expansion joint maintenance construction method based on a novel formwork system, and particularly relates to the technical field of bridge section steel expansion joint maintenance construction, and the method comprises the following steps: S1, preparation before construction, S2, on-site construction, and S3, construction summarization. When a traditional profile steel expansion joint is maintained and constructed, (1) flexible materials such as foam plates and cloth which are low in strength and not easy to fix are adopted to fill the joint and support concrete, the concrete in the expansion joint is easy to expand, leak slurry, block and pollute a lower bridge structure, and the working performance of free expansion of the structure is influenced; and (2) the gaps and the retaining concrete are filled with battens or square timbers, so that the installation difficulty is high, the formwork is easy to deviate, and the difficulty of taking out the gap filling material in the later period is high. According to the method, the maintenance construction method that a traditional joint filling material is replaced with the rail inner supporting type aluminum formwork system is adopted, operation is easy, the construction speed is high, precision is high, the side face structure size of the post-cast strip joint can be accurately controlled, and the phenomena of concrete formwork expansion and slurry leakage are eliminated; by changing the specifications of the self-sealing turn buckles, the formwork system can be suitable for construction of various types of profile steel expansion joint structures; meanwhile, in the construction process, through combination of the formwork and the horizontal laser instrument, a traditional rough construction method for controlling the profile steel and concrete surface elevation and flatness is changed, and the overall maintenance construction quality of the profile steel expansion joint structure is improved.
Owner:都正家 +1

Template system of irregular lattice beam plate

The utility model relates to the technical field of template system construction, and discloses a template system of an irregular lattice beam slab, which comprises a bottom floor slab, a top floor slab arranged at the top of the bottom floor slab, and a wall body arranged between the top floor slab and the bottom floor slab, a scaffold is arranged between the bottom floor and the top floor, a transverse steel formwork is laid on the top of the scaffold, a transverse reinforcement cage is arranged on the top of the transverse steel formwork, and a plurality of polystyrene foam blocks are arranged in the outline of the transverse reinforcement cage. A vertical steel formwork is arranged between part of adjacent polystyrene foam blocks to guarantee construction of reserved floor holes near a cross beam, wood formworks are vertically arranged at the tops of part of the polystyrene foam blocks to guarantee construction of reserved floor holes in the area, except for the cross beam, of a floor, and a main beam is arranged on one side of each polystyrene foam block. And secondary beams are arranged on one side of the main beam at intervals.
Owner:CHINA CIVIL ENG CONSTR CORP

Reserved hole template square pile shaping device convenient and fast to disassemble

The utility model relates to the technical field of constructional engineering, in particular to a conveniently detachable preformed hole formwork square pile shaping device which comprises a bottom plate, a first-stage locking positioning plate and a shaping frame, a base plate is arranged at the top of the bottom plate, and clamping holes are formed in the bottom plate and the base plate in a penetrating mode. A first-stage locking positioning plate is arranged on one side of the outer wall of the bottom plate, a second-stage locking positioning plate is arranged on the other side of the outer wall of the bottom plate, a first-stage locking lifting rod is arranged at the bottom of the interior of the first-stage locking positioning plate, and a shaping frame is installed at the bottom of the first-stage locking lifting rod. A second-stage locking lifting rod is mounted at the middle end of the interior of the second-stage locking positioning plate, a mold closing plate is mounted at the bottom of the second-stage locking lifting rod, and a feeding groove is formed in the top of the shaping frame. The problems that in the prior art, an existing preformed hole formwork dismounting device is complex in operation, low in efficiency, prone to damage a formwork and the like, and construction efficiency and quality are affected are solved.
Owner:SUQIAN HUAMEI NEW MATERIALS CO LTD

Pitched roof concrete vibrating and smoothing device

The utility model discloses a pitched roof concrete vibrating and smoothing device, which belongs to the technical field of building construction appliances and comprises a mounting frame, two face smoothing wheels are arranged below the mounting frame and are arranged in parallel front and back, and a vibrating plate is arranged between the two face smoothing wheels. A lifting mechanism used for driving the vibrating plate to work is arranged above the vibrating plate, a driving mechanism used for driving the noodle collecting wheel to rotate and the lifting mechanism to work is further arranged on the mounting frame, a telescopic rod is arranged on the mounting frame through a connecting frame, and an operating handle is arranged at the top end of the telescopic rod. According to the concrete surface finishing machine, the motor is used for driving the two surface finishing wheels to roll on the concrete surface to carry out concrete surface finishing operation; and meanwhile, the vibrating plate is driven to perform surface vibrating operation on the cement surface, so that the concrete surface is vibrated and polished, the construction operation is simple, the progress of vibrating and surface finishing of workers is greatly improved, the construction period is guaranteed, the labor cost is saved, the concrete appearance quality is improved, and very high practicability is achieved.
Owner:SHANXI NO 3 CONSTR ENG

Ribbed broken line plate and basement exterior wall post-cast strip sealing structure

The utility model relates to a ribbed broken line plate which comprises a reinforced concrete body and water stop screws, one end of each water stop screw is fixed in the reinforced concrete body, the other end of each water stop screw is arranged outside the reinforced concrete body and fixes a water stop steel plate, and the upper end and the lower end of the reinforced concrete body are respectively provided with a tenon and a mortise. A basement exterior wall post-cast strip sealing structure is characterized in that a plurality of ribbed broken line plates are arranged on the outer side of a basement exterior wall post-cast strip in the height direction, every two adjacent ribbed broken line plates are connected in a joggle joint mode, a formwork is arranged on the inner side of the basement exterior wall post-cast strip, and water stop screws on the ribbed broken line plates are fixed to the formwork. The construction method has the beneficial effects that the ribbed broken line plate component is convenient to manufacture on site, relatively light and easy to construct and operate, the interference of an unclosed part of the basement exterior wall post-cast strip on construction can be solved, compared with a traditional construction method, basement exterior wall waterproof construction and earthwork backfilling work can be carried out in advance, the construction period is greatly shortened, and the construction cost is saved.
Owner:WUHAN MUNICIPAL ENG MECHANIZED CONSTR CO LTD

Steel structure net rack rod piece reinforcing device

The utility model discloses a steel structure net rack rod piece reinforcing device which comprises reinforcing structures, and at least three reinforcing structures arranged in the axial direction of a net rack rod piece are evenly fixed in the circumferential direction of the net rack rod piece. The reinforcing structure comprises a rod body connecting plate, a conical head connecting plate and a reinforcing piece. The reinforcing device has the advantages that the reinforcing device can directly reinforce a net rack rod piece which does not meet the requirement for bearing capacity, rod piece replacement or overall net rack replacement is not needed, the cost is low, the period needed for rod piece reinforcement is short, construction operation is simple, and the overhaul efficiency can be effectively improved; the rod body connecting plates and the conical head connecting plates are arranged outside the net rack rod piece at intervals, welding operation with the original net rack rod piece belongs to interval welding, welding damage to the original net rack rod piece is not prone to being caused, and meanwhile welding stress concentration can be avoided.
Owner:INNER MONGOLIAN GRAND ARCHITECTURE DESIGN CO LTD

Flood drainage channel concrete slope formwork support

The utility model relates to the technical field of formwork supports, and discloses a flood drainage channel concrete slope formwork support which comprises a supporting plate and a longitudinal plate, a plurality of lock seats are fixedly connected to the two sides of the top face of the supporting plate, a steel pipe frame is installed on the lock seats, slope formworks for a flood drainage channel are installed on the steel pipe frame, and a triangular guide rail is arranged on the longitudinal plate. A plurality of vertical plates are fixedly connected to the two sides of the bottom face of the supporting plate, V-shaped wheels are rotationally connected to the vertical plates, and the V-shaped wheels are connected with the triangular guide rails in a matched mode. An L-shaped locking plate is fixedly connected to the longitudinal plate, a plurality of lower locking holes are formed in the L-shaped locking plate, a plurality of upper locking holes corresponding to the lower locking holes are formed in the two sides of the supporting plate, locking bolts are connected into the upper locking holes and the lower locking holes in a penetrating mode, and nuts are connected to the lower portions of the locking bolts in a threaded mode. The flood drainage channel formwork support in the structure is designed to be integrally movable, so that back-and-forth disassembly and assembly for use are not needed, the installation operation of the support is simplified, and the construction efficiency is improved.
Owner:THE SECOND CONSTRUCTION ENGINEERING CO LTD CCSEB

Bracket embedded part for No. 0 block of double-limb thin-wall pier and bracket

The utility model relates to the technical field of bridge construction, in particular to a double-limb thin-wall pier No.0 block bracket embedded part and a bracket, which comprise bracket embedded parts, at least two groups of bracket embedded parts are arranged along the vertical direction of a pier body and are respectively positioned at the upper end and the lower end of the pier body; comprising a bracket cross rod and a bracket inclined rod, one end of the bracket cross rod is fixedly connected with an upper end bracket embedded part, one end of the bracket inclined rod is fixedly connected with a lower end bracket embedded part, and the other end of the bracket inclined rod is fixedly connected with the other end, away from the upper end bracket embedded part, of the bracket cross rod. The embedded boxes and the shear parts on the two sides of the pier body can be fixedly connected through the shear part pull rods, and when the bracket embedded part is stressed, force can be transmitted to the embedded boxes and the shear parts on the two sides through the pull rods, so that the bracket embedded part can bear large bending shear stress.
Owner:ZHEJIANG COMM CONSTR GRP CO LTD

A special-shaped tunnel corner excavation device and a special-shaped tunnel boring machine

The present invention provides a device for excavating corners of a special-shaped tunnel and a special-shaped tunnel boring machine. The device for excavating corners includes a front support structure and a rear support structure. The bottoms of the front and rear support structures are provided with walking wheels. The front and / or rear support structures are provided with support shoes. The front support structure is provided with a connecting structure connected to a towing device. A main beam is connected between the front and rear support structures. A sliding sleeve that slides forward and backward is installed on the main beam. A cutterhead mounting frame is connected to the left and right sides of the sliding sleeve. A wheeled cutterhead for excavating corners of circular-section tunnels is installed on the cutterhead mounting frame. The device for excavating corners of the special-shaped tunnel also includes a horizontal driving mechanism for driving the wheeled cutterhead to move forward. The device for excavating corners of the special-shaped tunnel of the present invention can not only meet the needs of excavating and forming the special-shaped tunnel once, but also independently carry out the excavation of corners of the formed circular-section tunnel, and has high flexibility in use. At the same time, the present invention uses a set of sliding assembly structures to carry out excavation, which has a simple structure and is easy to control, and can reduce costs and improve construction efficiency.
Owner:CHINA RAILWAY ENGINEERING EQUIPMENT GROUP CO LTD

Construction guardrail capable of achieving corner stretching and retracting

The construction guardrail comprises a first supporting assembly and a second supporting assembly which are oppositely arranged, storage frames located on the first supporting assembly and the second supporting assembly are connected through a telescopic net, and the storage frames can be rotationally installed on the first supporting assembly or the second supporting assembly in the horizontal direction. The first supporting assembly and the second supporting assembly are each provided with a plurality of height adjusting assemblies capable of adjusting the distance between the lower end face of the first supporting assembly and the ground, and when the two construction guardrails are in butt joint, a connecting assembly used for detachably connecting the first supporting assembly and the second supporting assembly together is arranged between the first supporting assembly and the second supporting assembly which are in butt joint. The length of the construction guardrail and the position angles among the first supporting assembly, the telescopic net and the second supporting assembly can be flexibly adjusted, the distance between the lower end face of each supporting assembly and the ground can be flexibly adjusted according to the concave-convex condition of the ground, and therefore the stability of the supporting assemblies during placement is guaranteed. When two construction guardrails are connected in a butt joint mode, construction operation is simple, and convenience and high efficiency of guardrail construction or disassembly are guaranteed.
Owner:CHANGZHOU GENERAL TAP WATER CO LTD

Marking and positioning device for step installation

The utility model belongs to the field of municipal engineering, and particularly relates to a step installation marking positioning device which comprises a grab rail, a lower spring telescopic rod is fixed to one side of the bottom end of the grab rail, and a supporting horizontal rod is fixed to the other side of the bottom end of the grab rail. An arc-shaped rod A is fixed between the two middle lower spring telescopic rods; a hoop is fixed to the lower portion of the grab rail, four upper spring telescopic rods are hinged to one side of the hoop, the other side of the hoop is connected with a supporting inclined rod, and the supporting inclined rod and a supporting horizontal rod are fixed together. An arc-shaped rod B is fixedly connected between the outer ends of the supporting horizontal rods, and rollers are outwards arranged at the two ends of the arc-shaped rod B; the upper spring telescopic rod and the two protective covers are fixed together, the protective covers cover the roller, hollowed-out holes are formed in the periphery of the surface of the roller, the surface of the roller is coated with a coating layer, and the lower spring telescopic rod and the roller are rotationally connected together. According to the device, one-time positioning and paying-off can be conducted on the installation position of the step outside the well chamber, the working efficiency of measurement and paying-off before the step is installed is improved, and the problem that measurement and positioning paying-off of the step in the well chamber are difficult is solved.
Owner:JINAN URBAN CONSTRUCTION GROUP CO LTD +3

Steel pipe column ring beam steel bar construction method

The invention provides a steel pipe column ring beam steel bar construction method, which comprises the following steps of: hoisting ring beam steel bars under the working condition of hoisting construction from top to bottom, pre-placing prefabricated ring beam steel bars at the top of a constructed steel pipe column under the working condition of not meeting the hoisting construction from top to bottom, and then, after a new steel pipe column is mounted, pre-placing the prefabricated ring beam steel bars at the top of the constructed steel pipe column. And the preset ring beam reinforcing steel bar is lifted to the mounting position, the problem that the prefabricated ring beam reinforcing steel bar cannot be hoisted from top to bottom is solved, meanwhile, field binding is not needed, and the problem that the construction period is greatly prolonged is avoided. According to the construction method, the construction convenience and the construction efficiency are remarkably improved, the requirement for the working face is lowered, the construction problem of the ring beam steel bars at the special structure is solved under the condition that construction facilities are not increased, all the ring beam steel bars are integrally installed under the special working condition, the construction operation is simplified, and the construction cost is reduced. And the mounting efficiency and the construction quality are improved.
Owner:CHINA CONSTR FIRST DIV GROUP CONSTR & DEV

Transparent flame-retardant polyurethane pouring sealant as well as preparation method and application thereof

The invention provides a transparent flame-retardant polyurethane pouring sealant as well as a preparation method and application thereof. The polyurethane pouring sealant is prepared by mixing a component A and a component B according to a mass ratio of 2: 1, the component A is prepared from the following components in parts by weight: 10 to 20 parts of high molecular weight and high functionality polyether polyol, 10 to 20 parts of low molecular weight and high functionality polyether polyol, 10 to 20 parts of polyester polyol, 20 to 50 parts of phosphorus-containing active liquid flame retardant, 20 to 50 parts of phosphorus-containing inactive liquid flame retardant and 0.001 to 5 parts of catalyst; and the component B is isocyanate. The polyurethane pouring sealant is moderate in mixing viscosity, easy to operate, adjustable in operable time, transparent, flame-retardant, excellent in mechanical property, good in bonding force to various materials, free of plasticizers, environmentally friendly and capable of being widely applied to pouring and protection in the industries of household appliances and electronic components.
Owner:SHANGHAI HUITIAN NEW CHEMICAL MATERIALS CO LTD

Structural wall tie bar positioning device

The utility model provides a structural wall tie bar positioning device which comprises a vertical component, a plurality of horizontal components and a plurality of positioning components, at least one side of each horizontal component is connected with the positioning component in a sliding mode so as to position rubbing, and the horizontal components are connected with the vertical component in a sliding mode so as to adjust rubbing intervals in a sliding mode. At least one moving groove is formed in at least one side of the horizontal component, at least one sliding groove is formed in the vertical rod, scales are arranged on at least one side of the surface of each moving groove and at least one side of the surface of each sliding groove in the length direction, and adjustable rapid positioning of different tie bar intervals is achieved through the design of the moving grooves and the sliding grooves. The vertical component can be folded for storage; the positioning component is provided with buttons to control rubbing. The positioning device has the advantages that positioning can be completed by one constructor, high-position positioning can be performed without climbing, the positioning device is simple in structure, convenient to operate, high in construction efficiency and accurate in positioning, construction safety is guaranteed, construction cost is reduced, and the positioning device is convenient to detach and store and can be repeatedly used.
Owner:MCC TIANGONG GROUP

Template quick connector and use method

The invention provides a formwork quick connector and a using method, and belongs to the technical field of building construction, the connector comprises a screw rod arranged between two formworks in a penetrating mode, one end of the screw rod is provided with a quick locker, and the other end of the screw rod is provided with a connecting part; the connecting part comprises a second connecting column, the second connecting column is connected with the screw rod, the second connecting column is connected with a third connecting column, the third connecting column is connected with an embedding head, and the second connecting column is connected with a rubber sliding head; a fixing part is connected between the embedding head and the rubber sliding head on the third connecting column; the fixing part comprises a first connecting seat and a second connecting seat, a clamping piece is arranged on the second connecting seat, one end of the clamping piece is located between the embedding head and the rubber sliding head, a rotating sleeve is arranged between the first connecting seat and the second connecting seat, and a positioner is arranged on the first connecting seat. According to the connector, the working efficiency is improved, the construction period is shortened, and the construction cost is reduced.
Owner:CHINA UNITED NORTHWEST INST FOR ENG DESIGN & RES

Forestry greening maintenance device

The invention discloses a forestry greening maintenance device, and relates to the technical field of forestry maintenance devices.The forestry greening maintenance device is characterized in that four moving wheels are arranged below a bottom plate, one end of the bottom plate is connected with the first ends of two inclined rods, and the same push rod is arranged between the second ends of the two inclined rods; a supporting plate is vertically arranged on the bottom plate, a mounting plate is arranged above the bottom plate on one side of the supporting plate, and a reciprocating mechanism for driving the supporting plate and the mounting plate to lift in a reciprocating manner is arranged between the supporting plate and the mounting plate; a coating mechanism for spraying materials in a reciprocating rotating manner is arranged on the mounting plate and is driven by a reciprocating mechanism; a mixing mechanism is arranged on the bottom plate on the other side of the supporting plate and is driven by a reciprocating mechanism; the device is simple and reliable in structure, good in forestry greening maintenance effect, convenient to control and suitable for popularization.
Owner:FORESTRY SCI INST XIAOLONGSHAN FORESTRY EXPERIMENTAL BUREAU OF GANSU P ROVINCE +1

Construction method for local replacement of shield forming tunnel invasion limit duct piece

The invention discloses a construction method for local replacement of a shield forming tunnel invasion and limit duct piece. The invasion and limit duct piece is replaced in a shield tunnel through replacement equipment. The replacement equipment comprises a sealing structure, a circulation structure, a supporting structure, a duct piece breaking structure, a duct piece replacement structure and a man gate. The sealing structure is used for forming a closed space in the tunnel structure, the tunnel inner support is formed through grouting, the tunnel structure is supported through slurry balance, the stratum can be stabilized without arranging an external support, and the problems existing in existing stratum reinforcement are solved; and the new duct piece is installed through the duct piece replacement structure, so that the replacement operation of the invasion limit duct piece is effectively simplified, the construction period is greatly shortened, and meanwhile, the construction cost is also effectively reduced.
Owner:CHINA CONSTR COMM ENG GRP UNITED

Communication joint, cable assembly, composite module and communication system

The invention provides a communication connector, a cable assembly, a composite module and a communication system. The communication connector comprises a shell, a branching module and a pressing piece. One end of the shell is provided with an input port, the other end of the shell is provided with a first output port and a second output port, and each second output port is provided with an insertion piece. The branching module is located in the shell. The branching module is provided with a first type of branching holes and a second type of branching holes. The first-type branching hole is communicated with the input port and the first output port and is used for accommodating a first-type cable. And the second-type branching hole is communicated with the input port and the second output port and is used for accommodating a second-type cable. And the plug-in sheets extend into the second type of branching holes. The pressing piece limits the first type of cable to the communication connector. During construction, the composite cable can be directly inserted into the communication connector, so that the first type cable passes through the first output port and extends out of the shell. By cutting the first type cable, the end face of the first type cable can be flush with the end face of the shell, operation is easy and convenient, efficiency is high, and construction cost can be reduced.
Owner:HUAWEI TECH CO LTD

Recyclable assembly type retaining wall

The utility model relates to a recyclable assembly type retaining wall. A conventional retaining wall above a top beam causes great trouble to foundation pit construction due to complex construction procedures, high manufacturing cost and long construction period. The retaining wall structure comprises a plurality of connecting pieces and a plurality of retaining wall assemblies, the connecting pieces are arranged above a top beam at intervals, and the retaining wall assemblies are arranged above the top beam and connected between the adjacent connecting pieces respectively. The connecting piece comprises a U-shaped steel plate and profile steel, the profile steel is vertically arranged above the U-shaped steel plate, and the U-shaped steel plate is arranged on the top beam in a sleeving mode. The construction operation is simple, the manufacturing cost is low, and the construction period is short.
Owner:CHINA RAILWAY FIRST SURVEY & DESIGN INST GRP

Building wall surface construction method

The invention discloses a building wall surface construction method, and relates to the technical field of building construction.The method comprises the steps that preparation work is conducted, specifically, a building wall surface is cleaned; the heat preservation device is installed on the building wall face through a fixing device till the whole building wall face completely covers the heat preservation device, the heat preservation device comprises a first heat preservation plate and a second heat preservation plate, and the first heat preservation plate is provided with a first sliding part, a first oblique installation hole and a first oblique installation part; a second sliding mounting part, a second inclined mounting hole and a second inclined mounting part are arranged on the second insulation board; and wall surface construction is completed, and verification is carried out. According to the structure of the heat preservation device, sealing connection is achieved through the fixing structures which are in cross butt joint, the situation that the heat preservation effect is affected due to untight connection between different heat preservation plates is avoided, and the construction efficiency is further improved.
Owner:伍志强

Three-way temporary restraining device for tower beam of I-shaped steel-concrete composite beam cable-stayed bridge

The utility model discloses a three-way temporary restraining device for a tower beam of an I-shaped steel concrete superposed beam cable-stayed bridge, which comprises a vertical temporary restraining part, a longitudinal temporary restraining part and a transverse temporary restraining part, the vertical temporary restraint comprises a plurality of anchoring cushion stones arranged on a lower cross beam of the cable bent tower, vertical lifting cushions supported between the anchoring cushion stones and the steel beams and prestressed steel beams for anchoring the lower cross beam and the steel beams into a whole, and the prestressed steel beams penetrate through the anchoring cushion stones; the longitudinal temporary restraint comprises a seamless steel pipe for connecting the bottom of the steel beam and the lower cross beam into a whole in the longitudinal direction, and the transverse temporary restraint comprises limiting profile steel which is fixedly connected with an embedded part on a bridge deck on the top of the steel beam and an embedded part at the tower column. The utility model has the characteristics of simple on-site construction operation, high construction efficiency, low safety risk and high economic benefit.
Owner:CCCC SECOND HARBOR ENGINEERING CO LTD

Through-wall pipeline plugging device

The utility model provides a through-wall pipeline plugging device which comprises a functional cover arranged at the tail end of a working pipe, an operation opening is formed in the lower portion of the functional cover, a control valve is installed at the operation opening, a liquid storage cavity is formed between the functional cover and an inner sleeve, and the liquid storage cavity communicates with the operation opening. The functional cover comprises an arc-shaped plugging plate, a top plate is arranged between each end of the upper portion of the plugging plate and the inner sleeve, an end plate is arranged at the end, away from the working pipe, of the plugging plate, and the gap between the plugging plate and the inner sleeve is gradually increased from the side close to the working pipe to the side away from the working pipe. The through-wall pipeline plugging device is simple in structure and reasonable in design, the functional cover is welded to the tail end of the working pipe, so that a closed space is formed in the functional cover, when the through-wall pipeline plugging device is welded, leaked water flow is allowed to be discharged through the operation opening, and after the plugging device is welded, the operation opening is closed through the control valve, so that the sealing effect is achieved. And the construction operation is simple, and time and labor are saved.
Owner:TIANJIN PIPELINE ENG GROUP +1

Construction method for steel cable trunking fluorescent lamp strip in high and large space

The invention relates to the technical field of electrical lighting of buildings, in particular to a construction method of a high and large space steel cable trunking fluorescent lamp band, which is simple in construction, effectively reduces construction cost and construction period, ensures construction safety through low-altitude operation, greatly improves construction efficiency, and effectively saves investment of manpower and material resources. According to the construction method of the high and large space steel cable trunking fluorescent lamp strip, when a steel cable is assembled, one end of the steel cable which is stretched in advance penetrates into a lug ring, is folded back and penetrates into a heart-shaped ring, and then is fixed twice through two steel cable clamps; screw rods at the two ends of the turn buckle are screwed into the nut, and the maximum distance is kept; the iron wire bound at the tail end of the steel cable is removed, the steel cable penetrates through the turn buckle and the lug ring, is folded back and then is embedded into the heart-shaped ring, and then the two steel cable clamps are used for fixing the two steel cable clamps; the steel rope and the turn buckle are pulled up simultaneously, the lug ring at the other end is hooked, then the steel rope is tightened through a large rope, the steel rope is fixed to the lifting hook from the middle, and the tightness of the steel rope is adjusted by adjusting a screw of the turn buckle.
Owner:CHINA AEROSPACE CONSTR GROUP +1

A method and apparatus for multiple fracturing of low-permeability coal seams using electrical pulse combined with supersaturated ammonium carbonate solution.

PendingCN122082692AReduced explosion protection requirementsSolve the positioning problemFluid removalGas removalControl setAmmonium carbonate
This invention relates to the field of coal seam permeability enhancement technology, and discloses a method and apparatus for multiple fracturing of low-permeability coal seams using a combination of electrical pulses and supersaturated ammonium carbonate solution. The method includes: Step 1, drilling a single-hole long borehole in the coal seam, and then arranging an integrated discharge device within the borehole; Step 2, injecting a high-pressure supersaturated ammonium carbonate ion solution into the borehole, using a data monitoring and control center system to monitor the data within the borehole and control the integrated discharge device to release electrical pulses into the high-temperature, high-pressure conductive medium filling the borehole, thereby fracturing the coal seam and releasing gas; Step 3, after the electrical pulses are repeated 6-8 times, the discharge is stopped, the electrolyte solution is drained, and the integrated discharge device is removed. The single-hole long borehole is then connected to a gas extraction pipeline for gas extraction. This invention is safe, highly efficient, and has wider applicability, possessing urgent practical significance and important technical value.
Owner:ANHUI UNIV OF SCI & TECH