Connecting structure for connecting mid-partition wall and primary support
By setting the wall shoulder and the middle partition wall arch on the bottom of the middle partition wall, and installing a steel arch frame and grouting pipe, combining the ring ears and rubber pads to form an integral structure to resist the internal force of the surrounding rock, the traditional structure of the partition wall is solved. The problem of low stability improves the anti-biasing capacity and construction quality of the continuous arch tunnel.
Patent Information
- Application Number
- CN202420802501.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-17
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2034-04-17
AI Technical Summary
The traditional middle partition wall reinforcement structure cannot effectively resist the internal forces generated by surrounding rock bias, resulting in a decrease in the stability of the middle partition wall.
A connecting structure is designed for the connection between the middle partition wall and the initial support. By setting the wall shoulder and the middle partition wall arch on the bottom of the middle partition wall, and installing a steel arch frame and grouting pipe on it, using ring ears and rubber The pad reduces wear and forms an integral structure to resist internal forces of surrounding rock.
The anti-biasing capacity of the middle partition wall is improved, the vault sinking and steel arch settling are reduced, the overall stress and stability of the tunnel are enhanced, and the construction quality and safety are improved.
Smart Images

Figure CN221973555U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of multi-arch tunnel construction structures, in particular to a connection structure for connecting a middle partition wall with an initial support. Background Art
[0002] The double-arch tunnel generally replaces the rock mass between the two tunnels with cement concrete, adopts the three-pilot tunnel construction method, and forms a structure with double-hole arch walls connected. The connecting part in the middle is called the middle partition wall. With the continuous development of highway construction at home and abroad, the use of double-arch tunnels is increasing, especially in some areas with complex geology, which requires higher eccentric pressure bearing capacity of double-arch tunnels.
[0003] In traditional structures, the middle partition wall is reinforced by a single method of pouring concrete or overlapping steel bars, which cannot better resist the internal force generated by the eccentric pressure of the surrounding rock, resulting in reduced stability of the middle partition wall. Utility Model Content
[0004] In view of this, the connection structure between the middle partition wall and the initial support provided by the utility model solves the technical problem that the structure of the prior art causes the stability of the middle partition wall to be reduced.
[0005] A connection structure between a middle partition wall and an initial support is used for reinforcing the middle partition wall. A plurality of reinforcing components are arranged on the middle partition wall. The plurality of reinforcing components are used to form the middle partition wall and the surrounding rock into a whole to resist the internal force generated by the surrounding rock when biased.
[0006] Preferably or optionally, a wall shoulder is provided on the bottom surface of the middle partition wall, and the width of the wall shoulder is the same as the width of the top surface of the middle partition wall.
[0007] Preferably or optionally, a middle partition wall arch is provided on the wall shoulder, and the width of the middle partition wall arch is smaller than the width of the wall shoulder, so as to form a staggered section on the top surface of the wall shoulder, and the staggered section is used for overlapping one end of multiple installed steel arch frames and a gap is left between the middle partition wall arch and each of the steel arch frames, and the other end of the steel arch frame is anchored along the surrounding rock.
[0008] Preferably or optionally, a plurality of grouting pipes are arranged in the horizontal direction on the arch portion of the middle partition wall, and the grouting pipes are fixedly connected to one end of the steel arch frame.
[0009] Preferably or optionally, a ring ear is provided at one end of the grouting pipe, and the ring ear is fixedly connected to the steel arch frame.
[0010] Preferably or optionally, a rubber pad is provided between the ring ear and the steel arch frame, and the rubber pad is used to reduce the wear of the ring ear and the steel arch frame, and to form the middle partition wall and the steel arch frame into a whole, so as to resist the internal force generated by the surrounding rock.
[0011] Beneficial Effects
[0012] Through the action of multiple reinforcement components, the influence of uneven deformation of initial support on eccentric pressure can be reduced, the top of the middle partition wall can be avoided from being hollowed out, the middle partition wall, surrounding rock and steel arch frame can be formed into a whole, the eccentric pressure resistance of the middle partition wall can be improved, the sinking of the middle partition wall arch can be reduced, the settlement and displacement of the steel arch frame can be prevented, and the overall stress and stability of the tunnel can be increased, the cracking of the main tunnel arch can be avoided, and the construction quality and safety of the multi-arch tunnel can be improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] In order to more clearly illustrate the technical solutions of the embodiments of the present disclosure, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present disclosure. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0014] Figure 1 It is a schematic diagram of the overall structure;
[0015] Figure 2 It is a schematic diagram of the structure of one end of the grouting pipe, where:
[0016] 1. Bottom plate; 2. Middle partition wall; 3. Arch of middle partition wall; 4. Grouting pipe; 5. Ear; 7. Grouting anchor rod; 8. Steel arch frame; 9. Wall shoulder; 10. Stiffening rib. DETAILED DESCRIPTION
[0017] The embodiments of the present disclosure are described in detail below with reference to the accompanying drawings.
[0018] The following describes the embodiments of the present disclosure through specific examples, and those skilled in the art can easily understand other advantages and effects of the present disclosure from the contents disclosed in this specification. Obviously, the described embodiments are only a part of the embodiments of the present disclosure, rather than all of the embodiments. The present disclosure can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present disclosure. It should be noted that the following embodiments and features in the embodiments can be combined with each other without conflict. Based on the embodiments in the present disclosure, all other embodiments obtained by ordinary technicians in the field without making creative work are within the scope of protection of the present disclosure.
[0019] It should be noted that various aspects of the embodiments within the scope of the appended claims are described below. It should be apparent that the aspects described herein can be embodied in a wide variety of forms, and any specific structure and / or function described herein is merely illustrative. Based on the present disclosure, it should be understood by those skilled in the art that an aspect described herein can be implemented independently of any other aspect, and two or more of these aspects can be combined in various ways. For example, any number of aspects described herein can be used to implement the device and / or practice the method. In addition, other structures and / or functionalities other than one or more of the aspects described herein can be used to implement this device and / or practice this method.
[0020] It should also be noted that the illustrations provided in the following embodiments are only schematic illustrations of the basic concept of the present disclosure. The drawings only show components related to the present disclosure rather than being drawn according to the number, shape and size of components in actual implementation. In actual implementation, the type, quantity and proportion of each component may be changed arbitrarily, and the component layout may also be more complicated.
[0021] See also Figure 1 to Figure 2 The connection structure between the middle partition wall 2 and the initial support shown is used for reinforcing the middle partition wall 2. A plurality of reinforcing components are arranged on the middle partition wall 2. The plurality of reinforcing components are used to form the middle partition wall 2 into a whole with the surrounding rock to resist the internal force generated by the surrounding rock when the surrounding rock is under bias pressure. The purpose is to form the middle partition wall 2 into a whole with the surrounding rock and the steel arch frame 8. The steel arch frame 8 is an initial support device. The structure is used for the construction of hollow cavity technology.
[0022] As a specific implementation method provided in this case, one of the reinforcement components is to set a wall shoulder 9 on the bottom surface of the middle partition wall 2, and the width of the wall shoulder 9 is the same as the width of the top surface of the middle partition wall 2, to reinforce the middle partition wall 2, and to set a middle partition wall arch 3 on the wall shoulder 9, and the width of the middle partition wall arch 3 is smaller than the width of the wall shoulder 9, so as to form a staggered section on the top surface of the wall shoulder 9, and the staggered section is used for overlapping one end of multiple installed steel arch frames 8, and a gap is left between the middle partition wall arch 3 and each steel arch frame 8, and the other end of the steel arch frame 8 is anchored along the surrounding rock. Preferably, the middle partition wall arch 3 is centered on the wall shoulder 9, and staggered sections are formed at both ends of the wall shoulder 9. The steel arch frame 8 is installed on the staggered section, and a gap or gap is left between the steel arch frame 8 and the middle partition wall arch 3 for the steel arch frame 8 to deform due to force.
[0023] In the existing construction method, the steel arch frame 8 is erected or installed on the curved surface of the middle partition wall arch 3, and additional auxiliary tools and steel bars are required for stable fixation (for example, multiple locking angle anchors are required to tighten and stabilize), and when the surrounding rock is biased, a large component force is generated on the curved surface of the middle partition wall arch 3, affecting the stability of the steel arch frame 8. A certain amount of space is left to be deformed by the internal force of the surrounding rock to better resist the sinking and displacement of the surrounding rock. Specifically, the traditional method places a component force in the horizontal direction on the curved surface of the steel arch frame 8 when it is subjected to the vertical internal force of the surrounding rock. This force is superimposed on the horizontal force generated by the internal force of the surrounding rock, thereby increasing the force on the curved surface and reducing stability. Therefore, one end of the steel arch frame 8 is placed on the wall shoulder 9 to avoid the occurrence of this situation, and effectively use the deformation of the steel arch frame 8 itself to resist the internal force generated by the surrounding rock, without the need for additional locking angle anchors to be set in the middle partition wall arch 3 for reinforcement.
[0024] Further, such as Figure 2 As shown, a plurality of grouting pipes 4 are arranged in the horizontal direction on the arch portion 3 of the middle partition wall. The grouting pipe 4 is fixedly connected to one end of the steel arch frame 8, and a ring ear 5 is arranged at one end of the grouting pipe 4. The ring ear 5 is fixedly connected to the steel arch frame 8. A rubber pad is arranged between the ring ear 5 and the steel arch frame 8. The rubber pad is used to reduce the wear of the ring ear 5 and the steel arch frame 8, and form the middle partition wall 2 and the steel arch frame 8 into a whole, which can resist the internal force generated by the surrounding rock.
[0025] Furthermore, stiffening ribs 10 are arranged circumferentially of the ring ear 5 , and the stiffening ribs 10 are fixed to the steel arch frame 8 and reinforced using longitudinal connecting steel bars. The stiffening ribs 10 are used to increase the contact area between the grouting pipe 4 and the steel arch frame 8 , so as to improve the stability of the middle partition wall 2 .
[0026] As a specific implementation provided in this case, the reinforcement component also includes a grouting anchor rod 7, wherein the middle partition wall 2 is provided with steel bars in the vertical direction, and the steel bars pass through the wall shoulder 9 and are partially embedded in the middle partition wall arch 3.
[0027] One end of the grouting anchor rod 7 is embedded in the surrounding rock, and a corresponding reinforcement layer is formed on the surrounding rock to reinforce one end of the grouting anchor rod 7 (casting cement mortar), and the other end of the grouting anchor rod 7 extends into the middle partition wall arch 3 and is fixedly connected to one end of the steel bar.
[0028] In the above, the grouting anchor rod 7 and the grouting pipe 4 are arranged in a plum blossom shape, one end of the grouting pipe 4 is riveted to the steel bar, and the other end is connected to the steel arch frame 8. The grouting pipe 4 is a pipe for grouting to form the middle partition wall arch, and an exhaust hole 11 and a grouting hole are arranged on it. After the middle partition wall arch is formed, the rubber pad is installed. The partition wall arch 8 is formed by Figure 1 The outer mold 6 built in the middle is cast on site, for example, using a trolley for casting.
[0029] The multi-arch tunnel is inevitably accompanied by the generation of bias pressure. Under the action of bias pressure, additional bending moment, shear force and axial force will be generated. Among them, the additional bending moment mainly appears in the middle partition wall 2, which exerts an inward force on it; the shear force is mainly distributed in the connection part, which may cause cracks in the connection; the axial force is distributed in the entire tunnel structure. Through the action of multiple reinforcement components, the influence of uneven deformation of initial support on the bias pressure is reduced, the top of the middle partition wall 2 is prevented from being hollowed out (the role of the wall shoulder 9), the middle partition wall 2 is formed into a whole with the surrounding rock and the steel arch frame 8, the anti-bias pressure ability of the middle partition wall 2 is improved, the middle partition wall 2 arch top sinking is reduced, and the settlement and displacement of the steel arch frame 8 are prevented. It can also increase the overall force and stability of the tunnel, avoid cracking of the main hole arch top, and improve the construction quality and safety of the multi-arch tunnel.
[0030] The above is only a specific implementation of the present disclosure, but the protection scope of the present disclosure is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed in the present disclosure should be included in the protection scope of the present disclosure. Therefore, the protection scope of the present disclosure should be based on the protection scope of the claims.
Claims
1. A connection structure between a middle partition wall and an initial support, used for reinforcing the middle partition wall, characterized in that: A plurality of reinforcement components are arranged on the middle partition wall, and the plurality of reinforcement components are used to form the middle partition wall and the surrounding rock into a whole so as to resist the internal force generated by the surrounding rock when biased.
2. The connection structure according to claim 1, characterized in that: The reinforcement assembly includes a wall shoulder arranged on the top surface of the middle partition wall, and the width of the wall shoulder is the same as the width of the top surface of the middle partition wall.
3. The connection structure according to claim 2, characterized in that: A middle partition wall arch is arranged on the wall shoulder, and the width of the middle partition wall arch is smaller than the width of the wall shoulder, so as to form a staggered section on the top surface of the wall shoulder. The staggered section is used for overlapping one end of multiple steel arch frames, and a gap is left between the middle partition wall arch and the steel arch frame, and the other end of the steel arch frame is anchored along the surrounding rock.
4. The connection structure according to claim 3, characterized in that: The middle partition wall arch portion is provided with a plurality of grouting pipes along the horizontal direction, and the grouting pipes are fixedly connected to one end of the steel arch frame.
5. The connection structure according to claim 4, characterized in that: One end of the grouting pipe is provided with a ring ear, and the ring ear is fixedly connected to the steel arch frame.
6. The connection structure according to claim 5, characterized in that: A rubber pad is arranged between the ring ear and the steel arch frame, and the rubber pad is used to reduce the wear of the ring ear and the steel arch frame, and to form the middle partition wall and the steel arch frame into a whole to resist the internal force generated by the surrounding rock.
7. The connection structure according to claim 6, characterized in that: Stiffening ribs are arranged circumferentially of the ring ears, and the stiffening ribs and the steel arch frame are reinforced by longitudinally connecting steel bars. The stiffening ribs are used to increase the contact area between the grouting pipe and the steel arch frame, so as to improve the stability of the middle partition wall.
8. The connection structure according to claim 7, characterized in that: The reinforcement assembly also includes grouting anchors, wherein: The middle partition wall is provided with steel bars in the vertical direction, the steel bars pass through the wall shoulder and are partially embedded in the middle partition wall arch; One end of the grouting anchor rod is embedded in the surrounding rock, and a corresponding reinforcement layer is formed on the surrounding rock to reinforce one end of the grouting anchor rod. The other end of the grouting anchor rod extends into the middle partition wall arch and is fixedly connected to one end of the steel bar.
9. The connection structure according to claim 8, characterized in that: The grouting anchor rods and grouting pipes are arranged in a plum blossom shape.