Inverted trapezoidal structure support for large-span upper cross beam of ultrahigh bridge tower

Through the inverted trapezoidal prefabricated bracket structure and embedded corundle design, the problems of large weight of brackets and unstable lifting in the construction of bridge tower beams are solved, an efficient and safe construction process is achieved, and construction costs and construction periods are reduced.

CN222043943UActive Publication Date: 2024-11-22CHINA TIESIJU CIVIL ENGINEERING GROUP CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420698737.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-07
Publication Date
2024-11-22
Estimated Expiration
2034-04-07

AI Technical Summary

Technical Problem

The existing bridge tower beam construction bracket structure has large weight and unstable lifting, poses aerial risk, and has a long construction period and high cost.

Method used

The inverted trapezoidal prefabricated bracket structure is adopted, fixed by embedded corund legs and reserved holes, combined with high-strength materials and modular design, reducing the structural weight and improving lifting stability and construction efficiency.

Benefits of technology

It has achieved high structural stability, light weight, high safety, high construction efficiency and cost savings, reducing the risks of high-altitude operations and construction period.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222043943U_ABST
    Figure CN222043943U_ABST
Patent Text Reader

Abstract

The utility model belongs to the field of bridge construction, and particularly relates to an ultra-high bridge tower large-span upper cross beam inverted trapezoidal structure support which comprises two tower columns, brackets arranged on the opposite faces of the tower columns and a main truss erected on the brackets, reserved holes are formed in the corresponding positions of the tower columns below an upper cross beam, and the main truss is arranged in the reserved holes. Four reserved holes are reserved in each tower column; the brackets are installed in the reserved holes in a one-to-one correspondence mode, and the upper portions of the brackets are fixed in the reserved holes through opposite-pull screws. The main truss is of an inverted-trapezoid assembly type support structure. Two single inverted trapezoidal assembled brackets are connected into a group and are supported on the brackets of the two tower columns; according to the utility model, the work amount of high-altitude operation can be reduced, high-altitude risks and hidden dangers are reduced, the labor intensity of construction workers is reduced, the construction efficiency is improved, and the construction period is shortened; and the construction of the upper cross beams of suspension bridge towers of roads and railways of the same type, especially the construction of high-altitude and large-span upper cross beams, is realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of bridge construction, and in particular relates to an inverted trapezoidal structural support for a large-span upper crossbeam of a super-high bridge tower. Background Art

[0002] The middle part of the suspension bridge needs a bridge tower to support the highest point of the main cable. Taking a single-tower ground-anchored revolving cable suspension bridge as an example, its bridge tower is a portal reinforced concrete structure with a tower height of 109m and a spacing of about 32.1m between tower columns. A prestressed concrete structure upper beam is set on the top of the tower. The upper beam of the suspension bridge tower has the characteristics of high hanging height, large span, large concrete volume and short construction period. The current cast-in-place construction support structure of the bridge tower crossbeam is mainly to embed the bracket on the tower pier to support the Bailey truss to form a cast-in-place platform. However, the Bailey truss of this support is used in large quantities, resulting in a heavy weight of the support itself. It needs to be hoisted multiple times and the Bailey truss is easy to shake due to the high lifting height during hoisting. The high-altitude operation project is large and there are hidden risks at high altitude.

[0003] Therefore, it is necessary to provide an improved technical solution to address the above-mentioned deficiencies in the prior art. Utility Model Content

[0004] The utility model aims to overcome the deficiencies of the prior art and provide an inverted trapezoidal structure bracket for a large-span upper crossbeam of a super-high bridge tower.

[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0006] An inverted trapezoidal structural support for a large-span upper crossbeam of a super-high bridge tower comprises two tower columns arranged opposite to each other, brackets arranged on opposite surfaces of the tower columns, and a main truss erected on the brackets, and reserved holes are opened at corresponding positions on the tower columns below the upper crossbeam, and 4 reserved holes are reserved on each tower column; the brackets are installed in the reserved holes one by one, and the upper parts of the brackets are fixed in the reserved holes by tension screws;

[0007] The main truss is an inverted trapezoidal assembled bracket structure; two single-piece inverted trapezoidal assembled brackets are connected as a group and supported on the brackets of two tower columns.

[0008] Furthermore, a wedge is filled between the contact surface between the corbel and the tower column concrete to ensure that the bottom of the corbel is in full contact with the tower column concrete surface.

[0009] Furthermore, the reserved hole is in a rectangular shape, and embedded steel plates are embedded in the top surface, bottom surface and two opposite side surfaces of the reserved hole. Four pulling channels are reserved outside the top of each reserved hole; the root of the corbel is welded and fixed to the embedded steel plate.

[0010] Furthermore, the tensioning channel is formed by a PVC pipe pre-buried in the tower column concrete, the PVC pipe is horizontal, the PVC pipe is fixed by positioning steel bars, and the positioning steel bars are welded and fixed to the tower column steel bar skeleton.

[0011] Furthermore, the tension rods of the tension screws are made of fine-rolled threaded steel bars, with a single pre-tensioned steel bar of 35 tons; double nuts are arranged on the tensioned fine-rolled threaded steel bars, and a steel pad is arranged between the nuts of the tension screws and the tower column concrete.

[0012] Furthermore, a sand box is installed on the top of the corbel, and the sand boxes of each side tower column jointly support a group of corbel distribution beams, and both ends of the main truss are supported on the corbel distribution beams.

[0013] Furthermore, a plurality of pads are spot-welded and fixed to the top surface of each group of the single-piece inverted trapezoidal assembled brackets; all the pads are arranged in a matrix; distribution beams are supported on the pads, and the distribution beams are supported by templates through square timbers.

[0014] Furthermore, each inverted trapezoidal assembled bracket includes an upper chord, a lower chord, two outer diagonal rods, two inner diagonal rods, and two vertical rods; the upper chord and the lower chord are arranged opposite to each other, and the two outer diagonal rods are connected to the two ends of the upper chord and the lower chord; the upper chord, the lower chord, and the two outer diagonal rods form a trapezoid; the vertical rod is vertically connected between the end of the lower chord and the upper chord, and the inner diagonal rod is obliquely connected between the end of the lower chord and the upper chord; each rod is connected and fixed with high-strength bolts.

[0015] Furthermore, the middle parts of the upper chord and the lower chord are disconnected and provided with a butt joint.

[0016] Furthermore, all the single-piece inverted trapezoidal assembled brackets are connected into a whole through a transverse connection; the transverse connection includes an upper rod connection system arranged between the upper chord rods and a vertical rod connection system arranged on the vertical rods and the diagonal rods.

[0017] The beneficial effects of the utility model are:

[0018] (1) High structural stability: The utility model adopts embedded brackets to be installed in the reserved holes of the tower column, making full use of the high compressive strength of concrete; the main truss adopts steel assembly bracket, the structure is simple to bear force, has high strength, rigidity and stability, and can withstand large spans and high loads;

[0019] (2) Light weight and high safety: The utility model adopts high-strength materials, which not only reduces the weight of the structure itself, but also saves the amount of steel, while also improving the load-bearing capacity of the bracket, and has high wind and earthquake resistance. In addition, the main truss of the inverted trapezoidal assembled bracket structure is adopted to transfer the center of gravity of the structure to the bottom of the lifting point, thereby improving the stability of the high-altitude bracket hoisting. The inverted trapezoidal assembled bracket structure is hoisted as a whole piece after being assembled on the ground, and the single-piece truss overall hoisting construction method is adopted, which can reduce the amount of high-altitude work and reduce the risk of high-altitude hidden dangers;

[0020] (3) High installation and disassembly efficiency: The bracket, sand box, and inverted trapezoidal assembled bracket of the utility model all adopt modular design. The bracket and sand box are integral structures, and the assembled bracket is connected by rod units and pin shafts. Its processing and manufacturing are simple and fast; the bracket and sand box are directly hoisted and installed on site, and the assembled bracket is assembled on the ground and hoisted and installed by a tower crane; the longitudinal and transverse distribution beams are fixed-length steel structures, and only side-by-side welding and longitudinal welding are required on site, which greatly improves the on-site construction efficiency and reduces the construction period;

[0021] (4) Cost saving: The use of embedded bracket + inverted trapezoidal assembled bracket combined load-bearing bracket uses the tower column as the foundation of the load-bearing bracket, avoiding the large investment in floor-standing bracket structural materials, reducing the labor intensity of construction workers, reducing construction costs, and not occupying the construction site, which is convenient for three-dimensional cross-operation;

[0022] (5) Energy saving and environmental protection: Corbels, sand boxes, prefabricated brackets, and longitudinal and transverse distribution beams are all commonly used steel materials, which are recyclable and can reduce construction waste. They have a high recycling rate and are economical and reasonable.

[0023] In short, the utility model can reduce the amount of high-altitude operations, reduce the hidden risks of high-altitude operations, reduce the labor intensity of construction workers, improve construction efficiency, and shorten the construction period; it has a reference value for the construction of cross beams on bridge towers of the same type of highway and railway suspension bridges, especially for the construction of high-altitude and large-span cross beams. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] The drawings constituting part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments and descriptions of the present invention are used to explain the present invention and do not constitute an improper limitation on the present invention. Among them:

[0025] Figure 1 It is a schematic diagram of the main structure of an embodiment of the utility model.

[0026] Figure 2 for Figure 1 Schematic diagram of the local enlarged structure at point A in the middle.

[0027] Figure 3 It is a side structural schematic diagram of an embodiment of the utility model.

[0028] Figure 4 This is a schematic diagram of the main structure of the main truss of an embodiment of the utility model.

[0029] Figure 5 It is a side structural schematic diagram of the corbel according to an embodiment of the utility model.

[0030] Figure 6 It is a schematic diagram of the top view of the structure of the corbel according to an embodiment of the utility model.

[0031] Figure 7 The top view of the reserved hole in the embodiment of the utility model is a schematic diagram.

[0032] Figure 8 It is a schematic structural diagram of a steel mesh according to an embodiment of the utility model.

[0033] In the figure: 1-corbel, 2-main truss, 3-pad, 4-transverse distribution beam, 5-longitudinal distribution beam, 6-side distribution beam, 7-triangular frame, 8-tension screw, 9-upper rod connection system, 10-vertical rod connection system, 11-wedge 11-rail, 12-upper chord, 13-lower chord, 14-outer diagonal rod, 15-vertical rod, 16-inner diagonal rod, 17-node box, 18-sand box, 19-small crossbeam, 20-square timber, 21-formwork, 22-corbel distribution beam, 23-embedded steel plate, 24 steel bars in the hole, 25-steel mesh. DETAILED DESCRIPTION

[0034] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field belong to the protection scope of the present invention.

[0035] In the description of the present invention, the terms "longitudinal", "lateral", "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom" and the like indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings. They are only for the convenience of describing the present invention and do not require that the present invention must be constructed and operated in a specific direction. Therefore, they cannot be understood as limitations on the present invention. The terms "connected" and "connection" used in the present invention should be understood in a broad sense. For example, they can be fixed connections or detachable connections; they can be directly connected or indirectly connected through intermediate components. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.

[0036] The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments. It should be noted that the embodiments and features in the embodiments of the present invention can be combined with each other without conflict.

[0037] like Figures 1 to 8 As shown, an inverted trapezoidal structure support for a large-span upper crossbeam of a super-high bridge tower comprises two tower columns arranged opposite to each other, a corbel 1 arranged on opposite surfaces of the tower columns, and a main truss 2 erected on the corbel 1;

[0038] Reserved holes are provided at corresponding positions on the tower column below the upper crossbeam, 4 reserved holes are reserved on each tower column, and these reserved holes are symmetrically arranged with respect to the center line of the crossbeam; the corbels 1 are installed in the reserved holes one by one, and the upper part of the corbels 1 is fixed in the reserved holes by the tension screws 8; specifically, after the tower column concrete reaches 100% of the design strength, the corbels 1 are hoisted and embedded into the reserved holes one by one, and the tension screws are passed through the top of the corbels 1 to tension and firmly fix the embedded corbels 1 in the reserved holes of the tower column; the utility model makes full use of the high compressive strength of concrete through the embedded corbel 1 structure, and uses the principle of couple to transfer the load to the tower column with large bearing capacity and stable rigidity;

[0039] The main truss 2 is an inverted trapezoidal assembled bracket structure; two single-piece inverted trapezoidal assembled brackets are connected as a group and supported on the brackets 1 of two tower columns; the main truss 2 of the inverted trapezoidal assembled bracket structure fully utilizes the tensile and compressive resistance of high-strength steel and the stability and high bearing capacity of the inverted trapezoidal truss structure, which not only saves the amount of steel used for a single assembled bracket of the load-bearing bracket, but also reduces the amount of steel used for the horizontal connecting brackets between the load-bearing brackets. At the same time, the use of steel materials has the advantages of high recycling rate and economic rationality; the utility model saves materials, large-scale machinery and equipment, and personnel cost investment, achieving energy-saving and material-saving effects;

[0040] The utility model adopts an inverted trapezoidal assembled bracket structure, which transfers the center of gravity of the structure to below the lifting point, thereby improving the lifting stability of the high-altitude bracket; through ground assembly and overall lifting construction of the single truss, the amount of high-altitude work is reduced and the risk of high-altitude hazards is reduced.

[0041] Further, such as Figure 1 , Figures 7 and 8As shown, the reserved hole is a rectangular parallelepiped, and embedded steel plates 23 are embedded on the top, bottom and two opposite sides of the reserved hole; 4 tensioning channels are reserved outside the top of each reserved hole. In a specific embodiment, the reserved hole is 60cm wide, 75cm high and 40cm deep, and the embedded steel plate 23 is a Q235B steel plate with a size of 500mm×560mm and a thickness of 20mm. A number of in-hole steel bars 24 with a diameter of 20mm are welded on the back of the embedded steel plate 23; in a preferred embodiment, a number of steel meshes 25 are also arranged on the back of the embedded steel plate 23, and the steel meshes 25 are embedded in the concrete. The steel meshes 25 are formed by binding with HRB400φ12mm steel bars, and 5 bars are arranged with a spacing of 110mm in the transverse direction, 6 bars are arranged with a spacing of 150mm in the longitudinal direction, and 5 layers are arranged in the vertical direction with a spacing of 100mm; the in-hole steel bars 24 are inserted in the mesh of the steel mesh 25.

[0042] Further, such as Figure 1 to Figure 2 As shown, the tensioning channel is formed by a PVC pipe pre-buried in the tower column concrete, the PVC pipe is horizontal, the PVC pipe is fixed by positioning steel bars, and the positioning steel bars are welded and fixed to the tower column steel frame. In a specific embodiment, the tensioning channel is installed with a nominal φ60mm, 2.5mm thick PVC pipe, and the positioning steel bars are welded and fixed to the tower column structural steel bars every 30cm; when welding steel bars, it should be noted that welding slag should not burn the pipe to avoid floating of the pipe during concrete pouring and cement slurry blocking the pipe; the lateral spacing of the PVC pipes is 150mm, and before concrete pouring, the two ends of the tensioning channel are close to the template 21, and are tightly sealed with geotextiles and tape to prevent cement slurry from entering the tensioning channel.

[0043] Further, such as Figures 1 to 3 , Figure 5 to Figure 6 As shown, the bracket 1 is formed by welding Q345 steel plates. After the bracket 1 is welded, the weld (grade I weld) is tested. After passing the test, the bracket 1 is hoisted to the reserved hole by a tower crane and installed, and is welded and fixed to the embedded steel plate 23. The tension screw 8 at the top of the bracket 1 is made of PSB830 finely rolled threaded steel with a diameter of 32 mm. Each pre-tensioned 35 t is fixed to the outside of the tower column, and the root of the bracket 1 is welded and fixed to the embedded steel plate 23. Double nuts are set on the tensioned finely rolled threaded steel bars, and a 10×10 cm steel plate is set between the nuts and the tower column concrete. The plate is made of Q235 steel plate with a thickness of 20 mm.

[0044] Further, such as Figure 5 As shown, a wedge 11 is filled between the contact surface between the corbel 1 and the tower column concrete to ensure that the bottom of the corbel 1 is in full contact with the tower column concrete surface as a fulcrum of the force couple.

[0045] Further, such as Figures 1 to 3As shown, a sand box 18 is installed on the top of the corbel 1, and the sand boxes 18 of each side tower column jointly support a group of corbel distribution beams 22, and the two ends of the main truss 2 are supported on the corbel distribution beams 22; the corbel distribution beam 22 is a three-piece I45a I-beam transverse distribution beam 4, and the three-piece 45a I-beams are assembled and welded into a whole on the ground (adjacent I-beam flange plates are welded on one side), and 2 cm thick steel plate diagonal braces are set on both sides of the I-beam to fix it;

[0046] The utility model unloads sand from the sand box 18 to separate the inverted trapezoidal assembled bracket, the bottom template 21 system and other structures from the bottom of the upper beam bottom plate; then the main truss 2 is hoisted to the ground as a whole and then disassembled and removed.

[0047] Further, such as Figures 1 to 4 As shown, each inverted trapezoidal assembled bracket includes an upper chord 12, a lower chord 13, two outer oblique rods 14, two inner oblique rods 16, and two vertical plates; the upper chord 12 and the lower chord 13 are arranged opposite to each other, and the two outer oblique rods 14 are connected to the two ends of the upper chord 12 and the lower chord 13; the upper chord 12, the lower chord 13, and the two outer oblique rods 14 form a trapezoid; the vertical rod 15 is vertically connected between the end of the lower chord 13 and the upper chord 12, and the inner oblique rod 16 is obliquely connected between the end of the lower chord 13 and the upper chord 12; the two ends of the lower chord 13, the lower end of the outer oblique rod 14, the lower end of the inner oblique rod 16, and the lower end of the vertical rod 15 are connected and fixed by a node box 17;

[0048] Specifically, the upper chord 12 is HN700×300H steel, the lower chord 13 is 2[40a channel steel, the vertical rod 15 is φ426×6 steel pipe, the outer diagonal rod 14 is 2[40a channel steel, and the inner diagonal rod 16 is φ426×6 steel pipe; these rods are welded and processed in the factory, the weld quality is controlled according to level II, and outsourced flaw detection is carried out according to the frequency required by the specification, and high-strength bolts are used to connect and fix the rods;

[0049] The utility model designs the inverted trapezoidal assembled bracket rod material according to the stress characteristics of the structure, gives full play to the tensile and bending resistance of I-beams and channel steels and the compressive resistance of steel pipe columns, and connects them into an integral structure through flanges and pins. The structure is simple, easy to install, and the stress mode is clear. When hoisting, the center of gravity of the structure is located below the hoisting point, and the safety and stability are high.

[0050] Furthermore, due to the long length of the upper and lower chords 13, for the convenience of transportation, the middle parts of the upper chord 12 and the lower chord 13 are disconnected and provided with a butt joint;

[0051] During construction, first mark the control point positions of the inverted trapezoidal assembled support structure on the ground according to the dimensions of the design drawings, then use a tower crane to hoist the upper and lower chords 13, diagonal bars and vertical bars 15 to the assembly control point positions respectively, then connect the outer diagonal bars 14, vertical bars 15 and inner diagonal bars 16 to the flanges of the upper chord 12 respectively, and do not tighten the bolts during connection; then connect the outer diagonal bars 14, vertical bars 15 and inner diagonal bars 16 to the corresponding positions of the node box 17, and do not tighten the bolts during connection; then install the lower chord 13 and connect it to the node box 17; adjust the left and right upper chords 12 so that their center lines are on the same straight line, and control the distance of the butt welds of the upper chord 12 (weld width 10mm); then adjust the left and right lower chords Rod 13, also make its center line on the same straight line, when the distance of the butt weld of the lower chord rod 13 is greater than 10mm, appropriately adjust the distance between the two node boxes 17, so that the distance of the butt weld of the lower chord rod 13 is controlled at about 10mm; then adjust the elevation of the inverted trapezoidal assembled bracket to ensure that the center line of the inverted trapezoidal assembled bracket is basically at the same elevation. When the fine-tuning is completed and the welding requirements are met after verification, the position of the butt weld of the upper and lower chord rods 13 is temporarily welded and fixed with a horse plate, and then the upper and lower chord rods 13 are butt-welded respectively, and the weld grade is Grade I. After the butt welding is completed, immediately organize the supervisor to conduct NDT with the third party. After passing the inspection, a 20mm thick steel plate is welded on the outside of the butt weld for reinforcement. After the single-piece inverted trapezoidal prefabricated bracket group is assembled, two tower cranes are used to lift it as a whole to the top surface of the corbel distribution beam 22. Pay attention to the lifting synchronization of the tower crane during the lifting operation. The prefabricated bracket is installed from the inside to the outside, and is installed symmetrically with the center line of the beam. Every two prefabricated brackets are connected into a group. After the four groups of prefabricated brackets are hoisted, they are promptly connected into a whole by transverse connection. The transverse connection includes an upper rod connection system 9 arranged between the upper chord rods 12, and a vertical rod connection system 10 arranged on the vertical rods 15 and the diagonal rods; the transverse connections are respectively arranged at the nodes where the upper and lower chord rods 13 intersect with the vertical rods 15 and the diagonal rods to enhance the lateral stability of the prefabricated bracket.

[0052] Further, such as Figures 1 to 3As shown in the figure, several cushion blocks 3 are spot-welded and fixed on the top surface of each group of the single-piece inverted trapezoidal assembled supports; all the cushion blocks 3 are arranged in a matrix; a distribution beam is supported on the cushion blocks 3, and the distribution beam supports a formwork 21 through a square timber 20; a transverse distribution beam 4 is supported on the top of each group of cushion blocks 3 perpendicular to the direction of the upper cross beam, a longitudinal distribution beam 5 is supported on the top of the transverse distribution beam 4, several small cross beams 19 are arranged horizontally on the top of the longitudinal distribution beam 5, and the top of the small cross beam 19 supports a formwork 21 through a square timber 20. Generally, a bamboo plywood is used for the formwork 21; chamfers are arranged at both ends of the upper cross beam in this project, so triangular bents 7 adapted thereto are arranged at both ends of the upper cross beam. The top of the triangular bent 7 supports the formwork through a small cross beam 19 and a square timber 20, and the bottom of the triangular bent 7 is supported on the main truss 2 through a side distribution beam 6.

[0053] The overall construction process of the utility model is as follows: construction preparation → embedded part installation → bracket and sand box and distribution beam installation → inverted trapezoidal assembled support installation → transverse and longitudinal distribution beam installation → formwork system installation → concrete pouring → support removal → reserved hole closure.

[0054] The installation of the main truss and other steps have been introduced above. Next, the subsequent steps will be introduced:

[0055] (1) Installation of cushion blocks: The cushion blocks are composed of a combination welding of 4 pieces of I32a and φ426×6mm steel pipe columns, and the overall shape is "丄". The cushion blocks are welded into a whole in the factory, with a total of 24 sets, and 6 sets are used for each group of inverted trapezoidal assembled supports; they are directly hoisted onto the inverted trapezoidal assembled supports by a tower crane and fixed firmly by welding;

[0056] (2) Installation of transverse distribution beams: The transverse distribution beams are welded in a row by 4 pieces of I20a steel工字beams as a group. The single-group length is 9.0m and the weight is 1005kg. They are directly hoisted onto the top surface of the cushion block steel pipe columns by a tower crane and fixed firmly by spot welding;

[0057] (3) Installation of longitudinal distribution beams: The longitudinal distribution beams adopt I45a steel工字beams, and the longitudinal length is 28m. The specified-length 45a steel工字beams are butt-welded and lengthened on the ground, and 10mm-thick steel plates are welded on both sides of the web for reinforcement. After passing the acceptance, they are hoisted and installed in place by two tower cranes. The hoisting lifting points are set at a distance of 4.0m from the end. They are installed one by one in the order from the small mileage side to the large mileage side, with a spacing of 60cm. After the longitudinal distribution beams are adjusted to the marked line, they are spot-welded and fixed to the transverse distribution beams.

[0058] (4) Installation of longitudinal distribution beams: The bottom formwork system consists of a small horizontal beam of I20a, a 10×10cm square timber and an 18mm thick bamboo plywood from bottom to top. First, install the small horizontal beam of I20a. Use a tower crane to hoist the I20a I-beams one by one onto the longitudinal distribution beam and place them according to the marking line at a spacing of 75cm. Adjacent horizontal distribution beams are alternately cantilevered 3.0m to serve as the support for the operating platform on both sides of the beam. After the small horizontal beam is placed according to the marking line, it is fixed to the longitudinal distribution beam by spot welding. Then install the longitudinal square timber. The square timber is hoisted onto the transverse distribution beam in bundles using steel wire ropes and manually laid at intervals of 30 cm. When laying, ensure that the cantilever lengths at both ends of the square timber are the same to avoid overturning due to excessive cantilever at one end. Finally, lay the bamboo plywood. Use a tower crane to hoist the whole bundle of bamboo plywood onto the square timber, manually lay it from the center of the beam to both ends, and fix the bamboo plywood to the square timber with iron nails. After the bottom formwork is installed in place, check whether the joints are tight and leak-proof, whether the elevation and center line are accurate, whether there is any suspension between the bottom formwork and the square timber, etc. If any non-compliance is found, make adjustments in a timely manner.

[0059] (5) Dismantling of the support: Use tower cranes, chain hoists and other equipment to dismantle the support. Unload the sand in the sand box to lower the support as a whole, remove the bottom formwork, longitudinal and transverse distribution beams, main trusses, corbels and transverse distribution beams, and finally use M50 micro-expansive concrete to seal the reserved holes for embedded corbels on the tower column.

[0060] (6) Sealing of reserved holes: First, grind the embedded steel plates around the reserved holes. Then, weld HRB500Φ36mm steel bars between the upper and lower embedded steel plates. Set two rows in total. The welding position of the outer steel bars is consistent with the position of the main reinforcement of the tower column. The welding is full welding and the weld thickness is 10mm. Then weld four layers of HRB400Φ16mm horizontal steel mesh. Finally, seal the mold and cast micro-expansive concrete. Set the template with inner pull. The tie rod is welded firmly with Φ16mm steel bar and embedded steel plate. Reserve a hole for concrete casting on the top of the template. Then cast micro-expansive concrete and vibrate it to make it dense. Use mortar of the same grade as the tower column to fill the reserved tie rod hole of the embedded corbel to make it dense.

[0061] The utility model utilizes a tower column as a foundation of a load-bearing support, installs a corbel on the tower column, and sets up a steel structure support to form an upper crossbeam working platform, thereby saving foundation concrete, steel usage and construction costs; the corbel, sand box and assembled support adopt a modular design, which makes the processing and manufacturing in the factory simple, and the manual coordination with mechanical equipment during on-site ground assembly saves time, labor and energy; the main truss design adopts a Q345 steel inverted trapezoidal truss structure, which fully utilizes the tensile and compressive resistance of high-strength steel and the stability and high bearing capacity of the inverted trapezoidal truss structure, which not only saves the steel usage of a single assembled support of the load-bearing support, but also reduces the steel usage of the horizontal connecting support between the load-bearing supports; at the same time, the steel material has the advantages of high recycling rate and economic rationality; this construction method saves the investment in materials, large-scale machinery and equipment, and personnel costs, achieving the effect of energy saving and material saving.

[0062] Compared with the traditional floor-standing bracket, the utility model can reduce the use of steel by about 300t and reduce the time of bracket erection, which can save a lot of cost. It makes full use of the fixed-length steel bracket, reasonably allocates turnover materials, increases the turnover of steel brackets, reduces capital investment, saves 1.28 million yuan in equipment, materials and personnel, saves energy and reduces consumption, and increases the efficiency of enterprises.

[0063] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention are within the scope of protection of the pending claims of the present invention.

Claims

1. An inverted trapezoidal structure support for a large-span upper crossbeam of a super-high bridge tower, comprising two tower columns arranged opposite to each other, brackets (1) arranged on opposite surfaces of the tower columns, and a main truss (2) erected on the brackets (1), characterized in that: A reserved hole is opened at a corresponding position on the tower column below the upper crossbeam, and four reserved holes are reserved on each tower column; the brackets (1) are installed in the reserved holes one by one, and the upper part of the brackets (1) is fixed in the reserved holes by a tension screw (8); The main truss (2) is an inverted trapezoidal assembled support structure; Two single-piece inverted trapezoidal assembled brackets are connected as a group and supported on the brackets (1) of two tower columns.

2. The inverted trapezoidal structure support for the large-span upper crossbeam of the super-high bridge tower according to claim 1 is characterized in that: A wedge (11) is filled between the contact surface between the corbel (1) and the tower column concrete to ensure that the bottom of the corbel (1) is in complete contact with the tower column concrete surface.

3. The inverted trapezoidal structure support for the large-span upper crossbeam of the super-high bridge tower according to claim 1 is characterized by: The reserved hole is in a rectangular shape, and embedded steel plates (23) are embedded on the top surface, bottom surface and two opposite side surfaces of the reserved hole. Four pulling holes are reserved outside the top of each reserved hole. The root of the corbel (1) is welded and fixed to the embedded steel plate (23).

4. The inverted trapezoidal structure support for the large-span upper crossbeam of the super-high bridge tower according to claim 3 is characterized by: The tensioning channel is formed by a PVC pipe pre-buried in the tower column concrete. The PVC pipe is horizontal and fixed by positioning steel bars. The positioning steel bars are welded and fixed to the tower column steel bar skeleton.

5. The inverted trapezoidal structure support for the large-span upper crossbeam of the super-high bridge tower according to claim 1 is characterized in that: The tension rod of the tension screw rod (8) is made of fine-rolled threaded steel, and a single rod is pre-tensioned by 35 tons; double nuts are arranged on the tensioned fine-rolled threaded steel bar, and a steel pad is arranged between the nut of the tension screw rod (8) and the tower column concrete.

6. The inverted trapezoidal structure support for the large-span upper crossbeam of the super-high bridge tower according to claim 1 is characterized by: A sand box (18) is installed on the top of the corbel (1), and the sand boxes (18) of each side tower column jointly support a group of corbel distribution beams (22), and the two ends of the main truss (2) are supported on the corbel distribution beams (22).

7. The inverted trapezoidal structure support for the large-span upper crossbeam of the super-high bridge tower according to claim 1 is characterized by: A plurality of cushion blocks (3) are spot-welded and fixed to the top surface of each group of the single-piece inverted trapezoidal assembled brackets; all the cushion blocks (3) are arranged in a matrix; distribution beams are supported on the cushion blocks (3), and the distribution beams support templates (21) through square timbers (20).

8. The inverted trapezoidal structure support for the large-span upper crossbeam of the super-high bridge tower according to claim 1 is characterized by: Each inverted trapezoidal assembled bracket comprises an upper chord (12), a lower chord (13), two outer oblique rods (14), two inner oblique rods (16), and two vertical rods (15); the upper chord (12) and the lower chord (13) are arranged opposite to each other, and the two outer oblique rods (14) are connected to the two ends of the upper chord (12) and the lower chord (13); the upper chord (12), the lower chord (13), and the two outer oblique rods (14) form a trapezoid; the vertical rod (15) is vertically connected between the end of the lower chord (13) and the upper chord (12), and the inner oblique rod (16) is obliquely connected between the end of the lower chord (13) and the upper chord (12); and each rod is connected and fixed by high-strength bolts.

9. The inverted trapezoidal structure support for the large-span upper crossbeam of the super-high bridge tower according to claim 8, characterized in that: The middle parts of the upper chord (12) and the lower chord (13) are disconnected and provided with a butt joint.

10. The inverted trapezoidal structure support for the large-span upper crossbeam of the super-high bridge tower according to claim 8, characterized in that: All the single-piece inverted trapezoidal assembled brackets are connected into a whole through a transverse connection; the transverse connection includes an upper rod connection system (9) arranged between upper chord rods (12) and a vertical rod connection system (10) arranged on vertical rods (15) and diagonal rods.