Dam crest structure with reinforced arrangement
By setting up reinforcement layout areas and seismic grid beams on the top of the dam, the reinforcement grid and anchoring piers enhance the seismic resistance of the dam top, the serious deformation of the earth and rock dam body under earthquakes is solved, and simple and efficient seismic resistance is achieved Effect.
Patent Information
- Application Number
- CN202323480888.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-19
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2033-12-19
AI Technical Summary
Under earthquake conditions, the earth and rock dam body is severely deformed, resulting in structural damage. Existing seismic measures such as reinforcement reinforcement are difficult to effectively utilize, and the beam system structure is expensive and complex, which affects the dam filling progress.
The reinforcement arrangement area is set up at the top of the dam. The reinforcement mesh is arranged at intervals and is divided into upper consolidation part and lower consolidation part through the first anchoring pier. Combined with the seismic grid beam and seismic planting trough, the dam top is improved Integrity and seismic resistance, reinforced mesh and anchoring piers enhance the restraining effect of the rock pile body.
The seismic resistance and integrity of the dam top are improved, the construction is simple and the project volume is small, which significantly improves the seismic resistance and reduces the construction complexity and cost.
Smart Images

Figure CN222044106U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of earth-rock dam engineering, in particular to a dam top structure with reinforcement arrangement. Background Art
[0002] Under earthquake conditions, the earth-rock dam body will be greatly deformed, resulting in structural damage, affecting the safe operation of the dam. Due to the whip effect, the dam top has a strong earthquake response and more serious damage. Therefore, for projects with high seismic design intensity, certain seismic measures are required for the dam. It is a common measure to reinforce the rockfill on the dam top with steel mesh. However, the friction between the steel bars and the rockfill is small, and the strength of the steel bars cannot be effectively utilized. Therefore, some large-scale dam projects with high design intensity use beam structures to strengthen the integrity between the reinforced body and the rockfill. However, the concrete structure of the beam structure is expensive, and the construction of the beam system will seriously affect the progress of the dam filling. Utility Model Content
[0003] The purpose of the utility model is to provide a dam top structure that can meet the seismic requirements of the dam. To this end, the utility model adopts the following technical solutions:
[0004] A reinforced dam crest structure, wherein a reinforced arrangement area is arranged from the upper area of a dam body to the dam crest, wherein the reinforced arrangement area is flatly laid with reinforced meshes in both the upstream dam body and the downstream dam body, wherein the reinforced meshes are provided with spacing spaces in the vertical direction of the dam body filling, and a first anchoring pier is provided at the connection node of the steel bars inside the reinforced meshes, wherein the first anchoring pier is divided into an upper consolidation part and a lower consolidation part by the reinforced meshes, and is used to form layered consolidation with the filling body inside the dam body; an earthquake-resistant grid beam is provided on the downstream dam surface of the dam body, and the end of the reinforced mesh of the downstream dam body is anchored in the earthquake-resistant grid beam, while the end of the reinforced mesh of the upstream dam body does not exceed the padding area, thereby forming an integrated earthquake-resistant protection state for the part of the dam body crest with a strong whipping effect.
[0005] Furthermore: the reinforcement arrangement area is located within the range of 1 / 4-1 / 5 of the dam height at the dam top.
[0006] Furthermore: the reinforcement mesh includes first steel bars and second steel bars that are crisscrossed with each other, the layout direction of the first steel bars is perpendicular to the dam axis, and the layout direction of the second steel bars is parallel to the dam axis.
[0007] Furthermore: the reinforcement mesh is arranged within the range of 10-20m inside the upstream and downstream dam bodies of the dam body, and the spacing between the upper and lower layers of the reinforcement mesh in the vertical direction is between 1.5-2.5m; at the same time, the spacing between adjacent first steel bars in the same layer is smaller than the spacing between adjacent second steel bars in the same layer.
[0008] Furthermore: a node steel bar is arranged inside the first anchor pier, and the node steel bar is connected to the first steel bar and the second steel bar at the same time.
[0009] Furthermore: the upper consolidation portion of the first anchor pier is coated with cushion material on the outside, and the cushion material is arranged on the first anchor pier in the transition material area, the main rockfill area and the secondary rockfill area.
[0010] Furthermore: a wave-breaking wall is arranged upstream of the dam crest of the dam main body, and an earthquake-resistant planting trough is arranged downstream of the dam crest of the dam main body, and the wave-breaking wall and the earthquake-resistant planting trough are both arranged along the dam axis direction; a dam crest transition material is arranged between the wave-breaking wall and the earthquake-resistant planting trough on the dam crest of the dam main body, and a pavement structure is laid on top of the dam crest transition material.
[0011] Furthermore: a layer of reinforcement mesh is arranged in the filling surface corresponding to the bottom of the wave-breaking wall, and the end of the first steel bar of the layer of reinforcement mesh extends into the wave-breaking wall.
[0012] Compared with the prior art, the utility model has the following beneficial effects:
[0013] The utility model utilizes the first anchor pier of the reinforced mesh node to improve the restraint between the reinforced mesh and the rockfill body, and improves the integrity and seismic performance of the rockfill body in the reinforcement arrangement area; and the reinforced mesh has a small amount of engineering work, can achieve significant seismic effects, and has basically no appearance control requirements for the anchor pier, and is easy to construct. At the same time, the large seismic planting trough downstream of the dam crest is anchored with the dam crest transition material through the third steel bar, and the integrity of the reinforced concrete structure of the seismic planting trough and the connection of the third steel bar are utilized to improve the seismic effect of the top of the dam crest. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 This is a structural diagram of the dam top reinforcement arrangement of the utility model;
[0015] Figure 2 It is a structural schematic diagram of the reinforced mesh of the utility model;
[0016] Figure 3 It is the plane section of the anchor pier at the node position of the reinforced mesh of the utility model;
[0017] Figure 4 It is a vertical section of the anchor pier at the node position of the reinforced mesh of the utility model.
[0018] The markings in the attached drawings are: 1-panel; 2-pad area; 3-transition material area; 4-main rockfill area; 5-secondary rockfill area; 6-dam top transition material; 7-wave-breaking wall; 8-seismic planting trough; 81-third steel bar; 82-second anchor pier; 9-seismic grid beam; 10-pavement structure; 11-reinforced mesh; 111-first steel bar; 112-second steel bar; 113-first anchor pier; 114-node steel bar; 115-pad material. DETAILED DESCRIPTION
[0019] The present invention is further described below in conjunction with the accompanying drawings and embodiments, but they are not intended to limit the present invention.
[0020] like Figure 1-4 As shown, a reinforced dam crest structure is provided, in which a reinforcement arrangement area is arranged from the upper area of the dam body to the dam crest to reinforce the upstream and downstream dam bodies, and at the same time, the reinforcement arrangement area is located at the position where the whip effect of the dam crest is strong, and is located within the range of 1 / 4-1 / 5 of the dam height of the dam crest; the reinforcement arrangement area is flatly laid with a reinforcement mesh 11 in both the upstream dam body and the downstream dam body, and the reinforcement mesh 11 is arranged parallel to the dam axis, and the reinforcement mesh 11 is provided with a spacing space in the vertical direction of the dam body filling, and a first anchor pier 113 is provided at the connection node of the steel bars inside the reinforcement mesh 11, and the first anchor pier 113 is provided at the connection node of the steel bars inside the reinforcement mesh 11. An anchor pier 113 is divided into an upper consolidation part and a lower consolidation part by a reinforcement mesh 11, which is used to form layered consolidation with the fill inside the dam body, so that the lower consolidation part of the first anchor pier 113 is embedded in the lower fill dam body, and the upper consolidation part of the first anchor pier 113 is embedded in the upper fill dam body; the downstream dam surface of the dam body is provided with an earthquake-resistant grid beam 9, and the end of the reinforcement mesh 11 of the downstream dam body is anchored in the earthquake-resistant grid beam 9, and the end of the reinforcement mesh 11 of the upstream dam body does not exceed the cushioning area 2, thereby forming an integrated earthquake-resistant protection state for the part of the dam top with a strong whip effect.
[0021] like Figure 1-3 As shown, the reinforcement mesh 11 includes first steel bars 111 and second steel bars 112 that are crisscrossed with each other. The layout direction of the first steel bars 111 is perpendicular to the dam axis, and the layout direction of the second steel bars 112 is parallel to the dam axis. In this embodiment, the spacing between adjacent first steel bars 111 in the same layer is smaller than the spacing between adjacent second steel bars 112 in the same layer. Among them, the spacing between the first steel bars 111 in the direction perpendicular to the dam axis on the same layer of reinforcement mesh 11 is about 2m, while the spacing between the steel bars 12 in the direction parallel to the dam axis on the same layer is larger than 2m and can reach 6m.
[0022] At the same time, the reinforcement mesh 11 is arranged within the range of 10-20m inside the upstream dam body and the downstream dam body, and the spacing between the upper and lower layers of the reinforcement mesh 11 in the vertical direction is 2m, which is generally an integer multiple of the corresponding part of the dam body filling layer.
[0023] In this embodiment, the steel bars in the reinforcement mesh 11 are made of stainless steel bars with a diameter of more than 20 mm.
[0024] like Figure 3-4 As shown, a node steel bar 14 is disposed inside the first anchor pier 113 , and the node steel bar 14 is connected to the first steel bar 111 and the second steel bar 112 at the same time, so as to improve the consolidation effect of the first anchor pier 113 .
[0025] like Figure 3-4 As shown, the upper consolidation part of the first anchor pier 113 is covered with cushion material 115 so that the cushion material 115 protects the upper consolidation part of the first anchor pier 113, and the cushion material 115 is arranged on the first anchor pier 113 in the transition material area 3, the main rockfill area 4, and the secondary rockfill area 4. In this embodiment, the thickness of the cushion material 115 is not less than 20 cm. At the same time, the cushion material 115 is used in that, because the first anchor pier 113 needs to be filled to the connection node of the reinforcement mesh 11, and the upper consolidation part of the first anchor pier 113 needs to protrude from the filling surface, if a relatively coarse material is directly filled at this time, a large gap is likely to appear where the first anchor pier 113 contacts the filling material in the area. Therefore, the first anchor pier 113 is strengthened in the connection effect with the filling material in the transition material area 3, the main rockfill area 4, and the secondary rockfill area 5 except the cushion material area 2 through the cushion material 115.
[0026] like Figure 1 As shown, a wave-breaking wall 7 is arranged upstream of the dam crest of the dam body, and an earthquake-resistant planting trough 8 is arranged downstream of the dam crest of the dam body, and both the wave-breaking wall 7 and the earthquake-resistant planting trough 8 are arranged along the dam axis; a dam crest transition material 6 is arranged between the wave-breaking wall 7 and the earthquake-resistant planting trough 8 on the dam crest of the dam body, and a road surface structure 10 is laid on top of the dam crest transition material 6. In this embodiment, the height of the earthquake-resistant planting trough 8 is not less than 1m, and it adopts a reinforced concrete structure.
[0027] At the same time, the upstream dam surface is provided with a transition material area 3, a cushion material area 2 and a panel 1 in sequence from the inside to the outside.
[0028] like Figure 1 As shown, a layer of reinforcement mesh 11 is arranged in the filling surface corresponding to the bottom of the wave-breaking wall 7, and the end of the first steel bar 111 of the layer of reinforcement mesh 11 extends into the wave-breaking wall 7. In this embodiment, the first steel bar 111 of the layer of reinforcement mesh 11 is cast in the concrete of the wave-breaking wall 7, and the distance is generally 40 times the diameter of the steel bar according to the structural requirements of the tensile steel bar.
[0029] like Figure 1 As shown, the seismic planting trough 8 is provided with a third steel bar 81 perpendicular to the dam axis at its bottom, one end of the third steel bar 81 extends into the dam top transition material 6, and the third steel bar 81 is provided with a second anchor pier 82 connected to the dam top transition material 6 on the end thereof to improve the stability of the seismic planting trough 8 on the dam top.
[0030] See also Figure 1-4 When constructing the dam top structure, the specific construction steps are as follows:
[0031] S1: Fill the main body of the dam to the reinforcement arrangement area, and arrange the reinforcement mesh 11 according to the laying range and spacing, locate the connection nodes of the reinforcement mesh 11 and dig a filling pit with a pit depth of 20cm-40cm and a top length and width of 40cm-50cm;
[0032] S2: Lay the first steel bar 111 and the second steel bar 112, and lay a circle of node steel bars 114 at the connection node (the first steel bar 111 in the downstream dam body reinforcement mesh 11 needs to extend 1m out of the dam slope in advance), and cast the first anchor pier 113. The lower consolidation part of the first anchor pier 113 covers the entire pre-excavated filling pit, and the upper consolidation part of the first anchor pier 113 is 20-40cm higher than the filling surface;
[0033] S3: Lay a cushion material 15 with a thickness of not less than 20 cm on the periphery of the first anchor pier 113, and cover the upper consolidation part thereof, and use a small tamping plate for manual initial tamping;
[0034] S4: Fill the padding area 2, transition material area 3, main rockfill area 4 and secondary rockfill area 5 of the dam body according to filling requirements;
[0035] S5: repeat the above steps S1-4 until the bottom of the wave-breaking wall 7, and complete the reinforcement mesh 11 and the first anchor pier 113 at this elevation;
[0036] S6: tying the internal steel bars required for forming the wave-breaking wall 7, and tying the first steel bars 111 of the layer of reinforcement mesh 11 to the bottom steel mesh of the wave-breaking wall 7, and thereby casting the wave-breaking wall 7 and forming it;
[0037] S7: Fill the dam top transition material 6 to the bottom elevation of the earthquake-resistant planting trough 8 downstream of the dam top, tie the steel bars of the earthquake-resistant planting trough 8, lay the third steel bars 81, and tie the third steel bars 81 to the bottom steel bar net of the earthquake-resistant planting trough 8;
[0038] S8: pouring concrete for the earthquake-resistant planting trough 8 and the second anchor pier 82 at the end of the third steel bar 81;
[0039] S9: Fill the dam top transition material 6 to the dam top, thereby constructing the dam top pavement structure 10.
[0040] S10: When repairing the downstream dam surface, construct the seismic resistant grid beam 9 and bury the first steel bar 111 extending out of the dam body into the concrete of the seismic resistant grid beam 9.
[0041] The above embodiment is only a preferred technical solution of the present invention. Those skilled in the art should understand that the technical solutions or parameters in the embodiments can be modified or replaced without departing from the principle and essence of the present invention, and all should be included in the protection scope of the present invention.
Claims
1. A dam crest structure with reinforced arrangement, characterized by: A reinforcement arrangement area is provided from the upper area of the dam body to the dam top, wherein the reinforcement arrangement area is provided with a reinforcement mesh (11) laid flatly in both the upstream dam body and the downstream dam body, wherein the reinforcement mesh (11) is provided with a spacing space in the vertical direction of the dam body filling, and a first anchoring pier (113) is provided at the connection node of the internal steel bars of the reinforcement mesh (11), and the first anchoring pier (113) is divided into an upper consolidation part and a lower consolidation part by the reinforcement mesh (11); the downstream dam surface of the dam body is provided with an anti-seismic grid beam (9), and the end of the reinforcement mesh (11) of the downstream dam body is anchored in the anti-seismic grid beam (9), while the end of the reinforcement mesh (11) of the upstream dam body does not exceed the padding area (2).
2. The reinforced dam crest structure according to claim 1, characterized in that: The reinforcement arrangement area is located within the range of 1 / 4-1 / 5 of the dam height at the dam top.
3. The reinforced dam crest structure according to claim 1, characterized in that: The reinforcement mesh (11) comprises first steel bars (111) and second steel bars (112) that are crisscrossed with each other, the first steel bars (111) are arranged in a direction perpendicular to the dam axis, and the second steel bars (112) are arranged in a direction parallel to the dam axis.
4. The reinforced dam crest structure according to claim 3, characterized in that: The reinforcement mesh (11) is arranged within a range of 10-20 m inside the upstream and downstream dam bodies of the dam body, and the vertical spacing between the upper and lower layers of the reinforcement mesh (1) is between 1.5-2.5 m; at the same time, the spacing between adjacent first steel bars (111) in the same layer is smaller than the spacing between adjacent second steel bars (112) in the same layer.
5. The reinforced dam crest structure according to claim 3, characterized in that: A node steel bar (14) is provided inside the first anchoring pier (113), and the node steel bar (14) is connected to the first steel bar (111) and the second steel bar (112) at the same time.
6. The reinforced dam crest structure according to claim 3, characterized in that: The upper consolidation portion of the first anchor pier (113) is covered with cushion material (115), and the cushion material (115) is arranged on the first anchor pier (113) in the transition material area (3), the main rockfill area (4), and the secondary rockfill area (5).
7. The reinforced dam crest structure according to claim 3, characterized in that: A wave-breaking wall (7) is provided upstream of the dam crest of the dam main body, and an earthquake-resistant planting trough (8) is provided downstream of the dam crest of the dam main body, wherein the wave-breaking wall (7) and the earthquake-resistant planting trough (8) are both arranged along the dam axis; a dam crest transition material (6) is provided between the wave-breaking wall (7) and the earthquake-resistant planting trough (8) of the dam crest of the dam main body, and a road surface structure (10) is laid on top of the dam crest transition material (6).
8. The reinforced dam crest structure according to claim 7, characterized in that: A layer of reinforcement mesh (11) is provided in the filling surface corresponding to the bottom of the wave-breaking wall (7), and the end of the first steel bar (111) of the layer of reinforcement mesh (11) extends into the wave-breaking wall (7).
9. The reinforced dam crest structure according to claim 7, characterized in that: The seismic-resistant planting trough (8) is provided with a third steel bar (81) perpendicular to the dam axis in its bottom, one end of the third steel bar (81) extends into the dam top transition material (6), and the third steel bar (81) is provided with a second anchor pier (82) on the end thereof.