Steel pipe bearing frame for pouring construction
By designing a combined cast steel pipe load-bearing frame, the problem of limited height and length of steel pipe frames in the existing technology is solved, and flexible adjustment and standardization of the steel pipe support system is realized, construction efficiency and stability are improved, and cost is reduced and safety hazards.
Patent Information
- Application Number
- CN202420563312.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-22
- Publication Date
- 2024-11-12
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing fastener steel pipe frames are limited by the rigidity and stability of the frame body in terms of erection height and length, and are not reusable and have limited scope of application, making it difficult to meet the complex structural support needs of large amusement buildings.
A cast steel pipe load-bearing frame including top, connection and bottom components is designed. Through the combination of slide chutes, sliding blocks, fixing holes, sleeve rods and fixing bolts, the steel pipe support system is flexibly adjusted and standardized to adapt to Template support requirements for complex structures.
It realizes flexible adjustment and high standardization of the steel pipe support system, shortens installation and demolition time, improves construction progress and stability, reduces construction costs, and supports multiple reuses, reducing safety hazards.
Smart Images

Figure CN221989903U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction steel pipe load-bearing frames, in particular to a pouring construction steel pipe load-bearing frame. Background Art
[0002] In the field of architecture, public amusement buildings are developing towards being larger, taller, more complex, with more diverse structural forms, more complete functions and stronger comprehensiveness. Large-scale all-weather amusement buildings require tall shared spaces, so that the column spacing needs to be larger to meet the structural layout of the amusement space. Similarly, these spaces also require large load platform beams. Conventional pure steel structures cannot meet their load requirements and require large-span concrete structures or concrete rigid structures. The formwork for the construction of these ultra-high and large-span reinforced concrete superstructures has become the focus and difficulty in construction. In actual engineering construction, coupler-type steel pipe scaffolding is usually used to solve the high formwork problem of such structural construction.
[0003] However, in the prior art, the erection height and length of the fastener steel pipe rack are affected by the rigidity and stability of the rack body, resulting in that the erection length and height of the rack body are greatly limited, and the reusability is not high enough and the scope of application is not wide enough. Utility Model Content
[0004] The purpose of the utility model is to solve the problems existing in the above-mentioned prior art and to propose a steel pipe load-bearing frame for pouring construction.
[0005] The top of the two sliding blocks is installed in the two sets of sliding blocks, and the top of the two sets of sliding blocks is installed with two conveying plates, and the top of the two conveying plates has two sets of fixing holes. One side of the two first connecting rods has two sets of fixing blocks, one side of the two sets of fixing blocks has two second connecting rods, and the bottom of the two first connecting rods is installed with cross fixing plates; the connecting assembly includes two groups of sleeve rods, one side of the two groups of sleeve rods has multiple connecting holes, and the bottom of the two groups of sleeve rods has two groups of sleeve blocks; the bottom assembly includes two groups of fixing rods, two groups of fixing bolts are provided on one side of the two groups of fixing rods, two groups of connecting blocks are installed on the bottom of the two groups of fixing rods, and two groups of fixing seats are installed on the bottom of the two groups of fixing rods.
[0006] Preferably, the two groups of sliding blocks are slidably connected to the two first connecting rods, and the two conveying plates are fixedly installed to the two groups of sliding blocks.
[0007] Preferably, the two second connecting rods are fixedly mounted to two groups of fixing blocks, and two groups of fixing members are provided on one side of the cross fixing plate.
[0008] Preferably, the cross fixing plate is movably mounted on the two sets of fixing members, and the plurality of connecting holes are communicated with the interiors of the two sets of sleeve rods.
[0009] Preferably, the two groups of sleeve blocks are sleeve-connected with the two groups of sleeve rods, and the two groups of fixing bolts are threadedly connected with the two groups of fixing rods.
[0010] Preferably, the two groups of connecting blocks are fixedly mounted on the two groups of fixing rods, and the two groups of fixing seats are movably connected to the two groups of fixing rods.
[0011] Preferably, the two groups of fixing rods are sleeve-connected with the two groups of sleeve blocks, and the two groups of sleeve rods are fixedly installed with the two groups of fixing blocks.
[0012] Compared with the prior art, the advantages and positive effects of the present invention are:
[0013] 1. In the present invention, the steel pipe support system can flexibly adjust the size and shape according to different engineering needs, and adapt to the template support requirements of various complex structures, such as beams, plates, columns, stairs and other different parts. The steel pipe scaffolding has a high degree of standardization and is easy and quick to disassemble and assemble. After reasonable maintenance, it can be repeatedly used in multiple engineering projects, reducing construction costs.
[0014] 2. In this utility model, standard components are used for rapid construction, which greatly shortens the installation and dismantling time of the formwork support system, is conducive to speeding up the overall construction progress, and with standardized connection accessories and reasonable support layout, it can effectively ensure the stability of the frame and reduce safety hazards during construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 The utility model provides a schematic diagram of the overall structure of a steel pipe load-bearing frame for pouring construction;
[0016] Figure 2 This utility model provides a structural schematic diagram of the top assembly of a steel pipe load-bearing frame for pouring construction;
[0017] Figure 3 The utility model provides a structural diagram of a connection assembly of a steel pipe load-bearing frame for pouring construction;
[0018] Figure 4 The utility model provides a structural schematic diagram of the bottom component of a steel pipe load-bearing frame for pouring construction.
[0019] Legend: 1. Top assembly; 101. First connecting rod; 102. Slide groove; 103. Sliding block; 104. Conveying plate; 105. Fixing hole; 106. Fixing block; 107. Second connecting rod; 108. Cross fixing plate; 109. Fixing piece; 2. Connecting assembly; 201. Sleeve rod; 202. Connecting hole; 203. Sleeve block; 3. Bottom assembly; 301. Fixing rod; 302. Fixing bolt; 303. Connecting block; 304. Fixing seat. DETAILED DESCRIPTION
[0020] In order to more clearly understand the above-mentioned purpose, features and advantages of the present invention, the present invention is further described below with reference to the accompanying drawings and embodiments. It should be noted that the embodiments of the present application and the features therein can be combined with each other without conflict.
[0021] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways than those described herein. Therefore, the present invention is not limited to the specific embodiments disclosed in the following specification.
[0022] Example 1, as Figures 1-4 As shown, the utility model provides a steel pipe load-bearing frame for pouring construction, including a top component 1, a connecting component 2 and a bottom component 3; the top component 1 includes two first connecting rods 101, two sets of slide grooves 102 are opened on one side of the two first connecting rods 101, two sets of sliding blocks 103 are arranged inside the two sets of slide grooves 102, two conveying plates 104 are installed on the top of the two sets of sliding blocks 103, two sets of fixing holes 105 are opened on the top of the two conveying plates 104, two sets of fixing blocks 106 are installed on one side of the two first connecting rods 101, and the two sets of fixing blocks 103 are installed on the top of the two sets of sliding blocks 103. 6, two second connecting rods 107 are installed on one side, and a cross fixing plate 108 is installed at the bottom of the two first connecting rods 101; the connecting component 2 includes two groups of sleeve rods 201, and multiple connecting holes 202 are opened on one side of the two groups of sleeve rods 201, and two groups of sleeve blocks 203 are installed at the bottom of the two groups of sleeve rods 201; the bottom component 3 includes two groups of fixing rods 301, and two groups of fixing bolts 302 are set on one side of the two groups of fixing rods 301, two groups of connecting blocks 303 are installed at the bottom of the two groups of fixing rods 301, and two groups of fixing seats 304 are installed at the bottom of the two groups of fixing rods 301.
[0023] The effect achieved by the entire embodiment 1 is as follows: in the top component 1, the connecting component 2 and the bottom component 3; the top component 1 includes two first connecting rods 101, two sets of slide grooves 102 are opened on one side of the two first connecting rods 101, two sets of sliding blocks 103 are arranged inside the two sets of slide grooves 102, two conveying plates 104 are installed on the top of the two sets of sliding blocks 103, two sets of fixing holes 105 are opened on the top of the two conveying plates 104, two sets of fixing blocks 106 are installed on one side of the two first connecting rods 101, two second connecting rods 107 are installed on one side of the two sets of fixing blocks 106, and a cross fixing plate 108 is installed on the bottom of the two first connecting rods 101; the connecting component 2 includes two sets of sleeve rods 201, two sets of sleeve rods 202 A plurality of connection holes 202 are opened on one side of 01, and two sets of blocks 203 are installed at the bottom of the two sets of sleeve rods 201; the bottom component 3 includes two sets of fixing rods 301, two sets of fixing bolts 302 are set on one side of the two sets of fixing rods 301, two sets of connection blocks 303 are installed at the bottom of the two sets of fixing rods 301, and two sets of fixing seats 304 are installed at the bottom of the two sets of fixing rods 301. The steel pipe support system can flexibly adjust the size and shape according to different engineering requirements, and adapt to the template support requirements of various complex structures, such as beams, plates, columns, stairs and other different parts. The steel pipe scaffolding has a high degree of standardization and is convenient and quick to disassemble and assemble. After reasonable maintenance, it can be repeatedly used in multiple engineering projects, reducing construction costs.
[0024] Example 2, as Figures 1-4 As shown, two groups of sliding blocks 103 are slidably connected to the two first connecting rods 101, two conveying plates 104 are fixedly installed with the two groups of sliding blocks 103, two second connecting rods 107 are fixedly installed with the two groups of fixed blocks 106, two groups of fixing parts 109 are set on one side of the cross fixing plate 108, the cross fixing plate 108 and the two groups of fixing parts 109 are movably installed, a plurality of connecting holes 202 are connected with the interior of the two groups of sleeve rods 201, the two groups of sleeve blocks 203 are sleeved and connected with the two groups of sleeve rods 201, two groups of fixing bolts 302 are threadedly connected with the two groups of fixing rods 301, two groups of connecting blocks 303 are fixedly installed with the two groups of fixing rods 301, two groups of fixing seats 304 are movably connected with the two groups of fixing rods 301, the two groups of fixing rods 301 are sleeved and connected with the two groups of sleeve rods 201, and the two groups of fixing blocks 106 are fixedly installed.
[0025] The effect achieved by the entire embodiment 2 is that the two sets of sliding blocks 103 are slidably connected to the two first connecting rods 101, the two conveying plates 104 are fixedly installed with the two sets of sliding blocks 103, the two second connecting rods 107 are fixedly installed with the two sets of fixing blocks 106, two sets of fixing members 109 are set on one side of the cross fixing plate 108, the cross fixing plate 108 and the two sets of fixing members 109 are movably installed, the multiple connecting holes 202 are connected to the interior of the two sets of sleeve rods 201, the two sets of sleeve blocks 203 are sleeved and connected with the two sets of sleeve rods 201, and the two sets of fixing bolts 302 are connected with the two sets of sleeve rods 201. The fixing rod 301 is threadedly connected, the two sets of connecting blocks 303 are fixedly installed with the two sets of fixing rods 301, the two sets of fixing seats 304 are movably connected with the two sets of fixing rods 301, the two sets of fixing rods 301 are sleeve-connected with the two sets of sleeve blocks 203, and the two sets of sleeve rods 201 are fixedly installed with the two sets of fixing blocks 106. Standard components are used for rapid construction, which greatly shortens the installation and dismantling time of the formwork support system, is conducive to speeding up the overall construction progress, and with standardized connection accessories and reasonable support layout, it can effectively ensure the stability of the frame and reduce safety hazards during construction.
[0026] Working principle: in the top component 1, the connecting component 2 and the bottom component 3; the top component 1 includes two first connecting rods 101, two sets of slide grooves 102 are provided on one side of the two first connecting rods 101, two sets of sliding blocks 103 are provided inside the two sets of slide grooves 102, two conveying plates 104 are installed on the top of the two sets of sliding blocks 103, two sets of fixing holes 105 are provided on the top of the two conveying plates 104, two sets of fixing blocks 106 are installed on one side of the two first connecting rods 101, two second connecting rods 107 are installed on one side of the two sets of fixing blocks 106, and a cross fixing plate 108 is installed on the bottom of the two first connecting rods 101; The connecting component 2 includes two sets of sleeve rods 201, and multiple connecting holes 202 are opened on one side of the two sets of sleeve rods 201. Two sets of sleeve blocks 203 are installed at the bottom of the two sets of sleeve rods 201; the bottom component 3 includes two sets of fixing rods 301, and two sets of fixing bolts 302 are set on one side of the two sets of fixing rods 301. Two sets of connecting blocks 303 are installed at the bottom of the two sets of fixing rods 301, and two sets of fixing seats 304 are installed at the bottom of the two sets of fixing rods 301. The steel pipe support system can flexibly adjust the size and shape according to different engineering requirements to adapt to the template support requirements of various complex structures, such as beams, plates, columns, stairs and other different parts. The standardization is high, and the assembly and disassembly are convenient and quick. After reasonable maintenance, it can be repeatedly used in multiple engineering projects, which reduces the construction cost. The two sets of sliding blocks 103 are slidably connected with the two first connecting rods 101, the two conveying plates 104 are fixedly installed with the two sets of sliding blocks 103, the two second connecting rods 107 are fixedly installed with the two sets of fixed blocks 106, two sets of fixing parts 109 are set on one side of the cross fixing plate 108, and the cross fixing plate 108 is movably installed with the two sets of fixing parts 109, and multiple connecting holes 202 are connected with the interior of the two sets of sleeve rods 201. The two sets of sleeve blocks 203 are connected with the two sets of sleeve rods 201. The two sets of fixing bolts 302 are threadedly connected to the two sets of fixing rods 301, the two sets of connecting blocks 303 are fixedly installed with the two sets of fixing rods 301, the two sets of fixing seats 304 are movably connected with the two sets of fixing rods 301, the two sets of fixing rods 301 are sleeve-connected with the two sets of sleeve blocks 203, and the two sets of sleeve rods 201 are fixedly installed with the two sets of fixing blocks 106. Standard components are used for rapid construction, which greatly shortens the installation and dismantling time of the formwork support system, is conducive to speeding up the overall construction progress, and with standardized connection accessories and reasonable support layout, it can effectively ensure the stability of the frame and reduce safety hazards during construction.
[0027] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any other form. Any technician familiar with the profession may use the technical content disclosed above to change or modify it into an equivalent embodiment with equivalent changes for application in other fields. However, any simple modification, equivalent change and modification of the above embodiment made according to the technical essence of the present invention without departing from the content of the technical solution of the present invention shall still fall within the scope of protection of the technical solution of the present invention.
Claims
1. A steel pipe load-bearing frame for pouring construction, characterized in that: It comprises a top component (1), a connecting component (2) and a bottom component (3); The top component (1) comprises two first connecting rods (101), two groups of slide grooves (102) are provided on one side of the two first connecting rods (101), two groups of sliding blocks (103) are arranged inside the two groups of slide grooves (102), two conveying plates (104) are installed on the top of the two groups of sliding blocks (103), two groups of fixing holes (105) are provided on the top of the two conveying plates (104), two groups of fixing blocks (106) are installed on one side of the two first connecting rods (101), two second connecting rods (107) are installed on one side of the two groups of fixing blocks (106), and a cross fixing plate (108) is installed on the bottom of the two first connecting rods (101); The connection assembly (2) comprises two sets of sleeve rods (201), a plurality of connection holes (202) are provided on one side of the two sets of sleeve rods (201), and two sets of sleeve blocks (203) are installed at the bottom of the two sets of sleeve rods (201); The bottom assembly (3) comprises two groups of fixing rods (301), two groups of fixing bolts (302) are arranged on one side of the two groups of fixing rods (301), two groups of connecting blocks (303) are installed at the bottom of the two groups of fixing rods (301), and two groups of fixing seats (304) are installed at the bottom of the two groups of fixing rods (301).
2. A steel pipe load-bearing frame for pouring construction according to claim 1, characterized in that: The two groups of sliding blocks (103) are slidably connected to the two first connecting rods (101), and the two conveying plates (104) are fixedly mounted to the two groups of sliding blocks (103).
3. A steel pipe load-bearing frame for pouring construction according to claim 1, characterized in that: The two second connecting rods (107) are fixedly mounted to the two groups of fixing blocks (106), and two groups of fixing members (109) are provided on one side of the cross fixing plate (108).
4. A steel pipe load-bearing frame for pouring construction according to claim 3, characterized in that: The cross fixing plate (108) and the two groups of fixing members (109) are movably mounted, and the plurality of connection holes (202) are connected to the interior of the two groups of sleeve rods (201).
5. The steel pipe load-bearing frame for pouring construction according to claim 1, characterized in that: The two groups of sleeve blocks (203) are sleeved and connected with the two groups of sleeve rods (201), and the two groups of fixing bolts (302) are threadedly connected with the two groups of fixing rods (301).
6. A steel pipe load-bearing frame for pouring construction according to claim 1, characterized in that: The two groups of connection blocks (303) are fixedly mounted on the two groups of fixing rods (301), and the two groups of fixing seats (304) are movably connected to the two groups of fixing rods (301).
7. The steel pipe load-bearing frame for pouring construction according to claim 1, characterized in that: The two groups of fixing rods (301) are sleeved and connected with the two groups of sleeve blocks (203), and the two groups of sleeve rods (201) are fixedly installed with the two groups of fixing blocks (106).