Tie bar protection device for arch bridge construction

By designing the tie rod protection device for telescopic rods and positioning components, the problem of tie rods falling off during construction is solved, the stable installation and verticality of tie rods are achieved, and the construction cost is reduced.

CN222008668UActive Publication Date: 2024-11-15CHINA RAILWAY TENTH GROUP OF THE FIFTH ENGINEERING CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420571036.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-23
Publication Date
2024-11-15
Estimated Expiration
2034-03-23

AI Technical Summary

Technical Problem

The tie rods are prone to fall off during the construction of the arch bridge, resulting in waste of costs and unstable installation.

Method used

A tie rod protection device including a symmetrical fixing frame, a telescopic rod, a positioning assembly and a storage box is designed. The distance between the positioning assembly is adjusted by the telescopic rod, and the tie rod is fixed by a semi-circular arc-shaped positioning plate and an ear plate to prevent it from falling off.

Benefits of technology

Effectively prevent the tie rod from falling off, improve the installation stability and verticality of the tie rod, reduce the need to replace the new tie rod, and reduce construction costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222008668U_ABST
    Figure CN222008668U_ABST
Patent Text Reader

Abstract

The utility model discloses a tie bar protection device for arch bridge construction, which comprises two fixing frames which are symmetrically arranged, a supporting plate is arranged at the top of each fixing frame, a telescopic rod is arranged at the top of each supporting plate, a plurality of connecting columns are fixedly connected to the connecting end of one fixing frame, and the connecting columns are fixedly connected to the connecting ends of the fixing frames. The connecting end of one fixing frame is provided with a connecting column, the connecting end of the other fixing frame is provided with an inserting groove matched with the connecting column, positioning assemblies are installed on the inner sides of the two fixing frames and between the movable ends of the two telescopic rods, and storage boxes are further installed on the inner sides of the fixing frames. The positioning assembly comprises two U-shaped frames which are symmetrically arranged, arc-shaped positioning plates are fixedly connected to the interiors of the U-shaped frames, and lug plates are symmetrically and fixedly connected to the two sides of each U-shaped frame. The distance between the two positioning assemblies can be adjusted through stretching out and drawing back of the telescopic rod, the two positioning plates are spliced into the circular ring shape so that the position of the tie bar can be limited, meanwhile, the tie bar can be prevented from toppling and falling off, and the mounting stability of the tie bar is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of arch bridge construction, in particular to a tie rod protection device for arch bridge construction. Background Art

[0002] The tie rod that bears the horizontal thrust of the arch end in a tied arch bridge is called a tie rod. It makes the arch end support produce no horizontal thrust, making it a thrust-free arch. According to the comparison of the stiffness of the tie rod and the arch rib, it can be divided into rigid tie rods and flexible tie rods. Rigid tie rods are subject to both tension and compression, while flexible tie rods are only subject to tension.

[0003] During the construction process, the tie rods are usually connected to the two ends of the bridge body and the bridge arch through riveting. During actual construction, there is a risk of the tie rods falling off, which may cause the tie rods to bump, deform, and bend, and new tie rods need to be replaced, resulting in cost waste. Utility Model Content

[0004] The technical problem to be solved by the utility model is the risk of the tie rod falling off during construction.

[0005] In order to solve the above problems, the technical solution of the utility model is: a tie rod protection device for arch bridge construction, comprising two symmetrically arranged fixing frames, a support plate is installed on the top of the fixing frames, a telescopic rod is installed on the top of the support plate, a connecting end of one of the fixing frames is fixedly connected to a plurality of connecting columns, and a connecting end of the other fixing frame is provided with a slot adapted to the connecting column, a positioning assembly is installed on the inner side of the two fixing frames and between the movable ends of the two telescopic rods, and a storage box is also installed on the inner side of the fixing frame; the positioning assembly comprises two symmetrically arranged U-shaped frames, an arc-shaped positioning plate is fixedly connected to the inside of the U-shaped frame, and ear plates are symmetrically fixedly connected to both sides of the U-shaped frame.

[0006] Furthermore, a through hole 1 is provided on the connecting column and the slot, and a bolt 1 is installed in the through hole 1.

[0007] Furthermore, the telescopic rod is a multi-stage hydraulic telescopic rod, and reinforcing rods are fixedly connected to both sides of the telescopic rod.

[0008] Furthermore, two U-shaped frames are respectively mounted on two fixed frames through cross bars, and another two U-shaped frames are fixedly mounted on the movable ends of the two telescopic rods through connecting rings.

[0009] Furthermore, the positioning plate is a semicircular arc structure, and the positioning plate is fixedly installed inside the U-shaped frame through a plurality of positioning blocks.

[0010] Furthermore, a second through hole is provided in the middle of the ear plate, and the ear plates of the two U-shaped frames are connected by two bolts.

[0011] The advantages of the utility model compared with the existing technology are: the utility model can adjust the distance between the two positioning components by extending and retracting the telescopic rod, and the two positioning plates spliced ​​into a circular ring can limit the position of the tie rod and prevent the tie rod from tipping over and falling off, thereby ensuring the stability of the tie rod installation. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a stereogram of the utility model.

[0013] Figure 2 It is a structural diagram of a fixing frame of the utility model.

[0014] Figure 3 It is a structural diagram of a positioning component fixing frame of the utility model.

[0015] As shown in the figure: 1. Fixed bracket; 2. Support plate; 3. Telescopic rod; 4. Connecting column; 5. Storage box; 6. U-shaped frame; 7. Positioning plate; 8. Ear plate; 9. Bolt one; 10. Reinforcing rod; 11. Cross bar; 12. Connecting ring; 13. Positioning block; 14. Bolt two. DETAILED DESCRIPTION

[0016] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments; based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.

[0017] like Figure 1 to Figure 2 As shown, a tie rod protection device for arch bridge construction includes two symmetrically arranged fixing frames 1, a support plate 2 is installed on the top of the fixing frames 1, a telescopic rod 3 is installed on the top of the support plate 2, the telescopic rod 3 is a multi-stage hydraulic telescopic rod, and reinforcing rods 10 are fixedly connected to both sides of the telescopic rod 3, a connecting end of one fixing frame 1 is fixedly connected to a plurality of connecting columns 4, a connecting end of the other fixing frame 1 is provided with a slot adapted to the connecting column 4, a through hole 1 is provided on the connecting column 4 and the slot, a bolt 1 9 is installed in the through hole 1, and a storage box 5 is also installed on the inner side of the fixing frame 1.

[0018] Storing cement mortar in the storage box 5 can increase the weight of the fixing frame 1, thereby improving the stability of the device.

[0019] like Figure 3As shown, positioning components are installed on the inner sides of the two fixed frames 1 and between the movable ends of the two telescopic rods 3, and the positioning components include two symmetrically arranged U-shaped frames 6, an arc-shaped positioning plate 7 is fixedly connected inside the U-shaped frame 6, the positioning plate 7 is a semicircular arc structure, and the positioning plate 7 is fixedly installed inside the U-shaped frame 6 through a plurality of positioning blocks 13, ear plates 8 are symmetrically fixedly connected on both sides of the U-shaped frame 6, the two U-shaped frames 6 are respectively installed on the two fixed frames 1 through a cross bar 11, and the other two U-shaped frames 6 are fixedly installed on the movable ends of the two telescopic rods 3 through a connecting ring 12, a through hole two is opened in the middle of the ear plate 8, and the ear plates 8 of the two U-shaped frames 6 are connected by bolts two 14.

[0020] In specific use, the two fixing frames 1 are placed on both sides of the bridge deck tie rod perforations, the connecting column 4 is inserted into the slot and fixed by bolt 1 9, that is, the connection of the two fixing frames 1 can be realized, and then the two U-shaped frames 6 are connected together by bolt 2 14. At this time, the two semi-circular arc-shaped positioning plates 7 are spliced ​​into a circular ring shape, and the extension of the telescopic rod 3 can adjust the spacing between the two positioning components. Then, when the tie rod passes through the bridge deck tie rod perforations from the bottom of the arch bridge and is lifted upward, the tie rod passes through the inner sides of the two positioning plates 7, and the position of the tie rod can be limited by the two limit assemblies, thereby improving the verticality of the tie rod. At the same time, the setting of the two limit assemblies can prevent the tie rod from tipping over and falling off, thereby ensuring the stability of the tie rod installation. After the top end of the tie rod is installed, the cement mortar in the storage box 5 can be used to cast the tie rod perforations on the bridge deck, thereby improving the practicality of the device.

[0021] The undisclosed parts in the present invention are all prior art, and their specific structures and working principles are not described in detail.

[0022] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0023] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

[0024] The above description of the utility model and its implementation methods is not restrictive. The drawings show only one implementation method of the utility model, and the actual structure is not limited thereto. In short, if ordinary technicians in this field are inspired by it and design structural methods and embodiments similar to the technical solution without creativity without departing from the purpose of the invention of the utility model, they should all fall within the protection scope of the utility model.

Claims

1. A tie rod protection device for arch bridge construction, comprising two symmetrically arranged fixing frames (1), a support plate (2) being mounted on the top of the fixing frames (1), and a telescopic rod (3) being mounted on the top of the support plate (2), characterized in that: A plurality of connecting columns (4) are fixedly connected to the connecting end of one of the fixing frames (1), a slot adapted to the connecting columns (4) is provided at the connecting end of the other fixing frame (1), positioning components are installed on the inner sides of the two fixing frames (1) and between the movable ends of the two telescopic rods (3), and a storage box (5) is also installed on the inner side of the fixing frames (1); The positioning assembly comprises two symmetrically arranged U-shaped frames (6), an arc-shaped positioning plate (7) is fixedly connected inside the U-shaped frame (6), and ear plates (8) are symmetrically fixedly connected on both sides of the U-shaped frame (6).

2. The tie rod protection device for arch bridge construction according to claim 1, characterized in that: The connecting column (4) and the slot are both provided with a through hole 1, and a bolt 1 (9) is installed in the through hole 1.

3. The tie rod protection device for arch bridge construction according to claim 1, characterized in that: The telescopic rod (3) is a multi-stage hydraulic telescopic rod, and reinforcing rods (10) are fixedly connected to both sides of the telescopic rod (3).

4. The tie rod protection device for arch bridge construction according to claim 1, characterized in that: Two U-shaped frames (6) are respectively mounted on two fixed frames (1) via cross bars (11), and another two U-shaped frames (6) are fixedly mounted on the movable ends of two telescopic rods (3) via connecting rings (12).

5. The tie rod protection device for arch bridge construction according to claim 4 is characterized in that: The positioning plate (7) is a semicircular arc structure, and the positioning plate (7) is fixedly installed inside the U-shaped frame (6) via a plurality of positioning blocks (13).

6. The tie rod protection device for arch bridge construction according to claim 1, characterized in that: A second through hole is provided in the middle of the ear plate (8), and the ear plates (8) of the two U-shaped frames (6) are connected by two bolts (14).