Self-propelled synchronous curing device for overall cast-in-place lining concrete of full-circle tunnel
Through the self-propelled fully-circular tunnel integrated cast-in-place lining concrete synchronous maintenance device, the safety hazards and quality problems of manual sprinkler maintenance are solved, and automated and safe concrete maintenance is achieved, reducing costs and increasing costs Maintenance quality.
Patent Information
- Application Number
- CN202420388452.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-29
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-02-28
AI Technical Summary
After the construction of a fully circular tunnel lining concrete, manual sprinkler maintenance has safety hazards and limitations, making it difficult to achieve comprehensive and effective concrete protection, especially in high clearance and circular cross-sectional environments, which can easily lead to safety risks and quality problems for operators.
A self-propelled fully circular tunnel integrated cast-in-place lining concrete synchronous maintenance device was designed. Through the frame connected to the lining trolley, the booster pump with timing function and an automated water management system, an automated and safe maintenance process is realized, including Wire rope connection with rubber sleeves, glue load-bearing wheels and float level switches ensure automatic walking of the device and water source management.
It realizes automated, safe and reliable concrete curing, reduces personnel investment and costs, improves maintenance quality, reduces safety hazards, and extends the equipment life through anti-rust pipelines and nozzle materials.
Smart Images

Figure CN222010227U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of tunnel engineering, and in particular to a self-propelled full-circle tunnel integral cast-in-situ lining concrete synchronous maintenance device. Background Art
[0002] During the construction of full-circle tunnel lining concrete, a period of curing is required after the concrete is poured to ensure that the concrete reaches the designed strength and prevent cracks and deformation. At present, after the overall cast-in-place lining construction of the full-circle tunnel, the lining concrete curing is mainly artificial sprinkling curing due to factors such as the compression of the clearance behind the lining, the circular cross-section of the tunnel, and the protection of the finished concrete.
[0003] However, the clearance height behind the tunnel lining mostly ranges from 6 to 10m, and it has a circular cross-section. Manual watering maintenance has problems such as slippery working surface and easy falls of workers, posing a high safety risk. At the same time, the maintenance water flow is limited by the height of the effective water column, and the arch top maintenance is difficult, making it difficult to achieve comprehensive and effective maintenance. The maintenance frequency is closely related to the sense of responsibility of the workers. Therefore, the manual watering maintenance method has great safety hazards and limitations, and the quality of the tunnel lining concrete is difficult to be effectively protected.
[0004] Therefore, there is an urgent need for a synchronous maintenance device for the integral cast-in-place lining concrete of a self-propelled full-circle tunnel of a water conservancy project to solve the above problems.
[0005] The information disclosed in this background technology section is only used to deepen the understanding of the background technology of the present disclosure, and should not be regarded as acknowledging or suggesting in any form that the information constitutes the prior art known to those skilled in the art. Summary of the invention
[0006] In view of at least one of the above technical problems, the present disclosure provides a self-propelled full-circle tunnel integral cast-in-place lining concrete synchronous curing device, which is connected to a lining trolley and equipped with a booster pump with a timing function to achieve automatic, safe and reliable tunnel concrete curing.
[0007] According to one aspect of the present disclosure, there is provided a self-propelled full-circle tunnel integral cast-in-situ lining concrete synchronous maintenance device, comprising a frame, a water collecting tank installed at the bottom of the frame, and a maintenance pipeline installed on the frame; the water collecting tank is provided with a water inlet and a water outlet, the water inlet is provided with a float liquid level switch, the water outlet is connected to a water outlet pipeline, and the water outlet pipeline is provided with a self-priming booster pump with a timing function; the maintenance pipeline comprises a maintenance main pipeline and a maintenance branch pipeline.
[0008] In some embodiments of the present disclosure, a steel wire rope with a rubber sleeve, a fixing hook and an anti-loosening mechanism are provided at the front end of the frame for connecting the lining trolley.
[0009] In some embodiments of the present disclosure, two sets of load-bearing wheels are provided at the bottom of the frame, the front end of which is a universal wheel and the rear end is a fixed wheel; the load-bearing wheels are provided with matching brake mechanisms; the load-bearing wheels are rubber parts.
[0010] In some embodiments of the present disclosure, a cover plate is further provided on the top of the water collecting tank; the water inlet end is used to be connected to a corresponding water pipe, and the water outlet end of the water outlet pipe is connected to the maintenance main pipe.
[0011] In some embodiments of the present disclosure, the maintenance main pipeline is longitudinally arranged at the top of the frame, the maintenance branch pipeline is circumferentially arranged at the top of the frame and connected with the maintenance main pipeline, and maintenance nozzles are installed on the maintenance branch pipelines; the longitudinal spacing between adjacent maintenance branch pipelines is 1 to 2 m, and the circumferential spacing between adjacent maintenance nozzles is 1 to 2 m.
[0012] In some embodiments of the present disclosure, the main maintenance pipeline and the branch maintenance pipeline are both PE pipes; the maintenance nozzle is made of pure copper.
[0013] One or more technical solutions provided in the embodiments of the present application have at least any of the following technical effects or advantages:
[0014] 1. As the frame is connected to the lining trolley by a steel wire rope with a rubber sleeve, the lining trolley provides power for the movement of the device, and there is no need for manual or mechanical operation to push the device to move. The maintenance process is safer and more reliable, and the maintenance quality is higher. At the same time, the cost is reduced due to the reduction of personnel input.
[0015] 2. Since the load-bearing wheels are made of rubber, it is beneficial to protect the finished concrete on the ground during the movement of the device. Each load-bearing wheel is equipped with a brake mechanism, which can achieve emergency stopping in special circumstances to ensure the safety of personnel and equipment.
[0016] 3. As the water inlet of the water collecting tank is equipped with a float liquid level switch and the outlet pipe is equipped with a self-priming booster pump with a timing function, the water storage in the water collecting tank, the timing of the booster pump and the circulation maintenance are all completed automatically without manual intervention. The high degree of automation can effectively improve and guarantee the quality of concrete maintenance, while reducing personnel input and saving costs.
[0017] 4. Since the maintenance pipeline is made of PE pipe and the maintenance nozzle is made of pure copper, it can prevent the pipeline from rusting and clogging, thereby avoiding frequent replacement of pipelines and nozzles and contamination of finished concrete, and also saving construction costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 This is a front view of a self-propelled full-circle tunnel integral cast-in-place lining concrete synchronous curing device in one embodiment of the present application.
[0019] Figure 2 This is a left view of a self-propelled full-circle tunnel integral cast-in-place lining concrete synchronous curing device in one embodiment of the present application.
[0020] In the above figures, 1 is a frame, 2 is a water collecting tank, 3 is a wire rope, 4 is a fixed hook, 5 is an anti-loosening mechanism, 6 is a universal wheel, 7 is a directional wheel, 8 is a brake mechanism, 9 is a water pipe, 10 is a float liquid level switch, 11 is a water outlet pipe, 12 is a self-priming booster pump, 13 is a cover plate, 14 is a maintenance main line, 15 is a maintenance branch line, and 16 is a maintenance nozzle. DETAILED DESCRIPTION
[0021] In order to better understand the technical solution of the present application, the above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0022] In the description of the present application, it should be understood that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", "vertical", "horizontal", "clockwise", "counterclockwise", etc., indicating the orientation or position relationship, are based on the orientation or position relationship shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. The terms "first", "second", etc. involved in the present application are used to distinguish the objects described and do not have any order or technical meaning. The terms "connection" and "connection" involved in the present application, unless otherwise specified, include direct and indirect connections (connections).
[0023] Unless otherwise specified, the components, structures, and mechanisms involved in the following embodiments are conventional commercially available products.
[0024] Embodiment 1
[0025] This example discloses a self-propelled full-circle tunnel integral cast-in-situ lining concrete synchronous curing device, see Figure 1 , Figure 2 , including a frame 1, a water collecting tank 2 and a maintenance pipeline; the front end of the frame 1 is connected to the lining trolley, and the lining trolley is used as a power source to provide power for the frame 1 to move, thereby achieving safe and reliable maintenance.
[0026] See also Figure 2The front end of the frame 1 is provided with a steel wire rope 3 with a rubber sleeve, a fixed hook 4 and an anti-loosening mechanism 5. It is connected to the lining trolley through the steel wire rope 3. There is no need for manual operation or mechanical operation to push the device to move, so the maintenance quality is higher. At the same time, the cost is reduced due to the reduction in personnel investment; two sets of load-bearing wheels are provided at the bottom end of the frame 1, the front end of which is a universal wheel 6, and the rear end is a directional wheel 7. The frame 1 can be adjusted in direction. Both sets of load-bearing wheels are made of rubber material. During the walking process, damage to the finished concrete on the ground is avoided; both sets of load-bearing wheels are equipped with corresponding brake mechanisms 8, which can achieve emergency parking under special circumstances to ensure the safety of personnel and equipment.
[0027] See also Figure 1 , Figure 2 The water collecting tank 2 is installed in the middle position of the bottom of the frame 1, which can effectively lower the center of gravity of the frame 1, increase the stability of the frame 1, and ensure the safety of walking and maintenance of the frame 1; the water collecting tank 2 is provided with a water inlet end and a water outlet end, the water inlet end is used to connect with the corresponding tap water pipe 9, and a float liquid level switch 10 is provided at its end; when the water level in the water collecting tank 2 is lower than the set value, the float liquid level switch 10 is automatically opened, and water is introduced through the water inlet end; when the water level in the water collecting tank 2 is higher than the set value, the float liquid level switch 10 is automatically closed and water is stopped. By connecting the tap water pipe 9 and setting the float liquid level switch 10, automatic water storage in the water collecting tank 2 is realized.
[0028] The water outlet end of the water collecting tank 2 is connected with an outlet pipe 11, which is vertically installed on the frame 1, and the top of which is connected to the maintenance main line 14; a self-priming booster pump 12 with a timing function is installed in the outlet pipe 11, which can adjust the continuous and intermittent time of the cycle of the booster pump 12 in combination with the frequency and humidity requirements of concrete curing, and the booster pump 12 can automatically time, effectively improving and ensuring the quality of concrete curing; a cover plate 13 is also provided on the top of the water collecting tank 2, and the cover plate 13 can realize the closure of the water collecting tank 2 except for the water inlet and outlet ends; the water collecting tank 2 can realize automatic water storage and water discharge, with a high degree of automation, reducing personnel input and saving engineering costs.
[0029] See also Figure 1 , Figure 2The maintenance pipeline includes a maintenance main pipeline 14 and a maintenance branch pipeline 15. The maintenance main pipeline 14 is longitudinally arranged on the top of the frame 1. There are five maintenance branch pipelines 15, which are circumferentially arranged on the top of the frame 1 and connected with the maintenance main pipeline 14. The longitudinal spacing between adjacent maintenance branch pipelines 15 is 1.5m; each maintenance branch pipeline 15 is installed with a maintenance nozzle 16, and the circumferential spacing between adjacent maintenance nozzles 16 is 1.5m. The maintenance water flow is pressurized by a booster pump 12, and the nozzles are arranged with a longitudinal and circumferential spacing of 1.5*1.5m to achieve comprehensive and effective maintenance of the lining concrete; both the maintenance main pipeline 14 and the maintenance branch pipeline 15 use PE pipes, and the maintenance nozzles 16 are made of pure copper, which can prevent the pipelines from rusting and clogging, thereby avoiding frequent replacement of pipelines and nozzles and pollution of finished concrete, and also saving construction costs.
[0030] Although some preferred embodiments of the present invention have been described, those skilled in the art may make additional changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications falling within the scope of the present application.
[0031] Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the spirit and scope of the inventive concept. Thus, if these modifications and variations of the present application fall within the scope of the claims of the present application and their equivalents, the present application is also intended to include these modifications and variations.
Claims
1. A self-propelled full-circle tunnel integral cast-in-place lining concrete synchronous curing device, characterized in that: It includes a frame, a water collecting tank installed at the bottom of the frame, and a maintenance pipeline installed on the frame; the water collecting tank is provided with a water inlet and a water outlet, the water inlet is provided with a float liquid level switch, the water outlet is connected to a water outlet pipeline, and the water outlet pipeline is provided with a self-priming booster pump with a timing function; the maintenance pipeline includes a maintenance main pipeline and a maintenance branch pipeline.
2. The self-propelled full-circle tunnel integral cast-in-situ lining concrete synchronous curing device according to claim 1 is characterized in that: The front end of the frame is provided with a steel wire rope with a rubber sleeve, a fixing hook and an anti-loosening mechanism for connecting the lining trolley.
3. The self-propelled full-circle tunnel integral cast-in-situ lining concrete synchronous curing device according to claim 1 is characterized in that: Two groups of load-bearing wheels are arranged at the bottom of the frame, the front end of which is a universal wheel and the rear end is a fixed wheel; the load-bearing wheels are all provided with matching brake mechanisms; the load-bearing wheels are rubber parts.
4. The self-propelled full-circle tunnel integral cast-in-situ lining concrete synchronous curing device according to claim 1 is characterized in that: A cover plate is also provided on the top of the water collecting tank; the water inlet end is used to be connected to a corresponding water pipe, and the water outlet end of the water outlet pipe is connected to the maintenance main pipe.
5. The self-propelled full-circle tunnel integral cast-in-situ lining concrete synchronous curing device according to claim 1 is characterized in that: The maintenance main pipeline is longitudinally arranged at the top of the frame, the maintenance branch pipeline is circumferentially arranged at the top of the frame and connected with the maintenance main pipeline, and maintenance nozzles are installed on the maintenance branch pipelines; the longitudinal spacing between adjacent maintenance branch pipelines is 1 to 2m, and the circumferential spacing between adjacent maintenance nozzles is 1 to 2m.
6. The self-propelled full-circle tunnel integral cast-in-situ lining concrete synchronous curing device according to claim 5 is characterized in that: The main maintenance pipeline and the branch maintenance pipeline are both PE pipes; the maintenance nozzle is made of pure copper.