High-stability positioning structure for laying sand blocking fence

By designing an automated device to automatically lay straw fences, the problem of low efficiency of high vertical sand barrier laying is solved, efficient desert environment governance is achieved, and negative impact on the ecological environment is reduced.

CN222008686UInactive Publication Date: 2024-11-15SHANDONG JIAOTONG UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420623809.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-28
Publication Date
2024-11-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The laying efficiency of medium and high vertical sand barriers in the prior art is low, and traditional sand prevention measures are not effective in restoring desert environments, which may affect ecological balance and climate water circulation mode.

Method used

An automated device including vehicle body, feeding assembly, woven cutting assembly and filling plate was designed. Straw fences were automatically laid through feeding robot arms, woven robot arms and hole punchers, and laying efficiency was improved by automated installation, and filling through filling Soil slabs are covered with soil and enhanced ecological governance.

Benefits of technology

The laying efficiency of high-profile sand barriers has been improved, land desertification has been effectively prevented, desert environmental governance capabilities have been enhanced, and negative impacts on the ecological environment have been reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222008686U_ABST
    Figure CN222008686U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of sand barrier laying equipment, and provides a high-stability positioning structure for laying a sand barrier, which comprises a vehicle body, driving wheels are arranged on two sides of the vehicle body, and a shell is fixedly mounted at the top end of the vehicle body; the feeding plate is arranged on one side of the vehicle body, straw is placed on the feeding plate, then the straw is taken down from the feeding plate through the feeding mechanical arm and placed on the discharging channel, the straw is pushed to one side of the two weaving mechanical arms along the discharging channel, and during the period, the puncher can conduct punching work on one side of the vehicle body, so that follow-up rod insertion is facilitated, and the labor intensity of workers is lowered. Rope winding structures are arranged in the two weaving mechanical arms, after conveyed straw is clamped, weaving ropes are wound between the straw, then the woven straw is inserted into a formed hole, then the two soil filling plates at the tail of the vehicle body can sweep scattered soil on the outer side to the position of the straw which is just inserted, and the soil filling purpose is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of sand barrier laying equipment, and in particular relates to a positioning structure for laying sand barrier with high stability. Background Art

[0002] With the promotion of China's "Belt and Road" initiative and the development of highways, the mileage of highways crossing sandy areas has increased year by year, and the hazards of wind and sand along the route have become increasingly severe. Some routes have been completely affected by wind and sand. In recent years, wind and sand scientific research has received extensive attention from scholars at home and abroad, especially in the fields of wind and sand physics and sand control engineering research. However, the research on wind and sand processes and disaster mechanisms on highways in sandy areas still needs to be strengthened, especially the theoretical research on wind and sand disasters on highways in sandy areas is not closely linked to engineering sand control practices, which to a certain extent hinders the selection and reasonable layout of highway wind and sand prevention measures. China's railway wind and sand disaster line is the longest in the world. The wind in the wind and sand area is strong, the surface vegetation is less developed, and the climate is dry. Vegetation is easily covered by quicksand under the action of wind. When the wind and sand flow encounters obstacles at the railway subgrade and the upper structure of the line, a deceleration zone is formed near them, which changes the structure of the wind and sand flow. The sand carried in the wind and sand flow is easy to deposit near the line, increasing the workload of railway maintenance and endangering the operational safety of the railway. First of all, wind and sand fixation can be carried out before road construction can be carried out; the traditional grass grid sand barrier is not effective in sand control, and the high vertical sand barrier is a good prevention and control method. The high vertical sand barrier is a good protection method that can change the roughness of the surface and improve environmental governance.

[0003] At present, the laying of high vertical sand barriers mainly relies on manual labor, and the laying efficiency is relatively low for the vast desert. Although the mechanical sand control system is huge in scale, it has slow progress in the technical field. With the development of social economy, more and more desert engineering constructions are being carried out in the world, and the scale of mechanical sand control systems will also become larger and larger. In addition, there is no integrated automatic laying machine for high vertical sand barriers in the domestic and foreign markets;

[0004] Traditional methods also include the use of chemical materials and processes, such as spraying chemical reinforcement agents to build a consolidation layer on the sand dunes or sandy surfaces that can prevent wind from blowing, in order to control and improve the sand damage environment. However, it only fixes the sand in the desert to the ground, and it cannot play a big role in the restoration of the desert environment. And the use of sand fixation agents will have a certain impact on the ecological environment of desert areas, such as making the land hard, affecting soil rations, and affecting the ecological balance of the area. Moreover, the long-term use of sand fixation agents may also affect the local climate and water cycle patterns. Utility Model Content

[0005] The utility model aims to provide a positioning structure for laying a sand-blocking fence with high stability, so as to solve the problems raised in the above-mentioned background technology.

[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0007] A positioning structure for laying a sand barrier with high stability, comprising:

[0008] A vehicle body, wherein driving wheels are arranged on both sides of the vehicle body, and a shell is fixedly mounted on the top of the vehicle body;

[0009] A feeding assembly, the feeding assembly is arranged on one side of the vehicle body, the feeding assembly comprises a feeding plate fixedly installed on one side of the vehicle body, a feeding mechanical arm is fixedly installed on one side of the feeding plate, and an auxiliary frame is fixedly installed on one side of the feeding plate;

[0010] A weaving blanking component is arranged on one side of the interior of the vehicle body, and the weaving blanking component includes two weaving mechanical arms fixedly installed inside the vehicle body, a puncher is arranged on one side of the interior of the vehicle body, and two filling plates are movably installed on the side of the vehicle body away from the puncher.

[0011] Preferably, a material discharge plate is fixedly installed on one side of the interior of the vehicle body, a feeding robot arm is fixedly installed on one side of the material discharge plate, a material discharge channel is fixedly installed on one side of the material discharge plate, the material discharge channel faces the weaving robot arm, an auxiliary frame is fixedly installed on one side of the material discharge plate, and the auxiliary frame is arranged in an arc-shaped structure.

[0012] Preferably, two weaving robot arms are fixedly installed inside the vehicle body, and the two weaving robot arms are symmetrically arranged. A puncher is fixedly installed on one side of the vehicle body close to the material discharge plate, and the output end of the puncher faces the ground.

[0013] Preferably, two soil-filling plates are movably mounted on a side of the vehicle body away from the discharge plate, and the two soil-filling plates are symmetrically arranged.

[0014] Compared with the prior art, the beneficial effects of the utility model are:

[0015] The utility model sets a discharge plate on one side of a vehicle body, places the straw on the discharge plate, then takes the straw off the discharge plate by a feeding mechanical arm and places it on a discharge channel, and then pushes the straw along the discharge channel to one side of two weaving mechanical arms, during which a puncher will perform hole drilling work on one side of the vehicle body to facilitate subsequent rod insertion, and the two weaving mechanical arms are equipped with a rope winding structure, which clamps the delivered straw and then winds the braiding rope between the straws, and then inserts the braided straw into the opened holes, and then the two filling plates at the rear of the vehicle body sweep the loose soil on the outside to the newly inserted straw, so as to achieve the purpose of filling; the device adopts automated installation, which solves the problem of low installation efficiency of existing high vertical sand barriers, effectively strengthens ecological management, and prevents land desertification. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0017] Figure 2 It is a schematic diagram of the internal structure of the vehicle body of the utility model;

[0018] Figure 3 It is a schematic diagram of the structure of the utility model when viewed from above.

[0019] In the figure: 1. vehicle body; 11. driving wheel; 12. outer shell; 2. feeding assembly; 21. discharge plate; 22. feeding robot arm; 23. discharge channel; 24. auxiliary frame; 3. weaving discharge assembly; 31. weaving robot arm; 32. puncher; 33. filling plate. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0021] Example:

[0022] See also Figure 1 - Figure 3 As shown, a positioning structure for laying a sand barrier with high stability comprises:

[0023] A vehicle body 1, with driving wheels 11 arranged on both sides of the vehicle body 1, and a housing 12 fixedly mounted on the top of the vehicle body 1;

[0024] A feeding assembly 2, which is arranged at one side of the vehicle body 1, and includes a feeding plate 21 fixedly installed at one side of the vehicle body 1, a feeding mechanical arm 22 fixedly installed at one side of the feeding plate 21, and an auxiliary frame 24 fixedly installed at one side of the feeding plate 21;

[0025] The weaving blanking component 3 is arranged on one side of the interior of the vehicle body 1. The weaving blanking component 3 includes two weaving robot arms 31 fixedly installed inside the vehicle body 1, a puncher 32 is arranged on one side of the interior of the vehicle body 1, and two filling plates 33 are movably installed on the side of the vehicle body 1 away from the puncher 32.

[0026] Specifically, a discharge plate 21 is fixedly installed on one side of the vehicle body 1, a feeding robot arm 22 is fixedly installed on one side of the discharge plate 21, a discharge channel 23 is fixedly installed on one side of the discharge plate 21, the discharge channel 23 faces the weaving robot arm 31, an auxiliary frame 24 is fixedly installed on one side of the discharge plate 21, the auxiliary frame 24 is arranged in an arc structure, two weaving robot arms 31 are fixedly installed on the vehicle body 1, and the two weaving robot arms 31 are symmetrically arranged, a puncher 32 is fixedly installed on the side of the vehicle body 1 close to the discharge plate 21, and the output end of the puncher 32 faces the ground, and two filling plates 33 are movably installed on the side of the vehicle body 1 away from the discharge plate 21, and the two filling plates 33 are symmetrically arranged.

[0027] As can be seen from the above, the discharge plate 21 is used to store straw, the feeding robot arm 22 can take the straw and put it into the discharge channel 23, and push the straw to the two weaving robot arms 31. The auxiliary frame 24 plays a certain corrective role to prevent the straw position from being offset when the feeding robot arm 22 takes the straw, resulting in the inability to accurately put it into the discharge channel 23. The two weaving robot arms 31 are used to weave the straw together and then insert it into the ground. The weaving robot arm 31 is equipped with a rope winding structure, which cooperates with the weaving robot arm 31 to wind the rope between the straws. The puncher 32 is used to punch holes in the ground during the movement of the vehicle body 1 to facilitate the subsequent insertion of the straw into the hole. The two filling plates 33 can swing left and right. When the straw is inserted into the hole, the two filling plates 33 can fill the loose soil on the outside into the pores to achieve soil covering. The power source of the filling plates 33 can use existing technology to drive it to swing left and right, which will not be described in detail here.

[0028] During specific use, the straw is first placed on the discharge plate 21, and then the straw is taken off the discharge plate 21 by the feeding robot arm 22 and placed on the discharge channel 23, and then the straw is pushed along the discharge channel 23 to one side of the two weaving robot arms 31. During this period, the puncher 32 will perform hole drilling work on one side of the vehicle body 1. After the two weaving robot arms 31 clamp the delivered straw, the weaving rope is wrapped between the straws, and then the weaved straws are inserted into the opened holes. Then the two filling plates 33 at the rear of the vehicle body 1 will sweep the loose soil on the outside to the newly inserted straw to achieve the purpose of filling.

[0029] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A positioning structure for laying a sand barrier with high stability, characterized in that: include: A vehicle body (1), wherein driving wheels (11) are arranged on both sides of the vehicle body (1), and a housing (12) is fixedly mounted on the top of the vehicle body (1); A feeding assembly (2), the feeding assembly (2) being arranged on one side of the interior of the vehicle body (1), the feeding assembly (2) comprising a feeding plate (21) fixedly mounted on one side of the vehicle body (1), a feeding mechanical arm (22) fixedly mounted on one side of the feeding plate (21), and an auxiliary frame (24) fixedly mounted on one side of the feeding plate (21); A weaving blanking assembly (3) is arranged on one side of the interior of a vehicle body (1), the weaving blanking assembly (3) comprises two weaving mechanical arms (31) fixedly installed inside the vehicle body (1), a puncher (32) is arranged on one side of the interior of the vehicle body (1), and two filling plates (33) are movably installed on the side of the vehicle body (1) away from the puncher (32).

2. A positioning structure for laying a sand barrier with high stability according to claim 1, characterized in that: A material discharge plate (21) is fixedly mounted on one side of the interior of the vehicle body (1), a feeding mechanical arm (22) is fixedly mounted on one side of the material discharge plate (21), a material discharge channel (23) is fixedly mounted on one side of the material discharge plate (21), the material discharge channel (23) faces the weaving mechanical arm (31), an auxiliary frame (24) is fixedly mounted on one side of the material discharge plate (21), and the auxiliary frame (24) is arranged in an arc-shaped structure.

3. A positioning structure for laying a sand barrier with high stability according to claim 1, characterized in that: Two weaving mechanical arms (31) are fixedly installed inside the vehicle body (1), and the two weaving mechanical arms (31) are symmetrically arranged. A puncher (32) is fixedly installed on one side of the vehicle body (1) close to the material discharge plate (21), and the output end of the puncher (32) faces the ground.

4. A positioning structure for laying a sand barrier with high stability according to claim 3, characterized in that: Two soil filling plates (33) are movably mounted on one side of the vehicle body (1) away from the discharge plate (21), and the two soil filling plates (33) are symmetrically arranged.