Hanging type membrane filtration and precipitation device and integrated system
By setting up a hanging membrane filtration precipitation device in the MBR membrane bioreactor, the sludge is precipitated by inclined pipe assembly, the transmembrane pressure difference caused by sludge aggregation is solved, the membrane cleaning frequency is reduced, and the sewage treatment efficiency is improved. Facilities utilization.
Patent Information
- Application Number
- CN202420272225.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-04
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2034-02-04
AI Technical Summary
In MBR membrane bioreactors, the lack of a precipitation tank causes sludge to accumulate around the membrane, increasing the transmembrane pressure difference, and frequently requiring membrane cleaning, affecting working efficiency.
A hanging membrane filtration precipitation device is designed, including a bracket, mud collector, inclined tube assembly and membrane filtration assembly. The sludge is precipitated through the inclined tube assembly to reduce the pollution of the sewage on the membrane and alleviate the transmembrane pressure difference. It is set in In the sedimentation tank, an integrated system is combined with a micro-oxygen tank, an anaerobic tank, a sedimentation tank and a clean water tank to achieve effective sedimentation and filtration of sewage.
It effectively reduces the frequency of the medicinal washing of the membrane filtration module, extends the service life of the membrane, improves the efficiency of sewage treatment, and reduces the floor area of the facility.
Smart Images

Figure CN222024181U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of sewage treatment, and in particular to a hanging membrane filtration sedimentation device and an integrated system. Background Art
[0002] MBR membrane bioreactor (Membrane Bio-Reactor, MBR) is a new type of wastewater treatment system that organically combines membrane separation technology with biological treatment technology. The membrane components replace the terminal secondary sedimentation tank of traditional biological treatment technology, maintain a high concentration of activated sludge in the bioreactor, increase the organic load of biological treatment, thereby reducing the footprint of sewage treatment facilities, and reducing the amount of residual sludge by maintaining a low sludge load. It mainly uses the activated sludge and macromolecular organic matter in the interception tank of the membrane separation equipment immersed in the aerobic biological pool. The concentration of activated sludge (MLSS) in the membrane bioreactor system can be increased to 8000~10,000mg / L, or even higher; the sludge age (SRT) can be extended to more than 30 days.
[0003] In sewage treatment, the MBR membrane process organically combines biological methods and membrane technology to produce water through membrane filtration of microporous membranes, and replaces traditional sedimentation tanks and filtration tanks with membrane pools, greatly reducing the footprint of the pool.
[0004] However, without a sedimentation tank, a large amount of sludge tends to gather around the membrane, increasing the transmembrane pressure difference during membrane filtration. When the pressure difference reaches a certain level, the membrane will stop producing water for chemical washing, and the chemical washing will be more frequent, seriously affecting work efficiency. Utility Model Content
[0005] The utility model aims to avoid the shortcomings of the prior art and provide a sewage treatment technology capable of reducing the frequency of MBR membrane cleaning.
[0006] The purpose of the utility model is achieved through the following technical solutions:
[0007] According to one aspect of the present application, a hanging membrane filtration sedimentation device is provided, which is arranged in a sedimentation tank and includes: a bracket, a mud collecting bucket, an inclined tube assembly and a plurality of membrane filtration assemblies; the top of the membrane filtration assembly is fixedly connected to the top of the bracket; the mud collecting bucket is arranged at the lower part of the bracket; the inclined tube assembly is fixedly arranged at a position between the membrane filtration assembly and the mud collecting bucket.
[0008] Specifically, the inclined tube assembly is a rectangular structure and includes a plurality of evenly distributed inclined holes.
[0009] The above also includes: a partition, the partition is used to form a compartment in the sedimentation tank; the compartment is arranged on one side of the partition, and the inclined tube assembly and the membrane filtration assembly are arranged on the other side of the partition.
[0010] More specifically, a crossbeam and a grid plate are also provided on the top of the bracket; the membrane filtration assembly is fixedly connected to the crossbeam via a mounting plate.
[0011] According to another aspect of the present application, an integrated system is provided, comprising: a box body; the box body comprises a micro-aerobic tank, an anaerobic tank, a sedimentation tank and a clean water tank arranged in sequence; the sedimentation tank is equipped with the above-mentioned hanging membrane filtration sedimentation device.
[0012] Specifically, the microaerobic tank is provided with a first overflow pipe; one end of the first overflow pipe is arranged at the upper part of the microaerobic tank, and the other end is connected to the anaerobic tank; the anaerobic tank is provided with a second overflow pipe; one end of the second overflow pipe is arranged at the upper part of the anaerobic tank, and the other end is connected to the compartment.
[0013] Another specific method further includes an emptying pipe; the emptying pipe is connected to a plurality of emptying valves, and each emptying valve is respectively connected to a corresponding micro-aerobic tank, an anaerobic tank, a sedimentation tank and a clean water tank.
[0014] Another specific embodiment further comprises a water production pump; the membrane filtration assembly is also provided with a water collecting pipe; one end of the water production pump is connected to the water collecting pipe, and the other end is connected to the clean water tank.
[0015] Another specific embodiment further comprises a sludge pump; the input end of the sludge pump is connected to a sludge inlet pipe, and the output end is connected to a first sludge outlet pipe and a second sludge outlet pipe; the sludge inlet pipe is connected to a sludge collecting bucket, and the first sludge outlet pipe is connected to a micro-oxygen tank.
[0016] Another specific method also includes a backwash pump and a fan; the input end of the backwash pump is connected to the clean water tank, and the output end is connected to the water collecting pipe; the fan is connected to a scrubbing air duct for cleaning the membrane filtration component.
[0017] The beneficial effects achieved by the utility model are as follows: a hanging membrane filtration sedimentation device is arranged in a sedimentation tank, comprising: a bracket, a mud collecting bucket, an inclined tube assembly and a plurality of membrane filtration assemblies; the top of the membrane filtration assembly is fixedly connected to the top of the bracket; the mud collecting bucket is arranged at the lower part of the bracket; the inclined tube assembly is fixedly arranged at a position between the membrane filtration assembly and the mud collecting bucket; the sewage entering the sedimentation tank needs to pass through the sedimentation effect of the inclined tube assembly before contacting the membrane filtration assembly; the inclined tube assembly can precipitate most of the sludge, effectively reducing the pollution of the membrane filtration assembly by sewage, slowing down the increase of the trans-membrane pressure difference, and effectively reducing the frequency of drug washing of the membrane filtration assembly. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the technical solutions in the embodiments of the present application, a brief introduction will be given below to the drawings required for use in the description of the embodiments. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0019] Figure 1 It is a schematic diagram of the three-dimensional structure of a hanging membrane filtration sedimentation device according to an embodiment of the present application;
[0020] Figure 2 It is a partial structural schematic diagram of a hanging membrane filtration sedimentation device according to an embodiment of the present application;
[0021] Figure 3 is a schematic diagram of the three-dimensional structure of the integrated system of an embodiment of the present application;
[0022] Figure 4 It is a first partial structural diagram of the integrated system of an embodiment of the present application;
[0023] Figure 5 is a second partial structural diagram of the integrated system of an embodiment of the present application;
[0024] in, Figures 1 to 5 Including:
[0025] 1. Box; 11. Micro-aerobic tank; 111. First overflow pipe; 12. Anaerobic tank; 121. Second overflow pipe;
[0026] 13. Sedimentation tank; 14. Clear water tank;
[0027] 151. Water production pump; 152. Backwash pump; 153. Sludge pump;
[0028] 16. Fan; 161. Clean the air duct;
[0029] 171, first water inlet pipe; 172, first water outlet pipe; 173, second water inlet pipe; 174, second water outlet pipe;
[0030] 175, mud inlet pipe; 176, first mud outlet pipe; 177, main water inlet pipe; 178, main water outlet pipe; 179, second mud outlet pipe;
[0031] 18. Drain pipe; 181. Drain valve;
[0032] 191, first electric valve; 192, second electric valve; 193, third electric valve; 194, fourth electric valve;
[0033] 2. Suspended membrane filtration sedimentation device; 21. bracket; 211. partition plate; 212. grid plate; 213. mounting plate;
[0034] 214, beam; 22, membrane filtration assembly; 221, water collecting pipe;
[0035] 23. Inclined pipe assembly; 24. Mud collecting bucket; 25. Maintenance platform; 26. Compartment. DETAILED DESCRIPTION
[0036] In order to make the purpose, technical solution and advantages of the present application clearer, the technical solution of the present application will be clearly and completely described through the implementation method with reference to the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present application.
[0037] Example 1
[0038] One of the implementation methods of an integrated system of the present application is as follows: Figures 1 to 5 As shown, it includes: a box body 1; in this embodiment, a railing and a ladder are also provided on the periphery of the box body 1 for use during maintenance.
[0039] The housing 1 includes a micro-aerobic tank 11 , an anaerobic tank 12 , a sedimentation tank 13 and a clean water tank 14 which are sequentially arranged therein; the micro-aerobic tank 11 is connected to a main water inlet pipe 177 ; and the clean water tank 14 is connected to a main water outlet pipe 178 .
[0040] The micro-aerobic tank 11 is provided with a first overflow pipe 111; one end of the first overflow pipe 111 is arranged at the upper part of the micro-aerobic tank 11, and the other end is connected to the anaerobic tank 12. The sewage from the regulating tank (not shown in the figure) enters the micro-aerobic tank 11 from the main water inlet pipe 177 through a lifting pump (not shown in the figure), and after a certain residence time, the sewage enters the anaerobic tank 12 through the first overflow pipe 111.
[0041] The sewage from the micro-aerobic pool 11 flows through the first overflow pipe 111 after a certain residence time and overflows to the anaerobic pool 12, where the organic matter in the water is removed by denitrification under the action of anaerobic bacteria. Since the dissolved oxygen in the sludge reacts with the organic matter in the sewage from the micro-aerobic pool 11, there is a short-range nitrification effect, which can decompose the large organic matter that is difficult to decompose into small organic matter, and can better complete the denitrification reaction. Therefore, a flow pusher is built into the anaerobic pool 12 to make the denitrification reaction better.
[0042] The sedimentation tank 13 has a built-in hanging membrane filtration sedimentation device 2 , and the built-in partition 211 of the hanging membrane filtration sedimentation device 2 forms a compartment 26 between the sedimentation tank 13 and the anaerobic tank 12 .
[0043] The anaerobic tank 12 is provided with a second overflow pipe 121; one end of the second overflow pipe 121 is arranged at the upper part of the anaerobic tank 12, and the other end is connected to the compartment 26. After a certain residence time in the anaerobic tank 12, the sewage enters the compartment 26 through the second overflow pipe 121.
[0044] The hanging membrane filtration sedimentation device 2 also includes: a bracket 21, a mud collecting bucket 24, an inclined tube assembly 23 and a plurality of membrane filtration assemblies 22. Among them, the compartment 26 is arranged on one side of the partition 211, and the inclined tube assembly 23 and the membrane filtration assembly 22 are arranged on the other side of the partition 211. A crossbeam 214 and a grid plate 212 are also arranged on the top of the bracket 21; the membrane filtration assembly 22 is fixedly connected to the crossbeam 214 through the mounting plate 213, so that the membrane filtration assembly 22 is hung on the upper part of the sedimentation tank 13.
[0045] The mud collecting bucket 24 is arranged at the lower part of the bracket 21, and the inclined tube assembly 23 is fixedly arranged between the membrane filtration assembly 22 and the mud collecting bucket 24. The inclined tube assembly 23 is a rectangular structure and includes a plurality of evenly distributed inclined holes.
[0046] In this embodiment, both sides of the partition 211 are welded to the pool side plates of the box body 1, and together with the pool side plates, form a compartment 26. The bottom of the partition 211 is lower than the bottom of the inclined tube assembly 23, and after the sewage enters the compartment 26, it must pass through the bottom of the inclined tube assembly 23 to enter the membrane area of the upper membrane filtration assembly 22.
[0047] The inclined tube assembly 23 disposed in the middle of the sedimentation tank 13 can precipitate most of the sludge. This reduces the amount of sewage sludge in the upper part of the sedimentation tank 13, reduces the pollution to the membrane of the membrane filtration assembly 22, effectively slows down the increase in transmembrane pressure difference, and reduces the frequency of drug washing. In addition, the filtering and sedimentation functions are integrated in one sedimentation tank 13, effectively reducing the floor space of the tank.
[0048] In this embodiment, a drain pipe 18 is also included, and the drain pipe 18 is connected to a plurality of drain valves 181. Each drain valve 181 is respectively connected to the corresponding micro-aerobic tank 11, anaerobic tank 12, sedimentation tank 13 and clean water tank 14 for draining the pool water.
[0049] In this embodiment, a maintenance platform 25 is provided at the bottom of the membrane filtration assembly 22. The bottom of the maintenance platform 25 is supported by a steel section, and a grid plate or a flat plate is provided on the steel section and fixed. A ladder is provided on the wall of the sedimentation tank 13. When maintenance is required, the drain valve at the bottom is opened to drain water so that the water level is lower than the platform. The maintenance personnel can go down the maintenance platform 25 through the ladder for maintenance, eliminating the trouble of lifting the membrane filtration assembly 22 for maintenance.
[0050] More specifically, an integrated system of the present application also includes: a water production pump 151 , a sludge pump 153 , a backwash pump 152 and a fan 16 .
[0051] The fan 16 is connected to a scrubbing air duct 161 , and the scrubbing air duct 161 is connected to the lower part of the membrane filter assembly 22 . The fan 16 is used to provide high-pressure air to clean the membrane surface of the membrane filter assembly 22 .
[0052] In addition, since the sludge in the sedimentation tank 13 has a relatively high amount of dissolved oxygen, in order to enhance the short-range nitrification, the micro-aerobic tank 11 may also be provided with an aeration pipe for proper aeration.
[0053] The bottom of the sludge collecting hopper 24 is connected to the input end of the sludge pump 153 through the sludge inlet pipe 175, and the output end of the sludge pump 153 is connected to the first sludge outlet pipe 176 and the second sludge outlet pipe 179; the first sludge outlet pipe 176 is connected to the micro-aerobic pool 11, and the second sludge outlet pipe 179 is used to connect to an external sludge pool (not shown in the figure); the first sludge outlet pipe 176 is provided with a fourth electric valve 194, and the second sludge outlet pipe 179 is provided with a third electric valve 193. By starting the sludge pump 153 and controlling the third electric valve 193 and the fourth electric valve 194, excess sludge can be drawn to the micro-aerobic pool 11 to provide a carbon source and microorganisms for the micro-aerobic pool 11; when the amount of sludge is large, it is also discharged to the external sludge pool through the second sludge outlet pipe 179 of the sludge pump 153. That is, when the sludge concentration is too high, the fourth electric valve 194 is closed and the third electric valve 193 is opened to discharge the sludge into the sludge pool; when the sludge concentration is appropriate, the third electric valve 193 is closed and the fourth electric valve 194 is opened to discharge the sludge into the micro-aerobic pool 11.
[0054] The membrane filtration assembly 22 is also provided with a water collecting pipe 221 ; the input end of the water production pump 151 is connected to the water collecting pipe 221 through the first water inlet pipe 171 , and the output end is connected to the clean water tank 14 through the first water outlet pipe 172 ; the first water outlet pipe 172 is provided with a second electric valve 192 .
[0055] The input end of the backwash pump 152 is connected to the clean water tank 14 through the second water inlet pipe 173 , and the output end, the second water outlet pipe 174 , is connected to the water collecting pipe 221 ; the second water outlet pipe 174 is provided with a first electric valve 191 .
[0056] When water is produced, when the water production pump 151 is started, negative pressure is generated in the water collection pipe 221; since the water collection pipe 221 is connected to the membrane of each membrane filtration assembly 22, sewage enters the water collection pipe 221 through membrane filtration, and flows into the clean water tank 14 through the first water outlet pipe 172 connected to the water production pump 151. When the water production pump 151 is turned on to produce water, the second electric valve 192 on the first water outlet pipe 172 is opened, the first electric valve 191 on the second water outlet pipe 174 is closed, and the backwash pump 152 is closed.
[0057] During backwashing, the backwash pump 152 is started, the water production pump 151 is closed, the backwash pump 152 takes water from the clean water tank 14, the first electric valve 191 on the second water outlet pipe 174 is opened, the second electric valve 192 on the first water outlet pipe 172 is closed, and the membrane of the membrane filtration assembly 22 is backwashed from the second water outlet pipe 174.
[0058] Note that the above are only preferred embodiments of the present application and the technical principles used. Those skilled in the art will understand that the present application is not limited to the specific embodiments described herein, and that various obvious changes, readjustments and substitutions can be made by those skilled in the art without departing from the scope of protection of the present application. Therefore, although the present application is described in more detail through the above embodiments, the present application is not limited to the above embodiments, and may include more other equivalent embodiments without departing from the concept of the present application, and the scope of the present application is determined by the scope of the appended claims.
Claims
1. A hanging membrane filtration sedimentation device, arranged in a sedimentation tank, characterized in that: include: A bracket, a mud collecting bucket, an inclined tube assembly and several membrane filtration assemblies; The top of the membrane filtration assembly is fixedly connected to the top of the bracket; The mud collecting bucket is arranged at the lower part of the bracket; The inclined tube assembly is fixedly arranged at a position between the membrane filtration assembly and the mud collecting bucket.
2. A hanging membrane filtration sedimentation device according to claim 1, characterized in that: The inclined tube assembly is a rectangular structure and includes a plurality of evenly distributed inclined holes.
3. A hanging membrane filtration sedimentation device according to claim 1 or 2, characterized in that: Also includes: a partition plate, the partition plate being used to form a compartment in the sedimentation tank; The compartment is arranged on one side of the partition, and the inclined tube assembly and the membrane filtration assembly are arranged on the other side of the partition.
4. A hanging membrane filtration sedimentation device according to claim 3, characterized in that: The top of the bracket is also provided with a crossbeam and a grid plate; The membrane filtration assembly is fixedly connected to the crossbeam via a mounting plate.
5. An integrated system, characterized in that: include: A box; the box includes a micro-aerobic tank, an anaerobic tank, a sedimentation tank and a clean water tank which are arranged in sequence; the sedimentation tank is equipped with a hanging membrane filtration sedimentation device according to any one of claims 1 to 4.
6. An integrated system according to claim 5, characterized in that: The micro-aerobic pool is provided with a first overflow pipe; one end of the first overflow pipe is arranged at the upper part of the micro-aerobic pool, and the other end is connected to the anaerobic pool; The anaerobic tank is provided with a second overflow pipe; one end of the second overflow pipe is arranged at the upper part of the anaerobic tank, and the other end is communicated with the compartment.
7. An integrated system according to claim 6, characterized in that: Also included is a drain pipe; The drain pipe is connected with a plurality of drain valves, and each drain valve is respectively connected with a corresponding micro-aerobic tank, an anaerobic tank, a sedimentation tank and a clear water tank.
8. An integrated system according to claim 6, characterized in that: It also includes a water production pump; The membrane filtration assembly is also provided with a water collecting pipe; One end of the water production pump is connected to the water collecting pipe, and the other end is connected to the clean water tank.
9. An integrated system according to claim 6, characterized in that: It also includes a sludge pump; the input end of the sludge pump is connected to a sludge inlet pipe, and the output end is connected to a first sludge outlet pipe and a second sludge outlet pipe; The mud inlet pipe is connected to the mud collecting bucket, and the first mud outlet pipe is connected to the micro-aerobic tank.
10. An integrated system according to claim 8, characterized in that: It also includes a backwash pump and blower; The input end of the backwash pump is connected to the clean water tank, and the output end is connected to the water collecting pipe; The blower is connected with a scrubbing air duct for cleaning the membrane filtration assembly.
