Traction device for pushing operation of steel box girder

By designing the traction device for the top pushing operation of steel box beams, the triangular structure of flexible traction parts and drive parts, combined with the step-type top pushing equipment, the problem of inconvenient guidance of traditional steel guide beams is solved, and construction efficiency and safety are improved.

CN221989127UActive Publication Date: 2024-11-12SICHUAN ROAD BRIDGE & BRIDGE ENG CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323516904.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-21
Publication Date
2024-11-12
Estimated Expiration
2033-12-21

AI Technical Summary

Technical Problem

In the construction of steel box beams, when the traditional pushing method uses steel guide beams for guidance, it is inconvenient to unload and use, resulting in low construction efficiency.

Method used

A traction device for steel box beam thrust operation is designed, including a beam end lifting assembly and a guide assembly. A triangular structure is formed by using flexible traction members and driving members. Combined with a step-type thrust device, it realizes automatic lifting and guidance of the end of the beam body. Avoid using additional equipment.

Benefits of technology

The efficiency of steel box beam over-pushing construction is improved, the installation and use process of steel guide beams is simplified, and the ends of the beam body are kept in a horizontal state during movement, reducing construction time and labor consumption.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221989127U_ABST
    Figure CN221989127U_ABST
Patent Text Reader

Abstract

The utility model provides a traction device for steel box girder pushing operation, which is matched with walking type pushing equipment for use and is used for pushing construction of a girder body formed by splicing a plurality of steel box girders, a girder end lifting component is arranged on the girder body, and a guide component is arranged on the girder body and a next pier column and is used for towing the girder body; the beam end lifting assembly comprises a support, a first flexible traction piece and a first driving piece, the support and the first driving piece are arranged on the beam body in a spaced mode, one end of the first flexible traction piece is connected with the end of the beam body, the other end of the first flexible traction piece bypasses the top of the support to be connected with the first driving piece, and the first driving piece is used for pulling the first flexible traction piece; the first flexible traction piece and the beam body form a triangular structure, and the first flexible traction piece is wound on a first guide wheel at the top end of the bracket; the problems that during traditional incremental launching construction, the end of a steel box girder is guided through a steel guide beam, and the steel guide beam is inconvenient to mount, dismount and use, so that the incremental launching operation efficiency is low are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of steel box girder jacking operation equipment, in particular to a traction device for steel box girder jacking operation. Background Art

[0002] When erecting steel box girders, the top-pushing method or the towing method is currently mainly used. The top-pushing method or the towing method is to assemble the bridge span structure in sections on the assembly platform behind the top-pushing direction of the bridge in advance, and set up steel guide beams, temporary piers, slideways and other devices, and use the top-pushing equipment or the towing equipment to push the beam end forward section by section until it completely crosses the obstacles under the bridge. The top-pushing equipment commonly used in the top-pushing method is the walking top-pushing equipment or the hydraulic jack, and the towing equipment commonly used in the towing method is the winch or other traction equipment.

[0003] When the steel box girder moves from the current pier or temporary pier to the next pier or temporary pier, the jacking method is to set a steel guide beam at the front end of the steel box girder. As the steel box girder moves, the steel guide beam is first erected on the next pier or temporary pier. As the steel box girder continues to move, the steel guide beam can guide the end of the steel box girder and prevent the end of the steel box girder from falling during the movement. However, when using the steel guide beam for guidance, it is not convenient to install and unload the steel guide beam at the end of the steel box girder, and when it transitions to the next pier or temporary pier, jacking equipment is still required to lift the end of the steel guide beam to successfully pass over. It is not very convenient to use and also leads to low overall construction efficiency of the jacking operation. Utility Model Content

[0004] The utility model aims to provide a traction device for jacking operation of a steel box girder, which solves the problem that in traditional jacking construction, the end of the steel box girder is guided by a steel guide beam, and the installation and use of the steel guide beam are not convenient, resulting in low efficiency of the jacking operation.

[0005] The embodiment of the utility model is realized by the following technical scheme: a traction device for jacking operation of a steel box beam, used in conjunction with a walking jacking device, for jacking construction of a beam body spliced ​​with multiple steel box beams, comprising a beam end lifting assembly and a guide assembly, wherein the beam end lifting assembly is arranged on the beam body, and the guide assembly is arranged on the beam body and the next pier column, and is used to haul the beam body;

[0006] The beam end lifting assembly includes a bracket, a first flexible traction member and a first driving member. The bracket and the first driving member are arranged on the beam body at intervals. One end of the first flexible traction member is connected to the end of the beam body, and the other end of the first flexible traction member bypasses the top of the bracket and is connected to the first driving member. The first driving member is used to pull the first flexible traction member so that the first flexible traction member and the beam body form a triangular structure.

[0007] Furthermore, a first guide wheel is rotatably provided at the top end of the bracket, and the first flexible traction member is wound around the first guide wheel.

[0008] Furthermore, a second guide wheel is rotatably provided on the bracket, a third guide wheel is rotatably provided on the end of the beam body, and one end of the first flexible traction member away from the first driving member is sequentially wound around the third guide wheel and the second guide wheel and then connected to the beam body.

[0009] Furthermore, it also includes a second driving member, and one end of the first flexible traction member away from the first driving member is connected to the second driving member.

[0010] Furthermore, it also includes a base, the bracket is arranged on the base, and the base includes an upper and lower layer of clamping frames, the upper and lower layers of the clamping frames are clamped at the connection between the steel box girder of the penultimate section and the steel box girder of the penultimate section, and the upper and lower layers of the clamping frames are connected and fixed to each other.

[0011] Further, the guide assembly includes a third driving member, a second flexible traction member and a fourth guide wheel, the third driving member is arranged on the beam body, the fourth guide wheel is arranged on the pier in front of the movement of the beam body, one end of the second flexible traction member is connected to the third driving member, and the other end of the second flexible traction member is wound around the fourth guide wheel and connected to the end of the beam body;

[0012] The height of the fourth guide wheel is higher than the height of the beam body.

[0013] Furthermore, it also includes a fifth guide wheel, which is rotatably arranged at the end of the beam body, and one end of the second flexible traction member close to the beam body is wrapped around the fifth guide wheel and connected to the pier.

[0014] The technical solution of the embodiment of the utility model has at least the following advantages and beneficial effects:

[0015] 1. The first driving member is used to pull the first flexible traction member so that the first flexible traction member and the beam body form a triangular structure. The first driving member can be a winch, a hydraulic cylinder, or an electric hoist. The first flexible traction member is mainly a steel cable or a high-strength chain. The first driving member acts on the first flexible traction member to pull the front end of the beam body obliquely upward, and then when the beam body moves, its end portion remains horizontal or slightly tilted. Combined with the jacking of the walking-type jacking equipment, the bridge pier in front of the movement can be crossed without the help of additional jacking equipment.

[0016] 2. In addition to directly pulling the end of the beam, you can also use a pulley group for labor-saving traction. The third guide wheel at the end of the beam can be regarded as a movable pulley, and then traction is performed from both ends of the first flexible traction member. The second driving member is the same as the first driving member, which is a winch or hydraulic cylinder with the ability to pull heavy objects, thereby making it more convenient to lift the end of the beam. At the same time, the entire two-stage lifting assembly can be set up in multiple groups. After being installed directly on the beam in the early stage, it can be used throughout the entire jacking construction process until all the piers are crossed. At the same time, it is very convenient to install and disassemble on the beam, which greatly improves construction efficiency.

[0017] 3. The third driving member is a winch, electric hoist, etc., which is arranged on the beam body. It only needs to set the fourth guide wheel on the pier in front of the moving beam body, and then wrap the second flexible traction member around the fourth guide wheel and connect it to the beam body, or directly connect the two ends of the second flexible traction member and the third driving member and the pier in front of the movement, and then directly reel in the second flexible traction member to guide and pull the beam body to avoid excessive deviation, and cooperate with the movement and correction of the walking-type pushing equipment to facilitate the pushing of the beam body.

[0018] 4. In order to facilitate the guidance of the beam, a pulley group is set on the basis of the traction of the third driving member and the pier in front of the mobile to reduce the strength of the third driving member. There are many implementation methods. The fifth guide wheel can reduce half of the original pulling force. At the same time, multiple groups of guiding components can be set to jointly pull the beam. The use method is simple, and installation and disassembly are also convenient. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the utility model and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without paying creative work.

[0020] Figure 1 This is a schematic diagram of the main structure of a traction device for jacking operation of a steel box girder provided by the utility model;

[0021] Figure 2 A schematic diagram of the top view of a traction device for jacking operation of a steel box girder provided by the utility model;

[0022] Icons: 1. Walking jacking equipment, 2. Beam body, 21. Steel box beam, 3. Beam end lifting assembly, 31. Bracket, 32. First flexible traction member, 33. First driving member, 34. First guide wheel, 35. Second guide wheel, 36. Third guide wheel, 37. Second driving member, 4. Guide assembly, 41. Third driving member, 42. Second flexible traction member, 43. Fourth guide wheel, 44. Fifth guide wheel, 5. Base, 51. Clamp frame, 6. Pier. DETAILED DESCRIPTION

[0023] In order to make the purpose, technical scheme and advantages of the embodiments of the utility model clearer, the technical scheme in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Generally, the components of the embodiments of the utility model described and shown in the drawings here can be arranged and designed in various different configurations.

[0024] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the present invention to be protected, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0025] Embodiment 1:

[0026] Reference Figure 1 to Figure 2 As shown, this embodiment provides a traction device for steel box girder jacking operation, which is used in conjunction with a walking jacking device 1 and is used for the jacking construction of a beam body 2 spliced ​​with multiple steel box girders 21. It includes a beam end lifting assembly 3 and a guide assembly 4. The beam end lifting assembly 3 is arranged on the beam body 2 and is used to lift the end of the beam body 2 to prevent the end of the beam body 2 from sagging during movement. The guide assembly 4 is arranged on the beam body 2 and the next pier 6 and is used to pull the beam body 2 and cooperate with the walking jacking device 1 to jointly realize the jacking construction of the beam body 2.

[0027] like Figure 1 and 2 As shown, the beam end lifting assembly 3 includes a bracket 31, a first flexible traction member 32 and a first driving member 33. The bracket 31 and the first driving member 33 are arranged on the beam body 2 at intervals. One end of the first flexible traction member 32 is connected to the end of the beam body 2, and the other end of the first flexible traction member 32 bypasses the top of the bracket 31 and is connected to the first driving member 33. The first driving member 33 is used to pull the first flexible traction member 32 so that the first flexible traction member 32 and the beam body 2 form a triangular structure.

[0028] More specifically, a first guide wheel 34 is rotatably disposed at the top of the bracket 31 , and the first flexible traction member 32 is wound around the first guide wheel 34 .

[0029] In specific implementation, the first driving member 33 can be a winch, a hydraulic cylinder, an electric hoist, etc., and the first flexible traction member 32 is mainly a steel cable or a high-strength chain. The first driving member 33 acts on the first flexible traction member 32 to pull the front end of the beam body 2 obliquely upward, and then when the beam body 2 moves, its end remains horizontal or slightly tilted. Combined with the jacking of the walking-type jacking device 1, the bridge pier in front of the movement can be crossed without the help of additional jacking equipment.

[0030] Embodiment 2:

[0031] Based on the above embodiment, a second guide wheel 35 is rotatably provided on the bracket 31, a third guide wheel 36 is rotatably provided on the end of the beam body 2, and the end of the first flexible traction member 32 away from the first driving member 33 is sequentially wound around the third guide wheel 36 and the second guide wheel 35 and then connected to the beam body 2.

[0032] The first flexible traction member 32 further includes a second driving member 37 , and one end of the first flexible traction member 32 away from the first driving member 33 is connected to the second driving member 37 .

[0033] like Figure 1 and 2 As shown, in the specific implementation, in addition to the method of directly pulling the end of the beam body 2 in the first embodiment, the pulley group can also be used for labor-saving traction. The third guide wheel 36 at the end of the beam body 2 can be regarded as a movable pulley, and then traction is performed from both ends of the first flexible traction member 32. The second driving member 37 is the same as the first driving member 33, which is a winch or a hydraulic cylinder with the ability to pull heavy objects, thereby making it more convenient to lift the end of the beam body 2. Figure 2 As described above, the entire two-stage lifting assembly 3 can be set up in multiple groups. After being installed directly on the beam body 2 in the early stage, it can be used throughout the entire jacking construction process until all the piers 6 are passed. At the same time, it is very convenient to install and disassemble on the beam body, which greatly improves construction efficiency.

[0034] More specifically, Figure 1 and 2As shown, it also includes a base 5, and a bracket 31 is arranged on the base 5. The base 5 includes an upper and lower layer of clamping frames 51. The upper and lower layers of the clamping frames 51 are clamped at the connection between the penultimate steel box girder 21 and the penultimate steel box girder 21. The upper and lower layers of the clamping frames 51 are mutually connected and fixed, thereby ensuring the stability of the connection between the two steel box girder sections 21. At the same time, the bracket 31 and the two traction members must be kept at a certain distance from the beam end 2, especially the first flexible traction member 32 and the second driving member 37. The farther away from the pier 6 contacting the end of the beam body, the easier it is to lift the beam end 2. The bracket 31 is usually at the connection between the two steel box girder sections, and the first flexible traction member 32 and the second driving member 37 are on the penultimate steel box girder section 21. In this way, only one group of base 5 needs to be set.

[0035] Embodiment three:

[0036] Based on the above embodiments, Figure 1 and 2 As shown, the guide assembly 4 includes a third driving member 41, a second flexible traction member 42 and a fourth guide wheel 43. The third driving member 41 is arranged on the beam body 2, and the fourth guide wheel 43 is arranged on the pier 6 in front of the movement of the beam body 2. One end of the second flexible traction member 42 is connected to the third driving member 41, and the other end of the second flexible traction member 42 is wound around the fourth guide wheel 43 and connected to the end of the beam body 2; the height of the fourth guide wheel 43 is higher than the height of the beam body 2, which is convenient for pulling the end of the beam body 2 obliquely upward.

[0037] In specific implementation, the third driving member 41 is a winch, an electric hoist, etc., which is arranged on the beam body 2. It is only necessary to set the fourth guide wheel 43 on the pier 6 in front of the moving beam body 2, and then wrap the second flexible traction member 42 around the fourth guide wheel 43 and connect it to the beam body 2, or directly connect the two ends of the second flexible traction member 42 and the third driving member 41 and the pier 6 in front of the movement, and then directly reel in the second flexible traction member 42 to guide and pull the beam body 2 to avoid excessive deviation, and cooperate with the movement and correction of the walking-type pushing equipment 1 to facilitate the pushing of the beam body 2. The second flexible traction member 42 is a steel cable or a high-strength chain.

[0038] Embodiment 4:

[0039] Based on Example 3, Figure 1 and 2 As shown, it also includes a fifth guide wheel 44, which is rotatably arranged at the end of the beam body 2, and one end of the second flexible traction member 42 close to the beam body 2 is wound around the fifth guide wheel 44 and connected to the pier 6.

[0040] During specific implementation, in order to facilitate the guidance of the beam body 2, a pulley group is set on the basis of the pulling of the third driving member 41 and the pier 6 in front of the mobile to reduce the strength of the third driving member 41. There are many implementation methods. The fifth guide wheel 44 can reduce half of the original pulling force. At the same time, multiple groups of guide components 4 can be set to jointly pull the beam body 2. The method of use is simple, and installation and disassembly are also convenient.

[0041] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may be subject to various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A traction device for jacking operation of a steel box beam, used in conjunction with a walking jacking device (1), for jacking construction of a beam body (2) spliced ​​with a plurality of steel box beams (21), characterized in that: It comprises a beam end lifting assembly (3) and a guide assembly (4), wherein the beam end lifting assembly (3) is arranged on the beam body (2), and the guide assembly (4) is arranged on the beam body (2) and the next pier (6) and is used to pull the beam body (2); The beam end lifting assembly (3) comprises a bracket (31), a first flexible traction member (32) and a first driving member (33); the bracket (31) and the first driving member (33) are arranged on the beam body (2) at intervals; one end of the first flexible traction member (32) is connected to the end of the beam body (2); the other end of the first flexible traction member (32) bypasses the top of the bracket (31) and is connected to the first driving member (33); the first driving member (33) is used to pull the first flexible traction member (32) so that the first flexible traction member (32) and the beam body (2) form a triangular structure.

2. A traction device for jacking operation of a steel box girder according to claim 1, characterized in that: A first guide wheel (34) is rotatably disposed at the top end of the bracket (31), and the first flexible traction member (32) is wound around the first guide wheel (34).

3. A traction device for jacking operation of a steel box girder according to claim 2, characterized in that: A second guide wheel (35) is rotatably provided on the bracket (31), a third guide wheel (36) is rotatably provided at the end of the beam body (2), and one end of the first flexible traction member (32) away from the first driving member (33) is successively wound around the third guide wheel (36) and the second guide wheel (35) and then connected to the beam body (2).

4. A traction device for jacking operation of a steel box girder according to claim 3, characterized in that: It also includes a second driving member (37), and one end of the first flexible traction member (32) away from the first driving member (33) is connected to the second driving member (37).

5. A traction device for jacking operation of a steel box girder according to claim 4, characterized in that: It also comprises a base (5), the bracket (31) is arranged on the base (5), the base (5) comprises an upper and lower layer of clamping frames (51), the upper and lower layers of the clamping frames (51) are clamped at the connection between the penultimate section of the steel box girder (21) and the penultimate section of the steel box girder (21), and the upper and lower layers of the clamping frames (51) are connected and fixed to each other.

6. A traction device for jacking operation of a steel box girder according to any one of claims 1 to 5, characterized in that: The guide assembly (4) comprises a third driving member (41), a second flexible traction member (42) and a fourth guide wheel (43), wherein the third driving member (41) is arranged on the beam body (2), the fourth guide wheel (43) is arranged on the pier (6) in front of the movement of the beam body (2), one end of the second flexible traction member (42) is connected to the third driving member (41), and the other end of the second flexible traction member (42) is arranged behind the fourth guide wheel (43) and connected to the end of the beam body (2); The height of the fourth guide wheel (43) is higher than the height of the beam body (2).

7. A traction device for jacking operation of a steel box girder according to claim 6, characterized in that: It also includes a fifth guide wheel (44), which is rotatably arranged at the end of the beam body (2), and one end of the second flexible traction member (42) close to the beam body (2) is arranged around the fifth guide wheel (44) and connected to the pier (6).