High-silicon alloy production device

By designing a movable storage frame and universal wheel in the high-silicon alloy production device and using cloth bag shields during transportation, the problem of scattering of raw stone dust is solved, and the safe transportation of materials and environmental cleaning is achieved.

CN222019703UActive Publication Date: 2024-11-19NINGBO HELANSHAN METALLURGY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420056639.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-10
Publication Date
2024-11-19
Estimated Expiration
2034-01-10

AI Technical Summary

Technical Problem

During the production process of high-silicon alloys, a large amount of dust adheres to the surface of the crushed raw stone material, causing dust to fall everywhere during long-distance transportation, affecting production efficiency and the environment.

Method used

A high silicon alloy production device is designed. By installing a storage frame and a universal wheel on the transport belt, the mobility of the storage frame is achieved by using the universal wheel and the return spring, and a cloth bag is covered during the transportation process to prevent dust from falling. , and at the same time, the fast limiting and extraction of storage frame are achieved through the movable cover plate and positioning insert rod to ensure safe transportation of materials.

Benefits of technology

It effectively prevents the scattering of dust in raw stone materials during transportation, improves the convenience of use and environmental sanitation of production equipment, and avoids dust pollution.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222019703U_ABST
    Figure CN222019703U_ABST
Patent Text Reader

Abstract

The utility model discloses a high-silicon alloy production device which comprises a supporting frame, a vibration crusher is installed on the supporting frame, a feeding port is arranged above the vibration crusher, and a conveying belt is installed at the lower end of the vibration crusher. A conveying belt is installed in a supporting frame, the conveying belt can move raw stones crushed by a vibration crusher to a material collecting bin, raw stone materials fall into the material collecting bin, then a movable storage frame is installed in the material collecting bin, the storage frame can drive universal wheels to enter the material collecting bin, and therefore the raw stones can be conveniently collected. When the raw stone materials need to be transported, the pull handle can be pulled to enable the storage frame to drive the universal wheels to be pulled out of the material receiving bin, and in the transportation process of the storage frame, the top of the storage frame can be covered with shielding objects such as a cloth bag, so that the storage frame is convenient to transport. The raw stone materials are directly prevented from being exposed to the outside for a long time in the transportation process, and therefore dust is effectively prevented from being scattered in the transportation process of the raw stone materials.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of high-silicon alloy production equipment, in particular to a high-silicon alloy production device. Background Art

[0002] High silicon alloy is an alloy composed of silicon, iron, dolomite and other raw materials. It is an alloy with a wide range of uses and a large output. In the production process of high silicon alloy, the raw material needs to be crushed, ground and screened. The existing high silicon alloy production equipment can basically meet the above-mentioned usage requirements, but there are still some shortcomings that need to be improved.

[0003] Most of the high-silicon alloy production devices widely used on the market need to be used with a vibration crusher to ensure that the size of the crushed raw stone materials is as consistent as possible, so as to facilitate the control of the heating time of the raw stone. However, in actual use, due to the large amount of dust adhering to the surface of the crushed raw stone materials, it is easy to cause dust to float everywhere when transported on a long-distance conveyor belt. For this reason, we propose a high-silicon alloy production device to solve the above problem. Utility Model Content

[0004] The purpose of the utility model is to provide a high silicon alloy production device to solve the problems raised in the above background technology.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a high-silicon alloy production device, including a support frame, a vibration crusher is installed on the support frame, a feed port is arranged above the vibration crusher, a conveyor belt is installed at the lower end of the vibration crusher, a material receiving bin is installed below the conveyor belt, two sets of guide grooves are provided at the bottom of the material receiving bin, a storage frame is provided in the material receiving bin, universal wheels are installed at the four corners of the bottom end of the storage frame, the storage frame can drive the universal wheels to pass through the guide grooves, a handle is installed on the left outer wall of the storage frame, positioning blocks are installed on the front and rear sides of the left end of the storage frame, and a positioning assembly is installed on the left side of the support frame.

[0006] As a further preferred embodiment of the present technical solution, two groups of guide slide rods are installed on the front and rear sides of the left end of the support frame, and movable sleeve plates are arranged on the outside of the guide slide rods. Guide slide holes are opened on the movable sleeve plates, and the guide slide rods pass through the guide slide holes on the movable sleeve plates. Top plates are installed on the ends of the guide slide rods, and positioning rods are installed on the opposite ends of the left sides of the two groups of movable sleeve plates. Handles are installed on the opposite ends of the left sides of the two groups of movable sleeve plates, and sockets are opened on the two groups of positioning blocks. The opposite ends of the two groups of positioning rods can be inserted into the sockets on the positioning blocks, and return springs are wound around the outside of the guide slide rods.

[0007] As a further preferred embodiment of the present technical solution, the inner wall of the storage frame is polished.

[0008] As a further preferred embodiment of the present technical solution, the height of the positioning rod is the same as the height of the insertion hole on the positioning block, and the outer wall of the positioning rod can fully fit with the inner wall of the insertion hole.

[0009] As a further preferred embodiment of the present technical solution, the diameter of the guide slide rod is the same as the diameter of the guide slide hole on the movable sleeve plate, and the movable sleeve plate is slidably connected with the guide slide rod through the guide slide hole.

[0010] As a further preferred embodiment of the present technical solution, the outer walls of the two groups of handles are both ground.

[0011] As a further preferred embodiment of the present technical solution, two ends of the return spring are respectively connected to the outer wall of the movable sleeve plate and the outer wall of the top plate, and the movable sleeve plate is elastically connected to the top plate through the return spring.

[0012] The utility model provides a high silicon alloy production device, which has the following beneficial effects:

[0013] 1. The utility model installs a conveyor belt inside the support frame so that the conveyor belt can move the raw stones crushed by the vibration crusher to the receiving bin, allowing the raw stone materials to fall into the receiving bin, and then installs a movable storage frame in the receiving bin so that the storage frame can drive the universal wheels to enter the receiving bin and allow the storage frame to store the raw stone materials that fall into the receiving bin. When the raw stone materials need to be transported, the handle can be pulled to allow the storage frame to drive the universal wheels to be pulled out of the receiving bin, and during the transportation of the storage frame, a cloth bag or other covering material can be placed on the top of the storage frame, which directly avoids the raw stone materials from being exposed to the outside for a long time during transportation, thereby effectively preventing the raw stone materials from scattering dust during transportation.

[0014] 2. The utility model installs a transversely movable sleeve plate on the left side of the support frame, and positioning rods are installed on both sets of movable sleeve plates. When the storage frame is pushed into the material receiving bin, the return spring outside the guide slide bar releases the elastic force to push the two sets of movable sleeve plates to move towards each other, so that the two sets of movable sleeve plates drive the two sets of positioning rods to quickly insert into the sockets on the positioning blocks, so that the two sets of positioning rods can quickly form or release the movable limiting effect on the storage frame, avoiding the storage frame from accidentally detaching from the material receiving bin, and improving the convenience of the device when used. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;

[0016] Figure 2 This is a schematic diagram of the structure of the utility model when viewed from above;

[0017] Figure 3 It is a schematic diagram of the structure of the active state of the utility model;

[0018] Figure 4 For the utility model Figure 1 A is an enlarged structural diagram of FIG.

[0019] In the figure: 1. support frame; 2. vibration crusher; 3. feed port; 4. conveyor belt; 5. material collecting bin; 6. guide groove; 7. storage frame; 8. universal wheel; 9. pull handle; 10. guide slide bar; 11. movable sleeve plate; 12. guide slide hole; 13. top plate; 14. positioning rod; 15. grip; 16. positioning block; 17. socket; 18. reset spring. DETAILED DESCRIPTION

[0020] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0021] The utility model provides a technical solution: Figures 1 to 4 As shown, in the present embodiment, a high silicon alloy production device comprises a support frame 1, a vibration crusher 2 is installed on the support frame 1, a feed port 3 is arranged above the vibration crusher 2, a conveyor belt 4 is installed at the lower end of the vibration crusher 2, a material receiving bin 5 is installed below the conveyor belt 4, two groups of guide grooves 6 are provided at the bottom of the material receiving bin 5, a storage frame 7 is arranged in the material receiving bin 5, universal wheels 8 are installed at the four corners of the bottom end of the storage frame 7, the storage frame 7 can drive the universal wheels 8 to pass through the guide grooves 6, a handle 9 is installed on the left outer wall of the storage frame 7, positioning blocks 16 are installed on the front and rear sides of the left end of the storage frame 7, and a positioning component is installed on the left side of the support frame 1.

[0022] By installing the conveyor belt 4 inside the support frame 1, the conveyor belt 4 can move the raw stone crushed by the vibration crusher 2 to the receiving bin 5, and the raw stone material can fall into the receiving bin 5. Then, by installing a movable storage frame 7 in the receiving bin 5, the storage frame 7 can drive the universal wheel 8 to enter the receiving bin 5, and the storage frame 7 can store the raw stone material that falls into the receiving bin 5. When the raw stone material needs to be transported, the handle 9 can be pulled to allow the storage frame 7 to drive the universal wheel 8 to be pulled out of the receiving bin 5. During the transportation of the storage frame 7, a cloth bag or other covering material can be covered on the top of the storage frame 7, which directly avoids the raw stone material from being exposed to the outside for a long time during transportation, thereby effectively preventing the raw stone material from scattering dust during transportation.

[0023] In other embodiments, two sets of guide slide bars 10 are installed on both sides of the left end of the support frame 1, and movable sleeve plates 11 are arranged on the outside of the guide slide bars 10. The movable sleeve plates 11 are provided with guide slide holes 12, and the guide slide bars 10 pass through the guide slide holes 12 on the movable sleeve plates 11. Top plates 13 are installed at the ends of the guide slide bars 10. Positioning plug rods 14 are installed on the opposite ends of the left sides of the two sets of movable sleeve plates 11. Handles 15 are installed on the opposite ends of the left sides of the two sets of movable sleeve plates 11. Plug holes 17 are opened on the two sets of positioning blocks 16. The opposite ends of the two sets of positioning plug rods 14 can be inserted into the plug holes 17 on the positioning blocks 16. Reset springs 18 are wound around the outside of the guide slide bars 10.

[0024] By installing a movable sleeve plate 11 that can be moved laterally on the left side of the support frame 1, and installing positioning rods 14 on both sets of movable sleeve plates 11, when it is necessary to pull out the storage frame 7 in the receiving bin 5, the two sets of handles 15 can be pulled to allow the two sets of movable sleeve plates 11 to drive the positioning rods 14 to slide along the outside of the guide slide bar 10, and the return spring 18 on the outside of the guide slide bar 10 is squeezed and deformed by the movable sleeve plate 11 to store force. When the two sets of movable sleeve plates 11 drive the two sets of positioning rods 14 to completely leave the inside of the socket 17 on the positioning block 16, the two sets of positioning rods 14 can release the activity of the positioning block 16. The limiting effect can be achieved by pulling the handle 9 and then pulling the storage frame 7 out of the material receiving bin 5. When the storage frame 7 is pushed into the material receiving bin 5, the pulling force on the two sets of handles 15 can be released, allowing the return spring 18 outside the guide slide bar 10 to release the elastic force to push the two sets of movable sleeves 11 to move towards each other, allowing the two sets of movable sleeves 11 to drive the two sets of positioning rods 14 to quickly insert into the sockets 17 on the positioning blocks 16, so that the two sets of positioning rods 14 can quickly form or release the movable limiting effect on the storage frame 7, avoiding the storage frame 7 from accidentally detaching from the material receiving bin 5, thereby improving the convenience of the device when used.

[0025] In other embodiments, the inner wall of the storage frame 7 is polished;

[0026] Through this design, the adhesion between the inside of the storage frame 7 and the raw stone material can be effectively reduced, making it easier to discharge the raw stone material in the storage frame 7.

[0027] In other embodiments, the height of the positioning rod 14 is the same as the height of the insertion hole 17 on the positioning block 16, and the outer wall of the positioning rod 14 can fully fit with the inner wall of the insertion hole 17;

[0028] This design ensures that the two groups of positioning rods 14 can be accurately inserted into the insertion holes 17 on the positioning block 16 , while preventing the positioning rods 14 from shaking in the insertion holes 17 .

[0029] In other embodiments, the diameter of the guide slide rod 10 is the same as the diameter of the guide slide hole 12 on the movable sleeve plate 11, and the movable sleeve plate 11 forms a sliding connection with the guide slide rod 10 through the guide slide hole 12;

[0030] Through this design, the movable sleeve plate 11 can drive the guide sliding hole 12 to slide smoothly and quickly along the surface of the guide sliding rod 10, thereby improving the stability of the device during use.

[0031] In other embodiments, the outer walls of the two sets of handles 15 are both polished;

[0032] Through this design, when the two sets of handles 15 need to be pulled, the friction between the two sets of handles 15 and the hands can be effectively increased, thereby facilitating the effective pulling of the two sets of handles 15.

[0033] In other embodiments, the two ends of the return spring 18 are respectively connected to the outer wall of the movable sleeve plate 11 and the outer wall of the top plate 13, and the movable sleeve plate 11 is elastically connected to the top plate 13 through the return spring 18;

[0034] With this design, the return spring 18 outside the guide slide rod 10 applies a continuous elastic force to the movable sleeve 11 toward the storage frame 7, so that the movable sleeve 11 can drive the positioning rod 14 to quickly insert into the socket 17 on the positioning block 16.

[0035] The electrical components mentioned in this article are all connected to an external main controller and industrial power supply, and the main controller can be a conventional known device for control such as a computer.

[0036] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A high silicon alloy production device, comprising a support frame (1), a vibration crusher (2) is installed on the support frame (1), a feed inlet (3) is arranged above the vibration crusher (2), and the device is characterized in that: A conveyor belt (4) is installed at the lower end of the vibration crusher (2), and a material receiving bin (5) is installed below the conveyor belt (4). Two sets of guide grooves (6) are provided at the bottom of the material receiving bin (5). A storage frame (7) is provided in the material receiving bin (5). Universal wheels (8) are installed at the four corners of the bottom of the storage frame (7). The storage frame (7) can drive the universal wheels (8) to pass through the guide grooves (6). A handle (9) is installed on the left outer wall of the storage frame (7). Positioning blocks (16) are installed on both the front and rear sides of the left end of the storage frame (7), and a positioning component is installed on the left side of the support frame (1).

2. A high silicon alloy production device according to claim 1, characterized in that: Two groups of guide slide bars (10) are installed on both the front and rear sides of the left end of the support frame (1), and the guide slide bars (10) are provided with movable sleeves (11) on the outside, and the movable sleeves (11) are provided with guide slide holes (12). The guide slide bars (10) penetrate the guide slide holes (12) on the movable sleeves (11), and the ends of the guide slide bars (10) are installed with top plates (13). The left opposite ends of the two groups of movable sleeves (11) are installed with positioning rods (14), and the left opposite ends of the two groups of movable sleeves (11) are installed with handles (15). The two groups of positioning blocks (16) are provided with insertion holes (17), and the opposite ends of the two groups of positioning rods (14) can be inserted into the insertion holes (17) on the positioning blocks (16). The guide slide bars (10) are wound with return springs (18) on the outside.

3. A high silicon alloy production device according to claim 1, characterized in that: The inner wall of the storage frame (7) is polished.

4. A high silicon alloy production device according to claim 2, characterized in that: The height of the positioning rod (14) is the same as the height of the insertion hole (17) on the positioning block (16), and the outer wall of the positioning rod (14) can be fully fitted with the inner wall of the insertion hole (17).

5. A high silicon alloy production device according to claim 2, characterized in that: The diameter of the guide slide rod (10) is the same as the diameter of the guide slide hole (12) on the movable sleeve plate (11), and the movable sleeve plate (11) is slidably connected to the guide slide rod (10) via the guide slide hole (12).

6. A high silicon alloy production device according to claim 2, characterized in that: The outer walls of the two sets of handles (15) are both ground.

7. A high silicon alloy production device according to claim 2, characterized in that: The two ends of the return spring (18) are respectively connected to the outer wall of the movable sleeve (11) and the outer wall of the top plate (13); the movable sleeve (11) is elastically connected to the top plate (13) via the return spring (18).