Basket type oil well oil drainage device

By designing a basket oil well oil drainer, the combined structure of elastic diameter strips and sealing sleeves is used to solve the problem of opening holes of oil pipe columns in oil field well repair operations, and the function of liquid leaking into the well in the oil pipe is realized, avoiding the well being stuck and production impact ensures the corrosion resistance and stability of the device.

CN222025746UActive Publication Date: 2024-11-19JILIN ZHONGWEI OIL & GAS ENGINEERING CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420724667.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-04
Publication Date
2024-11-19
Estimated Expiration
2034-04-04

AI Technical Summary

Technical Problem

In oilfield well repair operations, it is difficult for the existing technology to effectively open holes through the oil pipe columns to realize the way of liquid in the oil pipe leaking into the well. Due to factors such as corrosion, scaling, wax formation, and biased grinding, there is a lack of widely applicable methods.

Method used

A basket oil well oil drainer is designed, including an upper joint, an open-hole tube equipped with a sealing sleeve, a pump cylinder short connection and a multiple elastic diameter upper and lower baskets, and the sealing sleeve is pushed through the plunger lock nut of the oil pump. and elastic diameter strips, open the openings to realize the connection between the oil pipe and the ring sleeve space.

Benefits of technology

This device does not change the outer diameter of the oil pipe, avoids the phenomenon of stuck wells, is stable installation, is corrosion-resistant and scaling, does not affect oil well production, realizes the function of liquid leaking into the well in the oil pipe, and simplifies the well repair operation process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222025746U_ABST
    Figure CN222025746U_ABST
Patent Text Reader

Abstract

The utility model discloses a basket type oil well oil drainage device for oil field workover treatment. Comprising an upper connector, a hole opening pipe provided with a sealing sleeve and a pump cylinder pup joint, an upper basket provided with a plurality of opening elastic diameter strips and a lower basket provided with a plurality of closing elastic diameter strips are arranged in the pump cylinder pup joint, and the upper basket and the lower basket are connected together through shear pins. The device is characterized in that an upper basket provided with a plurality of opening elastic radial strips and a lower basket provided with a plurality of closing elastic radial strips are arranged in the pump cylinder pup joint, and the upper basket and the lower basket are connected together through shear pins. During workover operation, except for normal pipe lifting and rod lifting operation, the oil pipe can be perforated without any other operation mode, so that the interior of the oil pipe is communicated with the space of the ring sleeve, and oil drainage is realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to an oil field downhole tool, in particular to a basket type oil well drainer used for oil field well repairing operation. Background Art

[0002] Before the present invention, when each oil field was working over the oil well, there were many ways to make a hole at the lower end of the oil pipe string to release the liquid in the pipe string into the well when lifting the oil pipe string. However, due to the influence and limitation of many factors such as corrosion, scaling, waxing, eccentric wear, annular space, space in the oil pipe, and operation mode in the well, there is no satisfactory and widely used hole-making measure and method. Therefore, when lifting the pipe string in the workover operation of the oil well, it is still a big problem to realize the release of the liquid in the oil pipe into the well when lifting the pipe string by making a hole in the oil pipe. Summary of the invention

[0003] The purpose of the utility model is to provide a device for opening a hole in the oil pipe column of a pumping well for well repairing in oil fields - a basket type oil well drainer. When the oil well is repaired, the pumping rod column is lifted up, and the plunger locking nut of the oil pump is used to push the relevant components in the device, push open the sealing sleeve sealed at the opening position of the opening pipe, open the opening on the opening pipe, and make the inside of the oil pipe column and the annular space connected. Through this opening, when the pipe is lifted up, the liquid in the oil pipe can be drained into the well.

[0004] The purpose of the utility model is achieved through the following measures: the basket type oil well oil drainer includes an upper joint, an open hole pipe equipped with a sealing sleeve, and a pump barrel short circuit, in which an upper basket with multiple opening elastic diameter strips and a lower basket with multiple closing elastic diameter strips are installed, and the upper basket and the lower basket are connected together by shear nails. Its characteristics are: the pump barrel short circuit is equipped with an upper basket with multiple opening elastic diameter strips and a lower basket with multiple closing elastic diameter strips, and the upper basket and the lower basket are connected together by shear nails.

[0005] The oil drain has the following features:

[0006] 1. The outer diameter of the tubing string is not changed, and there is no well jamming when the tubing string is raised or lowered due to the installation of the oil drainer.

[0007] 2. It does not affect the installation of various accessories such as straightening blocks in the tubing string.

[0008] 3. The function of the oil drainer will not be damaged by corrosion, scaling, waxing, eccentric wear and other phenomena in the well.

[0009] 4. The oil drain has no impact on the production of oil wells.

[0010] 5. During the normal production of the oil well, the function of the oil drainer will not be destroyed.

[0011] 6. When the oil well is installed with the oil drainer, no other operation is required except for normal pipe and rod lifting operations to drill holes in the oil pipe, so that the inside of the oil pipe and the annulus space are connected to achieve oil drainage. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 This is a schematic diagram of the structure of a basket-type oil well drainer. DETAILED DESCRIPTION

[0013] The basket type oil well drainer is composed of two sections, namely, an oil pipe short-circuit 1 and a pump barrel short-circuit 5.

[0014] Short-circuit the oil pipe 1: The sealing sleeve 4 is installed in the perforated pipe 3 to seal the opening K on the wall of the perforated pipe 3. The upper joint 2 and the perforated pipe 3 are connected by threads.

[0015] Pump barrel short circuit 5 sections:

[0016] An upper basket 6 with a plurality of elastic radial strips for opening and a lower basket 8 with a plurality of elastic radial strips for closing are connected as one body through shear nails 7 and then installed into a pump barrel short circuit 5.

[0017] The working principle and usage of the basket type oil well drainer are:

[0018] When the oil well is put into production and the tubing string is lowered into the well, the pump short connection 5 is connected to the upper end of the pump barrel, and it is lowered into the well together with the pump barrel, and then the first tubing is lowered (to prevent the operator from operating too large a size when adjusting the stroke distance, a second tubing can be connected), and then the tubing short connection 1 is connected, and then all the remaining tubings are lowered into the well. That is, the order of lowering the tubing string into the well is: pump barrel--pump barrel short connection 5--tubing (one or two)--tubing short connection 1-+all the remaining tubings. The installation of the basket oil well drainer is completed with the lowering of the tubing string into the well.

[0019] The lowering procedure of the oil pump plunger and the sucker rod string remains unchanged. During the lowering process, when the oil pump plunger passes through the pump barrel short circuit 5, the plunger opens the closing of the elastic strip of the lower basket 8 and passes smoothly into the pump barrel. After the plunger passes, the closing of the elastic strip of the lower basket 8 is recovered to the original state.

[0020] During the well repair operation, the sucker rod column is lifted up, and the plunger of the oil pump is lifted out of the pump barrel. The locking nut on the upper end of the plunger hits the closing part of the elastic strip of the lower basket 8, pushing the lower basket 8 and the upper basket 6 upward together. When the upper basket 6 enters the perforated pipe 3, the elastic strip on it opens the upper opening part under the action of the elastic force, and pushes the sealing sleeve 4 to push it upward to open the K hole. When the sealing sleeve 4 continues to move upward and hits the upper joint 2, the sealing sleeve 4 and the upper basket 6 stop moving upward. The lower basket 8 continues to move upward with the plunger, the shear nail 7 is cut off, the lower basket 8 is disconnected from the upper basket 6, moves upward with the plunger, and is then lifted out of the oil well. The rod lifting operation is completed, and the oil pipe string is opened at the same time, so that the inside of the oil pipe string and the casing ring are connected through the K hole.

[0021] After the rod lifting operation is completed, the pipe lifting operation is carried out. While the oil pipe string is being lifted, the liquid in the pipe string can be discharged into the well through the K hole.

Claims

1. A basket-type oil well drainer, comprising an upper joint, an open-hole pipe equipped with a sealing sleeve, and a pump barrel short-circuit, characterized in that: An upper basket (6) with a plurality of opening elastic strips and a lower basket (8) with a plurality of closing elastic strips are arranged in the pump barrel short-circuit (5); the upper basket (6) and the lower basket (8) are connected together by shear nails (7).