Overwater construction platform

By setting up scaffolding around the floating platform and utilizing the floating bridge area, the problem of high tower construction costs in marshy terrain was solved, achieving the effects of a stable working area and convenient passage.

CN222022850UInactive Publication Date: 2024-11-19HUNAN PROVINCIAL TRANSMISSION & DISTRIBUTION ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420860576.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-23
Publication Date
2024-11-19
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

When constructing towers in marshy terrain, existing technologies suffer from high construction costs, long construction periods, and are not suitable for shallow water environments.

Method used

Design a floating construction platform that uses scaffolding around the platform for restraint to ensure its stability while floating in the water, and utilizes a floating bridge area to facilitate personnel access and reduce construction costs.

Benefits of technology

It enabled the formation of a stable working area in the marshland, reduced construction costs, met the needs of tower erection, and facilitated the passage of personnel and materials.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222022850U_ABST
    Figure CN222022850U_ABST
Patent Text Reader

Abstract

The utility model discloses an overwater construction platform, which belongs to the technical field of power transmission tower construction, and comprises a floating body platform and scaffolds, the scaffolds are arranged on the periphery of the floating body platform, the scaffolds are set up at the water bottom, the scaffolds are abutted against the floating body platform, the floating body platform comprises a working area and a floating bridge area, and the working area is provided with a floating bridge. The working area is provided with a tower body space for an iron tower to pass through, and the floating bridge area is connected with the working area and the ground. The floating body platform is limited through the scaffold, the floating stability of the floating body platform in water is guaranteed, the construction cost for limiting and fixing the floating body platform is reduced, the floating body platform can form a working area in the mire terrain, meanwhile, the floating bridge area is used for facilitating passing of personnel, and the requirement for tower assembling construction is met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of power transmission iron tower construction, in particular to an above-water construction platform. Background Art

[0002] In the construction of transmission line towers in muddy terrain such as paddy fields, ponds, fish ponds, and shrimp ponds, the traditional construction method is generally adopted, that is, the plan of first cofferdam pumping and then tower construction. This construction plan has certain disadvantages: on the one hand, the cofferdam construction still faces the threat of rising water brought by the rainy season; on the other hand, the rental costs of the generated pumping equipment, small excavators, etc. are high, and the construction period of each cofferdam is long.

[0003] Since the water in swamp terrain is relatively shallow, which is obviously different from rivers, lakes and seas, the steel pontoons used in deeper waters are not suitable for shallow paddy fields, ponds, fish ponds, shrimp ponds and other swamp terrains. Moreover, the construction cost is too high and it is not suitable for the demand for tower construction in small swamp terrains.

[0004] Therefore, how to carry out tower assembly operations in muddy terrain and complete the construction of tower assembly at low cost is a technical problem faced by those skilled in the art. Utility Model Content

[0005] The purpose of the utility model is to provide an above-water construction platform to solve the problems existing in the above-mentioned prior art. The floating platform is limited by a scaffold to ensure the stability of the floating platform floating in the water, thereby reducing the construction cost of limiting and fixing the floating platform. The floating platform can form a working area in the muddy terrain, and the floating bridge area is used to facilitate the passage of personnel, thereby meeting the needs of tower assembly construction.

[0006] To achieve the above purpose, the utility model provides the following solutions:

[0007] The utility model provides an above-water construction platform, comprising a floating platform and a scaffolding, wherein the scaffolding is arranged around the floating platform, the scaffolding is built on the bottom of the water, the scaffolding abuts against the floating platform, the floating platform comprises a working area and a floating bridge area, the working area is provided with a tower body space for an iron tower to pass through, and the floating bridge area connects the working area and the ground.

[0008] Preferably, the working area includes a tower material splicing area and a walking area connected to the tower material splicing area, the tower material splicing area and the walking area form a ring-shaped working area, and the middle part of the ring is the tower body space.

[0009] Preferably, the distance between the boundary of the tower material splicing area and the tower body space is greater than the distance between the boundary of the walking area and the tower body space.

[0010] Preferably, the floating bridge area is vertically arranged to the ground road, or the floating bridge area and the ground road have an angle other than 90 degrees.

[0011] Preferably, the scaffolding includes vertical poles, cross poles and struts, the floating platform abuts the vertical poles, the vertical poles are vertically inserted into the bottom of the water, the cross poles are horizontally connected to the vertical poles, the struts are installed obliquely as a whole, the top ends of the struts are connected to the cross poles or the vertical poles, and the bottom ends of the struts are inserted into the bottom of the water.

[0012] Preferably, the vertical pole is higher than the floating platform, the cross bar is arranged at a portion of the vertical pole that is higher than the floating platform, and the cross bar and the vertical pole that is higher than the floating platform serve as a fence.

[0013] Preferably, it also includes an anchoring device, the floating platform is a rectangular platform, at least three corners of the rectangular platform are anchored by the anchoring device, the anchoring device includes an anchor chain and an anchor pile, one end of the anchor chain is connected to the floating platform, and the other end of the anchor chain is connected to the anchor pile, and the anchor pile is fixed on the ground or the bottom of the water. When fixed on the bottom of the water, the anchor pile adopts a Hall anchor.

[0014] Preferably, the floating platform comprises a single-body pontoon, and ear plates are provided at four corners of the single-body pontoon, and different single-body pontoons are connected via the ear plates.

[0015] Preferably, the positions of the ear plates in the height direction of the monofloating vessel are different, and the connection of two ear plates, the connection of three ear plates and the connection of four ear plates respectively use gaskets of different thicknesses.

[0016] Preferably, the top of the single pontoon is provided with an anti-slip protrusion, and the corner recesses of the different single pontoons are provided with a blocking pin, or the top of the floating platform is paved with a scaffolding board.

[0017] Compared with the prior art, the utility model has achieved the following technical effects:

[0018] The utility model provides a scaffolding around the floating platform, and the scaffolding is fixed to the bottom of the water. The floating platform is limited by the scaffolding to ensure the stability of the floating platform floating in the water, which reduces the construction cost of limiting and fixing the floating platform, and enables the floating platform to form a working area in the muddy terrain. At the same time, the working area is connected to the ground through the floating bridge area, which is convenient for construction personnel to enter and exit, thereby meeting the needs of tower assembly construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0020] Figure 1 It is a top view of the utility model;

[0021] Figure 2 This is a schematic diagram of the floating platform partition;

[0022] Figure 3 It is a side view of the utility model;

[0023] Figure 4 It is a top view of the single pontoon;

[0024] Figure 5 This is a schematic diagram of the assembly of a single pontoon;

[0025] Among them, 1. floating platform; 11. working area; 111. tower material splicing area; 112. walking area; 12. floating bridge area; 13. tower body space; 2. scaffolding; 21. vertical pole; 22. horizontal pole; 23. strut; 3. single pontoon; 31. anti-slip protrusion; 32. ear plate; 4. anchoring device; 5. scaffolding board; 6. sealing pin; 7. bolt; 8. thick gasket; 9. thin gasket; 10. iron tower; 20. ground road. DETAILED DESCRIPTION

[0026] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0027] The purpose of the utility model is to provide an above-water construction platform to solve the problems existing in the prior art. The floating platform is limited by a scaffold to ensure the stability of the floating platform floating in the water, thereby reducing the construction cost of limiting and fixing the floating platform. The floating platform can form a working area in a muddy terrain, and the floating bridge area is used to facilitate the passage of personnel, thereby meeting the needs of tower assembly construction.

[0028] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0029] like Figures 1 to 5 As shown, the utility model provides an above-water construction platform, including a floating platform 1 and a scaffolding 2. The floating platform 1 can be formed by splicing a plurality of small floating units, which are connected and fixed to each other. A corresponding number of floating units are used according to the requirements of the construction site. The floating units can adopt small floating structures such as single pontoons 3 and pontoons, which can be suitable for shallow water environments with swampy terrain. Because the floating platform 1 may float and move in the water, it can be limited by the scaffolding 2. Specifically, the scaffolding 2 is arranged around the floating platform 1. Since it is in a shallow water environment, the scaffolding 2 can be directly built on the bottom of the water. By abutting the floating platform 1 with the scaffolding 2, the floating platform 1 can be limited and fixed in the water by the scaffolding 2. The floating platform 1 includes a work area 11 and a floating bridge area 12. The work area 11 is used as a site for tower material operation and construction. A tower body space 13 for the iron tower 10 to pass through is provided inside the work area 11. That is, the work area 11 is surrounded by the outer periphery of the tower body space 13, which is convenient for construction of the iron tower 10. The floating bridge area 12 connects the work area 11 and the ground, enabling personnel to pass between the ground and the work area 11, thereby ensuring the convenience of construction.

[0030] The utility model is provided with a scaffolding 2 around the floating platform 1, and the scaffolding 2 is fixed to the bottom of the water. The floating platform 1 is limited by the scaffolding 2 to ensure the stability of the floating platform 1 floating in the water, and the construction cost of limiting and fixing the floating platform 1 is reduced. The floating platform 1 can form a working area 11 in the muddy terrain. At the same time, the working area 11 is connected to the ground through the floating bridge area 12, which is convenient for construction personnel to enter and exit, thereby meeting the needs of tower assembly construction.

[0031] like Figure 2 As shown, the working area 11 includes a tower material splicing area 111 and a walking area 112 connected to the tower material splicing area 111, wherein the tower material splicing area 111 is mainly used for splicing and hoisting of tower materials, and the walking area 112 is mainly used for personnel to travel between different tower material splicing areas 111. Generally, two tower material splicing areas 111 are relatively arranged around the iron tower 10 to meet the construction needs. The tower material splicing area 111 and the walking area 112 form a ring-shaped working area 11, which is convenient for the passage of personnel and the transportation of tower materials. The middle part of the ring of the working area 11 is the tower body space 13.

[0032] Furthermore, the distance between the boundary of the tower material splicing area 111 and the tower body space 13 is greater than the distance between the boundary of the walking area 112 and the tower body space 13. That is to say, the effective area of ​​the tower material splicing area 111 can be set larger than the effective area of ​​the walking area 112, thereby reducing the manpower and material resources consumed in the overlapping of the floating platform 1 while meeting the construction requirements.

[0033] The floating platform 1 is generally set according to the orientation of the tower 10. When the tower 10 has four main foundations, the four main foundations can form a rectangular area. The floating platform 1 is set around the rectangular area parallel to the four sides of the rectangular area. At this time, the periphery of the floating platform 1 may not be parallel to the ground road 20 on the corresponding side. However, sometimes in order to reduce the distance between the floating platform 1 and the ground road 20, it is also possible to consider changing the orientation of the main foundation of the tower 10 to change the setting method of the floating platform 1. The floating bridge area 12 serves as a passage connecting the working area 11 of the floating platform 1 and the ground. The floating bridge area 12 can be set perpendicular to the ground road 20, or it can have a non-90-degree angle with the ground road 20. When there is a Figure 1 At the angle shown, if personnel and transport vehicles enter the working area 11 from the left side of the ground road 20 via the floating bridge area 12, the turning radius can be reduced, making it easier for personnel and vehicles to enter the floating platform 1.

[0034] like Figure 3 As shown, the scaffolding 2 includes vertical poles 21, cross bars 22 and struts 23. The floating platform 1 abuts against the vertical poles 21. The two can be tied and fixed, or just in contact. Because the scaffolding 2 is arranged on the periphery of the floating platform 1, the floating platform 1 can be limited and blocked. The vertical poles 21 are vertically inserted into the bottom of the water, directly inserted into the bottom mud or fixed on the bottom base; the cross bars 22 are horizontally connected to the vertical poles 21, and one or more layers of cross bars 22 can be arranged in the length direction of the vertical poles 21; the struts 23 are installed obliquely as a whole, the top of the struts 23 are connected to the cross bars 22 or the vertical poles 21, and the bottom of the struts 23 are inserted into the bottom of the water. Similarly, they can be directly inserted into the bottom mud or fixed on the bottom base. The struts 23 support the floating platform 1, providing the scaffolding 2 with a more stable support force for the floating platform 1.

[0035] Furthermore, the vertical pole 21 is higher than the floating platform 1, and the cross bar 22 is arranged at the part of the vertical pole 21 higher than the floating platform 1, so that the cross bar 22 and the vertical pole 21 higher than the floating platform 1 can be used as a fence, which can protect the personnel and tower materials on the floating platform 1 and prevent them from falling into the water.

[0036] It can also include an anchoring device 4. The floating platform 1 is a rectangular platform arranged around the iron tower 10. At least three corners of the rectangular platform are anchored by the anchoring device 4 to effectively fix the floating platform 1. The anchoring device 4 and the scaffolding 2 can jointly support and limit the position of the floating platform 1. The anchoring device 4 includes an anchor chain and an anchor pile. One end of the anchor chain is connected to the floating platform 1, and the other end of the anchor chain is connected to the anchor pile. The position of the anchor pile can be reasonably selected and set according to the actual construction site conditions. For example, the anchor pile can be fixed on the ground or on the bottom of the water. The two anchoring methods can be used alone or in combination. When fixed on the bottom of the water, the anchor pile can adopt the structure of a Hall anchor.

[0037] Combination Figure 4 and Figure 5 As shown, the floating platform 1 includes a single pontoon 3, which is hollow inside and can float on the surface of the water body. Ear plates 32 are arranged at the four corners of the single pontoon 3, and the ear plates 32 have mounting holes. The ear plates 32 of different single pontoons 3 are stacked up and down, and the connection of different ear plates 32 is achieved by passing bolts 7 through the mounting holes of the ear plates 32, so that different single pontoons 3 can be extended around the single pontoon 3 to form a wider floating platform 1.

[0038] The positions of the ear plates 32 in the height direction of the single-body pontoon 3 are different, so that the tops of the single-body pontoons 3 can be kept in the same horizontal plane after connecting different single-body pontoons 3. In order to ensure the stability of the single-body pontoons 3 after connecting different single-body pontoons 3, gaskets of different thicknesses can be used. For example, a thick gasket 8 can be used to connect two ear plates 32, and a thin gasket 9 can be used to connect three ear plates 32 or four ear plates 32.

[0039] like Figure 3 and Figure 4 As shown, the top of the single pontoon 3 may be provided with an anti-skid protrusion 31, which may be in the shape of a circular protrusion or a rectangular protrusion, and the corner depressions of different single pontoons 3 may be provided with a blocking pin 6, which can provide a flatter floating platform 1. The top of the floating platform 1 may also be paved with a scaffolding board 5, which can be used to prevent slipping and remove depressions, and provide a flat and stable floating platform 1.

[0040] The present invention uses specific examples to illustrate the principle and implementation of the present invention. The above examples are only used to help understand the method and core idea of ​​the present invention. At the same time, for those skilled in the art, according to the idea of ​​the present invention, there will be changes in the specific implementation and application scope. In summary, the content of this specification should not be understood as limiting the present invention.

Claims

1. An above-water construction platform, characterized in that: It includes a floating platform and a scaffolding. The scaffolding is arranged around the floating platform, the scaffolding is built on the bottom of the water, and the scaffolding abuts against the floating platform. The floating platform includes a working area and a floating bridge area. The working area is provided with a tower body space for the iron tower to pass through, and the floating bridge area connects the working area and the ground.

2. The above-water construction platform according to claim 1, characterized in that: The working area includes a tower material splicing area and a walking area connected to the tower material splicing area. The tower material splicing area and the walking area form a ring-shaped working area, and the middle part of the ring is the tower body space.

3. The above-water construction platform according to claim 2, characterized in that: The distance between the boundary of the tower material splicing area and the tower body space is greater than the distance between the boundary of the walking area and the tower body space.

4. The above-water construction platform according to claim 1, characterized in that: The floating bridge area is vertically arranged with respect to the ground road, or the floating bridge area and the ground road have an angle other than 90 degrees.

5. The above-water construction platform according to claim 1, characterized in that: The scaffolding includes vertical poles, horizontal poles and struts. The floating platform abuts against the vertical poles. The vertical poles are vertically inserted into the bottom of the water. The horizontal poles are horizontally connected to the vertical poles. The struts are installed obliquely as a whole. The top ends of the struts are connected to the horizontal poles or the vertical poles, and the bottom ends of the struts are inserted into the bottom of the water.

6. The above-water construction platform according to claim 5, characterized in that: The vertical pole is higher than the floating platform, the cross bar is arranged at a portion of the vertical pole that is higher than the floating platform, and the cross bar and the vertical pole that is higher than the floating platform serve as a fence.

7. The above-water construction platform according to claim 1, characterized in that: It also includes an anchoring device, the floating platform is a rectangular platform, at least three corners of the rectangular platform are anchored by the anchoring device, the anchoring device includes an anchor chain and an anchor pile, one end of the anchor chain is connected to the floating platform, and the other end of the anchor chain is connected to the anchor pile, the anchor pile is fixed on the ground or the bottom of the water, and when fixed on the bottom of the water, the anchor pile adopts a Hall anchor.

8. The above-water construction platform according to claim 1, characterized in that: The floating platform includes a single pontoon, and ear plates are arranged at four corners of the single pontoon, and different single pontoons are connected through the ear plates.

9. The above-water construction platform according to claim 8, characterized in that: The positions of the ear plates in the height direction of the monofloat are different, and the connection of two ear plates, the connection of three ear plates and the connection of four ear plates respectively use gaskets of different thicknesses.

10. The above-water construction platform according to claim 8, characterized in that: The top of the single buoy is provided with an anti-slip protrusion, and the corner depressions of different single buoys are provided with blocking pins, or the top of the floating platform is paved with a scaffolding board.