Front support steel structure supporting structure
By adopting a front-supported steel structure in the foundation pit support structure and utilizing a combination of temporary piles and lattice columns, a stable support system is formed, which solves the problem of unstable support caused by soft ground and improves the stability and efficiency of foundation pit excavation.
Patent Information
- Application Number
- CN202420209076.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-29
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-01-29
AI Technical Summary
The existing foundation pit support structure suffers from soft ground, which prevents the lattice columns from effectively supporting the retaining components, thus reducing the efficiency of foundation pit excavation.
A front-supported steel structure is adopted. Temporary piles are set on one side of the enclosure components, and the lattice columns are inserted obliquely to the upper part of the temporary piles. Combined with the design of concrete walers and temporary piers, a stable support system is gradually formed. This ensures that earthwork excavation is carried out on the upper part of the temporary piles at the bottom of the pit and at the end of the lattice columns. After the temporary piers and reinforced cushion concrete reach the strength, the bottom slab is constructed to achieve effective support for the enclosure components.
It improved the stability and efficiency of foundation pit excavation, ensured the smooth progress of foundation pit construction, and reduced construction inconvenience and costs.
Smart Images

Figure CN222044213U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building engineering construction, in particular to a front-support steel structure supporting structure. Background Art
[0002] During engineering construction, foundation pit excavation requires foundation pit support. Traditional foundation pit support methods mainly include cast-in-place piles, cement-soil mixing piles and other retaining bodies combined with horizontal support systems to form support structures. However, the horizontal supports set up lead to inconvenience in subsequent construction, increased construction period and cost, etc. Therefore, diagonal bracing structures began to appear, which better solved the above-mentioned problems of horizontal supports.
[0003] Based on the above search results:
[0004] Most of the existing foundation pit support structures use lattice columns directly inserted into the ground to support the enclosure components. Since the ground is relatively soft, the enclosure components cannot be effectively supported, thereby reducing the work efficiency of foundation pit excavation. Utility Model Content
[0005] In order to solve the above technical problems, the utility model proposes a front-support steel support structure, in which temporary piles are set on one side of the enclosure assembly. After the construction of the temporary piles is completed, the lower end of the lattice column is obliquely inserted to the upper position of the temporary piles. After the position of the temporary pier is determined, the temporary pier and the reinforced cushion layer concrete reach sufficient strength, and then the remaining pit edge earth is excavated.
[0006] The technical solution for achieving the purpose of the utility model is: a front-support steel structure supporting structure, including a ground, an enclosure assembly is installed inside the ground, two temporary piles are provided on one side of the enclosure assembly, the tops of the two temporary piles are commonly fixedly connected to a temporary pier, a concrete purlin is fixedly connected to the outer wall of the enclosure assembly, a lattice column is fixedly connected to one side of the concrete purlin, a fixing hole is opened on the temporary pier, and the other end of the lattice column passes through the fixing hole and extends to the interior of the temporary pier.
[0007] In some embodiments, a steel mesh is provided in the temporary pier.
[0008] In some embodiments, a reinforcement cushion is fixedly connected to the top of the temporary pier, a bottom plate is fixedly connected to the top of the reinforcement cushion, a movable hole is opened on the bottom plate, and a lattice column is fixedly connected in the movable hole.
[0009] In some embodiments, a head plate is fixedly connected to the bottom end of the lattice column.
[0010] In some embodiments, a water-stop steel plate is provided at the intersection of the lattice column and the bottom plate.
[0011] Compared with the prior art, the present invention has the following significant advantages:
[0012] During the construction of the pile foundation, the utility model sets the temporary pile on one side of the enclosure assembly. After the construction of the temporary pile is completed, the lower end of the lattice column is obliquely inserted to the upper position of the temporary pile. The upper end of the lattice column is within the design range of the concrete enclosure purlin. The enclosure assembly is constructed according to the bottom elevation of the concrete enclosure purlin. The surface earthwork is excavated. During the construction of the concrete enclosure purlin, it is necessary to ensure that the lattice column and the concrete enclosure purlin are reliably connected to perform the remaining earthwork excavation. At this time, effective support has not yet been formed in the foundation pit, so it is necessary to leave soil at the edge of the pit, and carry out soil excavation at the upper part of the temporary pile at the bottom of the pit and the end of the lattice column. After the earthwork is excavated and the position of the temporary pier is determined, the temporary pier is poured with concrete, a head plate is set at the end of the lattice column, and a water stop steel plate is set within the range of the bottom plate of the lattice column. After the concrete of the temporary pier and the reinforced cushion layer reaches the strength, the remaining earthwork at the pit edge is excavated. After the concrete of the bottom plate construction reaches the strength, the oblique lattice column steel piles are cut off to provide a working surface for the underground structure construction, thereby supporting the enclosure components, improving the stability during foundation excavation, facilitating the excavation of the foundation, and improving the efficiency of foundation excavation;
[0013] The invention solves the problem that most of the existing foundation pit support structures adopt the method of directly inserting lattice columns into the ground to support the enclosure components, and because the ground is relatively soft, the enclosure components cannot be effectively supported, thereby reducing the work efficiency of foundation pit excavation. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] The utility model is further explained below in conjunction with the accompanying drawings and embodiments:
[0015] Figure 1 It is a schematic diagram of the overall cross-sectional three-dimensional structure provided by the utility model in one embodiment;
[0016] Figure 2 It is a schematic cross-sectional structure diagram of basement structure construction after the oblique lattice columns are cut off in one embodiment of the utility model.
[0017] Description of reference numerals:
[0018] 1. Ground; 2. Fence assembly; 3. Temporary piles; 4. Temporary piers; 5. Steel mesh; 6. Reinforcement cushion; 7. Bottom plate; 8. Concrete purlin; 9. Lattice column; 10. Waterstop steel plate; 11. Head plate. DETAILED DESCRIPTION
[0019] The utility model is described in detail below, and the technical solutions in the embodiments of the utility model are clearly and completely described. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0020] The utility model provides a front support steel structure through improvement. The technical solution of the utility model is:
[0021] like Figure 1-Figure 2 As shown, a front-support steel structure supporting structure includes a ground 1, an enclosure component 2 is installed inside the ground 1, two temporary piles 3 are arranged on one side of the enclosure component 2, and the tops of the two temporary piles 3 are fixedly connected to a temporary pier 4. In order to improve the structural stability between the temporary piles 3 and the temporary pier 4, the two are fixed by welding. A concrete enclosure purlin 8 is fixedly connected to the outer wall of the enclosure component 2. The enclosure component 2 and the concrete enclosure purlin 8 are preferably fixed by welding to improve stability. A lattice column 9 is fixedly connected to one side of the concrete enclosure purlin 8. A fixing hole is opened on the temporary pier 4, and the other end of the lattice column 9 passes through the fixing hole and extends to the interior of the temporary pier 4. Through the arrangement of the lattice column 9, support for the enclosure component 2 is achieved, stability during foundation excavation is improved, foundation excavation is convenient, and foundation excavation efficiency is improved.
[0022] like Figure 1 As shown, in one embodiment, a steel mesh 5 is provided in the temporary pier 4; by providing the steel mesh 5, the temporary pier 4 is reinforced to improve stability.
[0023] like Figure 1 As shown, in one embodiment, the top of the temporary pier 4 is fixedly connected with a reinforcement cushion layer 6, and the top of the reinforcement cushion layer 6 is fixedly connected with a base plate 7. In order to improve the structural stability between the reinforcement cushion layer 6 and the base plate 7, the two are fixed by welding, and a movable hole is opened on the base plate 7, and a lattice column 9 is fixedly connected in the movable hole; through the setting of the base plate 7, the excavation construction of the foundation pit is completed, which is convenient for the construction of the basement.
[0024] like Figure 1 As shown, in one embodiment, the lattice column 9 and the head plate 11 are preferably fixed by welding to improve the stability between the two. The bottom end of the lattice column 9 is fixedly connected with the head plate 11; through the setting of the head plate 11, the lattice column 9 is closed, which is convenient for pouring concrete and improving the stability of the lattice column 9.
[0025] like Figure 1 As shown, in one embodiment, a water-stop steel plate 10 is provided at the intersection of the lattice column 9 and the bottom plate 7; by providing the water-stop steel plate 10, water is prevented from penetrating into the bottom plate 7, and waterproof treatment is performed.
[0026] The specific working method is: during the pile foundation construction, the temporary pile 3 is set on one side of the enclosure component 2. After the temporary pile 3 is constructed, the lower end of the lattice column 9 is obliquely inserted to the upper position of the temporary pile 3. The upper end of the lattice column 9 is within the design range of the concrete enclosure purlin 8. The enclosure component 2 is constructed according to the bottom elevation of the concrete enclosure purlin 8. The surface earthwork is excavated. When the concrete enclosure purlin 8 is constructed, it is necessary to ensure that the lattice column 9 is reliably connected to the concrete enclosure purlin 8 for the remaining earthwork excavation. At this time, effective support has not yet been formed in the foundation pit, so it is necessary to leave soil at the edge of the pit, and at the upper part of the temporary pile 3 at the bottom of the pit and the end of the lattice column 9 Earth excavation is carried out at the end. After the position of the temporary pier 4 is determined, concrete is poured on the temporary pier 4. A head plate 11 is set at the end of the lattice column 9. A waterstop steel plate 10 is set within the range of the bottom plate 7 of the lattice column 9. After the concrete of the temporary pier 4 and the reinforced cushion layer 6 reaches the strength, the remaining pit edge earth is excavated. After the concrete of the bottom plate 7 reaches the strength, the oblique lattice column 9 steel piles are cut off to provide a working surface for the underground structure construction, thereby supporting the enclosure assembly 2, improving the stability during foundation excavation, facilitating the excavation of the foundation, and improving the efficiency of foundation excavation.
[0027] The technical means disclosed in the utility model are not limited to the technical means disclosed in the above technical means, but also include technical solutions composed of equivalent replacement of the above technical features. Matters not covered in the utility model belong to the common knowledge of those skilled in the art.
Claims
1. A front-support steel structure, comprising a ground surface (1), characterized in that: A fence assembly (2) is installed inside the ground (1), two temporary piles (3) are arranged on one side of the fence assembly (2), the tops of the two temporary piles (3) are fixedly connected to a temporary pier (4), a concrete purlin (8) is fixedly connected to the outer wall of the fence assembly (2), a lattice column (9) is fixedly connected to one side of the concrete purlin (8), a fixing hole is opened on the temporary pier (4), and the other end of the lattice column (9) passes through the fixing hole and extends to the inside of the temporary pier (4).
2. A front brace steel structure support structure according to claim 1, characterized in that: A steel mesh (5) is provided inside the temporary pier (4).
3. The front support steel structure according to claim 1 is characterized in that: The top of the temporary pier (4) is fixedly connected to a reinforcement cushion layer (6), the top of the reinforcement cushion layer (6) is fixedly connected to a base plate (7), a movable hole is opened on the base plate (7), and a lattice column (9) is fixedly connected in the movable hole.
4. The front brace steel structure support structure according to claim 1, characterized in that: A head plate (11) is fixedly connected to the bottom end of the lattice column (9).
5. The front support steel structure according to claim 1 is characterized in that: A water-stop steel plate (10) is provided at the intersection of the lattice column (9) and the bottom plate (7).