Desulfurized limestone powder bin boiling disc air supply device

By using manual ball valve, solenoid valve, pneumatic valve, aerodynamic alarm and other components in the desulfurized limestone powder chamber boiling disk air supply device, the air supply channel is automatically controlled, which solves the pressure increase and air waste caused by long-term air supply. Problem, improving air supply effect and safety, and reducing wear risk by strengthening casing and wear-resistant inner tube.

CN222011973UActive Publication Date: 2024-11-15BINZHOU HONGNUO NEW MATERIALS CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323092598.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-11-16
Publication Date
2024-11-15
Estimated Expiration
2033-11-16

AI Technical Summary

Technical Problem

The existing desulfurized limestone powder bin boiling tray air supply device design has problems such as increased pressure at the soft connection of the cutter port, damage to the connection pipeline, waste of compressed air and dust, which affects environmental protection and safety.

Method used

A air supply device including boiling disc, air supply assembly and safety warning assembly was designed. The air supply passage is controlled through manual ball valve and solenoid valve, the air supply branch pipe is automatically started, the air pressure detector and acoustic and light alarm are set, and a reinforcement sleeve is adopted. The tube and wear-resistant inner tube improve pipe strength and wear resistance, and prevent limestone powder from entering through breathable plates and sealing gaskets.

Benefits of technology

It effectively avoids the pressure increase and air waste caused by long-term air supply, improves the air supply effect and management convenience, reduces the risk of dust and air leakage, and promptly deals with pressure abnormalities through safety warning components.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222011973U_ABST
    Figure CN222011973U_ABST
Patent Text Reader

Abstract

The utility model discloses a desulfurized limestone powder bin boiling disc air supply device, which belongs to the technical field of air supply, and comprises a plurality of boiling discs, an air supply component and a safety early warning component, the air supply component is connected with the plurality of boiling discs, and the plurality of boiling discs are uniformly distributed on the outer wall of a limestone powder bin; the air supply assembly comprises a flow dividing pipe, an air supply pipe, an air supply branch pipe, a ball valve and an electromagnetic valve, and a safety early warning assembly is arranged between the flow dividing pipe and the boiling discs. The device has the beneficial effects that the air supply component is connected with the boiling disc of the limestone powder bin, and the air supply branch pipe controlled by the electromagnetic valve is arranged, so that the device can be automatically started during discharging of the limestone powder bin, and the problems that the pressure at the soft connecting part of a discharging port is increased and a connecting pipeline is damaged due to long-time air supply are solved; the air supply effect of the boiling disc of the limestone powder bin is improved, meanwhile, the safety early warning assembly used for monitoring the pressure of the pipeline is arranged on the air supply channel, and an audible and visual alarm can be given out when the pressure is abnormal.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of air supply, in particular to a desulfurization limestone powder bin boiling plate air supply device. Background Art

[0002] Desulfurization refers to the process of removing sulfur from fuel before combustion and before flue gas emissions. In the desulfurization purification system workshop of the electrolytic aluminum industry, the boiling plate at the bottom of the limestone powder bin of the desulfurization system is supplied with compressed air. The function of the boiling plate is to make the limestone powder fluid during pulping. According to the process characteristics, pulping is done 2-3 times per shift, each lasting half an hour.

[0003] In the prior art, the original design of the boiling pan air supply is continuous, but long-term air supply will cause the pressure at the soft connection of the discharge port to increase, damage the connecting pipe, and cause waste of compressed air, which is easy to cause dust and affect environmental protection. There is a lack of a stable and easy-to-control air supply structure, and its safety and durability need to be improved. Utility Model Content

[0004] In order to overcome the problems that the original design of the air supply of the boiling plate in the prior art is continuous, but long-term air supply will cause the pressure at the soft connection of the discharge port to increase, damage the connecting pipe, and cause waste of compressed air, which is easy to cause dust, affecting environmental protection, lacks a stable and easy-to-control air supply structure, and its safety and durability need to be improved, the utility model provides a desulfurization limestone powder silo boiling plate air supply device, including a boiling plate, an air supply component and a safety warning component, the air supply component is connected to a plurality of boiling plates, and the plurality of boiling plates are evenly Distributed on the outer wall of the limestone powder bin, the air supply assembly includes a shunt pipe, an air supply pipe, an air supply branch pipe, a ball valve and a solenoid valve. The bottom of the air supply pipe is connected to the air supply branch pipe, and the air supply branch pipe and the air supply pipe are both connected to the shunt pipe. Ball valves are respectively provided on the air supply branch pipe and the air supply pipe. A solenoid valve is provided on the air supply branch pipe at a position next to the ball valve. A safety warning assembly is provided between the shunt pipe and several of the boiling plates, and the safety warning assembly includes an air pressure detector and an audible and visual alarm.

[0005] The boiling plate of the limestone powder silo is connected through an air supply component, and an air supply pipe controlled by a manual ball valve and an air supply branch pipe controlled by a solenoid valve are set. According to the actual air supply needs, a suitable air supply channel can be selected for air supply, and the solenoid valve of the air supply branch pipe can be automatically started when the limestone powder silo is unloaded, thereby avoiding the problem of increased pressure at the soft connection of the unloading port due to long-term air supply, damage to the connecting pipe, and waste of compressed air that easily causes dust. The air supply effect of the boiling plate of the limestone powder silo is improved and it is also easy to manage. At the same time, a safety warning component for monitoring the pipeline pressure is set on the air supply channel, which can send out an audible and visual alarm when the pressure is abnormal.

[0006] Preferably, the diverter pipe is connected to the plurality of boiling plates via a plurality of connecting pipes, the air pressure detector and the sound and light alarm are arranged on the front and rear outer walls of the connecting pipes, and the air pressure detector is connected to the sound and light alarm.

[0007] Preferably, a feed pipe is connected to the bottom of the limestone powder bin, a spiral feeder is provided on the feed pipe, and the spiral feeder is electrically connected to the solenoid valve.

[0008] Preferably, a ventilation plate is provided at the connection between the boiling pan and the limestone powder bin, and a plurality of ventilation holes are formed on the ventilation plate.

[0009] Preferably, the outer walls of the air supply pipe and the air supply branch pipe are provided with a reinforcing sleeve, and the inner walls of the air supply pipe and the air supply branch pipe are provided with a wear-resistant inner pipe.

[0010] Preferably, a sealing gasket is provided between the boiling pan and the limestone powder bin, and an auxiliary filter is provided between the boiling pan and the connecting pipe.

[0011] The boiling pan is connected to the limestone powder bin through a breathable plate. The breathable plate is provided with a plurality of breathable holes to facilitate ventilation and prevent the limestone powder from entering the boiling pan. A sealing gasket is provided between the boiling pan and the limestone powder bin to enhance the sealing performance and avoid air leakage and limestone powder leakage.

[0012] Preferably, a buckle is provided on the outer edge of the air-permeable plate, and a groove matching the buckle is formed on the inner side of the boiling pan.

[0013] Preferably, a pressure relief valve is provided on the air supply pipe before the air supply branch pipe, and the pressure relief valve is externally connected to a pressure relief pipeline.

[0014] Preferably, a fixing plate is provided on the side of the boiling pan, and the fixing plate is provided with a plurality of fixing holes.

[0015] Through the fixing plate and the fixing holes, the boiling plate can be conveniently fixed tightly on the limestone powder bin by bolts.

[0016] Preferably, the reinforcing sleeve is made of a reinforced steel plate, and the wear-resistant inner tube is made of a ceramic wear-resistant material.

[0017] By setting a reinforcing sleeve on the outside of the air supply pipe and the air supply branch pipe, the strength of the pipe can be improved so that it has better pressure resistance and pressure bearing capacity. By setting a wear-resistant inner pipe inside the air supply pipe and the air supply branch pipe, the impact resistance of the inner wall of the pipe can be improved and the wear caused by compressed air scouring can be reduced.

[0018] Beneficial effects:

[0019] The beneficial effects produced by adopting the technical solution of the utility model are as follows:

[0020] (1) The boiling pan of the limestone powder silo is connected through an air supply component, and an air supply pipe controlled by a manual ball valve and an air supply branch pipe controlled by an electromagnetic valve are set. According to the actual air supply needs, a suitable air supply channel can be selected for air supply. In addition, the electromagnetic valve of the air supply branch pipe can be automatically started when the limestone powder silo is unloaded, thereby avoiding the problem of increased pressure at the soft connection of the unloading port due to long-term air supply, damage to the connecting pipe, and waste of compressed air that easily causes dust. The air supply effect of the boiling pan of the limestone powder silo is improved and it is also easy to manage. At the same time, a safety warning component for monitoring the pipeline pressure is set on the air supply channel, which can issue an audible and visual alarm when the pressure is abnormal.

[0021] (2) By installing a reinforcing sleeve on the outside of the air supply pipe and the air supply branch pipe, the strength of the pipe can be improved, making it have better pressure resistance. By installing a wear-resistant inner pipe inside the air supply pipe and the air supply branch pipe, the impact resistance of the inner wall of the pipe can be improved and the wear caused by compressed air erosion can be reduced.

[0022] (3) The boiling pan is connected to the limestone powder bin through a breathable plate. The breathable plate is provided with a plurality of breathable holes to facilitate ventilation and prevent the limestone powder from entering the boiling pan. A sealing gasket is provided between the boiling pan and the limestone powder bin to enhance the sealing performance and avoid air leakage and limestone powder leakage. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] In order to more clearly illustrate the technical solution of the implementation mode of the utility model, the drawings required for use in the implementation mode will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the utility model and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without paying creative work.

[0024] Figure 1 This is a schematic diagram of the overall structure of the utility model desulfurization limestone powder silo boiling plate air supply device;

[0025] Figure 2 This is a front sectional structural diagram of the utility model desulfurization limestone powder silo boiling plate air supply device;

[0026] Figure 3 It is a schematic diagram of the planar structure of the boiling plate on the air supply device of the boiling plate in the desulfurization limestone powder silo of the utility model;

[0027] Figure 4 It is a schematic diagram of the internal structure of the boiling plate on the boiling plate air supply device of the desulfurization limestone powder silo of the utility model;

[0028] Figure 5The utility model is a diagram showing the internal structure of the air supply pipe on the air supply device of the boiling plate of the desulfurization limestone powder silo.

[0029] In the figure: 1. Limestone powder silo; 2. Boiling plate; 3. Air supply assembly; 4. Connecting pipe; 5. Diverter pipe; 6. Air pressure detector; 7. Sound and light alarm; 8. Feeding pipe; 9. Spiral feeder; 10. Air supply pipe; 11. Ball valve; 12. Air supply branch pipe; 13. Solenoid valve; 14. Breathable plate; 15. Breathing hole; 16. Fixing plate; 17. Fixing hole; 18. Sealing gasket; 19. Wear-resistant inner tube; 20. Reinforced sleeve; 21. Auxiliary filter; 22. Buckle; 23. Pressure relief valve. DETAILED DESCRIPTION

[0030] In order to make the purpose, technical solutions and advantages of the embodiments of the utility model clearer, the technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Therefore, the following detailed description of the embodiments of the utility model provided in the drawings is not intended to limit the scope of the utility model for which protection is sought, but merely represents the selected embodiments of the utility model. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.

[0031] This embodiment connects the limestone powder bin boiling pan through an air supply component, and sets an air supply pipe controlled by a manual ball valve and an air supply branch pipe controlled by an electromagnetic valve. According to the actual air supply needs, a suitable air supply channel can be selected for air supply, and the electromagnetic valve of the air supply branch pipe can be automatically started when the limestone powder bin is unloaded, avoiding the problem of increased pressure at the soft connection of the unloading port due to long-term air supply, damage to the connecting pipe, and waste of compressed air that easily causes dust. It improves the air supply effect of the limestone powder bin boiling pan and makes it easy to manage. At the same time, a safety warning component for monitoring the pipeline pressure is set on the air supply channel, which can issue an audible and visual alarm when the pressure is abnormal. The specific implementation method is as follows:

[0032] like Figures 1 to 5As shown, a desulfurized limestone powder silo boiling plate air supply device includes a boiling plate 2, an air supply component 3 and a safety warning component. The air supply component 3 is connected to a plurality of boiling plates 2, and the plurality of boiling plates 2 are evenly distributed on the outer wall of the limestone powder silo 1. The air supply component 3 includes a shunt pipe 5, an air supply pipe 10, an air supply branch pipe 12, a ball valve 11 and a solenoid valve 13. The bottom of the air supply pipe 10 is connected to the air supply branch pipe 12, and the air supply branch pipe 12 and the air supply pipe 10 are both connected to the shunt pipe 5. Ball valves 11 are respectively provided on the air supply branch pipe 12 and the air supply pipe 10. A solenoid valve 13 is provided on the air supply branch pipe 12 at a position next to the ball valve 11. A safety warning component is provided between the shunt pipe 5 and the plurality of boiling plates 2, and the safety warning component includes an air pressure detector 6 and an audible and visual alarm 7. The boiling pan 2 of the limestone powder silo 1 is connected through the air supply component 3, and an air supply pipe 10 controlled by a manual ball valve 11 and an air supply branch pipe 12 controlled by a solenoid valve 13 are set. According to the actual air supply needs, a suitable air supply channel can be selected for air supply, and the solenoid valve 13 of the air supply branch pipe 12 can be automatically started when the limestone powder silo 1 is unloaded, thereby avoiding the problem of increased pressure at the soft connection of the unloading port due to long-term air supply, damage to the connecting pipeline, and waste of compressed air that easily causes dust, thereby improving the air supply effect of the boiling pan 2 of the limestone powder silo 1 and making it easy to manage. At the same time, a safety warning component for monitoring the pipeline pressure is set on the air supply channel, which can emit an audible and visual alarm when the pressure is abnormal, and the air supply pipe 10 is connected to the compressed air source.

[0033] The shunt pipe 5 is connected to a plurality of boiling plates 2 through a plurality of connecting pipes 4. An air pressure detector 6 and an audible and visual alarm 7 are arranged on the front and rear outer walls of the connecting pipes 4. The air pressure detector 6 is connected to the audible and visual alarm 7. The air pressure detector 6 can monitor the internal pressure of the connecting pipe 4 and the entire air supply channel. When the pressure is abnormal, the audible and visual alarm 7 can send out an audible and visual alarm to remind the staff to deal with it in time.

[0034] A feeding pipe 8 is connected to the bottom of the limestone powder silo 1, and a spiral feeder 9 is arranged on the feeding pipe 8. The spiral feeder 9 is electrically connected to the solenoid valve 13. When the feeding pipe 8 is feeding, the spiral feeder 9 is started and the associated solenoid valve 13 is started, so that the air supply branch pipe 12 can be automatically controlled to realize rapid air supply. After the feeding is completed, the solenoid valve 13 is automatically closed to avoid the waste of compressed air.

[0035] A ventilation plate 14 is provided at the connection between the boiling pan 2 and the limestone powder bin 1, and a plurality of ventilation holes 15 are formed on the ventilation plate 14. The inner diameter of the ventilation hole 15 is smaller than the outer diameter of the limestone powder particles. The boiling pan 2 is connected to the limestone powder bin 1 through the ventilation plate 14. The ventilation holes 15 provided on the ventilation plate 14 can facilitate ventilation and prevent the limestone powder from entering the boiling pan 2, thereby preventing the limestone powder from damaging the air supply channel.

[0036] The outer wall of the air supply pipe 10 and the air supply branch pipe 12 is provided with a reinforcing sleeve 20, and the inner wall of the air supply pipe 10 and the air supply branch pipe 12 is provided with a wear-resistant inner pipe 19. By providing the reinforcing sleeve 20 on the outside of the air supply pipe 10 and the air supply branch pipe 12, the strength of the pipeline can be improved so that it has better pressure resistance and pressure bearing capacity. By providing the wear-resistant inner pipe 19 inside the air supply pipe 10 and the air supply branch pipe 12, the impact resistance of the inner wall of the pipeline can be improved and the wear caused by compressed air scouring can be reduced.

[0037] A sealing gasket 18 is provided between the boiling pan 2 and the limestone powder bin 1, and an auxiliary filter screen 21 is provided between the boiling pan 2 and the connecting pipe 4. The sealing gasket 18 provided between the boiling pan 2 and the limestone powder bin 1 can enhance the sealing performance to avoid air leakage and limestone powder leakage. The auxiliary filter screen 21 can perform secondary filtration to block the limestone powder.

[0038] A buckle 22 is provided on the outer edge of the air permeable plate 14, and a slot matching the buckle 22 is formed on the inner side of the boiling pan 2. The buckle 22 and the slot can make the air permeable plate 14 easy to disassemble and assemble, thereby facilitating its cleaning or replacement.

[0039] A pressure relief valve 23 is provided on the air supply pipe 10 before the air supply branch pipe 12. The pressure relief valve 23 is externally connected to a pressure relief pipeline. The pressure relief valve 23 can be used to relieve pressure when the pressure inside the air supply channel is too high, thereby improving the safety of the device.

[0040] A fixing plate 16 is provided on the side of the boiling pan 2 , and a plurality of fixing holes 17 are provided on the fixing plate 16 . Through the fixing plate 16 and the fixing holes 17 , the boiling pan 2 can be conveniently and tightly fixed on the limestone powder bin 1 by bolts.

[0041] The material of the reinforcing sleeve 20 is a reinforced steel plate, and the material of the wear-resistant inner tube 19 is a ceramic wear-resistant material.

[0042] Working principle: The limestone powder bin is unloaded through the unloading pipe and the spiral unloader arranged on the unloading pipe. When unloading, the limestone powder bin boiling plate is connected to the air supply component for air supply. The air supply component is provided with an air supply pipe controlled by a manual ball valve and an air supply branch pipe controlled by an electromagnetic valve. According to the actual air supply needs, a suitable air supply channel can be selected for air supply, and the solenoid valve of the air supply branch pipe can be automatically started when the unloading spiral unloader of the limestone powder bin is started, and closed when the spiral unloader stops, thereby automatically controlling the conduction of the air supply branch pipe, avoiding the problem of increased pressure at the soft connection of the unloading port caused by long-term air supply, damage to the connecting pipe, and waste of compressed air that easily causes dust, thereby improving the air supply effect of the boiling plate of the limestone powder bin and making it easy to manage. At the same time, A safety warning component for monitoring pipeline pressure is set up. The air supply pipeline can be monitored by an air pressure detector. When the pressure is abnormal, an audible and visual alarm will sound an audible and visual alarm to remind the staff to deal with it in time. The reinforcing sleeve arranged on the outside of the air supply pipe and the air supply branch pipe can improve the strength of the pipeline and make it have better pressure resistance. The wear-resistant inner pipe arranged inside the air supply pipe and the air supply branch pipe can improve the impact resistance of the inner wall of the pipeline and reduce the wear caused by compressed air scouring. The boiling plate is connected to the limestone powder bin through a breathable plate. A number of breathable holes are arranged on the breathable plate to facilitate ventilation and prevent limestone powder from entering the boiling plate. The sealing gasket arranged between the boiling plate and the limestone powder bin can enhance the sealing to avoid air leakage and leakage of limestone powder.

[0043] The above description is only the preferred implementation of the utility model, and is not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.

Claims

1. A desulfurization limestone powder silo boiling plate air supply device, characterized in that: The invention comprises a boiling pan (2), an air supply component (3) and a safety warning component, wherein the air supply component (3) is connected to a plurality of boiling pans (2), and the plurality of boiling pans (2) are evenly distributed on the outer wall of a limestone powder bin (1), and the air supply component (3) comprises a shunt pipe (5), an air supply pipe (10), an air supply branch pipe (12), a ball valve (11) and a solenoid valve (13), wherein the bottom of the air supply pipe (10) is connected to the air supply branch pipe (12), and the air supply branch pipe (11) is connected to the air supply branch pipe (12). The air supply branch pipe (12) and the air supply pipe (10) are both connected to the branch pipe (5), the air supply branch pipe (12) and the air supply pipe (10) are respectively provided with a ball valve (11), the air supply branch pipe (12) is provided with a solenoid valve (13) at a position beside the ball valve (11), and a safety warning component is provided between the branch pipe (5) and the plurality of boiling plates (2), the safety warning component comprising an air pressure detector (6) and an audible and visual alarm (7).

2. A desulfurization limestone powder silo boiling plate air supply device according to claim 1, characterized in that: The shunt pipe (5) is connected to a plurality of boiling pans (2) via a plurality of connecting pipes (4), the air pressure detector (6) and the sound and light alarm (7) are arranged on the outer wall of the connecting pipe (4) at the front and rear, and the air pressure detector (6) is connected to the sound and light alarm (7).

3. A desulfurization limestone powder silo boiling plate air supply device according to claim 1, characterized in that: The bottom of the limestone powder bin (1) is connected to a feed pipe (8), a spiral feeder (9) is arranged on the feed pipe (8), and the spiral feeder (9) is electrically connected to the solenoid valve (13).

4. A desulfurized limestone powder silo boiling plate air supply device according to claim 1, characterized in that: A ventilation plate (14) is provided at the connection between the boiling pan (2) and the limestone powder bin (1), and a plurality of ventilation holes (15) are formed on the ventilation plate (14).

5. The desulfurization limestone powder silo boiling plate air supply device according to claim 1 is characterized in that: The outer walls of the air supply pipe (10) and the air supply branch pipe (12) are sleeved with a reinforcing sleeve (20), and the inner walls of the air supply pipe (10) and the air supply branch pipe (12) are sleeved with a wear-resistant inner pipe (19).

6. A desulfurization limestone powder silo boiling plate air supply device according to claim 2, characterized in that: A sealing gasket (18) is provided between the boiling pan (2) and the limestone powder bin (1), and an auxiliary filter screen (21) is provided between the boiling pan (2) and the connecting pipe (4).

7. A desulfurized limestone powder silo boiling plate air supply device according to claim 4, characterized in that: A buckle (22) is provided on the outer edge of the air permeable plate (14), and a slot matching the buckle (22) is formed on the inner side of the boiling pan (2).

8. The desulfurization limestone powder silo boiling plate air supply device according to claim 1 is characterized in that: A pressure relief valve (23) is provided on the air supply pipe (10) before the air supply branch pipe (12), and the pressure relief valve (23) is externally connected to a pressure relief pipeline.

9. The desulfurization limestone powder silo boiling plate air supply device according to claim 1, characterized in that: A fixing plate (16) is arranged on the side of the boiling plate (2), and the fixing plate (16) is provided with a plurality of fixing holes (17).

10. The desulfurization limestone powder silo boiling plate air supply device according to claim 5, characterized in that: The material of the reinforcing sleeve (20) is a reinforced steel plate, and the material of the wear-resistant inner tube (19) is a ceramic wear-resistant material.