Automatic control device for construction perpendicularity of high bridge pier
By designing the automatic control device for verticality of the bridge high piers construction, the length of the connecting rope is automatically adjusted by using the guide rail and fixed ring structure, the problem of poor stability of the rope fixation is solved, the measurement accuracy and safety are improved, and the operation is simplified.
Patent Information
- Application Number
- CN202420620178.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-28
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-03-28
AI Technical Summary
In the construction of existing bridge high piers, the end fixation stability of the rope is poor, resulting in low verticality detection accuracy and construction workers have safety hazards on the top of the pier.
Design a bridge high piers construction verticality automatic control device, adopting a semi-ring docking structure of the first circular guide rail, the second circular guide rail and the fixed ring, combining the mounting frame, wire roll, pulley, connecting rope and plumb, through The reducer motor adjusts the length of the connecting rope to automatically measure the verticality and avoid manual handheld.
It improves the accuracy of the verticality measurement of bridge high piers construction, reduces the difficulty of manual operation, enhances safety, and simplifies the operation process.
Smart Images

Figure CN222043923U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of bridge engineering, in particular to an automatic control device for verticality of high pier construction of bridges. Background Art
[0002] Bridge piers are structures that support the span structure and transfer the dead load and vehicle live load to the foundation. Bridge abutments are located on both sides of the bridge. The function of the bridge piers is to support the span structure. The bridge abutments not only support the span structure, but also connect with the embankment and prevent the embankment from sliding. In order to protect the abutments and embankment fill, some protection and diversion projects are often carried out on both sides of the abutments.
[0003] During the construction of bridge piers, in order to ensure construction quality, it is necessary to use a combination of ropes and plumb bobs for measurement. However, the ends of existing ropes are usually manually fixed by construction workers, which has poor stability and reduces the accuracy of verticality detection. At the same time, construction workers are required to stand on the edge of the top of the pier, which poses certain safety hazards.
[0004] An automatic control device for the verticality of a high pier of a bridge is disclosed in Chinese patent CN220035218U. The automatic control device for the verticality of a high pier of a bridge adjusts the position of a clue by setting a control unit so that the clue can fit close to the outer wall of the high pier of the bridge. By setting a fixing unit, the stability of the detection can be maintained and the efficiency of the high pier of the bridge can be improved. The utility model solves the above-mentioned problem by proposing another technical solution. Utility Model Content
[0005] The utility model aims to overcome the shortcomings of the prior art and provide an automatic control device for the verticality of high pier construction of bridges, which effectively solves the deficiencies of the prior art.
[0006] In order to achieve the above-mentioned purpose, an embodiment of the utility model on one hand provides an automatic control device for the verticality of high pier construction of a bridge, comprising a first circular guide rail and a second circular guide rail, and the bottom ends of both are fixedly connected with a fixing ring, the first circular guide rail, the second circular guide rail and the fixing ring are all combined in a semi-ring docking manner, the outer wall of the first circular guide rail is provided with four mounting frames that can rotate in a circle, two first support wheels and two second support wheels are provided on both sides of the four mounting frames, one side of the top surface of the four mounting frames is respectively rotatably connected with a support rod and an electric push rod, the output ends of the four electric push rods are respectively rotatably connected to the middle parts of the four support rods, the top ends of the four support rods are rotatably connected with pulleys, one side of the top surface of the four mounting frames is provided with a wire reel, the outer walls of the four wire reels are wrapped with connecting ropes, one end of the four connecting ropes is respectively wrapped around the pulleys, and plumb bobs are provided at their ends, and four horizontally placed measuring rulers are provided inside the second circular guide rail.
[0007] Preferably, any of the above schemes has an I-shaped end face, the inner diameter of which is larger than the outer diameter of the fixing ring. This scheme allows the first circular guide rail to be stably mounted on the pier while maintaining a certain distance from the outer wall of the pier, so that the mounting frame can be rotated along the first circular guide rail to detect the verticality of different positions of the pier.
[0008] Preferably, any of the above schemes has a concave shape on the end faces of the second circular guide rail, and the inner diameter of the second circular guide rail is larger than the outer diameter of the fixing ring. By using this scheme, the second circular guide rail can be stably installed on the outer wall of the pier, thereby facilitating a certain distance between the second circular guide rail and the outer wall of the pier, while guiding the movement of the sliding block and changing the position of the measuring ruler.
[0009] Preferably, in any of the above schemes, the interiors of the two second circular guide rails are slidably connected with sliding blocks, and the four measuring rulers are fixedly connected to the four sliding blocks respectively. By using this scheme, it is convenient to fix the measuring ruler to one side of the sliding block, thereby facilitating the horizontal placement of the measuring ruler. At the same time, the sliding block can move along the interior of the second circular guide rail to change the relative position of the measuring ruler, thereby facilitating the detection of the verticality of different positions of the bridge pier.
[0010] Preferably, in any of the above schemes, the two fixing rings each include two first half rings and two limiting columns, the four limiting columns are respectively located at two ends of the first half ring, and limiting holes are provided at both ends of the other two first half rings, which are respectively slidably connected to the four limiting columns. By using this scheme, it is convenient to accurately dock the two adjacent first half rings, and at the same time ensure that the two first half rings are combined into a stable circular structure. At the same time, they are fixedly connected by fasteners, so that the fixing ring is stably installed on the outer wall of the pier to prevent the fixing ring from sliding.
[0011] Preferably, one side of the top surface of each of the four mounting frames is fixedly connected to a reduction motor, and the output end thereof is fixedly connected to one end of the four wire reels respectively. This scheme facilitates operation by powering on the reduction motor, which drives the wire reels to rotate, thereby adjusting the release length of the connecting rope and changing the height of the plumb bob. At the same time, the plumb bob pulls the connecting rope, thereby making the connecting rope hang in a vertical state, and cooperating with a measuring ruler to measure the verticality of the bridge pier.
[0012] The utility model has the following advantages:
[0013] 1. The automatic control device for verticality of high pier construction of the bridge is convenient to install on the pier by setting a first circular guide rail, a second circular guide rail and two fixed rings, and the four adopt a semi-ring structure. By setting four mounting frames, four wire reels, four pulleys, four connecting ropes and four plumb bobs, the connecting ropes are pulled into a vertical state by the plumb bobs, and the contact positions of the four connecting ropes and four measuring rulers are compared, so as to measure the verticality of the pier without manual measurement of ropes and plumb bobs. At the same time, the overall structure is simple and easy to operate.
[0014] 2. The automatic control device for verticality of high pier construction of the bridge is provided with a first circular guide rail and a second circular guide rail, both of which are circular structures, so that it is convenient for the user to push four mounting frames and four sliding blocks to rotate in a circle, thereby changing the position of the connecting rope and the plumb bob, thereby facilitating the measurement of verticality at different positions of the pier and improving the accuracy of the measurement. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 This is a schematic diagram of the structure of the utility model from a first perspective;
[0016] Figure 2 This is a schematic diagram of the structure of the utility model from a second viewing angle;
[0017] Figure 3 It is a schematic diagram of the exploded structure of the first circular guide rail of the utility model;
[0018] Figure 4 It is a schematic diagram of the explosion structure of the fixing ring of the utility model;
[0019] Figure 5 It is a schematic diagram of the exploded structure of the second circular guide rail of the utility model;
[0020] Figure 6 This is a schematic diagram of the mounting frame structure of the utility model.
[0021] In the figure: 1-first circular guide rail, 2-second support wheel, 3-electric push rod, 4-pulley, 5-fixed ring, 501-first half ring, 502-limiting column, 6-wire reel, 7-reduction motor, 8-mounting frame, 9-support rod, 10-first support wheel, 11-connecting rope, 12-plumb bob, 13-second circular guide rail, 14-sliding block, 15-measuring ruler, 16-limiting hole. DETAILED DESCRIPTION
[0022] The present invention is further described below in conjunction with the accompanying drawings, but the protection scope of the present invention is not limited to the following description.
[0023] like Figures 1 to 6As shown, an automatic control device for verticality of high pier construction of bridges comprises a first circular guide rail 1 and a second circular guide rail 13, and the bottom ends of both are fixedly connected with a fixing ring 5, the first circular guide rail 1, the second circular guide rail 13 and the fixing ring 5 are all combined in a semi-ring docking manner, the outer wall of the first circular guide rail 1 is provided with four mounting frames 8 that can rotate in a circle, two first supporting wheels 10 and two second supporting wheels 2 are provided on both sides of the four mounting frames 8, one side of the top surface of the four mounting frames 8 is respectively rotatably connected with a supporting rod 9 and an electric push rod 3, and the output ends of the four electric push rods 3 are respectively The four supporting rods 9 are rotatably connected to the middle parts thereof, and the top ends of the four supporting rods 9 are rotatably connected to pulleys 4. A wire reel 6 is provided on one side of the top surface of the four mounting frames 8, and the outer walls of the four wire reels 6 are wound with connecting ropes 11, and one end of the four connecting ropes 11 are respectively wound on the pulley 4, and a plumb bob 12 is provided at the end thereof. Four horizontally placed measuring rulers 15 are provided inside the second circular guide rail 13, and the four electric push rods 3 shorten or lengthen, thereby pushing the supporting rods 9 to rotate at a certain angle, so as to change the distance between the connecting rope 11 and the bridge pier, and to be used for detection suitable for different scenarios.
[0024] The shape of the end face of the first circular guide rail 1 is an I-shape, and its inner diameter is larger than the outer diameter of the fixing ring 5. As an optional technical solution of the present invention, this facilitates the first circular guide rail 1 to be stably installed on the bridge pier while maintaining a certain distance from the outer wall of the pier, so that the mounting frame 8 can be rotated along the first circular guide rail 1 to detect the verticality of different positions of the bridge pier.
[0025] The outer shapes of the end faces of the second circular guide rail 13 are all concave, and the inner diameter of the second circular guide rail 13 is larger than the outer diameter of the fixing ring 5. As an optional technical solution of the utility model, this facilitates the second circular guide rail 13 to be stably installed on the outer wall of the pier, and further facilitates leaving a certain distance between the second circular guide rail 13 and the outer wall of the pier, while guiding the movement of the sliding block 14 and changing the position of the measuring ruler 15.
[0026] The inside of the two second circular guide rails 13 are both slidably connected with sliding blocks 14, and four measuring rulers 15 are fixedly connected to the four sliding blocks 14 respectively. As an optional technical solution of the utility model, this facilitates the fixed connection of the measuring ruler 15 to one side of the sliding block 14, and then facilitates the horizontal placement of the measuring ruler 15. At the same time, the sliding block 14 can move along the inside of the second circular guide rail 13 to change the relative position of the measuring ruler 15, so as to facilitate the detection of the verticality of different positions of the bridge pier.
[0027] The two fixing rings 5 each include two first half rings 501 and two limiting posts 502. The four limiting posts 502 are respectively located at the two ends of the first half ring 501. The other two first half rings 501 have limiting holes 16 at both ends, which are slidably connected to the four limiting posts 502, respectively. As an optional technical solution of the utility model, this facilitates accurate docking of two adjacent first half rings 501, while ensuring that the two first half rings 501 are combined into a stable circular structure. At the same time, they are fixedly connected by fasteners, so that the fixing ring 5 is stably installed on the outer wall of the pier to prevent the fixing ring 5 from sliding.
[0028] A reduction motor 7 is fixedly connected to one side of the top surface of the four mounting frames 8, and the output end thereof is fixedly connected to one end of the four wire reels 6, respectively. As an optional technical solution of the utility model, this facilitates the operation of the reduction motor 7 by powering on the reduction motor 7. When the reduction motor 7 is powered on, the wire reel 6 is driven to rotate, so as to adjust the release length of the connecting rope 11 and change the height of the plumb bob 12. At the same time, the plumb bob 12 pulls the connecting rope 11 to make the connecting rope 11 hang in a vertical state, so as to cooperate with the measuring ruler 15 to measure the verticality of the bridge pier.
[0029] The following steps are required when using the automatic control device for verticality of high pier construction of bridges:
[0030] 1) When in use, two adjacent first half rings 501 are butt-connected and fixed by fasteners so that the device is fixedly installed on the bridge pier;
[0031] 2) changing the distance between the two fixing rings 5, thereby controlling the reduction motor 7 to be powered on and operate, so that the plumb bob 12 is lowered;
[0032] 3) Rotate the four sliding blocks 14 respectively to adjust the positions of the four measuring rulers 15 and bring them close to the connecting rope 11;
[0033] 4) Stabilize the positions of the four plumb bobs 12 and read the readings of the four connecting ropes 11 close to the measuring ruler 15 to measure the verticality of the bridge piers, thereby reducing the difficulty of manual measurement.
[0034] In summary, when the user uses it, by setting the first circular guide rail 1, the second circular guide rail 13 and the two fixing rings 5, and the four adopt a semi-ring structure, it is convenient to install the device on the bridge pier. By setting four mounting frames 8, four wire reels 6, four pulleys 4, four connecting ropes 11 and four plumb bobs 12, it is convenient to make the connecting ropes 11 pulled by the plumb bobs 12 become a vertical state. At the same time, by comparing the contact positions of the four connecting ropes 11 and the four measuring rulers 15, it is convenient to measure the verticality of the bridge pier, and there is no need to manually hold the ropes and plumb bobs for measurement. At the same time, the overall structure is simple and easy to operate. By setting the first circular guide rail 1 and the second circular guide rail 13, both of which are circular structures, it is convenient for the user to push the four mounting frames 8 and the four sliding blocks 14 to rotate in a circle, thereby changing the positions of the connecting ropes 11 and the plumb bobs 12, so as to facilitate the measurement of the verticality of the bridge pier at different orientations, thereby improving the accuracy of the measurement.
[0035] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. An automatic verticality control device for high bridge pier construction, characterized in that: The invention comprises a first circular guide rail (1) and a second circular guide rail (13), and the bottom ends of the two circular guide rails are fixedly connected with a fixing ring (5), the first circular guide rail (1), the second circular guide rail (13) and the fixing ring (5) are all assembled in a semi-ring docking manner, the outer wall of the first circular guide rail (1) is provided with four mounting frames (8) capable of circular rotation, two first support wheels (10) and two second support wheels (2) are provided on both sides of the four mounting frames (8), and one side of the top surface of the four mounting frames (8) is respectively rotatably connected with a support rod (9) and a second support wheel (2). An electric push rod (3), the output ends of the four electric push rods (3) are rotatably connected to the middle parts of four support rods (9), the top ends of the four support rods (9) are rotatably connected to pulleys (4), one side of the top surface of the four mounting frames (8) is provided with a wire reel (6), the outer walls of the four wire reels (6) are wound with connecting ropes (11), one end of the four connecting ropes (11) is respectively wound on the pulleys (4), and the ends thereof are provided with plumb bobs (12), and four horizontally placed measuring rulers (15) are provided inside the second circular guide rail (13).
2. The automatic verticality control device for high bridge pier construction according to claim 1 is characterized by: The outer shape of the end surface of the first circular guide rail (1) is an I-shape, and its inner diameter is larger than the outer diameter of the fixing ring (5).
3. The automatic verticality control device for high bridge pier construction according to claim 2 is characterized by: The outer shape of the end surface of the second circular guide rail (13) is a concave shape, and the inner diameter of the second circular guide rail (13) is greater than the outer diameter of the fixing ring (5).
4. The automatic verticality control device for high bridge pier construction according to claim 3 is characterized by: The insides of the two second circular guide rails (13) are both slidably connected with sliding blocks (14), and the four measuring rulers (15) are fixedly connected to the four sliding blocks (14) respectively.
5. The automatic verticality control device for high bridge pier construction according to claim 4 is characterized by: The two fixing rings (5) each comprise two first half rings (501) and two limiting posts (502), the four limiting posts (502) being respectively located at two ends of the first half ring (501), and limiting holes (16) being respectively provided at both ends of the other two first half rings (501) and being slidably connected to the four limiting posts (502).
6. The automatic verticality control device for high bridge pier construction according to claim 5 is characterized by: One side of the top surface of each of the four mounting frames (8) is fixedly connected to a reduction motor (7), and the output end of the reduction motor is fixedly connected to one end of each of the four wire coils (6).