Water circulation cooling device of air compressor
By setting up a heating box, a preheating box and a water storage tank in the air compressor cooling device, heat conduction is carried out using capillary network and water conduit pipe, and cooling is achieved through the fan, the problem of the compressor heat not being effectively utilized, and the heat is achieved. Effective utilization and cooling efficiency improvement.
Patent Information
- Application Number
- CN202420778572.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-16
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2034-04-16
AI Technical Summary
The existing air compressor cooling device fails to effectively utilize the heat generated by the compressor after absorbing the heat generated by the compressor, resulting in natural heat dissipation and waste of capacity.
A water circulation cooling device for air compressors is designed, including a heating box, a preheating box and a water storage tank. The capillary network and water conduit are used for heat conduction, and the heat of the coolant is used to heat and preheat pure water, and accelerate it through the fan. The airflow cools the coolant.
The heat generated by the compressor is effectively utilized to heat and preheat water, avoiding heat waste, and preventing the coolant from overheating through the fan, improving cooling efficiency.
Smart Images

Figure CN222025933U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of compressor cooling, in particular to a water circulation cooling device for an air compressor. Background Art
[0002] Publication number: CN215170598U, name: An air compressor cooling system, which discloses: comprising a first-stage compressor, a second-stage compressor, and a third-stage compressor connected in sequence, wherein the first-stage compressor, the second-stage compressor, and the third-stage compressor are respectively provided with a first heat dissipation shell, a second heat dissipation shell, and a third heat dissipation shell connected in sequence, and there are gaps between the first-stage compressor, the second-stage compressor, and the third-stage compressor and the first heat dissipation shell, the second heat dissipation shell, and the third heat dissipation shell, and the first heat dissipation shell, the second heat dissipation shell, and the third heat dissipation shell are respectively connected with a water cooler using circulating water to dissipate heat and a water pump for driving water circulation, the first, second, and third-stage compressors disperse the process of heat generated by compressed air, and control the heat dissipation at each stage, dissipate heat efficiently, and can accurately set the power of the cooling device, reducing unnecessary cooling consumption;
[0003] Although the above-mentioned disclosure realizes convenient control of the power of the cooling device and reduces unnecessary cooling consumption, the heat generated by the compressor is not effectively utilized after being absorbed by the cooling device, and the heat is allowed to dissipate naturally, resulting in a certain amount of capacity waste. Utility Model Content
[0004] In view of the deficiencies in the prior art, the utility model provides an air compressor water circulation cooling device, which solves the problem that although the above-mentioned disclosure realizes convenient control of the power of the cooling device and reduces unnecessary cooling consumption, the heat generated by the compressor is absorbed by the cooling device and is not effectively utilized, and the heat is allowed to dissipate naturally, thereby causing a certain amount of capacity waste.
[0005] To achieve the above objectives, the utility model is implemented through the following technical solutions: an air compressor water circulation cooling device, comprising a heating box, a preheating box and a water storage tank, wherein the heating box and the preheating box are respectively provided with a first capillary network and a second capillary network, the first capillary network and the second capillary network are interconnected through a first connecting pipe, the heating box and the preheating box are interconnected through a water pipe, the second capillary network and the water storage tank are interconnected through a second connecting pipe, and the top of the preheating box is fixedly connected to a main pipeline.
[0006] Preferably, a water inlet pipe is provided at one end of the heating box, the end of the water inlet pipe extends into the heating box and is connected to the first capillary network, and a faucet is fixedly installed on the side of the heating box.
[0007] Preferably, a water valve is fixedly installed on the circumference of the water conduit, and the height of the water conduit is smaller than the height of the main pipeline.
[0008] Preferably, a water outlet pipe is fixedly installed on the side of the water storage tank, a water pump is fixedly installed in the water storage tank, and the output end of the water pump is fixedly connected to the end of the water outlet pipe.
[0009] Preferably, a fan for supplying air into the water tank is fixedly mounted on the upper surface of the water tank.
[0010] Beneficial Effects
[0011] The utility model provides an air compressor water circulation cooling device. Compared with the prior art, it has the following beneficial effects:
[0012] (1) The air compressor water circulation cooling device is provided with a heating box and a preheating box. The heating box and the preheating box are respectively provided with a first capillary network and a second capillary network. The first capillary network and the second capillary network are interconnected by a first connecting pipe. The heat generated by the operation of the compressor is absorbed by the coolant. The coolant that absorbs the heat flows into the second capillary network after passing through the first capillary network. Pure water is stored in the heating box and the preheating box. The hotter coolant in the first capillary network and the second capillary network heats the pure water by heat conduction, so that the staff can use the heated pure water for daily use (such as taking a bath, etc.), thereby avoiding the waste of absorbed heat.
[0013] (2) The water circulation cooling device for the air compressor has a fan fixedly installed on the top of the water tank. The coolant is stored in the water tank. The fan drives the airflow to accelerate the cooling of the coolant, thereby avoiding insufficient cooling of the coolant and overheating of the compressor. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0015] Figure 2 This is a schematic diagram of the connection structure of the heating box, preheating box and water storage tank of the utility model;
[0016] Figure 3 It is an exploded schematic diagram of the overall structure of the utility model;
[0017] Figure 4 This is a schematic diagram of the connection structure of the water storage tank of the utility model.
[0018] In the figure: 1. heating box; 11. faucet; 12. water inlet pipe; 2. preheating box; 21. main pipeline; 3. water storage tank; 31. fan; 4. first connecting pipe; 5. second connecting pipe; 6. water guide pipe; 61. water valve; 7. water outlet pipe; 8. first capillary network; 9. second capillary network. DETAILED DESCRIPTION
[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0020] See also Figure 1-4 The utility model provides a technical solution: a water circulation cooling device for an air compressor, comprising a heating box 1, a preheating box 2 and a water storage tank 3, wherein the heating box 1 and the preheating box 2 are respectively provided with a first capillary network 8 and a second capillary network 9, the first capillary network 8 and the second capillary network 9 are interconnected through a first connecting pipe 4, the heating box 1 and the preheating box 2 are interconnected through a water guide pipe 6, the second capillary network 9 and the water storage tank 3 are interconnected through a second connecting pipe 5, and the top of the preheating box 2 is fixedly connected with a main pipeline 21.
[0021] Specifically, the heating box 1, the preheating box 2 and the water storage tank 3 are all box-type structures. Pure water is stored in the heating box 1 and the preheating box 2, and the coolant is stored in the water storage tank 3. The coolant in the water storage tank 3 flows into the compressor to absorb the heat generated by the compressor, and then flows into the first capillary network 8, and then flows into the water storage tank 3 through the second capillary network 9 to realize the circulation of the coolant. The coolant in the first capillary network 8 heats the pure water in the heating box 1 so that the surrounding staff can use the heated pure water for daily use to utilize the heat, thereby avoiding heat waste. The heated coolant in the heating box 1 flows into the second capillary network 9, and the remaining heat of the coolant in the second capillary network 9 preheats the pure water in the preheating box 2. The preheated pure water flows into the heating box 1 through the water conduit 6, thereby increasing the utilization efficiency of the heat in the coolant, and the pure water flows into the preheating box 2 through the main pipeline 21.
[0022] A water inlet pipe 12 is provided at one end of the heating box 1 , the end of the water inlet pipe 12 extends into the heating box 1 and is connected to the first capillary network 8 , and a faucet 11 is fixedly installed on the side of the heating box 1 .
[0023] Specifically, the coolant after absorbing heat from the compressor flows into the first capillary network 8 through the water inlet pipe 12, and the heated pure water is discharged through the faucet 11. The faucet 11 is a prior art. Furthermore, the pure water can be specifically replaced by domestic water.
[0024] A water valve 61 is fixedly installed on the circumference of the water conduit 6 , and the height of the water conduit 6 is smaller than the height of the main pipeline 21 .
[0025] Specifically, the height of the main pipeline 21 is greater than the height of the water pipe 6, so that the pure water in the preheating box 2 can flow normally into the heating box 1 through the water pipe 6, and the water valve 61 is used to control the flow rate of the pure water.
[0026] A water outlet pipe 7 is fixedly installed on the side of the water storage tank 3 , and a water pump is fixedly installed in the water storage tank 3 , and the output end of the water pump is fixedly connected to the end of the water outlet pipe 7 .
[0027] Specifically, the coolant in the water tank 3 flows out through the water outlet pipe 7, and the flowing coolant enters the compressor to absorb heat from the compressor.
[0028] A fan 31 for blowing air into the water tank 3 is fixedly mounted on the upper surface of the water tank 3 .
[0029] Specifically, the fan 31 supplies air to the water tank 3 to perform final cooling on the coolant in the water tank 3 to prevent the coolant temperature from being too high and the compressor from being unable to be cooled normally.
[0030] Meanwhile, the contents not described in detail in this specification belong to the prior art known to those skilled in the art.
[0031] During operation, the cooling liquid that absorbs heat flows into the first capillary network 8 through the water inlet pipe 12, and the cooling liquid in the first capillary network 8 heats the pure water in the heating box 1. Then the cooling liquid continues to flow into the second capillary network 9 to preheat the pure water in the preheating box 2. Finally, the cooling liquid that absorbs most of the heat is collected in the water storage tank 3, and the fan 31 cools the cooling liquid.
[0032] The heating process of pure water is as follows: pure water flows into the preheating box 2 through the main pipeline 21, the second capillary network 9 preheats the pure water, the preheated pure water flows into the heating box 1, and the pure water is heated by the first capillary network 8.
[0033] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0034] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A water circulation cooling device for an air compressor, Features: It comprises a heating box (1), a preheating box (2) and a water storage tank (3); The heating box (1) and the preheating box (2) are respectively provided with a first capillary network (8) and a second capillary network (9); the first capillary network (8) and the second capillary network (9) are interconnected via a first connecting pipe (4); The heating box (1) and the preheating box (2) are interconnected via a water pipe (6), and the second capillary network (9) and the water storage tank (3) are interconnected via a second connecting pipe (5); The top end of the preheating box (2) is fixedly connected to a main pipeline (21).
2. The air compressor water circulation cooling device according to claim 1, Features: A water inlet pipe (12) is provided at one end of the heating box (1), the end of the water inlet pipe (12) extends into the heating box (1) and is in communication with the first capillary network (8), and a faucet (11) is fixedly mounted on the side of the heating box (1).
3. The air compressor water circulation cooling device according to claim 1, Features: A water valve (61) is fixedly installed on the circumference of the water conduit (6), and the height of the water conduit (6) is smaller than the height of the main pipeline (21).
4. The air compressor water circulation cooling device according to claim 1, Features: A water outlet pipe (7) is fixedly mounted on the side of the water storage tank (3), a water pump is fixedly mounted inside the water storage tank (3), and the output end of the water pump is fixedly connected to the end of the water outlet pipe (7).
5. The air compressor water circulation cooling device according to claim 1, Features: A fan (31) for supplying air into the water tank (3) is fixedly mounted on the upper surface of the water tank (3).
Citation Information
Cited By
Self-cooling device of magnetic suspension air compressor
CN224049427U
