Novel steel structure connection node structure
By adopting a combined structure of arc grooves and screw holes in the connection node of the steel structure, combined with the threaded connection between the screw and the slide rod, the problem of the inability to adjust the angle of the steel beam in the traditional connection method is solved, and the steel beam and steel pipe column are realized The flexible adjustment and precise control of welding position improve construction quality.
Patent Information
- Application Number
- CN202420505831.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-15
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-03-15
AI Technical Summary
In traditional steel structure connection methods, the position of the steel frame determines the position of the steel beam, resulting in the fixation of the included angle of the steel beam cannot be adjusted, and the deviation of the welding position will affect the construction quality.
A new type of steel structure connection node is designed, adopting a combined structure of arcuate grooves and screw holes. Through the threaded connection of the screw and the slide rod, combined with elastic rubber gaskets, the flexible adjustment and fixation of the steel beam and the steel pipe column is achieved.
The angle adjustment between the steel beam and the steel pipe column is realized, avoiding welding position deviation, and improving construction quality and flexibility.
Smart Images

Figure CN222009187U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of steel structures, in particular to a novel steel structure connection node structure. Background Art
[0002] The combined connection structure of poured concrete steel pipe columns and steel beams used in the construction of houses.
[0003] Usually, a steel frame is welded on the steel pipe column, and the steel beam is connected and fixed to the steel frame during construction. The position of this type of structural steel frame determines the position of the connected steel beam, that is, the angle between the steel beam connected to the steel pipe column is fixed and cannot be adjusted. Once the welding position of the steel frame deviates, it will affect the subsequent construction quality.
[0004] Therefore, it is necessary to improve the traditional steel structure connection method to avoid the above-mentioned problems. Utility Model Content
[0005] The purpose of the utility model is to solve the above problems and to propose a new type of steel structure connection node structure.
[0006] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0007] A novel steel structure connection node structure includes a steel pipe column and a steel beam, wherein a fixing plate 1 and a fixing plate 2 are fixedly connected to the steel pipe column, the fixing plate 1 is provided with an arc groove, the fixing plate 2 is provided with a screw hole 1 corresponding to the arc groove, a connecting beam is attached to the fixing plate 1, the connecting beam is provided with a screw hole 2, a screw rod is threadedly connected to the screw hole 2, and the screw rod passes through the arc groove and is threadedly connected to the screw hole 1, and the connecting beam is fixed to the steel beam by a connecting piece.
[0008] Preferably, the connecting member includes a fixing rod fixedly connected to the connecting beam, the fixing rod is slidably connected to a sliding hole opened on the sliding rod, a vertical rod is fixedly connected to the sliding rod, an opening is opened on the steel beam, the vertical rod passes through the opening, and the vertical rod is threadedly connected to a screw sleeve.
[0009] Preferably, there are two fixing rods distributed on the connecting beam, and the number of the sliding holes corresponds to the number of the fixing rods.
[0010] Preferably, an elastic rubber gasket protrudes from the portion where the steel beam contacts the connecting beam.
[0011] Preferably, the screw holes 1 are arranged in groups of two on the fixing plate 2 below the arc-shaped groove, and there are multiple groups of screw holes.
[0012] In summary, due to the adoption of the above technical solution, the beneficial effects of the utility model are:
[0013] 1. The present application enables the connection beam to rotate in the area of the arc groove under the action of the arc groove, thereby changing the angle between the two connection beams and preventing subsequent steel frame welding position deviations. Therefore, the connection node can be adjusted according to actual needs.
[0014] 2. In the present application, the sliding rod moves in the vertical direction under the action of the fixed rod, so that the vertical rod passes through the opening. Under the action of the screw sleeve, the screw sleeve and the vertical rod are connected by threads, so that the steel beam and the connecting beam are fixed, that is, the steel beam and the steel pipe column are fixed. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 A schematic diagram of a steel structure connection node structure provided according to an embodiment of the utility model is shown;
[0016] Figure 2 A schematic diagram of a portion of the structure of a connecting beam provided according to an embodiment of the utility model is shown;
[0017] Figure 3 A schematic diagram of a partial structure of a steel beam provided according to an embodiment of the utility model is shown.
[0018] Legend:
[0019] 1. Steel pipe column; 2. Fixed plate 1; 3. Arc groove; 4. Fixed plate 2; 5. Screw hole 1; 6. Connecting beam; 7. Screw hole 2; 8. Screw rod; 9. Fixed rod; 10. Sliding rod; 11. Vertical rod; 12. Sliding hole; 13. Screw sleeve; 14. Steel beam; 15. Opening hole. DETAILED DESCRIPTION
[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0021] See also Figure 1-3 , the utility model provides a technical solution:
[0022] A novel steel structure connection node structure includes a steel pipe column 1 and a steel beam 14, wherein a fixing plate 2 and a fixing plate 4 are fixedly connected to the steel pipe column 1, an arc groove 3 is provided on the fixing plate 2, a screw hole 5 corresponding to the arc groove 3 is provided on the fixing plate 2, a connecting beam 6 is attached to the fixing plate 2, a screw hole 2 7 is provided on the connecting beam 6, a screw rod 8 is threadedly connected to the screw hole 2 7, and the screw rod 8 passes through the arc groove 3 and is threadedly connected to the screw hole 1 5, and the connecting beam 6 is fixed to the steel beam 14 by a connecting piece.
[0023] Specifically, Figure 1 As shown, the connecting member includes a fixing rod 9 fixedly connected to the connecting beam 6, the fixing rod 9 is slidably connected to a sliding hole 12 opened on a sliding rod 10, a vertical rod 11 is fixedly connected to the sliding rod 10, an opening 15 is opened on a steel beam 14, the vertical rod 11 passes through the opening 15, and the vertical rod 11 is threadedly connected to a screw sleeve 13. Two fixing rods 9 are distributed on the connecting beam 6, and the number of the sliding holes 12 corresponds to the number of fixing rods 9.
[0024] Specifically, Figure 3 As shown, an elastic rubber gasket protrudes from the portion where the steel beam 14 contacts the connecting beam 6. Therefore, when the steel beam 14 contacts the connecting beam 6, the steel beam 14 or the connecting beam 6 will not be worn.
[0025] Specifically, Figure 3 As shown, the screw holes 1 5 are arranged in groups of two on the fixing plate 2 4 below the arc groove 3, and there are multiple groups. Therefore, when the screw hole 2 7 provided on the connecting beam 6 moves at the arc groove 3, the screw rod 8 can be connected with the screw hole 2 7 and the screw hole 1 5 by threads, thereby fixing the position of the connecting beam 6.
[0026] In summary, the steel beam 14 provided in this embodiment is brought into contact with the connecting beam 6, and then the sliding rod 10 can be pushed to move until the vertical rod 11 passes through the opening 15. The screw sleeve 13 is connected to the vertical rod 11 by threads, so that the steel beam 14 and the connecting beam 6 can be fixed. Then the screw hole 2 7 opened on the connecting beam 6 can be aligned with the arc groove 3 and the screw hole 1 5 opened on the fixing plate 2 4. The screw rod 8 can be screwed, and after the screw rod 8 is screwed to the screw hole 2 7, the screw rod 8 passes through the arc groove 3 until the screw rod 8 is screwed to the screw hole 1 5. Install another steel beam 14 according to the above steps, and the angle between the two steel beams 14 can be controlled as required.
[0027] The above description of the embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A new type of steel structure connection node structure, comprising a steel pipe column (1) and a steel beam (14), It is characterized in that The steel pipe column (1) is fixedly connected with a fixing plate 1 (2) and a fixing plate 2 (4); the fixing plate 1 (2) is provided with an arc-shaped groove (3); the fixing plate 2 (4) is provided with a screw hole 1 (5) corresponding to the arc-shaped groove (3); a connecting beam (6) is attached to the fixing plate 1 (2); a screw hole 2 (7) is provided on the connecting beam (6); a screw rod (8) is connected to the screw hole 2 (7) by threads, and the screw rod (8) passes through the arc-shaped groove (3) and is connected to the screw hole 1 (5) by threads; the connecting beam (6) is fixed to the steel beam (14) by a connecting piece; The connecting member comprises a fixing rod (9) fixedly connected to the connecting beam (6), the fixing rod (9) being slidably connected to a sliding hole (12) provided on a sliding rod (10), a vertical rod (11) being fixedly connected to the sliding rod (10), an opening (15) being provided on the steel beam (14), the vertical rod (11) passing through the opening (15), and a screw sleeve (13) being connected to the vertical rod (11) via a thread.
2. According to the new steel structure connection node structure described in claim 1, It is characterized in that There are two fixing rods (9) distributed on the connecting beam (6), and the number of the sliding holes (12) corresponds to the number of the fixing rods (9).
3. According to the new steel structure connection node structure described in claim 1, It is characterized in that An elastic rubber gasket protrudes from the portion where the steel beam (14) contacts the connecting beam (6).
4. According to the new steel structure connection node structure described in claim 1, It is characterized in that The screw holes 1 (5) are arranged in groups of two on the fixing plate 2 (4) below the arc-shaped groove (3), and there are multiple groups of screw holes.
