Shear wall
By using the structural design of the clamping block, connecting pipe and internal expansion rod, the problem of waiting for cement grout to set in the existing shear wall connection is solved, realizing a fast and stable connection between the upper and lower shear walls, and improving construction efficiency and structural stability.
Patent Information
- Application Number
- CN202420645320.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-29
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-03-29
AI Technical Summary
The existing shear wall connection method requires a long time to set after pouring cement grout, which prolongs the construction time and is inconvenient for users.
The structure adopts a design consisting of a locking block, connecting pipe, internal expansion rod, and mounting base. By aligning the locking block with the connecting groove and expanding the internal expansion rod, the upper and lower shear walls can be quickly connected, avoiding the use of cement grout.
It enables rapid and stable connection between upper and lower shear walls, shortens construction time, and improves connection stability and compressive and shear resistance.
Smart Images

Figure CN222009271U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of construction engineering, and in particular to a shear wall. Background Art
[0002] Shear walls are also called wind-resistant walls, earthquake-resistant walls, or structural walls. They are the walls in houses or structures that mainly bear horizontal and vertical loads caused by wind loads or earthquakes. Shear walls are divided into plane shear walls and cylindrical shear walls.
[0003] The utility model patent with announcement number CN211735814U proposes a prefabricated shear wall connection structure, including an upper shear wall and a lower shear wall, wherein two rows of connecting steel bars are fixedly embedded inside the upper shear wall, and the connecting steel bars extend to the top and bottom ends of the upper shear wall, and two rows of connecting steel pipes are fixedly embedded on both sides of the lower shear wall close to and away from the upper shear wall, and the connecting steel bars are inserted into the interior of the connecting steel pipes, and the connecting steel pipes are filled with grouting, and an I-beam is fixedly connected between the lower shear wall and the two rows of connecting steel pipes.
[0004] The above-mentioned shear wall structure realizes a stable connection between the upper shear wall and the lower shear wall by embedding the bottom end of the connecting steel bar installed on the upper shear wall into the connecting steel pipe installed inside the lower shear wall, and then filling the connecting steel pipe with cement slurry to fix the connecting steel bar. However, after pouring the cement slurry, it takes a long time for the cement slurry to solidify and fix the connecting steel bar, which greatly prolongs the construction time and is inconvenient for users. Utility Model Content
[0005] The utility model aims to solve or at least alleviate the problem that the existing method of connecting shear walls by pouring cement slurry requires a long time to solidify the cement slurry, which greatly prolongs the construction time and is inconvenient for users.
[0006] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0007] A shear wall comprises a lower shear wall and an upper shear wall located above the lower shear wall and connected to the lower shear wall through a connecting structure to form an integral shear wall structure, the middle section of the top end of the lower shear wall extends upward to form a card block, the bottom end of the upper shear wall is reserved with a connecting groove whose inner cavity size is adapted to the size of the card block, the connecting structure comprises a plurality of mounting seats with circular cavities embedded in the lower shear wall on both sides of the card block, the inner diameter of the circular cavity gradually increases from the top end to the bottom end of the circular cavity, an inner expansion rod with a conical structure on the top is vertically installed on the bottom wall of the circular cavity, the connecting structure also comprises a plurality of connecting pipes whose top ends are embedded in the upper shear wall and are positioned opposite to the corresponding mounting seats, and an expansion joint is provided on the side wall of one end of the connecting pipe located outside the upper shear wall.
[0008] By adopting the above technical solution, when using, the user first hoists the upper shear wall to the top of the lower shear wall through the external hoisting equipment, and adjusts the position of the upper shear wall so that the connection groove reserved at the bottom of the upper shear wall is aligned with the block formed by the middle section of the top of the lower shear wall extending outward, and then moves the upper shear wall downward to set the connection groove on the block. At this time, the connecting pipe fixedly connected to the upper shear wall is just aligned with the circular cavity of the mounting seat embedded in the lower shear wall. Under the action of gravity, the upper shear wall pushes the bottom end of the connecting pipe to move into the circular cavity of the mounting seat, so that the bottom end of the connecting pipe is inserted into the circular cavity of the mounting seat. Inside the circular cavity, the top of the inner expansion rod is just inserted into the bottom end of the connecting pipe in reverse. Since the top of the inner expansion rod is a conical structure, as the connecting pipe moves toward the inside of the mounting seat, the inner expansion rod can reversely squeeze the bottom end of the connecting pipe to expand along the expansion joint until the outer wall of the connecting pipe fits tightly with the inner wall of the circular cavity, thereby stably connecting the connecting pipe and the mounting seat together, thereby avoiding the existing method of connecting the shear wall by pouring cement slurry, and the problem that it takes a long time to solidify the cement slurry after pouring, which greatly prolongs the construction time and is inconvenient for users.
[0009] Optionally, a plurality of first reinforcing ribs arranged horizontally and a plurality of second reinforcing ribs arranged vertically are pre-embedded in the lower shear wall and the upper shear wall, and the first reinforcing ribs and the second reinforcing ribs are staggered and interwoven to form a mesh structure.
[0010] By adopting the above technical solution, the first reinforcing ribs and the second reinforcing ribs are arranged inside the lower shear wall and the upper shear wall to improve the compression and shear resistance of the overall shear wall structure, making the overall shear wall structure more stable.
[0011] Optionally, the block is integrally cast with the lower shear wall, and the top end of the second reinforcing rib pre-embedded in the lower shear wall extends into the block.
[0012] By adopting the above technical solution, a card block is provided to be embedded in the bottom end of the upper shear wall, thereby improving the stability of the connection between the lower shear wall and the upper shear wall, and extending the top of the second reinforcing rib embedded in the lower shear wall into the card block, which can minimize the breakage of the card block after being subjected to force and improve the shear resistance of the card block.
[0013] Optionally, the bottom end of the mounting seat is sealed, and the inner diameter of the top end of the circular cavity is not less than the diameter of the end of the connecting pipe located outside the upper shear wall.
[0014] By adopting the above technical solution, the inner diameter of the top of the circular cavity is not less than the diameter of the end of the connecting pipe located outside the upper shear wall, which facilitates the alignment of the bottom end of the connecting pipe with the circular cavity opened on the mounting seat, thereby inserting the bottom end of the connecting pipe into the mounting seat to achieve a stable connection between the lower shear wall and the upper shear wall.
[0015] Optionally, the connecting pipe is in a tubular structure, and one end of the connecting pipe embedded in the upper shear wall is fixedly connected to a fixing seat having a diameter larger than an outer diameter of the connecting pipe.
[0016] By adopting the above technical solution, a fixing seat with a diameter larger than the outer diameter of the connecting pipe is provided to reduce the pressure between the end of the connecting pipe and the upper shear wall, so as to avoid the problem of excessive squeezing of the upper shear wall by the connecting pipe after being subjected to force, thereby causing damage to the upper shear wall.
[0017] Optionally, the distance between the bottom end of the inner expansion rod and the inner wall of the mounting seat is equal to the thickness of the side wall of the connecting tube, and the top diameter of the inner expansion rod is smaller than the inner diameter of the bottom end of the connecting tube.
[0018] By adopting the above technical solution, the distance between the bottom end of the inner expansion rod and the inner wall of the mounting seat is equal to the thickness of the side wall of the connecting pipe, so that the connecting pipe fits tightly with the inner wall of the mounting seat after expanding along the expansion joint. The top diameter of the inner expansion rod is smaller than the inner diameter of the bottom end of the connecting pipe, which facilitates the alignment of the inner expansion rod and the end of the connecting pipe.
[0019] Optionally, a waterstop steel plate is fixedly connected to the bottom end of the upper shear wall, a connecting groove is opened on the lower shear wall below the waterstop steel plate, and one end of the waterstop steel plate located outside the upper shear wall is embedded in the lower shear wall through the connecting groove.
[0020] By adopting the above technical solution, a waterstop steel plate is set to seal the horizontal seam at the connection between the upper shear wall and the lower shear wall, so as to avoid the problem of rainwater seeping into the room through the horizontal seam.
[0021] In summary, the beneficial effects of this application are as follows:
[0022] The present application adopts the coordinated arrangement of structures such as the mounting seat, the inner expansion rod, the connecting pipe and the expansion joint. When the bottom end of the connecting pipe installed on the upper shear wall is inserted into the mounting seat, the inner expansion rod can be reversely inserted into the connecting pipe. Since the top end of the inner expansion rod is a conical structure, as the connecting pipe moves toward the inside of the mounting seat, the inner expansion rod can reversely squeeze the bottom end of the connecting pipe to expand along the expansion joint until it fits tightly with the inner wall of the mounting seat, thereby stably connecting the upper shear wall and the lower shear wall together, and avoiding as much as possible the existing method of connecting the shear walls by pouring cement slurry, and the problem that it takes a long time to solidify the cement slurry after pouring, which greatly prolongs the construction time and is inconvenient for users. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a schematic diagram of the overall cross-sectional structure of this application;
[0024] Figure 2 It is a schematic diagram of the connection structure between the upper shear wall and the lower shear wall of the present application;
[0025] Figure 3 It is a three-dimensional structural schematic diagram of the connecting pipe of the present application.
[0026] Explanation of the reference numerals in the accompanying drawings: 1. Lower shear wall; 2. Upper shear wall; 3. First reinforcing rib; 4. Second reinforcing rib; 5. Block; 6. Connecting groove; 7. Mounting seat; 8. Inner expansion rod; 9. Connecting pipe; 10. Fixing seat; 11. Expansion joint; 12. Waterstop steel plate; 13. Connecting groove. DETAILED DESCRIPTION
[0027] The following is combined with Figure 1-3 This application is described in further detail.
[0028] See also Figure 1-3 A shear wall comprises a lower shear wall 1 and an upper shear wall 2 located above the lower shear wall 1 and connected to the lower shear wall 1 through a connecting structure to form an integral shear wall structure.
[0029] The middle section at the top of the lower shear wall 1 extends upward to form a card block 5, and a connecting groove 6 with an inner cavity size that matches the size of the card block 5 is reserved at the bottom of the upper shear wall 2. When the lower shear wall 1 and the upper shear wall 2 are connected to form an overall shear wall structure, the card block 5 is just embedded in the inner cavity of the connecting groove 6, so that the upper shear wall 2 and the lower shear wall 1 are connected through the card block 5 and the connecting groove 6, thereby improving the stability of the connection between the upper shear wall 2 and the lower shear wall 1.
[0030] The connection structure includes a plurality of mounting seats 7 with circular cavities embedded in the lower shear wall 1 on both sides of the clamping block 5, wherein the inner diameter of the circular cavity increases gradually from the top end to the bottom end.
[0031] The bottom wall of the circular cavity is vertically installed with an inner expansion rod 8 with a conical top structure. The connection structure also includes a plurality of connection pipes 9 whose top ends are embedded in the upper shear wall 2 and are opposite to the corresponding mounting seat 7. An expansion joint 11 is provided on the side wall of one end of the connection pipe 9 located outside the upper shear wall 2. After the bottom end of the connection pipe 9 is aligned with the circular cavity opened inside the mounting seat 7, the upper shear wall 2 is pressed downward to insert the bottom end of the connection pipe 9 into the circular cavity. At this time, the top end of the inner expansion rod 8 is just reversely inserted into the bottom end of the connection pipe 9. Since the top end of the inner expansion rod 8 is a conical structure, as the connection pipe 9 moves toward the mounting seat 7, the inner expansion rod 8 can reversely squeeze the bottom end of the connection pipe 9 to expand along the expansion joint 11 until the outer wall of the connection pipe 9 is tightly fitted with the inner wall of the circular cavity, so that the connection pipe 9 and the mounting seat 7 are stably connected together.
[0032] Reference Figure 1 A plurality of first reinforcing ribs 3 arranged horizontally and a plurality of second reinforcing ribs 4 arranged vertically are embedded in the lower shear wall 1 and the upper shear wall 2. The first reinforcing ribs 3 and the second reinforcing ribs 4 are staggered and interwoven to form a mesh structure. The first reinforcing ribs 3 and the second reinforcing ribs 4 are arranged in the lower shear wall 1 and the upper shear wall 2 to improve the compression and shear resistance of the overall shear wall structure and make the overall shear wall structure more stable.
[0033] Reference Figure 1 and Figure 2 The block 5 is integrally cast with the lower shear wall 1, and the top of the second reinforcing rib 4 embedded in the lower shear wall 1 extends into the block 5. The block 5 is used to be embedded in the bottom of the upper shear wall 2 to improve the stability of the connection between the lower shear wall 1 and the upper shear wall 2. The top of the second reinforcing rib 4 embedded in the lower shear wall 1 extends into the block 5, which can avoid the block 5 from breaking after being stressed as much as possible, and improve the anti-shear performance of the block 5.
[0034] Reference Figure 2 , the bottom end of the mounting seat 7 is sealed, and the top inner diameter of the circular cavity is not less than the diameter of the end of the connecting pipe 9 located outside the upper shear wall 2. The top inner diameter of the circular cavity is not less than the diameter of the end of the connecting pipe 9 located outside the upper shear wall 2, which facilitates the alignment of the bottom end of the connecting pipe 9 with the circular cavity opened on the mounting seat 7, so that the bottom end of the connecting pipe 9 is inserted into the mounting seat 7 to achieve a stable connection between the lower shear wall 1 and the upper shear wall 2.
[0035] Reference Figure 3 The connecting pipe 9 is a tubular structure, and a fixing seat 10 having a diameter greater than the outer diameter of the connecting pipe 9 is fixedly connected to one end of the connecting pipe 9 embedded in the upper shear wall 2. The fixing seat 10 having a diameter greater than the outer diameter of the connecting pipe 9 is provided to reduce the pressure between the end of the connecting pipe 9 and the upper shear wall 2, and to avoid the problem that the connecting pipe 9 over-extrudes the upper shear wall 2 after being stressed, thereby causing damage to the upper shear wall 2.
[0036] Reference Figure 1 and Figure 3 The distance between the bottom end of the inner expansion rod 8 and the inner wall of the mounting seat 7 is equal to the thickness of the side wall of the connecting tube 9, and the top diameter of the inner expansion rod 8 is smaller than the inner diameter of the bottom end of the connecting tube 9. The distance between the bottom end of the inner expansion rod 8 and the inner wall of the mounting seat 7 is equal to the thickness of the side wall of the connecting tube 9, so that the connecting tube 9 is tightly fitted with the inner wall of the mounting seat 7 after expansion along the expansion joint 11, and the top diameter of the inner expansion rod 8 is smaller than the inner diameter of the bottom end of the connecting tube 9, so that the inner expansion rod 8 and the end of the connecting tube 9 are conveniently aligned.
[0037] Reference Figure 2 The bottom end of the upper shear wall 2 is fixedly connected with a water-stop steel plate 12, and a connecting groove 13 is provided on the lower shear wall 1 below the water-stop steel plate 12. One end of the water-stop steel plate 12 located outside the upper shear wall 2 is embedded in the lower shear wall 1 through the connecting groove 13. The water-stop steel plate 12 is provided to seal the horizontal seam at the connection between the upper shear wall 2 and the lower shear wall 1, so as to avoid the problem of rainwater seeping into the room through the horizontal seam.
[0038] The implementation principle of the present application is as follows: when in use, the user first hoists the upper shear wall 2 to the top of the lower shear wall 1 through an external hoisting device, and adjusts the position of the upper shear wall 2 so that the connection groove 6 reserved at the bottom of the upper shear wall 2 is aligned with the block 5 formed by the middle section of the top of the lower shear wall 1 extending outward, and then moves the upper shear wall 2 downward to sleeve the connection groove 6 on the block 5. At this time, the connecting pipe 9 fixedly connected to the upper shear wall 2 is just aligned with the circular cavity of the mounting seat 7 embedded in the lower shear wall 1. Under the action of gravity, the upper shear wall 2 pushes the bottom end of the connecting pipe 9 to move into the circular cavity of the mounting seat 7, so that the bottom of the connecting pipe 9 is The end is inserted into the circular cavity, and the top of the inner expansion rod 8 is just reversely inserted into the bottom end of the connecting tube 9. Since the top of the inner expansion rod 8 is a conical structure, as the connecting tube 9 moves toward the inside of the mounting seat 7, the inner expansion rod 8 can reversely squeeze the bottom end of the connecting tube 9 to expand along the expansion joint 11 until the outer wall of the connecting tube 9 is tightly fitted with the inner wall of the circular cavity, thereby stably connecting the connecting tube 9 and the mounting seat 7 together, thereby avoiding the existing method of connecting the shear wall by pouring cement slurry, and the problem that it takes a long time to solidify the cement slurry after pouring, which greatly prolongs the construction time and is inconvenient for users.
[0039] The above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A shear wall, comprising a lower shear wall (1) and an upper shear wall (2) located above the lower shear wall (1) and connected to the lower shear wall (1) via a connecting structure to form an integral shear wall structure, wherein a middle section of the top end of the lower shear wall (1) extends upward to form a block (5), and a connecting groove (6) having an inner cavity size adapted to the size of the block (5) is reserved at the bottom end of the upper shear wall (2). Features: The connection structure comprises a plurality of mounting seats (7) with circular cavities therein which are embedded in the lower shear wall (1) on both sides of the clamping block (5), wherein the inner diameter of the circular cavity gradually increases from the top end to the bottom end of the circular cavity, and an inner expansion rod (8) with a conical top is vertically mounted on the bottom wall of the circular cavity. The connection structure also comprises a plurality of connecting pipes (9) whose top ends are embedded in the upper shear wall (2) and are positioned relative to the corresponding mounting seats (7), and an expansion joint (11) is provided on the side wall of one end of the connecting pipe (9) located outside the upper shear wall (2).
2. A shear wall according to claim 1, Features: A plurality of first reinforcing ribs (3) arranged horizontally and a plurality of second reinforcing ribs (4) arranged vertically are pre-buried inside the lower shear wall (1) and the upper shear wall (2); the first reinforcing ribs (3) and the second reinforcing ribs (4) are staggered and interwoven to form a mesh structure.
3. A shear wall according to claim 2, Features: The clamping block (5) and the lower shear wall (1) are cast in one piece, and the top end of the second reinforcing rib (4) pre-buried inside the lower shear wall (1) extends into the interior of the clamping block (5).
4. A shear wall according to claim 1, Features: The bottom end of the mounting seat (7) is sealed, and the inner diameter of the top end of the circular cavity is not less than the diameter of the end of the connecting pipe (9) located outside the upper shear wall (2).
5. A shear wall according to claim 1, Features: The connecting pipe (9) is in a tubular structure, and a fixing seat (10) having a diameter greater than the outer diameter of the connecting pipe (9) is fixedly connected to one end of the connecting pipe (9) embedded in the upper shear wall (2).
6. A shear wall according to claim 5, Features: The distance between the bottom end of the inner expansion rod (8) and the inner wall of the mounting seat (7) is equal to the thickness of the side wall of the connecting tube (9), and the top end diameter of the inner expansion rod (8) is smaller than the inner diameter of the bottom end of the connecting tube (9).
7. A shear wall according to claim 1, Features: A waterstop steel plate (12) is fixedly connected to the bottom end of the upper shear wall (2); a connecting groove (13) is provided on the lower shear wall (1) below the waterstop steel plate (12); and one end of the waterstop steel plate (12) located outside the upper shear wall (2) is embedded in the lower shear wall (1) through the connecting groove (13).