Building water supply and drainage anti-blocking pipeline structure
By designing cleaning devices and limiting devices in building water supply and drainage pipes, the blockage problem caused by solid waste precipitation in sewage is solved, the cleaning and tightness of the inner wall of the pipeline is achieved, and the normal circulation and stability of the sewage is ensured. sex.
Patent Information
- Application Number
- CN202420287437.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-07
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2034-02-07
AI Technical Summary
During use, building water supply and drainage pipes are prone to blockage due to the precipitation of solid waste in the sewage, which affects the drainage flow.
An anti-blocking structure including main pipe, water inlet pipe, drain pipe and cleaning device is designed. The cleaning device drives the cleaning brush through an electric telescopic rod, rack and gear system to clean impurities on the pipe wall and reinforce it through a limiting device. Pipe connection to prevent sewage from leaking.
Effectively clean impurities in the inner wall of the pipeline, prevent blockage, ensure normal circulation of sewage, and prevent sewage from leaking through reinforced connections, improving the efficiency of pipeline use and connection tightness.
Smart Images

Figure CN222025205U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building water supply and drainage pipelines, in particular to an anti-blocking pipeline structure for building water supply and drainage. Background Art
[0002] In water supply and drainage projects, pipes pass through floors, roofs, and walls; plastic water supply pipes and composite pipes are directly buried in walls (ground); sanitary appliances and their connections with pipes, pipe connections, water tanks, fire hydrants, valves and other equipment, accessories, fittings and their connections with pipes may cause blockage, thereby causing leakage.
[0003] During the use of existing building water supply and drainage pipes, the discharged sewage may contain a large amount of solid dirt, which is easy to precipitate in the pipes. The precipitated impurities will adhere to the pipe wall. When more and more dirt is precipitated, it will affect the flow rate of sewage discharge in the sewage pipe. Utility Model Content
[0004] The utility model aims to solve the technical problems in the above background and proposes an anti-blocking pipeline structure for building water supply and drainage.
[0005] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a building water supply and drainage anti-blocking pipeline structure, including a main pipeline body, two support frames are fixedly installed on the outer wall surface of the main pipeline body, a water inlet pipe is fixedly installed on the outer wall surface of the main pipeline body, a drainage pipeline body is movably inserted inside the main pipeline body, and a cleaning device is provided on the surface of one end of the main pipeline body away from the drainage pipeline body, the cleaning device includes an L-shaped plate, the L-shaped plate is fixedly installed on the surface of one end of the main pipeline body away from the drainage pipeline body, a rotating rod is rotatably connected to the surface of the vertical end of the L-shaped plate, the end of the rotating rod away from the L-shaped plate is located inside the main pipeline body and the drainage pipeline body, and a plurality of cleaning brushes are distributed in an annular manner on the outer wall surface of the rotating rod. The provision of the cleaning brush has the effect of cleaning impurities on the inner wall of the drainage pipeline body.
[0006] Preferably, a vertical bar is fixedly mounted on the outer wall surface of the water inlet pipe, a vertical groove is formed on the surface of the vertical bar, an L-shaped bracket is slidably connected inside the vertical groove, a rack is fixedly mounted on one end of the L-shaped bracket away from the vertical groove, a gear is fixedly mounted on the outer wall surface of the rotating rod, and the rack and the gear are meshed with each other. The setting of the rack has the effect of driving the gear to rotate, and the setting of the gear has the effect of driving the rotating rod to rotate.
[0007] Preferably, a rectangular plate is fixedly mounted on the surface of the vertical strip, an electric telescopic rod is fixedly mounted on the surface of the rectangular plate, and the output end of the electric telescopic rod is fixedly connected to the L-shaped bracket. The setting of the electric telescopic rod has the effect of driving the L-shaped bracket to move inside the vertical slot.
[0008] Preferably, a limiting device is provided on the outer wall surface of the drainage pipe body, and the limiting device includes a plug plate, which is fixedly mounted on the outer wall surface of the drainage pipe body, and a slot is provided on the surface of one end of the main pipe body away from the L-shaped plate, and one end of the plug plate away from the drainage pipe body is plugged into the slot. The provision of the plug plate and the slot has the effect of preliminarily limiting the drainage pipe body inside the main pipe body.
[0009] Preferably, a vertical rod is fixedly mounted on the outer wall surface of the main pipe body, a movable plate is slidably connected to the surface of the vertical rod, a plug rod is fixedly mounted on the bottom surface of the movable plate, a plug hole is provided on the surface of the horizontal end of the plug plate, and one end of the plug rod away from the movable plate is plugged into the plug hole. The provision of the plug rod and the plug hole has the effect of limiting the plug plate in the slot.
[0010] Preferably, a handle is fixedly mounted on the end surface of the movable plate away from the insertion rod, a circular plate is fixedly mounted on the end surface of the vertical rod away from the main pipe body, and a spring is fixedly mounted between the circular plate and the movable plate. The setting of the spring has the effect of limiting the position of the movable plate on the surface of the vertical rod.
[0011] Compared with the prior art, the advantages and positive effects of the utility model are:
[0012] 1. In the utility model, by setting a cleaning device, when the device needs to be used, first the sewage flows into the interior of the main pipe body through the water inlet pipe, and then flows into the interior of the drainage pipe body from the interior of the main pipe body. When it is necessary to clean the impurities attached to the pipe wall inside the drainage pipe body, first start the electric telescopic rod, the electric telescopic rod starts to drive the L-shaped bracket to move inside the vertical groove, the L-shaped bracket moves inside the vertical groove to drive the rack to move, the rack moves and meshes with the gear, so that the gear rotates, the gear rotation drives the rotating rod to rotate, the rotating rod rotation drives the cleaning brush to rotate, and the cleaning brush is used to scrape off the impurities attached to the pipe wall, thereby avoiding the phenomenon of sewage being blocked when flowing in the drainage pipe body. Through the cooperation of the above structure, the drainage pipe body has a cleaning function, and the impurities attached to the pipe wall can be cleaned, thereby avoiding the drainage pipe body from being blocked and affecting the normal flow of sewage.
[0013] 2. In the utility model, by setting a limit device, when it is necessary to strengthen the connection between the drainage pipe body and the main pipe body, the handle is first pulled upward, and the movement of the handle drives the movable plate to move on the surface of the vertical rod. The movement of the movable plate on the surface of the vertical rod will squeeze the spring, so that the spring is compressed. At the same time, the movement of the movable plate on the surface of the vertical rod also drives the insertion rod to move. When the insertion rod moves to a suitable position, the drainage pipe body is inserted into the interior of the main pipe body. When the drainage pipe body is inserted into the interior of the main pipe body, the insertion plate is also driven to be inserted into the interior of the slot. When the insertion plate and the slot are plugged in, the handle is released, and the spring rebound force is used to reset the insertion rod. The insertion rod is reset and then inserted into the interior of the jack. The insertion rod and the jack are plugged in, so that the insertion plate is limited in the interior of the slot. The insertion plate is limited in the interior of the slot so that the drainage pipe body is limited in the interior of the main pipe body. Through the cooperation of the above structure, the tightness of the connection between the main pipe body and the drainage pipe body is strengthened, thereby preventing sewage from flowing out from the connection between the two. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 A three-dimensional structural schematic diagram of a building water supply and drainage anti-blocking pipeline structure is proposed for the utility model;
[0015] Figure 2 The utility model provides a left-side structural schematic diagram of a building water supply and drainage anti-blocking pipeline structure;
[0016] Figure 3 The utility model proposes a building water supply and drainage anti-blocking pipeline structure Figure 1 The structural diagram at A in the middle;
[0017] Figure 4 The utility model proposes a building water supply and drainage anti-blocking pipeline structure Figure 2 Schematic diagram of the structure at B in the middle;
[0018] Legend:
[0019] 1. Main pipe body; 2. Support frame; 3. Water inlet pipe; 4. Drainage pipe body; 5. Cleaning device; 501. L-shaped plate; 502. Turn bar; 503. Cleaning brush; 504. Vertical bar; 505. Vertical groove; 506. L-shaped bracket; 507. Rack; 508. Gear; 509. Rectangular plate; 510. Electric telescopic rod; 6. Limiting device; 61. Insert plate; 62. Slot; 63. Vertical rod; 64. Moving plate; 65. Insert rod; 66. Socket; 67. Round plate; 68. Spring; 69. Handle. DETAILED DESCRIPTION
[0020] In order to more clearly understand the above-mentioned purpose, features and advantages of the utility model, the utility model is further described below in conjunction with the accompanying drawings and embodiments. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.
[0021] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways than those described herein. Therefore, the present invention is not limited to the specific embodiments of the following disclosure.
[0022] See also Figure 1-4 The utility model provides a technical solution: a building water supply and drainage anti-blocking pipeline structure, including a main pipeline body 1, two support frames 2 are fixedly installed on the outer wall surface of the main pipeline body 1, a water inlet pipe 3 is fixedly installed on the outer wall surface of the main pipeline body 1, and a drainage pipeline body 4 is movably inserted inside the main pipeline body 1.
[0023] The specific arrangement and function of the cleaning device 5 and the limiting device 6 will be described in detail below.
[0024] In this embodiment: a cleaning device 5 is provided on the surface of one end of the main pipe body 1 away from the drainage pipe body 4, and the cleaning device 5 includes an L-shaped plate 501, which is fixedly installed on the surface of one end of the main pipe body 1 away from the drainage pipe body 4, and the surface of the vertical end of the L-shaped plate 501 is rotatably connected with a rotating rod 502, and the end of the rotating rod 502 away from the L-shaped plate 501 is located inside the main pipe body 1 and the drainage pipe body 4, and a plurality of cleaning brushes 503 are distributed in a ring on the outer wall surface of the rotating rod 502.
[0025] In this embodiment, the provision of the cleaning brush 503 has the effect of cleaning the impurities on the inner wall of the drainage pipe body 4 .
[0026] Specifically, a vertical bar plate 504 is fixedly installed on the outer wall surface of the water inlet pipe 3, a vertical groove 505 is opened on the surface of the vertical bar plate 504, an L-shaped bracket 506 is slidably connected inside the vertical groove 505, a rack 507 is fixedly installed on the end of the L-shaped bracket 506 away from the vertical groove 505, and a gear 508 is fixedly installed on the outer wall surface of the rotating rod 502, and the rack 507 and the gear 508 are meshed with each other.
[0027] In this embodiment, the setting of the rack 507 has the effect of driving the gear 508 to rotate, and the setting of the gear 508 has the effect of driving the rotating rod 502 to rotate.
[0028] Specifically, a rectangular plate 509 is fixedly mounted on the surface of the vertical strip plate 504, and an electric telescopic rod 510 is fixedly mounted on the surface of the rectangular plate 509. The output end of the electric telescopic rod 510 is fixedly connected to the L-shaped bracket 506. The setting of the electric telescopic rod 510 has the effect of driving the L-shaped bracket 506 to move inside the vertical slot 505.
[0029] In this embodiment: a limiting device 6 is provided on the outer wall surface of the drainage pipe body 4, and the limiting device 6 includes an insert plate 61, which is fixedly mounted on the outer wall surface of the drainage pipe body 4. A slot 62 is provided on the surface of the end of the main pipe body 1 away from the L-shaped plate 501, and the end of the insert plate 61 away from the drainage pipe body 4 is plugged into the slot 62. When it is necessary to strengthen the connection between the drainage pipe body 4 and the main pipe body 1, first pull the handle 69 upwards, and the movement of the handle 69 drives the movable plate 64 to move on the surface of the vertical rod 63. The movement of the movable plate 64 on the surface of the vertical rod 63 will squeeze the spring 68, so that the spring 68 is compressed. At the same time, the movement of the movable plate 64 on the surface of the vertical rod 63 also drives the insert rod 65 to move. When the insert rod 65 moves to a suitable position, the drainage pipe body 4 is inserted into the interior of the main pipe body 1. When the drainage pipe body 4 is inserted into the interior of the main pipe body 1, it also drives the insert plate 61 to be inserted into the slot 62. When the plug plate 61 and the slot 62 are connected, the handle 69 is released, and the spring 68 is used to reset the plug rod 65. The plug rod 65 is reset and then inserted into the inside of the socket 66. The plug rod 65 and the socket 66 are connected, so that the plug plate 61 is limited in the inside of the slot 62. The plug plate 61 is limited in the inside of the slot 62 so that the drainage pipe body 4 is limited in the inside of the main pipe body 1. Through the cooperation of the above structure, the tightness of the connection between the main pipe body 1 and the drainage pipe body 4 is strengthened, thereby preventing sewage from flowing out from the connection between the two.
[0030] Specifically, a vertical rod 63 is fixedly installed on the outer wall surface of the main pipe body 1, and a movable plate 64 is slidably connected to the surface of the vertical rod 63. An insertion rod 65 is fixedly installed on the bottom surface of the movable plate 64. A hole 66 is provided on the surface of the horizontal end of the insertion plate 61, and the end of the insertion rod 65 away from the movable plate 64 is plugged into the hole 66.
[0031] In this embodiment, the provision of the inserting rod 65 and the inserting hole 66 has the effect of limiting the inserting plate 61 inside the slot 62 .
[0032] Specifically, a handle 69 is fixedly mounted on the end surface of the movable plate 64 away from the insertion rod 65 , a circular plate 67 is fixedly mounted on the end surface of the vertical rod 63 away from the main pipe body 1 , and a spring 68 is fixedly mounted between the circular plate 67 and the movable plate 64 .
[0033] In this embodiment, the setting of the spring 68 has the effect of limiting the position of the moving plate 64 on the surface of the vertical rod 63 .
[0034] Working principle: by setting the cleaning device 5, when it is needed to use the device, first the sewage flows into the interior of the main pipe body 1 through the water inlet pipe 3, and then flows into the interior of the drainage pipe body 4 from the interior of the main pipe body 1. When it is needed to clean the impurities attached to the pipe wall inside the drainage pipe body 4, first start the electric telescopic rod 510. The electric telescopic rod 510 starts to drive the L-shaped bracket 506 to move inside the vertical groove 505. The L-shaped bracket 506 moves inside the vertical groove 505 to drive the rack 507 to move. The rack 507 moves and engages with the gear 508, thereby causing the gear 508 to rotate. The rotation of the gear 508 drives the rotating rod 502 to rotate. The rotation of the rotating rod 502 drives the cleaning brush 503 to rotate. The cleaning brush 503 is used to scrape off the impurities attached to the pipe wall, thereby avoiding the phenomenon of sewage being blocked when flowing in the drainage pipe body 4. Through the cooperation of the above structure, the drainage pipe body 4 has a cleaning function, and can clean the impurities attached to the pipe wall, thereby avoiding the drainage pipe body 4 from being blocked and affecting the normal flow of sewage. When the connection between the drainage pipe body 4 and the main pipe body 1 needs to be reinforced, the handle 69 is first pulled upwards. The movement of the handle 69 drives the movable plate 64 to move on the surface of the vertical rod 63. The movement of the movable plate 64 on the surface of the vertical rod 63 will squeeze the spring 68, so that the spring 68 is compressed. At the same time, the movement of the movable plate 64 on the surface of the vertical rod 63 also drives the insertion rod 65 to move. When the insertion rod 65 moves to a suitable position, the drainage pipe body 4 is inserted into the interior of the main pipe body 1. When the drainage pipe body 4 is inserted into the interior of the main pipe body 1, the insertion plate 61 is also driven to be inserted into the slot 62 When the plug plate 61 and the slot 62 are connected, the handle 69 is released, and the spring 68 is used to reset the plug rod 65. The plug rod 65 is reset and then inserted into the inside of the socket 66. The plug rod 65 and the socket 66 are connected, so that the plug plate 61 is limited in the inside of the slot 62. The plug plate 61 is limited in the inside of the slot 62 so that the drainage pipe body 4 is limited in the inside of the main pipe body 1. Through the cooperation of the above structure, the tightness of the connection between the main pipe body 1 and the drainage pipe body 4 is strengthened, thereby preventing sewage from flowing out from the connection between the two.
[0035] The above is only a preferred embodiment of the utility model, and does not limit the utility model in other forms. Any technician familiar with the profession may use the technical content disclosed above to change or modify it into an equivalent embodiment with equivalent changes and apply it to other fields. However, any simple modification, equivalent change and modification made to the above embodiment based on the technical essence of the utility model without departing from the technical solution of the utility model still belongs to the protection scope of the technical solution of the utility model. In the description of the utility model, it should be noted that unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be directly connected, or indirectly connected through an intermediate medium, or it can be the internal connection of two components. For ordinary technicians in this field, the specific meanings of the above terms in the utility model can be understood by specific circumstances.
Claims
1. A building water supply and drainage anti-blocking pipeline structure, comprising a main pipeline body (1), two support frames (2) are fixedly installed on the outer wall surface of the main pipeline body (1), a water inlet pipe (3) is fixedly installed on the outer wall surface of the main pipeline body (1), and a drainage pipeline body (4) is movably inserted inside the main pipeline body (1), characterized in that: A cleaning device (5) is provided on the surface of one end of the main pipe body (1) away from the drainage pipe body (4), and the cleaning device (5) comprises an L-shaped plate (501), the L-shaped plate (501) is fixedly mounted on the surface of one end of the main pipe body (1) away from the drainage pipe body (4), a rotating rod (502) is rotatably connected to the surface of the vertical end of the L-shaped plate (501), the end of the rotating rod (502) away from the L-shaped plate (501) is located inside the main pipe body (1) and the drainage pipe body (4), and a plurality of cleaning brushes (503) are distributed in an annular manner on the outer wall surface of the rotating rod (502).
2. The anti-blocking pipe structure for building water supply and drainage according to claim 1, characterized in that: A vertical bar plate (504) is fixedly mounted on the outer wall surface of the water inlet pipe (3), a vertical groove (505) is formed on the surface of the vertical bar plate (504), an L-shaped bracket (506) is slidably connected inside the vertical groove (505), a rack (507) is fixedly mounted on one end of the L-shaped bracket (506) away from the vertical groove (505), a gear (508) is fixedly mounted on the outer wall surface of the rotating rod (502), and the rack (507) and the gear (508) are meshed with each other.
3. The anti-blocking pipe structure for building water supply and drainage according to claim 2 is characterized by: A rectangular plate (509) is fixedly mounted on the surface of the vertical strip plate (504), an electric telescopic rod (510) is fixedly mounted on the surface of the rectangular plate (509), and an output end of the electric telescopic rod (510) is fixedly connected to the L-shaped bracket (506).
4. The anti-blocking pipe structure for building water supply and drainage according to claim 1 is characterized by: The outer wall surface of the drainage pipe body (4) is provided with a limiting device (6), and the limiting device (6) comprises a plug plate (61). The plug plate (61) is fixedly mounted on the outer wall surface of the drainage pipe body (4). A slot (62) is provided on the surface of one end of the main pipe body (1) away from the L-shaped plate (501), and the end of the plug plate (61) away from the drainage pipe body (4) is plugged into the slot (62).
5. The anti-blocking pipe structure for building water supply and drainage according to claim 4 is characterized by: A vertical rod (63) is fixedly mounted on the outer wall surface of the main pipe body (1); a movable plate (64) is slidably connected to the surface of the vertical rod (63); an insertion rod (65) is fixedly mounted on the bottom surface of the movable plate (64); a plug hole (66) is provided on the surface of the horizontal end of the plug plate (61); and an end of the insertion rod (65) away from the movable plate (64) is plugged into the plug hole (66).
6. The anti-blocking pipe structure for building water supply and drainage according to claim 5, characterized in that: A handle (69) is fixedly mounted on the end surface of the movable plate (64) away from the insertion rod (65), a circular plate (67) is fixedly mounted on the end surface of the vertical rod (63) away from the main pipe body (1), and a spring (68) is fixedly mounted between the circular plate (67) and the movable plate (64).