Construction guardrail structure with irrigation function
By integrating water spray holes, water supply pipes, throttle valves and atomization spray heads on the construction guardrail, the problem of difficult irrigation on the construction site is solved, efficient irrigation and dust cleaning is achieved, operation is simplified, and structure is improved Stability and usage scenarios.
Patent Information
- Application Number
- CN202420561706.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-22
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2034-03-22
AI Technical Summary
At the construction site, irrigation of vegetation beside the guardrail is difficult, and the existing technology cannot effectively solve this problem.
Design a construction guardrail structure with irrigation function, including columns and blocks. The blocks are equipped with water spray holes. A water supply pipe is provided in the columns. Water supply through the inlet reaches the water spray hole. The lower beam is located lower than the root of the vegetation, and the flow is throttling. The valve controls the amount of water spray and installs atomized spray head on the connecting rod to clean vegetation surface dust, and the connecting pipes and quick connectors to achieve multi-guard connection and irrigation control.
It realizes efficient irrigation of vegetation, throttle valve controls the spraying speed, atomized spray heads clean dust, quick joints simplify operation, multiple guardrails irrigate at the same time, support blocks improve structural stability, and hooks expand usage scenarios.
Smart Images

Figure CN221973204U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of warning devices, and in particular to a construction guardrail structure with an irrigation function. Background Art
[0002] At present, guardrails are often used as warning isolation devices to isolate construction sites from non-construction sites during construction. Guardrails are usually placed at the edge of the construction site to achieve isolation between the construction site and the non-construction site, so as to reduce injuries caused by non-construction personnel mistakenly entering the construction site, and can also serve as a reminder to construction personnel.
[0003] Regarding the above-mentioned related technologies, when isolating construction sites such as roads or construction sites, there is often vegetation next to the guardrails. In order to facilitate operators to irrigate the vegetation and reduce the difficulty of construction workers in irrigating the vegetation. Utility Model Content
[0004] In order to facilitate the irrigation of vegetation next to the guardrail, the present application provides a construction guardrail structure with irrigation function.
[0005] The present application provides a construction guardrail structure with irrigation function, which adopts the following technical solution:
[0006] A construction guardrail structure with irrigation function comprises a column and a fence, wherein the fence is vertically arranged, and both ends of the fence are connected to the column, the fence is provided with a plurality of water spray holes, the column is provided with a water inlet for supplying water to the fence, and a first water supply pipe extending to the water spray hole is provided in the column.
[0007] By adopting the above technical solution, the fence is connected to the column, and the operator passes water into the fence through the water inlet. The water passes through the first water supply pipe to the water spray hole on the fence and is sprayed out through the water spray hole to achieve irrigation of vegetation.
[0008] Optionally, the barrier net includes an upper crossbeam, a connecting rod and a lower crossbeam, the water spray hole is located on the horizontal side of the lower crossbeam, and the lower crossbeam is provided with a throttle valve.
[0009] By adopting the above technical solution, the water entering the first water supply pipe from the water inlet enters the lower beam. Since the lower beam is located at a lower position, the roots of the vegetation can be irrigated directly, and the throttle valve can be used to effectively control the amount of water entering the lower beam, thereby achieving control of the water spraying speed.
[0010] Optionally, a second water supply pipe is provided in the connecting rod, the lower end of the second water supply pipe is connected to the first water supply pipe, and a plurality of atomizing nozzles are provided along the length direction of the connecting rod, and the atomizing nozzles and the water spray holes are located on the same side of the blocking net.
[0011] By adopting the above technical solution, an atomizing nozzle is installed on the connecting rod, and water supply is achieved by opening a second water supply pipe in the connecting rod. The atomized water has a larger coverage area, effectively achieving the cleaning of dust covering the surface of vegetation.
[0012] Optionally, the column includes a first column and a second column, the water inlet is located at the first column, the second column is provided with a water outlet, the water outlet is provided with a connecting pipe, and the first water supply pipe extends to the water outlet.
[0013] By adopting the above technical solution, a water outlet is opened on the second column and a connecting pipe is installed, and the water inlets and outlets of different guardrails are connected through the connecting pipe, thereby effectively supplying water to one guardrail and irrigating multiple guardrails at the same time.
[0014] Optionally, the upper cross beam is provided with a water supply pipeline along the length direction, a first water supply cavity connected to the water inlet is provided in the first column, a second water supply cavity connected to the water outlet is provided in the second column, one end of the water supply pipeline is connected to the first water supply cavity, and the other end of the water supply pipeline is connected to the second water supply cavity.
[0015] By adopting the above technical solution, when the lower beam throttle valve is closed, water enters the water supply pipeline through the first water supply chamber, and is discharged through the second water supply chamber and the water outlet, effectively achieving that when multiple guardrails are connected and some of them stop irrigating, other guardrails can still maintain water spraying irrigation.
[0016] Optionally, the water inlet, water outlet and connecting pipe are all provided with quick connectors.
[0017] By adopting the above technical solution, when an operator connects multiple guardrails, two different guardrails are connected through the quick connector of the connecting pipe, which effectively simplifies the operator's operating process.
[0018] Optionally, a support block for supporting the column is provided at the lower end of the column.
[0019] By adopting the above technical solution, support blocks are installed under the columns to support the whole, thereby effectively improving the stability of the overall structure.
[0020] Optionally, a hook for hanging a warning sign is provided on the side of the barrier away from the water spray hole.
[0021] By adopting the above technical solution and setting hooks to hang warning signs, it is convenient for operators to hang different warning signs in different usage scenarios, thereby effectively expanding the usage scenarios of the guardrail.
[0022] In summary, the present application includes at least one of the following beneficial technical effects:
[0023] 1. Through the connection between the column and the barrier, the operator passes water into the guardrail through the water inlet. The water passes through the first water supply pipe to the water spray hole on the barrier and is sprayed out through the water spray hole to irrigate the vegetation;
[0024] 2. The water entering the first water supply pipe from the water inlet enters the lower beam. Since the lower beam is located at a lower position, the roots of the vegetation can be irrigated directly, and the throttle valve can effectively control the amount of water entering the lower beam, thereby achieving control of the water spraying speed. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is an overall structural diagram of a construction guardrail structure with irrigation function.
[0026] Figure 2 It is a cross-sectional schematic diagram of the overall structure.
[0027] Explanation of the reference numerals: 1. column; 11. first column; 111. first water delivery chamber; 112. water inlet; 113. first water supply pipe; 12. second column; 121. second water delivery chamber; 122. water outlet; 13. throttle valve; 14. support block; 2. screen; 21. upper crossbeam; 211. hook; 212. water delivery pipeline; 22. connecting rod; 221. atomizing nozzle; 222. second water supply pipe; 23. lower crossbeam; 231. water spray hole; 3. connecting pipe; 4. quick connector. DETAILED DESCRIPTION
[0028] The present application is further described in detail below in conjunction with all the accompanying drawings.
[0029] The embodiment of the present application discloses a construction guardrail structure with irrigation function.
[0030] Reference Figure 1 and Figure 2 A construction guardrail structure with irrigation function includes a column 1 and a fence 2. The columns 1 are installed on both sides of the fence 2, and water spray holes 231 are opened on the fence 2. Water is supplied to the water spray holes 231 on the fence 2 through a water inlet 112 opened on the column 1 and a first water supply pipe 113 extending to the fence 2. The guardrail irrigates the surrounding vegetation.
[0031] Reference Figure 1 and Figure 2In order to control the flow rate of water spray, the barrier 2 includes an upper crossbeam 21, a connecting rod 22 and a lower crossbeam 23. The water spray hole 231 is opened on the horizontal side of the lower crossbeam 23. In this example, throttle valves 13 are installed on both sides of the lower crossbeam 23 close to the water inlet 112. The water output of the water spray hole 231 is adjusted by controlling the switch of the throttle valve 13. When the vegetation needs a large amount of water for irrigation, the switch of the throttle valve 13 is opened to increase the water flow rate at the water spray hole 231, thereby causing more water to be sprayed out from the water spray hole 231 in the same time, so that the irrigation rate is effectively improved.
[0032] Reference Figure 1 and Figure 2 , because the usage scene is usually outdoors, some dust and debris will accumulate on the vegetation. In order to clean the dust and debris on the vegetation while irrigating, an atomizing nozzle 221 is installed on the connecting rod 22. And the atomizing nozzle 221 and the water spray hole 231 are located on the same side of the guardrail. A second water supply pipe 222 is opened inside the connecting rod 22 to supply water to the atomizing nozzle 221, and the second water supply pipe 222 is connected to the lower section and the first water supply pipe 113. When the water flow enters the first water supply pipe 113 from the water inlet 112, part of it will enter the second water supply pipe 222 through the connection between the second water supply pipe 222 and the first water supply pipe 113, and reach the atomizing nozzle 221 installed on the connecting rod 22. Since the atomizing nozzle 221 can atomize the arriving water flow, the atomized water flow has a larger coverage area compared to direct spraying. When the water mist produced after atomization contacts the dust or debris on the vegetation, the dust or debris will fall to the ground along with the water droplets in the water mist, thus cleaning the dust or debris and making the vegetation more beautiful.
[0033] Reference Figure 1 and Figure 2 , in order to connect multiple guardrails and isolate a larger construction site, and irrigate a larger area of vegetation. In this embodiment, the column 1 includes a first column 11 and a second column 12, the water inlet 112 is located on the first column 11, the second column 12 is provided with a water outlet 122, the water outlet 122 is provided with a connecting pipe 3, and the first water supply pipe 113 extends to the water outlet 122. The water inlet 112 of the next construction fence is connected by the connecting pipe 3 installed on the water outlet 122 of the previous construction fence, and the connection between multiple construction fences is achieved by connecting them end to end in sequence. After the multiple construction fences are connected, water can be supplied to the water inlet 112 of the first construction fence to realize water supply to all construction fences at the same time.
[0034] Reference Figure 1In order to facilitate the installation and removal of the connecting pipe 3 by the operator, quick connectors 4 are installed at both ends of the connecting pipe 3, and corresponding quick connectors 4 are also installed at the water inlet 112 and the water outlet 122. When the operator connects and removes the connecting pipe 3, compared with the use of a clamp or other connection method, the quick connector 4 can be removed more quickly, and after removal, due to the self-locking characteristics of the quick connector 4, the water inside the construction fence will be sealed inside the construction fence and will not leak.
[0035] Reference Figure 2 In actual use, it may happen that only part of the vegetation within the scope of the connected construction fence needs to be irrigated, so it is necessary to stop spraying water on part of the construction fence. A water delivery pipeline 212 is provided along the length direction of the upper crossbeam 21, a first water delivery chamber 111 connected to the water inlet 112 is provided in the first column 11, and a second water delivery chamber 121 connected to the water outlet 122 is provided in the second column 12. One end of the water delivery pipeline 212 is connected to the first water delivery chamber 111, and the other end of the water delivery pipeline 212 is connected to the second water delivery chamber 121. When the corresponding construction fence needs to be closed and its water spraying is stopped, the throttle valves 13 at both ends of the lower crossbeam 23 are closed, and at this time, no water will flow through the water spray hole 231 and the atomizing nozzle 221. All water flows will enter through the water inlet 112, pass through the first water delivery chamber 111, the water delivery pipeline 212, the second water delivery chamber 121 in sequence, and finally enter the next construction fence through the water outlet 122 and the connecting pipe 3. This realizes the individual control of several connected construction fences, and further realizes the stop of water spraying at certain locations where irrigation is not required.
[0036] Reference Figure 1 Since the construction fence is heavy as a whole and some construction sites are not suitable for inserting the construction fence into the ground, a support block 14 is installed on the lower end surface of the column 1, and the length direction of the support block 14 is perpendicular to the length direction of the fence. This arrangement makes the overall structure of the construction fence more stable due to the effective increase in the support area when placing the construction fence.
[0037] Reference Figure 1 and Figure 2 The construction site usually needs to hang corresponding warning signs on the construction fence. In order to facilitate the hanging of warning signs on the construction fence, a hook 211 is installed on the side of the barrier 2 away from the water spray hole 231. In this example, the hook 211 is installed on the upper beam 21. The operator can hang the warning sign directly on the hook 211. It is also more convenient to replace the warning sign.
[0038] The implementation principle of the construction guardrail structure with irrigation function in the embodiment of the present application is: water is supplied to the water spray hole 231 on the lower beam 23 through the opened water inlet 112 and the first water supply pipe 113, so that water is sprayed out through the water spray hole 231 to irrigate the vegetation.
[0039] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A construction guardrail structure with irrigation function, comprising a column (1) and a barrier (2), characterized in that: The barrier net (2) is arranged vertically, and both ends of the barrier net (2) are connected to the column (1). The barrier net (2) is provided with a plurality of water spray holes (231), and the column (1) is provided with a water inlet (112) for supplying water to the barrier net (2). A first water supply pipe (113) extending toward the water spray hole (231) is provided in the column (1).
2. The construction guardrail structure with irrigation function according to claim 1, characterized in that: The barrier net (2) comprises an upper crossbeam (21), a connecting rod (22) and a lower crossbeam (23); the water spray hole (231) is located on the horizontal side of the lower crossbeam (23); and the lower crossbeam (23) is provided with a throttle valve (13).
3. The construction guardrail structure with irrigation function according to claim 2, characterized in that: A second water supply pipe (222) is provided in the connecting rod (22), the lower end of the second water supply pipe (222) is connected to the first water supply pipe (113), and a plurality of atomizing nozzles (221) are provided along the length direction of the connecting rod (22), and the atomizing nozzles (221) and the water spray holes (231) are located on the same side of the blocking net (2).
4. The construction guardrail structure with irrigation function according to claim 2, characterized in that: The column (1) comprises a first column (11) and a second column (12); the water inlet (112) is located on the first column (11); the second column (12) is provided with a water outlet (122); the water outlet (122) is provided with a connecting pipe (3); and the first water supply pipe (113) extends to the water outlet (122).
5. The construction guardrail structure with irrigation function according to claim 4, characterized in that: The upper cross beam (21) is provided with a water delivery pipeline (212) along the length direction; a first water delivery cavity (111) connected to the water inlet (112) is provided in the first column (11); a second water delivery cavity (121) connected to the water outlet (122) is provided in the second column (12); one end of the water delivery pipeline (212) is connected to the first water delivery cavity (111), and the other end of the water delivery pipeline (212) is connected to the second water delivery cavity (121).
6. The construction guardrail structure with irrigation function according to claim 1, characterized in that: The water inlet (112), the water outlet (122) and the connecting pipe (3) are all provided with quick connectors (4).
7. The construction guardrail structure with irrigation function according to claim 1, characterized in that: A support block (14) for supporting the column (1) is provided at the lower end of the column (1).
8. The construction guardrail structure with irrigation function according to claim 1, characterized in that: A hook (211) for hanging a warning sign is provided on one side of the barrier net (2) away from the water spray hole (231).