Converter device for accelerating smelting period
By introducing technologies such as cast-in-drop TCO low-carbon detection probes and oxygen guns into the converter device, the problems of long smelting cycles and slow detection speeds are solved, more efficient steel production is achieved, production efficiency and output are improved, and the production is reduced. cost.
Patent Information
- Application Number
- CN202323415777.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-14
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2033-12-14
AI Technical Summary
The smelting cycle of existing converters is too long, resulting in low production efficiency, high energy consumption and high cost, especially the long steel production time and slow end component detection speed affecting efficiency.
Using components such as casting TCO low-carbon detection probe, TCO detector, spectroscopy computer host, monitor and oxygen gun, the parameters in the melt pool are detected and analyzed in real time, and the smelting cycle is shortened, and the steel output speed and end-point component detection efficiency are improved. .
The smelting cycle was shortened to 28 minutes, which improved the continuous casting production efficiency, increased the pull speed to the designed pull speed, increasing the annual output of crude steel by 180,000 tons, reducing production costs, and achieving fast and accurate end-point component testing.
Smart Images

Figure CN222007853U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of steel production, and in particular to a converter device for accelerating a smelting cycle. Background Art
[0002] The length of the converter smelting cycle is a direct reflection of the steel plant's production organization and management capabilities, a direct reflection of the steel plant's converter utilization coefficient, and an important means for the steel plant to achieve the goals of low consumption and high efficiency, reducing costs and increasing efficiency.
[0003] The first steelmaking workshop currently has a 100-ton converter and an 8-machine 8-strand billet continuous casting machine. The average converter smelting cycle is 34 minutes. The maximum casting speed of the casting machine is designed to be 3.0 m / min, the actual casting speed is an average of 2.4 m / min, and the average casting cycle is 35 minutes. There are problems such as long smelting cycle, failure to meet casting machine production, low converter utilization coefficient, high energy consumption per ton of steel, and high cost per ton of steel. It is urgent to improve smelting efficiency and shorten the time required for smelting cycle production.
[0004] The inner diameter of the existing steel tapping port casing is 170mm, resulting in an average steel tapping time of more than 6 minutes in the early stage. The long steel tapping time not only affects the steel tapping temperature of the converter, but also seriously restricts the converter smelting cycle.
[0005] At the same time, the traditional end-point composition of the existing converter is slow to produce results. After the end-point composition is obtained through laboratory analysis, the laboratory technician enters the result into the computer and uploads it. The converter operator finally obtains the test result through the computer connected to the laboratory in the converter main control room, and then goes to the back of the furnace to perform steel tapping. By statistically analyzing the time from sampling to steel tapping, it is found that this process takes at least 3 minutes on average, which also leads to a slow converter smelting cycle.
[0006] The existing process of obtaining the final composition of the converter is completed by manual sampling when the furnace is poured at the end of blowing. Manual sampling certainly has the advantage of more accurate composition, but manual sampling is laborious and time-consuming, affecting the efficiency of the converter. Utility Model Content
[0007] In view of the above technical problems, the present application provides a converter device for accelerating the smelting cycle. After adopting the device, the smelting cycle is shortened to 28 minutes on average, and the fastest is 27 minutes. The shortening of the smelting cycle further improves the production efficiency of continuous casting, and the casting speed is increased from 2.4 meters / minute before the speed increase to 2.8 meters / minute. When production needs it, it can fully reach the designed casting speed of 3 meters / minute, and the annual crude steel output is increased by 180,000 tons.
[0008] The present application provides a converter device for accelerating the smelting cycle, comprising: a throwing-type TCO low-carbon detection probe, a TCO detector, a display, a spectrum computer host, a molten pool converter package, a throwing trajectory, and an oxygen gun;
[0009] An oxygen lance is inserted in the molten pool converter ladle;
[0010] One end of the missile launch path is connected to the molten pool converter ladle;
[0011] The throwing type TCO low carbon detection probe is thrown into the molten pool converter package through the throwing trajectory;
[0012] Electrical connection between the throwing type TCO low carbon detection probe and the TCO detector;
[0013] The TCO detector and the spectrum computer host are electrically connected to the display respectively;
[0014] The display is arranged outside the molten pool converter;
[0015] The throat diameter of the oxygen lance is 38.3mm and the outlet diameter is 49.8mm.
[0016] Preferably, it comprises: a dust removal hood; an oxygen lance installed on the dust removal hood; and one end of the oxygen lance is inserted into the molten pool converter bag.
[0017] Preferably, it comprises: a dust removal flue and a high-level silo; the feed pipe of the high-level silo is connected with a feeding port opened on the side wall of the dust removal flue; the dust removal flue is installed on the dust removal hood and is connected with the molten pool converter ladle.
[0018] Preferably, one end of the launching traverse is connected to the dust removal flue; and the discharge pipe of the high-level silo is connected to the launching traverse.
[0019] Preferably, it comprises: a gate valve; a gate valve is arranged on the discharge pipe of the high-level silo.
[0020] Preferably, the spectral computer host is arranged in a laboratory; the spectral computer host is electrically connected to the display through light.
[0021] Preferably, it comprises: a stand; a display is arranged on the top surface of the stand.
[0022] Preferably, a steel tapping port is provided on the side wall of the molten pool converter ladle.
[0023] Preferably, the tapping port is a casing with an inner diameter of 190 mm.
[0024] The beneficial effects of this application include:
[0025] 1) The converter device for accelerating the smelting cycle provided by the present application adopts a casing with an inner diameter of 190 mm under the safety premise of keeping the length and thickness of the steel outlet unchanged. After actual use, the steel tapping time is shortened to an average of about 4 minutes and 40 seconds, and the converter steel tapping temperature is correspondingly reduced by 10°C. The effect of improving the converter efficiency and reducing the production cost is achieved.
[0026] 2) The converter device for accelerating the smelting cycle provided in the present application directly connects the spectral computer host and the display arranged on the outside of the converter through optical fiber, and directly connects the spectral analysis signal to the display behind the furnace, so that the operator can obtain the spectral analysis data in real time and efficiently without waiting for manual uploading, which effectively shortens the converter time. After the technical transformation, the time from converter end point sampling to converter steel tapping is shortened to 90 seconds, and the average does not exceed 120 seconds, which effectively improves the converter efficiency.
[0027] 3) The converter device for accelerating the smelting cycle provided in the present application detects the temperature, oxygen content, carbon content and phosphorus content of the molten steel in the molten pool through a cast-type TCO low-carbon detection probe, and uses a display arranged outside the molten pool to facilitate the operator to check the parameters in the molten pool in time, which helps to improve the double hit rate of the converter endpoint and shorten the smelting cycle.
[0028] 4) The converter device for accelerating the smelting cycle provided by the present application, through the improvement and implementation of the above corresponding measures, the converter smelting cycle is shortened from an average of about 34 minutes before the improvement to 28 minutes after the improvement, and the fastest is only 27 minutes. The shortening of the smelting cycle further improves the production efficiency of continuous casting, and the drawing speed is increased from 2.4 meters / minute before the speed increase to 2.8 meters / minute. The time required for production can fully reach the designed drawing speed of 3 meters / minute, and the annual crude steel output is increased by 180,000 tons. According to the average profit of 450 yuan / ton of steel this year, the direct economic benefit is 81 million yuan, which basically meets the production needs and design requirements of the steel plant.
[0029] 5) The converter device for accelerating the smelting cycle provided in the present application has an oxygen lance nozzle arranged in the device with its throat diameter and outlet diameter increased, so that the oxygen supply intensity and oxygen flow rate in the device are effectively improved. Without affecting the safety and service life of the oxygen lance nozzle, the oxygen lance nozzle can cooperate with the converter's furnace volume ratio of 0.905, effectively improve the converter's molten pool stirring intensity and decarburization speed, effectively shorten the oxygen supply time, and effectively shorten the converter smelting cycle. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 A schematic diagram of the main structure of a converter device for accelerating the smelting cycle provided in this application;
[0031] Figure 2 A schematic diagram of the module connection structure provided for this application;
[0032] Legend:
[0033] Throwing type TCO low carbon detection probe 1, TCO detector 11, display 112, stand 114, spectral computer host 113, molten pool converter bag 3, dust removal flue 31, dust removal hood 32, steel outlet 34, oxygen gun 33, feeding port 35, throwing channel 323, feeding pipe 351, high-level silo 321, gate valve 322, throwing rack 41, servo motor 21, push head cylinder 212, operating table 211. DETAILED DESCRIPTION
[0034] In order to make the purpose, technical scheme and advantages of the embodiments of the present invention clearer, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. The components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.
[0035] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present invention.
[0036] The controller used in this embodiment is an existing structure, and the control circuit can be implemented through simple programming by technicians in this field. It belongs to the common knowledge in this field. It is only used without modification, so the control method and circuit connection are not described in detail.
[0037] The technical means that are not described in detail in this application and are not used to solve the technical problems of this application are all set according to the common knowledge in the field, and can be implemented in a variety of common knowledge settings.
[0038] See also Figures 1-2 The converter device for accelerating the smelting cycle provided in the present application includes: a throwing-type TCO low-carbon detection probe 1, a TCO detector 11, a display 112, a stand 114, a spectrum computer host 113, a molten pool converter bag 3, a dust removal flue 31, a dust removal hood 32, a steel outlet 34, an oxygen gun 33, a feeding port 35, a throwing channel 323, a feeding pipe 351, a high-level silo 321, a gate valve 322, a throwing rack 41, a servo motor 21, a pusher cylinder 212, and an operating table 211;
[0039] The thrown-type TCO low-carbon detection probe 1 and the TCO detector 11 are electrically connected through a wire to realize real-time transmission of the data inside the molten pool converter bag 3 obtained by the thrown-type TCO low-carbon detection probe 1 to the TCO detector 11. The TCO detector 11 is electrically connected to the display 121, which is convenient for displaying the data inside the molten pool converter bag 3 on the display 112 set on the outside of the molten pool converter bag 3, so that the operator can accurately obtain the situation inside the molten pool converter bag 3, improve the accuracy of the converter operation control point, and thus improve the converter efficiency.
[0040] The display 112 disposed on the outside of the molten pool converter bag 3 is also electrically connected to the spectral computer host 113 disposed in the laboratory, so as to display the sample test results to the on-site operators in real time, save the test data transmission time, and improve the converter efficiency.
[0041] The thrown TCO low carbon detection probe 1 is pushed by the converter throwing detection system and dropped into the molten pool converter bag 3 through a pipeline connected to the molten pool converter bag 3. After the converter operation is completed, the thrown TCO low carbon detection probe 1 is recovered to achieve the recycling of the probe.
[0042] In this application, a converter throwing detection system is used to realize the operation of dropping the TCO low-carbon detection probe 1 into the molten pool. The system is produced by Shanghai Prabo Metallurgical Detection Probe Co., Ltd. and model number is PR-20210330A.
[0043] For example, the converter throwing detection system includes: a bomb rack 41, a servo motor 21, a pusher head cylinder 212, and an operating table 211; the operating table 211 is electrically connected to the servo motor 21 and the pusher head cylinder 212, respectively, and is used to control the servo motor 21 and the pusher head cylinder 212; the throwing type TCO low carbon detection probes 1 to be thrown are stacked one by one on the bomb rack 41 and set on one side of the bombing channel; when the throwing type TCO low carbon detection probe 1 needs to be thrown out, the operator controls the servo motor 21 on the bomb rack 41 to start through the operating table 211, and the servo motor 21 is driven and connected with the gear chain assembly arranged in pairs in the frame body; a plurality of frames are arranged along the longitudinal interval between the symmetrically arranged gear chain assemblies, and the throwing type TCO low carbon detection probe 1 is placed on the frame body.
[0044] A guide ramp is provided on the lower side wall of the bomb rack 41, and one end of the guide ramp extends toward the lower part of the gear chain assembly.
[0045] When the thrown TCO low carbon detection probe 1 moves to the lead-out inclined plate along with the gear chain assembly, the thrown TCO low carbon detection probe 1 falls into the lead-out inclined plate and slides into the throwing slot along the lead-out inclined plate.
[0046] A pusher cylinder 212 is provided at one end of the throwing trough. When the operator sees the thrown TCO low carbon detection probe 1 falling into the throwing trough, the operator starts the pusher cylinder 212 through the operating table 211 to push the thrown TCO low carbon detection probe 1 into the conveying pipeline and then drop it into the molten pool converter bag 3.
[0047] The detailed structures of the above converter drop-type detection systems are the same as the existing ones or the model PR-20210330A produced by Shanghai Prabo Metallurgical Detection Probe Co., Ltd.
[0048] The top of the molten pool converter ladle 3 is open, and a dust removal hood 32 is arranged on the open top, and a dust removal flue 31 is inserted on the dust removal hood 32; one end of the feeding pipe 351 is connected to the feeding port 35 opened on the side wall of the dust removal flue 31, and the other end is respectively connected to the feeding pipe of the high-level silo 321 and the launching channel 323.
[0049] An oxygen lance 33 is inserted on the dust removal hood 32. In order to shorten the converter time, improve efficiency and meet production needs, the oxygen lance 33 used has a throat diameter of 38.3mm, an outlet diameter of 49.8mm, and an oxygen lance flow rate of 30052NM. 3 / h, oxygen supply intensity 3.6, molten steel supply pressure 1.2~1.5MPa.
[0050] The use of oxygen lance 33 of this size can effectively improve the oxygen supply intensity. Without affecting the safety and service life of the oxygen lance nozzle, combined with the converter's furnace volume ratio of 0.905, the converter's molten pool stirring intensity and decarburization speed can be improved, and the oxygen supply time can be shortened to about 13 minutes, effectively shortening the converter smelting cycle.
[0051] In a specific embodiment, it includes: a gate valve 322, and a gate valve 322 is arranged on the discharge pipe of the high-level silo 321 to facilitate the control of the discharge of materials into the molten pool converter ladle 3.
[0052] In a specific embodiment, it includes: a stand 114 ; the stand 114 is arranged outside the molten pool converter ladle 3 , and the display 112 is arranged on the top surface of the stand 114 .
[0053] In a specific embodiment, a tapping port 34 is provided on the side wall of the molten pool converter 3 for pouring out molten steel during the converter operation. Under the safety premise that the length and thickness of the tapping port remain unchanged, the tapping port 34 uses a casing with an inner diameter of 190 mm.
[0054] After the device was implemented, the converter smelting cycle was greatly shortened through the improvement and implementation of the above corresponding measures. The average smelting cycle before the improvement was about 34 minutes, and it was shortened to 28 minutes after the improvement, and the fastest was 27 minutes. The shortening of the smelting cycle further improved the production efficiency of continuous casting, and the drawing speed was increased from 2.4 meters / minute before the speed increase to 2.8 meters / minute. When production needs it, it can fully reach the designed drawing speed of 3 meters / minute, and the annual crude steel output is increased by 180,000 tons. Calculated at an average profit of 450 yuan / ton of steel this year, the direct economic benefits are 81 million yuan, which basically meets the production needs and design requirements of the steel plant.
[0055] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A converter device for accelerating the smelting cycle, characterized in that: include: Throwing type TCO low carbon detection probe, TCO detector, display, spectrum computer host, molten pool converter package, throwing ballistics, oxygen gun; An oxygen lance is inserted in the molten pool converter ladle; One end of the missile launch path is connected to the molten pool converter ladle; The throwing type TCO low carbon detection probe is thrown into the molten pool converter package through the throwing trajectory; Electrical connection between the throwing type TCO low carbon detection probe and the TCO detector; The TCO detector and the spectrum computer host are electrically connected to the display respectively; The display is arranged outside the molten pool converter; The throat diameter of the oxygen lance is 38.3mm and the outlet diameter is 49.8mm.
2. The converter device for accelerating the smelting cycle according to claim 1, characterized in that: include: Dust hoods; The oxygen gun is installed on the dust removal hood; One end of the oxygen lance is inserted into the molten pool converter ladle.
3. The converter device for accelerating the smelting cycle according to claim 2, characterized in that: include: Dust removal flue and high-level silo; the discharge pipe of the high-level silo is connected with the feeding port opened on the side wall of the dust removal flue; the dust removal flue is installed on the dust removal hood and is connected with the molten pool converter ladle.
4. The converter device for accelerating the smelting cycle according to claim 3, characterized in that: One end of the missile launch path is connected with the dust removal flue; and the discharge pipe of the high-level silo is connected with the missile launch path.
5. The converter device for accelerating the smelting cycle according to claim 3, characterized in that: include: Gate valve; A gate valve is provided on the discharge pipe of the high-level silo.
6. The converter device for accelerating the smelting cycle according to claim 1, characterized in that: The spectrum computer host is arranged in the laboratory; the spectrum computer host is electrically connected to the display through optical fibers.
7. The converter device for accelerating the smelting cycle according to claim 1, characterized in that: include: Stand; The display is arranged on the top surface of the stand.
8. The converter device for accelerating the smelting cycle according to claim 1, characterized in that: A steel outlet is provided on the side wall of the molten pool converter ladle.
9. The converter device for accelerating the smelting cycle according to claim 8, characterized in that: The steel outlet is a casing with an inner diameter of 190 mm.