Municipal asphalt road reinforcing structure

By setting up water guide arc pipes, geotextile layers and wire mesh layers in municipal asphalt roads, the problem of easy blockage of waterproof plate drainage troughs is solved, and the good hydrophobic performance and pavement stability of asphalt roads are achieved, reducing the risk of settlement in the rainy season.

CN222008525UActive Publication Date: 2024-11-15YONGMING GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420165512.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-23
Publication Date
2024-11-15
Estimated Expiration
2034-01-23

AI Technical Summary

Technical Problem

In the existing municipal asphalt road reinforcement structure, the drainage troughs on the waterproof board are easily blocked, resulting in the inability to discharge rainwater in time, affecting the hydrophobic performance of the road surface and possibly causing pavement settlement.

Method used

The structure consisting of a base layer, a gravel layer, a concrete layer and an asphalt concrete surface layer are used to set up water-guiding arc pipes, geotextile layers, fine sand layer and steel wire mesh layer. The water-guiding arc pipes are set up inclined, and rainwater passes through the permeable concrete layer and Geotextile filtration to achieve improved hydrophobic performance.

Benefits of technology

It effectively reduces the risk of pavement settlement in the rainy season, ensures good hydrophobic performance of asphalt roads, prevents rainwater accumulation and impurities from passing through, and improves road stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222008525U_ABST
    Figure CN222008525U_ABST
Patent Text Reader

Abstract

The municipal asphalt road reinforcing structure comprises a base layer, a gravel layer, a concrete layer and an asphalt concrete surface layer which are sequentially arranged from bottom to top, the concrete layer comprises a plain concrete layer and a pervious concrete layer which are sequentially arranged from top to bottom, and a plurality of water guide arc pipes are embedded in the upper end face of the gravel layer; the inner arc side of the water guide arc pipe is arranged upwards, the upper edge of the water guide arc pipe does not protrude out of the gravel layer, and a geotechnical cloth layer is laid on the lower end face of the pervious concrete layer. According to the asphalt road, the multiple water guide arc pipes are buried in the gravel layer, the geotechnical cloth is laid on the bottom face of the pervious concrete layer, rainwater permeating to the gravel layer can be filtered to a certain degree, and the good hydrophobic performance of the asphalt road is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of municipal roads, and in particular to a municipal asphalt road reinforcement structure. Background Art

[0002] Asphalt pavement refers to various types of pavement paved with road asphalt materials mixed into mineral materials. This type of pavement is formed by spreading and rolling asphalt concrete, and has the characteristics of being smooth, dust-free, impermeable, and durable. Asphalt binder can improve the ability of paving aggregate to resist damage to the road surface caused by driving and natural factors. The asphalt structural layer of asphalt pavement belongs to the category of flexible pavement, but in addition to flexible materials, its base layer can also use rigid cement concrete or semi-rigid hydraulic materials. The wide application of this type of pavement is due to its good stability and crack resistance.

[0003] In the related art, a Chinese patent with publication number CN218059744U proposes a municipal asphalt road reinforcement structure, including a reinforcement seat, the outer surface of the reinforcement seat is provided with reinforcing ribs, the outer surface of the reinforcing ribs is abutted with a waterproof board, the interior of the waterproof board is plugged with supporting piers, the outer surface of the waterproof board is provided with a drainage groove, the outer surface of the waterproof board is provided with a water collecting trough, the interior of the reinforcement seat is provided with a drainage hole, one end of the drainage hole is opposite to the drainage groove, the upper surface of the waterproof board is abutted with a filling net, the supporting piers are plugged into the interior of the filling net, the interior of the filling net is filled with a gravel layer, and the outer surface of the filling net is provided with drainage holes.

[0004] The above-mentioned related technologies have the following defects: the drainage grooves on the waterproof board are shallow and very easy to be blocked. Once the dust on the road surface penetrates into the drainage grooves with rainwater and accumulates, it will affect the drainage performance of the waterproof board, making it impossible for the accumulated water in the base layer to be discharged in time through the drainage holes on the reinforcement seat, which may cause road surface settlement. Utility Model Content

[0005] In order to improve the problem that the drainage grooves on the waterproof board are easily blocked, affecting the hydrophobic performance and thus causing road surface settlement, the present application provides a municipal asphalt road reinforcement structure.

[0006] The municipal asphalt road reinforcement structure provided in this application adopts the following technical solution:

[0007] A municipal asphalt road reinforcement structure comprises a base layer, a crushed stone layer, a concrete layer and an asphalt concrete surface layer which are arranged in sequence from bottom to top, the concrete layer comprises a plain concrete layer and a permeable concrete layer which are arranged in sequence from top to bottom, a plurality of water guide arc tubes are embedded in the upper end surface of the crushed stone layer, the inner arc sides of the water guide arc tubes are arranged upwards and the upper edges thereof do not protrude from the crushed stone layer, and a geotextile layer is laid on the lower end surface of the permeable concrete layer.

[0008] Furthermore, the geotextile layer is arranged at a position corresponding to the water guide arc tube and in contact with the inner arc side of the water guide arc tube.

[0009] Furthermore, a fine sand layer is provided between the geotextile layer and the permeable concrete layer, the upper end surface of the fine sand layer is flush with the lower end surface of the permeable concrete layer, and the lower end is in contact with the geotextile layer.

[0010] Furthermore, a wire mesh layer is provided between the fine sand layer and the gravel layer, and a plurality of binding members for binding the water guide arc tubes are provided on the wire mesh layer.

[0011] Furthermore, the water guide arc tube is arranged obliquely along the width direction of the base road.

[0012] Furthermore, a water channel is provided on the wide side of the base road, and the lower end of the water guide arc tube extends into the water channel.

[0013] Furthermore, the elevations of the plurality of water guide arc tubes are arranged in a staggered manner along the extension direction of the base layer.

[0014] In summary, the beneficial technical effects of this application are:

[0015] When there is a lot of rainwater accumulated on the road surface, the rainwater can enter the permeable concrete layer through the plain concrete layer. The permeable concrete layer can not only effectively divert the infiltrated rainwater to prevent accumulation, but also adsorb some impurities in the rainwater to a certain extent to reduce the impurity content in the rainwater that continues to infiltrate. In addition, the geotextile layer can also filter the impurities in the rainwater to a certain extent, so that the rainwater that infiltrates the water guide arc tube can flow out smoothly, achieving the good hydrophobic performance of the asphalt road of this application and effectively reducing the risk of road subsidence in the rainy season. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 is a cross-sectional view of the overall structure of an embodiment of the present application;

[0017] Figure 2 It is a structural longitudinal section diagram from the gravel layer to the sand and gravel layer in an embodiment of the present application.

[0018] Explanation of the accompanying reference numerals: 1. base layer; 2. crushed stone layer; 31. plain concrete layer; 32. permeable concrete layer; 4. asphalt concrete surface layer; 5. water-conducting arc tube; 6. geotextile layer; 7. fine sand layer; 8. wire mesh layer; 9. water-conducting channel. DETAILED DESCRIPTION

[0019] The technical solution of the present application will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present application, rather than all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present application.

[0020] The present application embodiment discloses a municipal asphalt road reinforcement structure. Figure 1 and Figure 2 A municipal asphalt road reinforcement structure includes a base layer 1, a crushed stone layer 2, a concrete layer and an asphalt concrete surface layer 4 arranged in sequence from bottom to top, and the concrete layer includes a plain concrete layer 31 and a permeable concrete layer 32 arranged in sequence from top to bottom, and the thickness of the permeable concrete layer 32 is less than that of the plain concrete layer 31. A plurality of water guide arc tubes 5 are embedded in the upper end surface of the crushed stone layer 2, and the inner arc side of the water guide arc tubes 5 is arranged upward and the upper edge thereof does not protrude from the crushed stone layer 2, and a geotextile layer 6 is laid on the lower end surface of the permeable concrete layer 32, that is, the geotextile layer 6 is covered on the plurality of water guide arc tubes 5.

[0021] After such arrangement, the plain concrete layer 31 can effectively bear the asphalt concrete surface layer 4 to ensure the effective bearing performance of the asphalt road. Once a lot of rainwater accumulates on the road surface, the rainwater can enter the permeable concrete layer 32 through the plain concrete layer 31. The permeable concrete layer 32 can not only effectively guide the infiltrated rainwater to prevent accumulation, but also adsorb some impurities in the rainwater to a certain extent to reduce the impurity content in the rainwater that continues to infiltrate. In addition, the geotextile layer 6 can also filter the impurities in the rainwater to a certain extent, so that the rainwater that infiltrates the water guide arc tube 5 can flow out smoothly, achieving the good hydrophobic performance of the asphalt road of the present application and effectively reducing the risk of road subsidence in the rainy season.

[0022] Specifically, refer to Figure 1 and Figure 2 The geotextile layer 6 is arranged in contact with the inner arc side of the water guide arc tube 5 at a position corresponding to the water guide arc tube 5, and a fine sand layer 7 is further arranged between the geotextile layer 6 and the permeable concrete layer 32. The upper end surface of the fine sand layer 7 is flush with the lower end surface of the permeable concrete layer 32, and the lower end is in contact with the geotextile layer 6. That is, the fine sand layer 7 and the geotextile layer 6 are flush with the upper end surface of the crushed stone layer 2 at a position where the water guide arc tube 5 is not buried in the crushed stone layer 2, and the geotextile layer 6 and the fine sand layer 7 are embedded in the water guide arc tube 5 at a position where the water guide arc tube 5 is buried in the crushed stone layer 2, so that the water guide arc tube 5 is stably embedded in the crushed stone layer 2, which can improve the stability of the water guide arc tube 5 and prevent the water guide arc tube 5 from being ruptured due to excessive pressure on the upper concrete layer, while not affecting the effective water guide performance of the water guide arc tube 5.

[0023] In addition, in order to further improve the stability of the water guide arc tube 5 during arrangement and avoid the water guide arc tube 5 from deviating when it is shallowly buried in the gravel layer 2, refer to Figure 1 and Figure 2 A wire mesh layer 8 is also arranged between the fine sand layer 7 and the gravel layer 2, and a plurality of tying members for tying the water arc tube 5 are arranged on the wire mesh layer 8, wherein the wire mesh layer 8 is specifically arranged between the geotextile layer 6 and the fine sand layer 7, and the tying members are arranged as steel wires wrapping around the bottom of the water arc tube 5.

[0024] In this way, the wire mesh layer 8 can stably position multiple water-conducting arc tubes 5, and can also press the geotextile layer 6 laid on the gravel layer 2 to prevent the geotextile layer 6 from being locally over-tensioned during laying, which may cause the sand and gravel layer to be unable to be tightly filled in the water-conducting arc tube 5, thereby effectively ensuring the effective protection effect of the sand and gravel layer on the inner arc side of the water-conducting arc tube 5.

[0025] And, refer to Figure 1 The water guide arc tube 5 is inclined along the width direction of the base layer 1, and a water guide channel 9 is arranged on the wide side of the base layer 1. The lower end of the water guide arc tube 5 extends into the water guide channel 9. Specifically, the water guide arc tube 5 can be unidirectionally inclined or bidirectionally inclined. In this embodiment, the guide arc tube is unidirectionally inclined.

[0026] In this way, rainwater that penetrates into the water guide arc tube 5 can flow along its slope to the water guide channel 9 on the side of the base layer 1, effectively reducing the possibility of water accumulation in the gravel layer 2, thereby reducing the probability of road surface settlement.

[0027] At the same time, in other feasible embodiments, it can be further arranged that the elevations of the multiple water arc tubes 5 are staggered in height along the extension direction of the base layer 1, that is, the buried depths of two adjacent water arc tubes 5 in the gravel layer 2 are different, so that the multiple water arc tubes 5 can more comprehensively collect rainwater that penetrates into the gravel layer 2, thereby improving the drainage efficiency.

[0028] The implementation principle of a municipal asphalt road reinforcement structure in the embodiment of the present application is:

[0029] When a lot of rainwater accumulates on the road surface, the rainwater can enter the permeable concrete layer 32 through the plain concrete layer 31. The permeable concrete layer 32 can not only effectively guide the infiltrated rainwater to prevent accumulation, but also adsorb some impurities in the rainwater to a certain extent to reduce the impurity content in the rainwater that continues to infiltrate. In addition, the geotextile layer 6 can also filter the impurities in the rainwater to a certain extent, so that the rainwater that infiltrates the water guide arc tube 5 can flow out smoothly, achieving the good hydrophobic performance of the asphalt road of the present application and effectively reducing the risk of road subsidence in the rainy season.

[0030] Unless otherwise defined, the technical terms or scientific terms used in this application should be understood by people with ordinary skills in the field to which this application belongs. The words "first", "second", "third" and similar words used in the specification and claims of this application do not indicate any order, quantity or importance, but are only used to distinguish different components. "One" or "one" and similar words do not indicate a quantitative limit, but indicate that there is at least one. "Include" or "comprise" and similar words mean that the elements or objects appearing before "include" or "comprise" include the elements or objects listed after "include" or "comprise" and their equivalents, and do not exclude other elements or objects. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.

[0031] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A municipal asphalt road reinforcement structure, comprising a base layer (1), a crushed stone layer (2), a concrete layer and an asphalt concrete surface layer (4) arranged in sequence from bottom to top, characterized in that: The concrete layer comprises a plain concrete layer (31) and a permeable concrete layer (32) arranged in sequence from top to bottom; a plurality of water guide arc tubes (5) are embedded in the upper end surface of the crushed stone layer (2); the inner arc side of the water guide arc tubes (5) is arranged upward and the upper edge thereof does not protrude from the crushed stone layer (2); and a geotextile layer (6) is laid on the lower end surface of the permeable concrete layer (32).

2. A municipal asphalt road reinforcement structure according to claim 1, characterized in that: The geotextile layer (6) is arranged in a position corresponding to the water guide arc tube (5) and in contact with the inner arc side of the water guide arc tube (5).

3. A municipal asphalt road reinforcement structure according to claim 2, characterized in that: A fine sand layer (7) is also provided between the geotextile layer (6) and the permeable concrete layer (32), the upper end surface of the fine sand layer (7) being flush with the lower end surface of the permeable concrete layer (32), and the lower end being in contact with the geotextile layer (6).

4. A municipal asphalt road reinforcement structure according to claim 3, characterized in that: A wire mesh layer (8) is further provided between the fine sand layer (7) and the gravel layer (2), and a plurality of binding members for binding the water guide arc tube (5) are provided on the wire mesh layer (8).

5. The municipal asphalt road reinforcement structure according to claim 1, characterized in that: The water guide arc tube (5) is arranged obliquely along the road width direction of the base layer (1).

6. A municipal asphalt road reinforcement structure according to claim 5, characterized in that: A water channel (9) is provided on the road width side of the base layer (1), and the lower end of the water arc tube (5) extends into the water channel (9).

7. A municipal asphalt road reinforcement structure according to claim 1, characterized in that: The elevations of the plurality of water guide arc tubes (5) are arranged in a staggered manner along the extension direction of the base layer (1).