Sampler structure

By designing a sampler structure with movable drill bit and guide rod matching, the problem of depth difference caused by soil extrusion in sleeve drilling sampling is solved, and the accuracy and stability of soil sampling are improved.

CN221989272UActive Publication Date: 2024-11-12CHINA COAL YANGTZE RIVER INFRASTRUCTURE CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420156279.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-23
Publication Date
2024-11-12
Estimated Expiration
2034-01-23

AI Technical Summary

Technical Problem

The existing sleeve drilling and sampling method is used to extrude the soil due to the drilling rod downward drilling during deep soil sampling, resulting in a difference in the sample depth and actual situation, reducing sampling accuracy and increasing sampling burden.

Method used

A sampler structure is designed, including a drill rod with a rod body and a spiral blade. A movable drill bit is installed at the front end. The drill bit is equipped with a sampling port and a digging teeth, and is equipped with a removable sleeve and a plug, using a guide rod and track. The groove realizes sampling and drilling switching, the drill bit has a spring to ensure stability, and the rod body is a hollow structure to reduce costs.

Benefits of technology

The movable drill bit cooperates with the rod body to provide sample storage space, and the coordination of the guide rod and track groove is used to close during drilling, avoid interference, and improve sampling accuracy and stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221989272U_ABST
    Figure CN221989272U_ABST
Patent Text Reader

Abstract

The utility model discloses a sampler structure which comprises a rod body, spiral blades are arranged on the side wall of the rod body so as to achieve rotary excavating, a drill bit is movably installed at the front end of the rod body, tunneling teeth are arranged at the end of the drill bit, and a sampling opening is formed in the end of the drill bit. The drill bit and the end, close to the rod body, of the drill bit define a space for storing sample materials, soil enters the space for placing the sample materials from the sampling opening along with rotary excavating, the guide rod and the track groove can be matched to seal the space for storing the sample materials during normal drilling, and the space is opened during sampling, so that the sample materials can be conveniently taken out. Therefore, interference during conventional sampling is avoided, and the sampling accuracy and stability are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of civil engineering construction, in particular to a sampler structure. Background Art

[0002] Before civil engineering construction, it is necessary to conduct on-site exploration, including investigation of relevant geological and hydrological conditions. It is necessary to sample the soil on site. The surface or near-ground soil can be collected by direct digging or excavation, while the sampling of deep soil is difficult. Generally, a sleeve drill is used for sampling. However, when sampling, the drill rod will squeeze the soil during the period and generate compression inside the rod body. Therefore, the method of calculating the sampling depth by the rod length after taking out will cause the depth of the collected sample to be different from the actual depth. Moreover, most of the sleeve drills now use a range from the surface to the deepest point, which increases the burden of the sampling process and reduces the sampling accuracy. To this end, we propose a sampler structure. Utility Model Content

[0003] The purpose of the utility model is to provide a sampler structure to solve the problems raised in the above background technology.

[0004] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a sampler structure, including a rod body, and the side wall of the rod body is provided with spiral blades like the existing drill rod, so as to realize rotary drilling. A drill bit is movably installed at the front end of the rod body, and the end of the drill bit is provided with excavation teeth. One end of the drill bit is located in the rod body and can move relative to the rod body. A sampling port is opened at the end of the drill bit, and the drill bit and the end close to the rod body enclose a space for storing sample materials. As the rotary drilling proceeds, soil enters the space for placing the sample materials from the sampling port.

[0005] Preferably, a sleeve is provided in the space for storing the sample, and a plug is provided on the sleeve. After the drill bit moves relative to the rod body, the plug can be used to seal the sampling port to prevent the sample from leaking out after sampling.

[0006] Preferably, at least one guide rod is provided on the side of the sleeve, and a track groove adapted to the guide rod is opened on the inner wall of the drill bit, and the track groove includes two connected tracks of different lengths. The switching between sampling and normal drilling can be realized by moving the guide rod.

[0007] Preferably, a spring is installed in the drill bit, and the spring has a tendency to move the drill bit away from the rod body, thereby ensuring operational stability.

[0008] Preferably, the plug and the sleeve are detachably arranged, and the distance between them is adjustable to meet the needs of different situations.

[0009] Preferably, part of the rod body is a hollow structure, thereby reducing costs.

[0010] Preferably, the tail end of the rod body is provided with a threaded groove to achieve connection

[0011] Compared with the prior art, the beneficial effects of the utility model are:

[0012] The technical solution of the utility model utilizes a movable drill bit in conjunction with a rod body, and a space of a certain volume can be used to store samples. The cooperation of a guide rod and a track groove can close the space for storing samples during normal drilling, and then open it during sampling, thereby avoiding interference that occurs during conventional sampling, thereby improving the accuracy and stability of sampling. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is the front view of the utility model;

[0014] Figure 2 It is a top view of the utility model;

[0015] Figure 3 It is a right view of the utility model;

[0016] Figure 4 It is a left view of the utility model;

[0017] Figure 5 It is an axial view of the utility model;

[0018] Figure 6 It is a transverse cross-sectional schematic diagram of the utility model;

[0019] Figure 7 It is a longitudinal cross-sectional schematic diagram of the utility model;

[0020] Figure 8 It is a three-dimensional diagram of the utility model;

[0021] Fig. 9 It is a cross-sectional view of the sleeve of the utility model;

[0022] Fig.10 It is an exploded view of the utility model.

[0023] In the figure: 1, rod body, 2, spiral blade, 3, excavation tooth, 4, drill bit, 5, sampling port, 6, sleeve, 601, mounting plate, 7, plug, 701, screw, 8, guide rod, 9, track groove, 10, track, 11, spring, 12, thread groove. DETAILED DESCRIPTION

[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0025] See also Figure 1-10 The utility model provides a technical solution: a sampler structure, including a rod body 1, the rod body 1 is the same as the prior art and is driven to rotate by other external power components, specifically as Figure 6 As shown, part of the rod body 1, i.e., the middle and rear part, is a hollow structure, which can reduce weight and cost, and also reduce the burden on the external drilling rig. In addition, a threaded groove 12 is provided at the rear end of the rod body 1, which can be used to connect other external drill rods to enable drilling at different depths.

[0026] The side wall of the rod body 1 is provided with a spiral blade 2 so that it can be drilled. A drill bit 4 is movably installed at the front end of the rod body 1, and a digging tooth 3 is provided at the end of the drill bit 4. Like the prior art, the digging tooth 3 can be made of a material with a high hardness level, such as tungsten carbide brazed with diamond.

[0027] The end of the drill bit 4 is provided with a sampling port 5, and the drill bit 4 and the end close to the rod body 1 enclose a space for storing samples. One end of the drill bit 4 is located in the rod body 1 and can move relative to the rod body 1. Specifically, a sleeve 6 is provided in the space for storing samples. Specifically, the sleeve 6 is fastened by a screw fastener (such as Figure 6 and 10 As shown in the figure, it is fixedly connected to the rod body 1 and can be disassembled when it needs to be taken out later.

[0028] The sleeve 6 is provided with a plug 7, and after the drill bit 4 moves relative to the rod body 1, the plug 7 can be used to seal the sampling port 5, thereby preventing the entry of external soil when sampling is not required.

[0029] At least one guide rod 8 is arranged on the side of the sleeve 6, and the guide rod 8 and the sleeve 6 are detachably connected (for example, the guide rod 8 is provided with a thread on the outside, and is in a through meshing connection with the sleeve 6), and the inner wall of the drill bit 4 is provided with track grooves 9 adapted to the guide rod 8, and the number corresponds to the number of the guide rods 8. By applying pressure and rotational force to the rod body 1 through an external drilling rig, the sampling port 5 can be closed or opened by using the plug 7 under the cooperation of the track groove 9 and the guide rod 8.

[0030] The track groove 9 includes two connected tracks 10 of different lengths, corresponding to the open and closed positions. In order to switch between the two tracks 10, a spring 11 is installed in the drill bit 4, and the spring 11 has a tendency to move the drill bit 4 away from the rod body 1. Fig.10 The right end of the spring 11 shown is fixedly connected to a bearing, and the bearing is fixedly connected to the sleeve 6 (via screws). After installation, the spring 11 is always in a compressed state and can have an elastic tendency to move the drill bit 4 away from the rod body 1. At the same time, the elastic force of the spring 11 is also used for the forward pressure of the drill bit 4 when sampling.

[0031] Due to production, tooling, wear and tear after use, the relative position of the plug 7 and the sampling port 5 sometimes needs to be adjusted, so the plug 7 and the sleeve 6 are detachably arranged, and the distance between the two is adjustable. Specifically, the tail of the plug 7 is fixedly connected with a screw rod 701, and the screw rod 701 is meshed and connected with the mounting plate 601 inside the sleeve 6. After adjustment, two screws are used to pre-tighten and fix the screw rod 701 through the mounting plate 601.

[0032] The specific process of use,

[0033] Assembly process:

[0034] Before use, the structure of this application is as follows Fig.10 Separate as shown;

[0035] First, the plug 7 is connected to the sleeve 6 according to the current actual situation, and the position of the plug 7 is determined;

[0036] Then, the spring 11 with the bearing is fixedly connected to the sleeve 6;

[0037] Insert the sleeve 6 into the drill bit 4, then engage the guide rod 8 with the sleeve 6 and penetrate it. Note that the outside of the guide rod 8 should be in the Fig. 9 The short track on the upper side is 10;

[0038] Then, the tail end of the sleeve 6 is connected to the rod body 1 by screws;

[0039] Finally, the tail end of the rod body 1 is connected to other drill rods, and can be rotated and excavated by external driving equipment such as a drilling rig.

[0040] Sampling process:

[0041] First, in the initial state, the outer end of the guide rod 8 is located in the short track 10, and under the action of the spring 11, the guide rod 8 is at the rightmost end of the track 10 ( Fig. 9 The one in the upper middle), at this time, the sampling port 5 is still in the state of being blocked by the plug 7 (moving to the left will make it more blocked);

[0042] Then the external drilling machine drives the rod body 1 to make the drill bit 4 drill (rotate and move forward). At this time, due to the thrust of drilling, the spring 11 will be compressed. At this time, the guide rod 8 is at the leftmost end of the track 10, and the rod body 1 (positive rotation) rotates in a direction that makes the guide rod 8 closely contact with the side wall of the track 10, thereby driving the drill bit 4 to rotate through the sleeve 6. The front end of the drill bit 4 continues to move forward for drilling. Since the sampling port 5 is closed at this time, no soil sample will be collected.

[0043] When the predetermined depth is reached (which can be determined by the rod body 1 and the length of the drill rod to be subsequently connected), the external drill is allowed to rotate in the opposite direction, and the guide rod 8 enters another track 10. The external drill is allowed to withdraw the drill by a certain distance (required to be at least greater than the size of the connection point of the two tracks 10, and the length of the track 10 is known, so it can be controlled). At this time, under the action of the spring 11, the guide rod 8 will leave the connection point of the two tracks 10 without affecting the subsequent rotation;

[0044] The drill rig retracts the drill by a distance (the size is known and can be actually controlled). Under the action of the spring 11, the sleeve 6 drives the plug 7 to shrink and leave the sampling port. The external drill rig continues to start rotating (but does not move forward), so that the soil sample in front can be rotary excavated under the top pressure of the spring 11 and enter the space for storing the sample from the sampling port.

[0045] After the sampling is completed (for example, the previous process is performed for one minute), the drill is allowed to drill forward. At this time, the guide rod 8 enters the leftmost end of the track 10 again. At this time, the drill rotates forward and can continue drilling. If the operation needs to be stopped at this time, the drill is retracted after forward rotation. Under the action of the spring 11, the guide rod 8 is always on the track 10 ( Fig. 9 In the one in the upper middle part), the sampling port 5 will not be opened regardless of whether it is rotated forward or reverse, thereby ensuring the sampling accuracy;

[0046] After the rod body 1 is taken out, the screws of the sleeve 6 and the rod body 1 can be loosened, and then they can be separated and the sample can be transferred.

[0047] It should be noted that the structure of the present application is generally used for sampling soil layers, not for sampling rock layers, because part of the elastic force of the spring 11 is required as digging force during sampling.

Claims

1. A sampler structure, comprising a rod body (1), wherein the side wall of the rod body (1) is provided with a spiral blade (2), a drill bit (4) is movably mounted at the front end of the rod body (1), and an excavation tooth (3) is provided at the end of the drill bit (4), characterized in that: One end of the drill bit (4) is located inside the rod body (1) and is movable relative to the rod body (1). A sampling port (5) is provided at the end of the drill bit (4), and the drill bit (4) and the end of the rod body (1) close to each other form a space for storing samples.

2. A sampler structure according to claim 1, characterized in that: A sleeve (6) is provided in the space for storing the sample, and a plug (7) is provided on the sleeve (6). After the drill bit (4) moves relative to the rod body (1), the plug (7) can be used to seal the sampling port (5).

3. A sampler structure according to claim 2, characterized in that: At least one guide rod (8) is provided on the side of the sleeve (6), and a track groove (9) adapted to the guide rod (8) is opened on the inner wall of the drill bit (4).

4. A sampler structure according to claim 3, characterized in that: The track groove (9) comprises two connected tracks (10) of different lengths.

5. A sampler structure according to claim 2, characterized in that: A spring (11) is installed in the drill bit (4), and the spring (11) has a tendency to move the drill bit (4) away from the rod body (1).

6. A sampler structure according to claim 2, characterized in that: The plug (7) and the sleeve (6) are detachably arranged, and the distance between them is adjustable.

7. A sampler structure according to any one of claims 1 to 6, characterized in that: The rod body (1) is a hollow structure.

8. A sampler structure according to any one of claims 1 to 6, characterized in that: The tail end of the rod body (1) is provided with a thread groove (12).