Continuous casting tundish
By designing the retaining wall and dam structure in the continuous casting tundra, the flow time and path of the steel molten steel in the tundra is extended, and the problem of insufficient residence time of the steel molten steel in the prior art is solved, which significantly improves the cleanliness and casting of the steel molten steel Blank quality.
Patent Information
- Application Number
- CN202420269692.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-04
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-02-04
AI Technical Summary
The existing continuous casting tundra molten steel has insufficient residence time, which causes inclusions to enter the continuous casting crystallizer with the steel, reducing the cleanliness of the steel and affecting the quality of the casting billet.
Design a continuous casting tundra, including a long water outlet, a shell, a retaining wall and a barrier dam. After the steel water enters the steel receiving area from the long water outlet, it passes through a "several" shaped path, and is realized in the casting flow area through the barrier effect of the barrier dam. Turn sideways and float upwards to extend flow time and avoid inclusions entering the crystallizer.
The flow time and path of the molten steel in the tundra is significantly extended, so that more inclusions float to the surface, improving the cleanliness of the molten steel, and the shortest residence time of the molten steel is increased by nearly 3 times, significantly improving the quality of the casting billet.
Smart Images

Figure CN222001847U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of casting, in particular to a continuous casting tundish. Background Art
[0002] The continuous casting tundish is an important transition container between the refining ladle and the continuous casting crystallizer. The design of its flow control refractory system plays a very important role in protecting continuous casting, reducing continuous casting pollution, improving the cleanliness of continuous casting molten steel and temperature control. Usually, different baffles are set in the continuous casting tundish to achieve the uniformity of the flow field and temperature of the molten steel and the floating of inclusions. The existing baffles mainly have V-shaped, U-shaped and other shapes. The baffle design method (from the bottom of the continuous casting tundish to the liquid surface of the continuous casting tundish) is used to achieve slag blocking. The baffle adopts the method of opening holes. By controlling the size, angle and number of holes opened on the baffle, the purpose of slag blocking and controlling the steel flow is achieved.
[0003] However, the residence time of molten steel in the existing continuous casting tundish is still insufficient, and inclusions are still discharged from the continuous casting tundish into the continuous casting crystallizer, resulting in reduced cleanliness of the molten steel, thereby affecting the quality of the ingot.
[0004] Therefore, it is urgent to design a continuous casting tundish to solve the above problems. Utility Model Content
[0005] One purpose of the utility model is to provide a continuous casting tundish, which can better prevent inclusions from entering the continuous casting crystallizer and improve the cleanliness of molten steel in the continuous casting crystallizer.
[0006] To achieve this purpose, the utility model adopts the following technical solutions:
[0007] Continuous casting tundish, including:
[0008] a shroud and a shell, molten steel entering the shell from the shroud;
[0009] a retaining wall installed in the shell and dividing the shell into a steel receiving area and a casting area, wherein the steel receiving area is located in the middle of the casting area, and the long shroud is located in the steel receiving area. A groove is provided at the bottom of the retaining wall to connect the steel receiving area and the casting area, and the height of the retaining wall is not lower than the highest liquid level of the molten steel in the shell;
[0010] Two dams, the top of the dams is set lower than the top of the retaining wall, the two dams are located in the casting zone and respectively on both sides of the above-mentioned trough, the distance between the two dams is smaller than the width of the bottom of the retaining wall, one end of the dam is connected to the retaining wall, and the other end of the dam is connected to the inner wall of the casting zone opposite to the retaining wall, and the dam is provided with a plurality of steel outlets in the casting zone on the side away from the above-mentioned trough.
[0011] As an optional scheme, the above-mentioned shell includes a casting part and a steel receiving part, the above-mentioned casting part extends along the first direction, the multiple above-mentioned steel outlets are arranged in the above-mentioned casting part at intervals along the above-mentioned first direction, the above-mentioned steel receiving part is protruded from the above-mentioned casting part along the second direction, the two ends of the above-mentioned retaining wall are respectively connected to the two inner walls of the above-mentioned steel receiving part opposite to each other in the above-mentioned first direction, and the above-mentioned first direction is set at an angle to the above-mentioned second direction.
[0012] As an optional solution, the retaining wall is constructed as a flat plate structure.
[0013] As an optional solution, a notch structure is opened at the top of the dam.
[0014] As an optional solution, the notch structure is in a stepped, semicircular, rectangular, U-shaped or sloped shape.
[0015] As an optional solution, the above-mentioned notch structure is provided at the connection between the above-mentioned dam and the above-mentioned retaining wall.
[0016] As an optional solution, the dam is provided with an inclined hole, and the inclined hole is inclined from bottom to top in a direction away from the slot.
[0017] As an optional solution, the angle between the inclined hole and the horizontal direction is less than or equal to 60°, and the diameter of the inclined hole is less than or equal to 130 mm.
[0018] As an optional solution, the height of the dam is greater than or equal to 210 mm and less than or equal to half of the highest liquid level of the molten steel in the shell.
[0019] As an optional solution, the distance between the two dams is less than or equal to 800 mm.
[0020] As an optional solution, the height of the above-mentioned groove is less than or equal to half of the height of the above-mentioned retaining wall.
[0021] As an optional solution, the two dams mentioned above serve as two side walls of the above-mentioned slot respectively.
[0022] The beneficial effects of the utility model are:
[0023] The utility model provides a continuous casting tundish, so that after molten steel enters the steel receiving area from the long water nozzle, the molten steel first flows upward to the top of the molten steel liquid surface, and then enters the casting flow area through the slot at the bottom of the retaining wall, takes a path equivalent to a "J" shape in the steel receiving area, and then the molten steel enters from the bottom of the casting flow area and needs to be blocked by two dams. The molten steel then transitions from the bottom of the dam to the top of the dam and then enters the area on the side of the dam away from the slot, and then flows out from the steel outlet. That is to say, the molten steel sequentially undergoes the process of floating up, sinking to the slot, and floating up to the top of the dam from entering to flowing out of the continuous casting tundish. The dam guides the molten steel stream to realize a lateral turn in the casting flow area and flow upward, so as to better form a surface flow, so that the residence time and flow path of the molten steel in the continuous casting tundish are both lengthened, thereby promoting more inclusions in the molten steel to float to the surface of the molten steel, thereby avoiding the inclusions from entering the continuous casting crystallizer from the steel outlet, and improving the quality of the molten steel. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 is a cross-sectional view of a continuous casting tundish provided in an embodiment of the utility model;
[0025] Figure 2 It is a distribution diagram of the flow route of molten steel in the continuous casting tundish provided by the prior art;
[0026] Figure 3 is a distribution diagram of the molten steel flow path of the continuous casting tundish provided in this embodiment;
[0027] Figure 4 It is a structural schematic diagram of a retaining wall and two retaining dams provided in an embodiment of the utility model;
[0028] Figure 5 It is a structural schematic diagram of a continuous casting tundish provided in an embodiment of the utility model;
[0029] Figure 6 It is a structural schematic diagram of a continuous casting tundish provided by the prior art.
[0030] In the figure:
[0031] 10. Long shroud; 20. Shell; 21. Steel receiving area; 22. Casting flow area; 23. Steel receiving part; 231. Flat part; 232. Connecting part; 24. Casting flow part; 241. Steel outlet; 30. Retaining wall; 31. Passing groove; 40. Dam; 41. Oblique hole; 42. Notch structure; 50. Turbulator; 60. Stopper rod;
[0032] 200, molten steel flow route; 200′, molten steel flow route;
[0033] 700', a continuous casting tundish of the prior art; 710', a retaining wall; 711', a through hole. DETAILED DESCRIPTION
[0034] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only the parts related to the present invention, rather than all structures, are shown in the accompanying drawings.
[0035] In the description of the present invention, unless otherwise clearly specified and limited, the terms "connected", "connected", and "fixed" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0036] In the present utility model, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.
[0037] In the description of this embodiment, the terms "upper", "lower", "left", "right" and other directions or positional relationships are based on the directions or positional relationships shown in the drawings, and are only for the convenience of description and simplified operation, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation of the present invention. In addition, the terms "first" and "second" are only used to distinguish in the description and have no special meaning.
[0038] This embodiment provides a continuous casting tundish, which can better prevent inclusions from entering the continuous casting mold and improve the cleanliness of molten steel in the continuous casting mold. Figure 1As shown, the continuous casting tundish includes a long shroud 10, a shell 20, a retaining wall 30 and two retaining dams 40. Molten steel enters the shell 20 from the long shroud 10; the retaining wall 30 is installed in the shell 20 and divides the shell 20 into a steel receiving area 21 and a casting strand area 22. The steel receiving area 21 is located in the middle of the casting strand area 22, and the long shroud 10 is located in the steel receiving area 21. A groove 31 is provided at the bottom of the retaining wall 30 to connect the steel receiving area 21 and the casting strand area 22. The height of the retaining wall 30 is not less than The highest liquid level of molten steel in the shell 20; the top of the dam 40 is set lower than the top of the retaining wall 30, the two dams 40 are located in the casting zone 22 and are respectively located on both sides of the slot 31, the distance between the two dams 40 is less than the width of the bottom of the retaining wall 30, one end of the dam 40 is connected to the retaining wall 30, and the other end of the dam 40 is connected to the inner wall of the casting zone 22 opposite to the retaining wall 30, and the dam 40 is away from the casting zone 22 on the side of the slot 31. A plurality of steel outlets 241 are opened. Through the above arrangement, after the molten steel enters the steel receiving area 21 from the long nozzle 10, the molten steel first floats upward to the top, then passes through the groove 31 at the bottom of the retaining wall 30 and enters the casting area 22. In the steel receiving area 21, the molten steel takes a path equivalent to a "J" shape, and then enters the casting area 22 from the bottom, and needs to be blocked by the two retaining dams 40. The molten steel then transitions from the bottom of the retaining dam 40 to the top of the retaining dam 40 and then enters the area on the side of the retaining dam 40 away from the groove 31, and then exits from the steel outlet 24. 1 outflow, that is, the molten steel goes through the process of floating up, sinking to the groove 31, and floating up to the top of the dam 40 from entering to flowing out of the continuous casting tundish. The dam 40 guides the molten steel stream to realize lateral turning and flow upward in the casting zone 22, so as to better form the surface flow, thereby lengthening the flow time and flow path of the molten steel in the continuous casting tundish, thereby ensuring sufficient time for the inclusions to float to the surface of the molten steel, thereby preventing the inclusions from entering the continuous casting crystallizer from the steel outlet 241.
[0039] At the same time, a plurality of steel outlets 241 are arranged at intervals on the side of each retaining dam 40 facing away from the slot 31 .
[0040] Attached Figure 6 This is a top view of a conventional continuous casting tundish, with through holes 711' (the lines of the through holes in the figure are dotted lines) opened on both sides of the retaining wall 710'. Figure 2 It is a streamline diagram of the prior art, in which the black line is the simulated molten steel flow route 200′ in the prior art solution (the darker positions in the figure are positions with more simulated molten steel flow routes, which cannot be avoided and is hereby explained). After the molten steel comes out of the through hole 711′, it flows directly to the steel outlet in the casting zone. The through hole 711′ of the retaining wall 710′ has a small aperture, which increases the flow rate of the molten steel and shortens the molten steel flow process. There is no obstruction between the molten steel coming out of the through hole 711′ and the steel outlet, so the molten steel flows quickly, and the inclusions in the molten steel do not have enough time to float up.
[0041] The retaining wall 30 in the utility model cancels the hole design and adds a slot 31 structure. The slot 31 has a larger area than the hole and will not accelerate the flow of molten steel. At the same time, the design of the dam 40 is added, so that the molten steel flowing out from the top of the dam 40 forms a good surface flow, further slowing down the flow rate of the molten steel. Figure 3 This is a streamline diagram of the present embodiment, in which the black lines are simulated molten steel flow paths 200 in the present embodiment (the darker positions in the diagram are locations with more simulated molten steel flow paths, which cannot be avoided and is hereby explained). Figure 3 It can be seen that compared with the streamline of the existing technology Figure 2 In this embodiment, the molten steel flow field is more evenly distributed, the flow rate is slower, and the molten steel stays in the continuous casting tundish longer, thereby providing more floating time for inclusions.
[0042] At the same time, for the covering agent on the surface of the molten steel in the tundish, in the prior art, due to the fast flow rate of the molten steel, after the molten steel comes out from the through hole 711', it is easy to cause "slag rolling", that is, the covering agent is rolled into the molten steel to form inclusions. Since the molten steel stays in the continuous casting tundish for a short time, the formed inclusions do not have sufficient time to float up to the covering agent again. In the embodiment of the utility model, after the molten steel comes out of the groove 31 of the retaining wall 30, it goes over the retaining dam 40, and there is less "slag rolling" in the surface flow formed compared with the prior art, and the rolled-in covering agent also has more residence time to float up to the covering agent. Therefore, compared with the prior art, this embodiment has fewer inclusions caused by "slag rolling".
[0043] Preferably, the height of the slot 31 is less than or equal to one half of the height of the retaining wall 30. Through the above arrangement, the height of the slot 31 is set within a reasonable range, which avoids the slot 31 being set too low, causing a slow flow rate or accumulation of impurities at the slot 31, and also avoids the slot 31 being set too high, affecting the blocking effect of the retaining wall 30 on the molten steel.
[0044] Alternatively, if Figure 1 As shown, the shell 20 includes a casting flow part 24 and a steel receiving part 23, the casting flow part 24 extends along a first direction (X direction in the figure), a plurality of steel outlets 241 are arranged in the casting flow part 24 at intervals along the first direction, the steel receiving part 23 is protruded from the casting flow part 24 along a second direction (Y direction in the figure, in this embodiment, the Y direction is perpendicular to the X direction, in other embodiments, the angle between the X direction and the Y direction is not limited), and the two ends of the retaining wall 30 are respectively connected to the two inner walls of the steel receiving part 23 opposite to each other in the first direction, and the first direction is set at an angle to the second direction. It can be understood that the casting flow part 24 and the steel receiving part 23 are both hollow, and the retaining wall 30 is set on one side of the steel receiving part 23. Specifically, as Figure 1 and Figure 5As shown, the steel receiving portion 23 includes two connecting portions 232 and a flat portion 231 , the flat portion 231 is connected between the two connecting portions 232 , and one end of each connecting portion 232 away from the flat portion 231 is connected to the casting strand portion 24 .
[0045] Preferably, the retaining wall 30 is constructed as a flat plate structure. Compared with the prior art, the flat plate structure is easier to open a groove 31 at the bottom, thereby maximizing the path of the molten steel in the steel receiving area 21.
[0046] Preferably, one end of the retaining dam 40 is connected to the retaining wall 30, and the other end is connected to the inner wall of the casting part 24. Through the above arrangement, the retaining dam 40 can provide a certain support force for the retaining wall 30, ensure the support strength of the retaining wall 30, and eliminate the setting of the supporting member in the prior art.
[0047] Optionally, the distance between the two dams 40 is less than or equal to 800 mm, which can be adapted to the settings of most casting sections 24. It should be noted that the distance between the two dams 40 is limited by the distance between the two steel outlets 241 located in the middle, and can be adjusted according to actual conditions.
[0048] Preferably, the height of the dam 40 is greater than or equal to 210 mm and less than or equal to half of the highest liquid level of the molten steel in the shell 20, so that the top of the dam 40 has sufficient space to allow the molten steel to pass through, and has a certain height so that the molten steel can appropriately cross the steel outlet 241 closer to the dam 40 and flow out to a farther location.
[0049] Preferably, if Figure 4 As shown, the retaining dam 40 is provided with an inclined hole 41, which is inclined from bottom to top in a direction away from the slot 31. The inclined hole 41 can guide the molten steel to flow upward, while reducing the static pressure of the molten steel on the retaining wall 30 and the retaining dam 40 during the pouring stage.
[0050] Preferably, the angle between the inclined hole 41 and the horizontal direction is less than or equal to 60°, and the diameter of the inclined hole 41 is less than or equal to 130 mm, which can ensure that the normal flow of molten steel does not cause large fluctuations in the steady state stage.
[0051] When actually injecting molten steel into the continuous casting tundish, there is not only a steady state situation, but also a situation where the molten steel in the previous ladle is used up and replaced with a new ladle filled with molten steel. When changing the ladle, the molten steel in the casting zone 22 gradually decreases. The lower the molten steel level, the smaller the area that the molten steel passes through the top of the dam 40, and the greater the flow rate. After changing the ladle, the molten steel level rises and the flow rate returns to a stable state. At this time, the molten steel speed in the casting zone 22 is prone to fluctuations, resulting in poor stability of casting at this stage.
[0052] In order to solve the above problems, Figure 4As shown, the top of the dam 40 is provided with a notch structure 42, which is equivalent to increasing the area through which the molten steel passes, and can appropriately reduce the flow rate, thereby preventing the molten steel from flowing too fast through the upper part of the dam 40 when the liquid level of the casting strand area 22 drops during the bag change operation. The notch structure 42 may be in a stepped, semicircular, rectangular, U-shaped or sloped shape, which is not limited here.
[0053] In this embodiment, the steel outlet 241 is arranged on the side opposite to the retaining wall 30 . In order to make the molten steel flowing out through the notch structure 42 avoid the steel outlet 241 , the notch structure 42 is opened at the connection between the retaining dam 40 and the retaining wall 30 .
[0054] In the continuous casting industry, the "shortest residence time" is usually used to characterize the shortest time from the molten steel entering the tundish from the long water nozzle 10 to the steel outlet 241. Under the same conditions, the longer the shortest residence time, the more time the inclusions in the molten steel have to float to the surface of the molten steel, and the better the quality of the molten steel.
[0055] According to the data obtained from the hydraulic simulation experiment, under stable working conditions, the shortest residence time of the continuous casting tundish in the prior art is T=42s, while the shortest residence time of the continuous casting tundish in this embodiment is T=122s, which is nearly 3 times that of the prior art; under the tundish changing working condition, the shortest residence time of the continuous casting tundish in the prior art is T=30s, while the shortest residence time of the continuous casting tundish in this embodiment is T=59s, which is nearly 2 times that of the prior art. It can be seen that the shortest residence time of the continuous casting tundish in this embodiment is significantly improved compared with the prior art, which greatly helps more inclusions in the molten steel float to the surface of the molten steel and significantly improves the quality of the molten steel.
[0056] Preferably, if Figure 5 As shown, the continuous casting tundish further includes a turbulator 50, which is disposed in the steel receiving area 21 and below the long shroud 10. The turbulator 50 is configured to force the molten steel coming out of the long shroud 10 to flow upward. It is understandable that if the turbulator 50 is not provided, the molten steel will also surge upward first. After the turbulator 50 is provided, the flow of the molten steel can be more regular and the flow direction can be more clear. Among them, the structure of the turbulator 50 is prior art and will not be described in detail here.
[0057] Preferably, each steel outlet 241 is provided with a stopper rod 60, and the stopper rod 60 is configured to adjust the liquid outflow rate of the steel outlet 241. By setting the stopper rod 60, the liquid outflow speed of the steel outlet 241 can be controlled. Among them, the structure of the stopper rod 60 cooperating with the steel outlet 241 is common in the art and will not be described in detail here.
[0058] Preferably, if Figure 4As shown, the two dams 40 serve as two side walls of the slot 31. It is understandable that the distance between the two dams 40 is consistent with the width of the slot 31, so that the molten steel can flow directly along the side walls of the dams 40 when passing through the slot 31.
[0059] Obviously, the above embodiments of the present invention are merely examples for the purpose of clearly illustrating the present invention, and are not intended to limit the implementation methods of the present invention. For those skilled in the art, various obvious changes, readjustments and substitutions can be made without departing from the scope of protection of the present invention. It is not necessary and impossible to list all implementation methods here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention shall be included in the scope of protection of the claims of the present invention.
Claims
1. A continuous casting tundish, characterized in that: include: A shroud (10) and a shell (20), molten steel enters the shell (20) from the shroud (10); a retaining wall (30) installed in the shell (20) and dividing the shell (20) into a steel receiving area (21) and a casting area (22); the steel receiving area (21) is located in the middle of the casting area (22); the long shroud (10) is located in the steel receiving area (21); a groove (31) is provided at the bottom of the retaining wall (30) so that the steel receiving area (21) and the casting area (22) are connected; and the height of the retaining wall (30) is not lower than the highest liquid level of the molten steel in the shell (20); Two retaining dams (40), the top of the retaining dams (40) being arranged lower than the top of the retaining wall (30), the two retaining dams (40) being located in the casting zone (22) and respectively located on both sides of the passage (31), the distance between the two retaining dams (40) being smaller than the width of the bottom of the retaining wall (30), one end of the retaining dam (40) being connected to the retaining wall (30), the other end of the retaining dam (40) being connected to the inner wall of the casting zone (22) opposite to the retaining wall (30), and a plurality of steel outlets (241) being provided in the casting zone (22) on the side of the retaining dam (40) away from the passage (31).
2. The continuous casting tundish according to claim 1, characterized in that: The shell (20) comprises a casting part (24) and a steel receiving part (23); the casting part (24) extends along a first direction; a plurality of steel outlets (241) are arranged at intervals in the casting part (24) along the first direction; the steel receiving part (23) is protruded from the casting part (24) along a second direction; two ends of the retaining wall (30) are respectively connected to two inner walls of the steel receiving part (23) opposite to each other in the first direction; and the first direction is arranged at an angle to the second direction.
3. The continuous casting tundish according to claim 1, characterized in that: The retaining wall (30) is constructed as a flat plate structure.
4. The continuous casting tundish according to claim 1, characterized in that: The dam (40) has a notch structure (42) at the top.
5. The continuous casting tundish according to claim 4, characterized in that: The notch structure (42) is in a stepped, semicircular, rectangular, U-shaped or sloped shape.
6. The continuous casting tundish according to claim 5, characterized in that: The notch structure (42) is provided at the connection between the retaining dam (40) and the retaining wall (30).
7. The continuous casting tundish according to any one of claims 1 to 6, characterized in that: The retaining dam (40) is provided with an inclined hole (41), and the inclined hole (41) is inclined from bottom to top in a direction away from the passage groove (31).
8. The continuous casting tundish according to claim 7, characterized in that: The angle between the inclined hole (41) and the horizontal direction is less than or equal to 60°, and the diameter of the inclined hole (41) is less than or equal to 130 mm.
9. The continuous casting tundish according to any one of claims 1 to 6, characterized in that: The height of the dam (40) is greater than or equal to 210 mm and less than or equal to half of the highest liquid level of the molten steel in the shell (20).
10. The continuous casting tundish according to any one of claims 1 to 6, characterized in that: The distance between the two retaining dams (40) is less than or equal to 800 mm.
11. The continuous casting tundish according to any one of claims 1 to 6, characterized in that: The height of the groove (31) is less than or equal to half the height of the retaining wall (30).
12. The continuous casting tundish according to any one of claims 1 to 6, characterized in that: The two retaining dams (40) respectively serve as two side walls of the slot (31).