High-fill embankment settlement observation device

By designing a high-fill embankment settlement observation device including settlement embedded parts, fixed references, hollow pipes and pulley components, the problem of existing equipment affecting construction compaction and susceptibility to interference is solved, and the construction period and use of the embankment is realized. accurate settlement observations during the period.

CN222027681UActive Publication Date: 2024-11-19RAILWAY NO 5 BUREAU GRP FIRST ENG CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323612906.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-28
Publication Date
2024-11-19
Estimated Expiration
2033-12-28

AI Technical Summary

Technical Problem

The existing high-fill subgrade settlement observation equipment affects the compaction quality during the construction period, is complex in installation and maintenance, and is susceptible to driving interference during use, resulting in inaccurate observations.

Method used

A high-fill embankment settlement observation device including settlement embedded parts, fixed references, hollow tubes, pulley components, pulley components, pulley components, gravity blocks and scale lines is designed. The settlement embedded parts are arranged at the position to be monitored by the embankment, and are realized by pulley components and pulley components. Settlement measurement, avoid gravity block shaking, and use scale marks to improve measurement accuracy.

Benefits of technology

The device does not affect the compaction quality of the embankment during the construction period, reduces external interference, is simple to operate, and can accurately observe settlement during the construction period and service period of the embankment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222027681U_ABST
    Figure CN222027681U_ABST
Patent Text Reader

Abstract

The utility model relates to a high-fill embankment settlement observation device which comprises a settlement embedded part, a fixed reference, a first hollow pipe, a second hollow pipe, a pulley assembly, a stay wire, a gravity block, a vertical sliding groove and scale marks, the settlement embedded part is arranged at a position to be monitored, the fixed reference is arranged on the outer side of a slope toe, the first hollow pipe is arranged below a high-fill embankment, and the second hollow pipe is arranged below the vertical sliding groove. One end of the first hollow pipe is located below the settlement embedded part, the other end of the first hollow pipe extends out of the outer side of a slope toe of the high-fill embankment, the second hollow pipe is vertically arranged, the upper end of the second hollow pipe is connected with the settlement embedded part, and the lower end of the second hollow pipe is connected with the first hollow pipe; the scale marks are located on one side of the vertical sliding groove, one end of the pull wire is connected with the sedimentation embedded part, the other end of the pull wire is connected with the gravity block, and the pull wire penetrates through the second hollow pipe and the first hollow pipe under traction of the pulley assembly and vertically stretches into the vertical sliding groove. The device can realize settlement observation in the construction period and the use period of the embankment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of roadbed settlement monitoring, and in particular to a high fill embankment settlement observation device. Background Art

[0002] High fill roadbeds are common in mountainous areas. High fill roadbeds are prone to settlement and deformation, so special attention should be paid to the settlement and deformation of high fill roadbeds. Monitoring the settlement of the roadbed during the construction period has a good guiding role in controlling the construction rate and ensuring the construction quality. Monitoring the settlement of the roadbed during the service period can timely detect settlement and deformation, prevent road collapse and cracking, and reduce road accidents.

[0003] At present, the settlement observation equipment for high embankment roadbed is mainly the settlement plate, which is composed of a steel bottom plate, a metal measuring rod and a protective sleeve rod. The steel bottom plate is buried in the soil layer to be observed, and the metal measuring rod is connected to the steel bottom plate and is continuously raised with the filling of the embankment. The top of the metal measuring rod is exposed to the ground, and the settlement amount at the top of the measuring rod measured by the level is used as the settlement amount of the soil layer to be observed. The use of settlement plates for settlement observation has the following shortcomings: First, it has a great impact on the roadbed construction. Construction machinery cannot approach the measuring rod for rolling, and can only use small machinery for rolling, so the compaction quality around the measuring rod is worse than elsewhere; second, the measuring rod needs to be continuously extended, which is troublesome to install; third, during the use of the highway, the top of the measuring rod protrudes from the road surface and is easily deformed by passing vehicles, resulting in inaccurate observation results. Utility Model Content

[0004] Based on this, it is necessary to provide a high fill embankment settlement observation device that can perform settlement observation during the embankment construction period and the service period, does not affect the construction compaction quality, is not disturbed by driving, and is easy to operate and use.

[0005] To achieve the above objectives, the technical solutions adopted in this application are as follows:

[0006] A high embankment settlement observation device, comprising a settlement embedded part, a fixed reference, a first hollow tube, a second hollow tube, a pulley assembly, a pull line, a gravity block, a vertical slide and a scale line, wherein the settlement embedded part is arranged at a position to be monitored on the high embankment, the fixed reference is arranged outside the slope foot of the high embankment, the first hollow tube is arranged below the high embankment, and one end of the first hollow tube is located below the settlement embedded part, and the other end extends outside the slope foot of the high embankment, and the second hollow tube is vertically The second hollow tube is arranged, and the upper end thereof is connected to the sinking embedded part, and the lower end thereof is connected to the first hollow tube, the vertical slide groove is arranged on the fixed reference, the gravity block is slidably installed on the vertical slide groove, the scale line is arranged on the fixed reference and is located on one side of the vertical slide groove, one end of the pull wire is connected to the sinking embedded part, and the other end is connected to the gravity block, and the pull wire passes through the second hollow tube and the first hollow tube under the traction of the pulley assembly and extends vertically into the vertical slide groove.

[0007] Furthermore, the sinking embedded part includes a closed box with a horizontal strip shape and a hollow interior. A pull hook is provided inside the closed box in the middle of the bottom wall, one end of the pull wire is fixedly connected to the pull hook, and a connection port is provided at the lower part of one end of the closed box, and the connection port is used to connect the upper end of the second hollow tube.

[0008] Furthermore, the first hollow tube has a first right-angle tube portion, a second right-angle tube portion and a straight tube portion, and the first right-angle tube portion and the second right-angle tube portion are respectively arranged at two ends of the straight tube portion; the straight tube portion is placed horizontally, the upper end of the first right-angle tube portion is connected to the second hollow tube, and the upper end of the second right-angle tube portion is fixed to one side of the fixed reference.

[0009] Furthermore, the pulley assembly includes a first pulley, a second pulley, a third pulley and a fourth pulley, the first pulley is arranged on the first right-angle tube portion, the second pulley is arranged on the second right-angle tube portion, a pulley bracket is provided on the fixed reference, the third pulley is arranged on the pulley bracket, and the fourth pulley is installed in the closed box at a position close to the connecting port, and the pull wire is sequentially wound around the fourth pulley, the first pulley, the second pulley and the third pulley.

[0010] Furthermore, a balancing block for balancing the gravity of the fourth pulley is provided in the closed box, and the balancing block and the fourth pulley are separately arranged on both sides of the hook.

[0011] Furthermore, the scale line is vertically arranged on the left side or the right side of the vertical slide groove, and a pointer is fixedly arranged on the gravity block, and the tip of the pointer points to the scale line.

[0012] Furthermore, small pulley assemblies are respectively arranged on the opposite sides of the gravity block, and the small pulley assemblies include a plurality of small pulleys arranged at intervals along the vertical direction, and the small pulleys abut against the wall surface of the vertical slide groove, and the gravity block is slidably installed on the vertical slide groove through two small pulley assemblies.

[0013] Furthermore, the second hollow tube is a corrugated rubber steel wire telescopic tube.

[0014] The high embankment settlement observation device of the present application sets the settlement embedded parts at the position to be monitored of the high embankment. When the position to be monitored settles, the settlement embedded parts will move down together, so the end of the wire connected to the settlement embedded parts will also move down the same distance, so the settlement amount of the position to be monitored can be known according to the vertical drop height of the gravity block connected to the other end of the wire. The device of the present application ensures that the gravity block can only move vertically by setting a vertical slide, avoiding the shaking of the gravity block and affecting the measurement accuracy. The scale line is set on one side of the vertical slide to facilitate observation, and the first hollow tube and the second hollow tube are set to form a space for the wire to pass through. The pulley assembly is set to pull the wire, and the overall operation and use of the device is simple. The high embankment settlement observation device of the present application is set as a whole below the position to be monitored of the high embankment, does not affect the compaction of the embankment construction, and the settlement observation is less disturbed by the outside world, so that settlement observation can be achieved during the embankment construction period and the use period. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0016] Figure 1 This is a schematic diagram of the structure of an embodiment of the present application;

[0017] Figure 2 for Figure 1 The enlarged schematic diagram at A in the middle is used to show the structure of the sinking embedded part in this application;

[0018] Figure 3 for Figure 1 The enlarged schematic diagram at B is used to show the structure and connection relationship of the gravity block, vertical slide groove and scale lines in this application.

[0019] Description of reference numerals:

[0020] 10. Sinking embedded parts; 11. Closing box; 12. Draw hook; 13. Connection port; 14. Balance block; 20. Fixed reference; 21. Pulley bracket; 30. First hollow tube; 31. First right-angle tube portion; 32. Second right-angle tube portion; 33. Straight tube portion; 40. Second hollow tube; 51. First pulley; 52. Second pulley; 53. Third pulley; 54. Fourth pulley; 60. Pull wire; 70. Gravity block; 71. Pointer; 72. Small pulley; 80. Vertical slide groove; 90. Scale line. DETAILED DESCRIPTION

[0021] In order to make the above-mentioned purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are described in detail below with reference to the accompanying drawings. The present application can be implemented in many other ways different from those described herein, and those skilled in the art can make similar improvements without violating the connotation of the present application, so the present application is not limited by the specific embodiments disclosed below.

[0022] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0023] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of this application, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0024] In this application, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0025] In the present application, unless otherwise clearly specified and limited, a first feature being “above” or “below” a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being “above”, “above”, and “above” a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being “below”, “below”, and “below” a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0026] refer to Figures 1 to 3 The present application provides a high embankment settlement observation device, comprising a settlement embedded part 10, a fixed reference 20, a first hollow tube 30, a second hollow tube 40, a pulley assembly, a pull line 60, a gravity block 70, a vertical slide 80 and a scale line 90, wherein the settlement embedded part 10 is arranged at a position to be monitored on the high embankment, the fixed reference 20 is arranged outside the slope foot of the high embankment, the first hollow tube 30 is arranged below the high embankment, and one end of the first hollow tube 30 is located below the settlement embedded part 10, and the other end extends outside the slope foot of the high embankment, and the second hollow tube 40 is vertically extended. The second hollow tube 40 is configured to have an upper end connected to the sinking embedded part 10 and a lower end connected to the first hollow tube 30, the vertical slide groove 80 is configured on the fixed reference 20, the gravity block 70 is slidably installed on the vertical slide groove 80, the scale line 90 is configured on the fixed reference 20 and is located on one side of the vertical slide groove 80, one end of the pull wire 60 is connected to the sinking embedded part 10, and the other end is connected to the gravity block 70, and the pull wire 60 passes through the second hollow tube 40 and the first hollow tube 30 under the traction of the pulley assembly and vertically extends into the vertical slide groove 80.

[0027] Specifically, refer to Figure 1 , Figure 2 and Figure 3The sinking embedded part 10 includes a closed box 11 and a hook 12 arranged inside the closed box 11 and located in the middle of the bottom wall. The closed box 11 is in a horizontal strip shape, and a connecting port 13 is provided at the lower part of one end of the closed box 11. The connecting port 13 is used to connect the upper end of the second hollow tube 40; the first hollow tube 30 has a first right-angle tube portion 31, a second right-angle tube portion 32 and a straight tube portion 33, and the first right-angle tube portion 31 and the second right-angle tube portion 32 are respectively arranged on the straight tube portion 33 The straight tube portion 33 is placed horizontally at both ends of the first right-angle tube portion 31, the upper end of the first right-angle tube portion 31 is used to connect the lower end of the second hollow tube 40, and the upper end of the second right-angle tube portion 32 extends out of the ground and is located on one side of the fixed reference 20; the pulley assembly includes a first pulley 51, a second pulley 52, a third pulley 53 and a fourth pulley 54, the first pulley 51 is arranged on the first right-angle tube portion 31, the second pulley 52 is arranged on the second right-angle tube portion 32, and a pulley is arranged on the fixed reference 20. The wheel bracket 21, the third pulley 53 is arranged on the pulley bracket 21, and the fourth pulley 54 is installed in the closed box 11 at a position close to the connecting port 13; a balancing block 14 for balancing the gravity of the fourth pulley 54 is provided in the closed box 11, and the balancing block 14 and the fourth pulley 54 are separately arranged on both sides of the hook 12; one end of the pull wire 60 is fixedly tied to the hook 12, and the other end is connected to the gravity block 70, the pull wire 60 is sequentially wound around the fourth pulley 54, the first pulley 51, the second pulley 52 and the third pulley 53, the pull wire 60 is vertically arranged between the fourth pulley 54 and the first pulley 51, the pull wire 60 is horizontally arranged between the first pulley 51 and the second pulley 52, the pull wire 60 is inclined to the vertical direction between the second pulley 52 and the third pulley 53, and the pull wire 60 is also vertically arranged between the third pulley 53 and the gravity block 70.

[0028] Preferably, the closed box 11 is a stainless steel box, the first hollow tube 30 is a round steel tube, the second hollow tube 40 is a corrugated rubber steel wire telescopic tube, and waterproof measures are provided at the connection between the second hollow tube 40 and the closed box 11 and at the connection between the second hollow tube 40 and the first hollow tube 30.

[0029] refer to Figure 3 The vertical slide groove 80 and the scale line 90 are both vertically arranged on the fixed reference 20, and the scale line 90 is located on the left or right side of the vertical slide groove 80. The gravity block 70 is slidably installed on the vertical slide groove 80, and a pointer 71 is fixedly arranged on the gravity block 70, and the tip of the pointer 71 points to the scale line 90.

[0030] refer to Figure 3 Small pulley assemblies are respectively arranged on the opposite sides of the gravity block 70, and the small pulley assemblies include a plurality of small pulleys 72 arranged at intervals in the vertical direction. The small pulleys 72 are against the wall surface of the vertical slide groove 80, and the gravity block 70 is slidably installed on the vertical slide groove 80 through two small pulley assemblies.

[0031] The high embankment settlement observation device of the present application sets the settlement embedded part 10 at the position to be monitored of the high embankment. When the position to be monitored settles, the settlement embedded part 10 will move down together, so the end of the pull wire 60 connected to the settlement embedded part 10 will also move down by the same distance, so that the settlement amount of the position to be monitored can be known according to the vertical drop height of the gravity block 70 connected to the other end of the pull wire 60. The device of the present application ensures that the gravity block 70 can only move vertically by setting a vertical slide 80 to avoid the gravity block 70 shaking and affecting the measurement accuracy, and sets a scale line 90 on one side of the vertical slide 80 for easy observation, sets a first hollow tube 30 and a second hollow tube 40 to form a space for the pull wire 60 to pass through, and sets a pulley assembly to pull the pull wire 60. The overall operation of the device is simple. The high embankment settlement observation device of the present application is overall arranged below the position to be monitored of the high embankment, does not affect the compaction of the embankment construction, and the settlement observation is less affected by external interference, thereby achieving settlement observation during the embankment construction period and the use period.

[0032] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0033] The above-described embodiments only express several implementation methods of the present application and should not be construed as limiting the scope of the patent application. It should be noted that, for a person of ordinary skill in the art, several modifications and improvements can be made without departing from the concept of the present application, and these all fall within the scope of protection of the present application. Therefore, the scope of protection of the present patent application shall be subject to the attached claims.

Claims

1. A high embankment settlement observation device, characterized in that: The sled comprises a settlement embedded part, a fixed reference, a first hollow tube, a second hollow tube, a pulley assembly, a pull wire, a gravity block, a vertical slide groove and a scale line, wherein the settlement embedded part is arranged at the position to be monitored of the high embankment, the fixed reference is arranged at the outside of the slope foot of the high embankment, the first hollow tube is arranged below the high embankment, and one end of the first hollow tube is located below the settlement embedded part, and the other end extends out of the slope foot of the high embankment, the second hollow tube is arranged vertically, and the upper end of the second hollow tube is connected to the settlement embedded part, and the lower end is connected to the first hollow tube, the vertical slide groove is arranged on the fixed reference, the gravity block is slidably installed on the vertical slide groove, the scale line is arranged on the fixed reference and is located on one side of the vertical slide groove, one end of the pull wire is connected to the settlement embedded part, and the other end is connected to the gravity block, and the pull wire passes through the second hollow tube and the first hollow tube under the traction of the pulley assembly and vertically extends into the vertical slide groove.

2. The high embankment settlement observation device according to claim 1 is characterized in that: The sinking embedded part includes a closed box with a horizontal strip shape and a hollow interior. A draw hook is provided in the middle of the bottom wall inside the closed box. One end of the pull wire is fixedly connected to the draw hook. A connection port is provided at the lower part of one end of the closed box. The connection port is used to connect the upper end of the second hollow tube.

3. The high embankment settlement observation device according to claim 2 is characterized in that: The first hollow tube comprises a first right-angle tube portion, a second right-angle tube portion and a straight tube portion, wherein the first right-angle tube portion and the second right-angle tube portion are respectively arranged at two ends of the straight tube portion; the straight tube portion is placed horizontally, the upper end of the first right-angle tube portion is connected to the second hollow tube, and the upper end of the second right-angle tube portion is fixed to one side of the fixed reference.

4. The high embankment settlement observation device according to claim 3 is characterized in that: The pulley assembly includes a first pulley, a second pulley, a third pulley and a fourth pulley, the first pulley is arranged on the first right-angle tube portion, the second pulley is arranged on the second right-angle tube portion, a pulley bracket is provided on the fixed reference, the third pulley is arranged on the pulley bracket, and the fourth pulley is installed in the closed box at a position close to the connecting port, and the pull wire is sequentially wound around the fourth pulley, the first pulley, the second pulley and the third pulley.

5. The high embankment settlement observation device according to claim 4 is characterized in that: A balancing block for balancing the gravity of the fourth pulley is arranged in the closed box, and the balancing block and the fourth pulley are separately arranged on both sides of the hook.

6. The high embankment settlement observation device according to claim 1, characterized in that: The scale line is vertically arranged on the left side or the right side of the vertical slide groove, and a pointer is fixedly arranged on the gravity block, and the tip of the pointer points to the scale line.

7. The high embankment settlement observation device according to claim 1 is characterized in that: Small pulley assemblies are respectively arranged on the opposite sides of the gravity block, and the small pulley assemblies include a plurality of small pulleys arranged at intervals along the vertical direction. The small pulleys abut against the wall surface of the vertical slide groove, and the gravity block is slidably installed on the vertical slide groove through two small pulley assemblies.

8. The high embankment settlement observation device according to claim 1, characterized in that: The second hollow tube is a corrugated rubber steel wire telescopic tube.