Electrolytic flue gas purification material conveying system capable of preheating aluminum oxide
By designing an electrolytic flue gas purification material delivery system for preheated alumina, fresh alumina reacts with high-temperature flue gas and shortens the conveying distance, the problem of cooling of alumina with flue-loaded flue is solved and a higher temperature is achieved to enter the electrolytic tank , reducing the energy consumption and investment costs of electrolytic production systems.
Patent Information
- Application Number
- CN202420055408.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-10
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-01-10
AI Technical Summary
During the purification of aluminum oxide electrolytic flue gas, fluorine-loaded aluminum oxide cools down due to the long-standing placement time, and the temperature is low when entering the electrolytic tank, resulting in an increase in energy consumption of the electrolytic production system.
An electrolytic flue gas purification material conveying system that can preheat alumina is designed to preheat alumina, and the aluminum flue-loading flue gas is preheated by reacting fresh alumina with high-temperature flue gas, and the conveying distance is shortened by returning to the alumina chute and the super-concentrated phase conveying chute. Let the fluorine-carrying aluminum oxide directly enter the electrolytic cell at high temperature.
It effectively reduces the energy consumption of the electrolytic production system, reduces the placement time and conveying distance of fluorine-carrying aluminum oxide, improves purification efficiency, saves investment costs, and solves the problems of large volume and dead material areas of traditional alumina silos.
Smart Images

Figure CN222043378U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a material conveying system, in particular to an electrolytic fume purification material conveying system capable of preheating aluminum oxide, belonging to the technical field of aluminum electrolytic fume treatment. Background Art
[0002] The electrolytic flue gas purification adopts the alumina adsorption process. Fresh alumina reacts with flue gas to generate fluorine-carrying alumina, which is stored in the fluorine-carrying alumina bin and then sent to the electrolytic cell through the super-dense phase conveying system to participate in the electrolytic reaction. After the alumina reacts with the electrolytic flue gas, the temperature rises to about 120°C. However, due to the long placement time in the fluorine-carrying alumina bin, generally 1.5 to 3 days, the temperature gradually decreases. When it is sent to the electrolytic cell, the fluorine-carrying alumina is about 45 to 50°C. When the fluorine-carrying alumina enters the electrolyte, it first absorbs a large amount of heat from the electrolyte, raising its own temperature to the electrolyte temperature. The amount of heat absorbed is: Q=C×m×Δt, where C is the specific heat capacity of alumina, 1.23016 J / g·k, m is the amount of alumina added, and Δt is the temperature difference between the electrolyte and the added alumina.
[0003] Therefore, developing a method to add the fluorine-loaded alumina after reacting with flue gas into the electrolytic cell as quickly as possible can utilize the waste heat of flue gas to effectively preheat the fluorine-loaded alumina and reduce the comprehensive power consumption of aluminum liquid. Summary of the invention
[0004] In order to solve the above technical problems, the utility model provides an electrolytic fume purification material conveying system capable of preheating alumina, with the purpose of reducing the placement time and conveying distance of fluorine-loaded alumina, making the fluorine-loaded alumina enter the aluminum electrolytic cell at a higher temperature, and effectively reducing the energy consumption of the electrolytic production system.
[0005] To achieve the above-mentioned purpose, the utility model provides an electrolytic flue gas purification material conveying system capable of preheating alumina, comprising a fresh alumina conveying system, a plurality of conveying systems within purification systems, and a fluorine-carrying alumina conveying system matched with the conveying system within the purification system. The fresh alumina conveying system is connected to the conveying system within the purification system through a second fresh alumina chute, and the conveying system within the purification system is connected to the fluorine-carrying alumina conveying system through a return alumina chute.
[0006] The fresh alumina conveying system includes an alumina warehouse, in which an alumina bag unpacking platform is provided. The alumina bag unpacking platform delivers alumina to a bucket elevator through a first fresh alumina chute. The bucket elevator lifts the fresh alumina to a height of 30m and then delivers it to the conveying system in the purification system through a second fresh alumina chute.
[0007] The conveying system in each purification system is placed next to the electrolysis workshop. The conveying system in each purification system includes a fresh alumina bin and a dust collector. A third fresh alumina chute is provided above the fresh alumina bin, and the third fresh alumina chute is connected to the second fresh alumina chute. A fourth fresh alumina chute is provided below the fresh alumina bin. An alumina material control and slag removal system is provided between the lower side wall of the fresh alumina bin and the fourth fresh alumina chute. The lower part of the dust collector is an ash hopper, and the upper part of the ash hopper is connected to the top of the reactor through a pipeline. The bottom of the reactor is connected to a high-temperature smoke pipe, and the fourth fresh alumina chute is connected to the reactor.
[0008] The lower part of the fresh alumina bin is conical, and a spare pipeline is provided between the bottom of the fresh alumina bin and the fourth fresh alumina chute.
[0009] The storage capacity of each fresh alumina bin is 0.5 to 3 days of electrolytic production usage of the corresponding electrolytic cell of the purification system.
[0010] The conveying system in each purification system processes the flue gas of 10 to 20 electrolytic cells, and the dust collector and ash hopper in the conveying system in each purification system can meet the consumption of aluminum electrolysis for 5 to 15 hours.
[0011] A circulating alumina material pipe is provided between the lower part of the ash hopper and the reactor, a fresh circulating alumina mixing buffer tank is provided on the circulating alumina material pipe, a fourth fresh alumina chute is connected to the fresh circulating alumina mixing buffer tank, and the fresh circulating alumina mixing buffer tank is connected to the reactor through a pipeline.
[0012] The ash hopper is in an inverted trapezoidal shape.
[0013] One end of the return alumina chute is arranged at the bottom outlet of the ash hopper, and the other end of the return alumina chute is connected to one end of the super-dense phase conveying chute of the fluorine-carrying alumina conveying system, and the other end of the super-dense phase conveying chute is connected to one end of the upper conveying chute of the electrolytic cell, and the upper conveying chute of the electrolytic cell is arranged above the electrolytic cell.
[0014] Advantages and effects of the utility model: The utility model reduces the placement time and transportation of fluorine-carrying aluminum oxide.
[0015] The distance, the fluorine-carrying alumina preheated by the electrolytic flue gas enters the aluminum electrolytic cell at a higher temperature, which effectively reduces the energy consumption of the electrolytic production system. The fluorine-carrying alumina bin and the bucket elevator connected to the fluorine-carrying alumina bin are cancelled, saving investment costs; the number of dust collectors in the purification system is small, the equipment configuration is more flexible, the material distribution is more uniform, and the purification efficiency is effectively improved; the volume of the fresh alumina bin is small, and the equipment is miniaturized, which effectively solves the problem of large volume of traditional alumina bins, dead material areas and invalid inventory; each set of purification system requires less alumina, and the alumina impurity removal and metering are more stable. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 This is a plan view of the utility model.
[0017] Figure 2 It is a schematic diagram of the connection between the fresh alumina bin and the third fresh alumina chute of the utility model.
[0018] Figure 3 It is a schematic diagram of the connection between the dust collector, the fresh alumina bin and the reactor of the utility model.
[0019] Figure 4 A schematic diagram showing the connection between the delivery system in the purification system of the utility model and the delivery system of fluorine-carrying aluminum oxide.
[0020] In the figure: 1. Alumina warehouse; 2. Alumina bag unpacking platform; 3. First fresh alumina chute; 4. Bucket elevator; 5. Second fresh alumina chute; 6. Third fresh alumina chute; 7. Fresh alumina warehouse; 8. Alumina material control and slag removal system; 9. Fourth fresh alumina chute; 10. Reactor; 11. Dust collector; 12. Ash hopper; 13. Circulating alumina material pipe; 14. Fresh circulating alumina mixing buffer tank; 15. Return alumina chute; 16. Super dense phase conveying chute; 17. Electrolytic cell upper conveying chute; 18. Electrolytic cell; 19. Pipeline; 20. High-temperature smoke pipe; 21. Spare pipeline. DETAILED DESCRIPTION
[0021] The following will be combined with the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0022] like Figure 1-4 As shown, an electrolytic flue gas purification material conveying system capable of preheating alumina includes a fresh alumina conveying system, 8 conveying systems within the purification system and 8 conveying systems for fluorine-loaded alumina. The fresh alumina conveying system is connected to the conveying system within the purification system through a second fresh alumina chute 5, and the conveying system within the purification system is connected to the conveying system for fluorine-loaded alumina through a return alumina chute 15.
[0023] The fresh alumina conveying system includes an alumina warehouse 1, in which an alumina bag unpacking platform 2 is provided. The alumina bag unpacking platform 2 delivers alumina to a bucket elevator 4 through a first fresh alumina chute 3. The bucket elevator 4 lifts the fresh alumina to a height of 30m and then delivers it to the conveying system in the purification system through a second fresh alumina chute 5. The second fresh alumina chute 5 delivers to a third fresh alumina chute 6 across the top of the electrolysis workshop.
[0024] The conveying system in each set of purification system is placed next to the electrolysis workshop. The conveying system in each set of purification system includes a fresh alumina bin 7 and a dust collector 11. A third fresh alumina chute 6 is provided above the fresh alumina bin 7. A fourth fresh alumina chute 9 is provided below the fresh alumina bin 7. An alumina material control and slag removal system 8 is provided between the lower side wall of the fresh alumina bin 7 and the fourth fresh alumina chute 9. The alumina material control and slag removal system 8 is used to remove impurities in the fresh alumina and measure the amount of material discharged. The lower part of the dust collector 11 is an ash hopper 12. The ash hopper 1 The upper part of the reactor 10 is connected to the top of the reactor 10 through the pipeline 19, the bottom of the reactor 10 is connected to the high-temperature smoke pipe 20, and the fourth fresh alumina chute 9 is connected to the reactor 10. Alumina is sent from the fresh alumina bin 7 to the reactor 10 through the fourth fresh alumina chute 9, and reacts with the high-temperature flue gas from the high-temperature smoke pipe 20. In the process of contacting with the flue gas, the alumina is preheated by the flue gas and the temperature is raised to about 120°C. After the reaction, the alumina enters the ash hopper 12 through the pipeline 19, and then enters the dust collector 11. After gas-solid separation, the fluorine-loaded alumina falls into the ash hopper 12.
[0025] The lower part of the fresh alumina bin 7 is conical, and a spare pipeline 21 is provided between the bottom of the fresh alumina bin 7 and the fourth fresh alumina chute 9. When the alumina material control and slag removal system 8 is overhauled, the spare pipeline 21 is opened.
[0026] The storage capacity of each fresh alumina bin 7 is 0.5 to 3 days of electrolytic production usage of the corresponding electrolytic cell of the purification system.
[0027] The conveying system in each purification system processes the flue gas of 10 to 20 electrolytic cells, and the dust collector 11 and ash hopper 12 in the conveying system in each purification system can meet the consumption of aluminum electrolysis for 5 to 15 hours.
[0028] A circulating alumina material pipe 13 is provided between the lower part of the ash hopper 12 and the reactor 10, a fresh circulating alumina mixing buffer tank 14 is provided on the circulating alumina material pipe 13, the fourth fresh alumina chute 9 is connected to the fresh circulating alumina mixing buffer tank 14, and the fresh circulating alumina mixing buffer tank 14 is connected to the reactor 10 through a pipeline; the ash hopper 12 is an inverted trapezoid. A portion of the fluorine-carrying alumina enters the fresh circulating alumina mixing buffer tank 14 through the circulating alumina material pipe 13, is mixed with the fresh alumina in the fourth fresh alumina chute 9, and is then sent to the reactor to continue to participate in the purification reaction.
[0029] One end of the return alumina chute 15 is arranged at the bottom outlet of the ash hopper 12, and the other end of the return alumina chute 15 is connected to one end of the super-dense phase conveying chute 16 of the conveying system of the fluorine-carrying alumina, and the other end of the super-dense phase conveying chute 16 is connected to one end of the upper conveying chute 17 of the electrolytic cell, and the upper conveying chute 17 of the electrolytic cell is arranged above the electrolytic cell 18. Another part of the fluorine-carrying alumina in the ash hopper 12 is firstly conveyed to the super-dense phase conveying chute 16 through the return alumina chute 15, and then discharged to the electrolytic cell 18 through the upper conveying chute 17 of the electrolytic cell. Since the fluorine-carrying alumina is conveyed almost without stopping, it is directly conveyed to the electrolytic cell through the fluorine-carrying alumina conveying system, and the conveying path is short, so the temperature of the fluorine-carrying alumina when entering the electrolytic cell is about 100-110°C.
[0030] According to the present invention, the temperature of the fluorine-carrying alumina when entering the electrolytic cell is 105°C, and the temperature of the fluorine-carrying alumina when entering the electrolytic cell in the traditional material transportation method is 50°C. The energy saving per ton of aluminum produced by the utility model compared with the traditional material transportation method is as follows:
[0031] Q = C × m × Δt;
[0032] Among them, C = 1.23016 J / g·k; about 1.92 tons of alumina raw materials are needed to produce one ton of aluminum, so m = 1.92 tons; Δt = 105-50 = 55℃ = 55k
[0033] Therefore, Q = 36kW·h. By adopting the utility model, 36kW·h of electricity can be saved for each ton of aluminum produced.
[0034] The above disclosure is only a preferred embodiment of the present invention, and certainly cannot be used to limit the scope of rights of the present invention. Therefore, equivalent changes made according to the claims of the present invention are still within the scope covered by the present invention.
Claims
1. A material conveying system for electrolytic flue gas purification capable of preheating alumina, It is characterized in that It includes a fresh alumina conveying system, several conveying systems in purification systems and a fluorine-loaded alumina conveying system matched with the conveying system in the purification system. The fresh alumina conveying system is connected to the conveying system in the purification system through a second fresh alumina chute, and the conveying system in the purification system is connected to the fluorine-loaded alumina conveying system through a return alumina chute.
2. The electrolytic flue gas purification material conveying system capable of preheating alumina according to claim 1, Features The fresh alumina conveying system includes an alumina warehouse with an alumina bag unpacking platform. The alumina bag unpacking platform delivers alumina to a bucket elevator through a first fresh alumina chute. The bucket elevator lifts the fresh alumina to a height of 30m and then delivers it to the conveying system in the purification system through a second fresh alumina chute.
3. The electrolytic flue gas purification material conveying system capable of preheating alumina according to claim 1, Features The conveying system in each purification system is placed next to the electrolysis workshop. There is no fluorine-containing alumina bin. The conveying system in each purification system includes a fresh alumina bin and a dust collector. A third fresh alumina chute is provided above the fresh alumina bin, which is connected to the second fresh alumina chute. A fourth fresh alumina chute is provided below the fresh alumina bin. An alumina material control and slag removal system is provided between the lower side wall of the fresh alumina bin and the fourth fresh alumina chute. The lower part of the dust collector is an ash hopper, the upper part of the ash hopper is connected to the top of the reactor through a pipeline, the bottom of the reactor is connected to a high-temperature smoke pipe, and the fourth fresh alumina chute is connected to the reactor.
4. The electrolytic flue gas purification material conveying system capable of preheating alumina according to claim 3, Features The lower part of the fresh alumina bin is conical, and a spare pipeline is provided between the bottom of the fresh alumina bin and the fourth fresh alumina chute.
5. The electrolytic flue gas purification material conveying system capable of preheating alumina according to claim 3, Features The storage capacity of each fresh alumina bin is 0.5 to 3 days of electrolytic production consumption of the corresponding electrolytic cell of the purification system.
6. The electrolytic flue gas purification material conveying system capable of preheating alumina according to claim 3, Features The conveying system in each purification system processes the flue gas of 10 to 20 electrolytic cells, and the dust collector and ash hopper in the conveying system in each purification system can meet the consumption of aluminum electrolysis for 5 to 15 hours.
7. The electrolytic flue gas purification material conveying system capable of preheating alumina according to claim 3, Features A circulating alumina material pipe is provided between the lower part of the ash hopper and the reactor, a fresh circulating alumina mixing buffer tank is provided on the circulating alumina material pipe, a fourth fresh alumina chute is connected to the fresh circulating alumina mixing buffer tank, and the fresh circulating alumina mixing buffer tank is connected to the reactor through a pipeline.
8. The electrolytic flue gas purification material conveying system capable of preheating alumina according to claim 1, Features One end of the return alumina chute is located at the bottom outlet of the ash hopper, and the other end of the return alumina chute is connected to one end of the super-dense phase conveying chute of the fluorine-loaded alumina conveying system, and the other end of the super-dense phase conveying chute is connected to one end of the upper conveying chute of the electrolytic cell, and the upper conveying chute of the electrolytic cell is located above the electrolytic cell.
