Toe end sliding sleeve with time delay function

By designing the toe-end sliding sleeve with delay function, the problems of high perforation costs and long cycles of the first section of the continuous oil pipe in shale oil and gas mining are solved, and the effect of reducing construction costs and increasing the output of shale oil and gas wells is achieved.

CN222045731UActive Publication Date: 2024-11-22DONGYING RUIFENG PETROLEUM TECH DEV CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420802284.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-17
Publication Date
2024-11-22
Estimated Expiration
2034-04-17

AI Technical Summary

Technical Problem

During the shale oil and gas mining process, the first section of the continuous oil pipe is expensive and easy to self-lock, and the construction period is long, which affects the transformation efficiency of the shale oil and gas well production.

Method used

A toe end sliding sleeve with delay function is designed, including a central tube, an opening sleeve, a sliding sleeve and a liquid cylinder. The delay mechanism is controlled by a water-soluble capsule, which reduces the starting pressure of the blasting disk assembly and passes a soluble gasket. Control the delay time to ensure the safety and efficiency of wellbore tests.

Benefits of technology

It effectively reduces the cost and construction cycle of the first stage fracturing transformation, increases the output of shale oil and gas wells, and adapts to the construction needs of different well depths due to the adjustable delay time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222045731U_ABST
    Figure CN222045731U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of oil and gas field well completion tools, in particular to a toe end sliding sleeve with a time delay function, which comprises a central pipe, a plurality of fracturing inner holes are arranged in the middle of the central pipe, an opening sleeve, a sliding sleeve and a hydraulic cylinder are sleeved on the central pipe, a plurality of fracturing outer holes are arranged on the opening sleeve, and the hydraulic cylinder is sleeved on the sliding sleeve. A time delay mechanism is connected between one end of the hydraulic cylinder and the opening sleeve, a first sealing space is formed among the hydraulic cylinder, the center pipe and the time delay valve sleeve, a second sealing space is formed among the time delay mechanism, the sliding sleeve and the opening sleeve, and a third sealing space is formed between the opening sleeve and the center pipe. At least two water-soluble capsules are arranged in the first sealed space, and a blasting disc assembly is arranged at the position, close to the first sealed space, of the center pipe. The toe end sliding sleeve is used for conducting first-section fracturing transformation operation, so that the construction efficiency can be improved, the operation risk is reduced, and the construction efficiency is improved. And meanwhile, the influence of the depth on the fracturing operation can be reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of oil and gas field completion tools, in particular to a toe end sliding sleeve with a time delay function. Background Art

[0002] One of the most commonly used methods for shale oil extraction is fracturing technology, and the first stage fracturing transformation is one of the important factors affecting the production of shale oil and gas wells. For the first stage fracturing transformation, the two common methods are to use continuous perforation of the tubing and toe end sliding sleeve to establish a fracturing transformation channel.

[0003] Although coiled tubing perforating technology has the advantages of mature technology and high success rate, in the field of oil and gas extraction, with the increasing development of shale oil and gas resources, the drilling depth is getting deeper and deeper, the horizontal well section is longer than that of conventional oil and gas wells, and the construction difficulty is also greater. The cost of perforating the first section of coiled tubing is high, it is easy to self-lock and the construction period is too long. Utility Model Content

[0004] In view of this, the purpose of the utility model is to provide a toe end sliding sleeve with a delay function to solve the problems of high cost, easy self-locking and long cycle of the first section perforation of the coiled tubing during shale oil and gas production.

[0005] Based on the above purpose, the utility model provides a toe-end sliding sleeve with a delay function, including a central tube, a plurality of fracturing inner holes are arranged in the middle of the central tube, an opening sleeve, a sliding sleeve and a liquid cylinder are arranged on the central tube, a plurality of fracturing outer holes corresponding to all the fracturing inner holes are arranged on the opening sleeve, one end of the liquid cylinder is threadedly connected to a place of the central tube at the lower end, and a delay mechanism is connected between the other end and the opening sleeve, a first sealed space is formed between the liquid cylinder, the central tube and the delay valve sleeve, a second sealed space is formed between the delay mechanism, the sliding sleeve and the opening sleeve, a third sealed space is formed between the opening sleeve and the central tube, the sliding sleeve is movably arranged in the third sealed space, at least two water-soluble capsules are arranged in the first sealed space, a bursting disc assembly is arranged at a place of the central tube close to the first sealed space, and the first sealed space and the second sealed hole are connected by starting the delay mechanism;

[0006] In the initial state, the sleeve is located in the middle of the central pipe, and is used to close the fracturing inner hole and the fracturing outer hole, so that the first sealed space, the second sealed space and the third sealed space are in a sealed state.

[0007] Preferably, the delay mechanism comprises:

[0008] A time-delay valve sleeve, one end of which is sleeved on the opening sleeve, and the other end of which is sleeved on the central tube, and the two ends of the time-delay valve sleeve are respectively threadedly connected to the outer wall of the opening sleeve and the inner wall of the liquid cylinder;

[0009] A time delay valve body is arranged at one end of the time delay valve sleeve close to the first sealed space, and a through hole is provided inside the time delay valve body for connecting the first sealed space and the second sealed space;

[0010] The soluble component is arranged inside the through hole.

[0011] Preferably, the soluble part comprises:

[0012] A plug with a hole, threadedly connected and arranged in the through hole;

[0013] The soluble gasket is placed at one end of the perforated plug close to the first sealing space through interference fit.

[0014] Preferably, the soluble gasket is provided with a countersunk hole of a fixed depth.

[0015] Preferably, the interior of the water-soluble capsule is solid sodium chloride.

[0016] Preferably, the bursting disc assembly comprises:

[0017] A threaded through hole is provided on the central tube;

[0018] A rupture seat, threadedly connected and arranged in the threaded through hole;

[0019] The rupture disk is clamped inside the rupture seat.

[0020] The beneficial effects of the utility model are as follows: under the premise of ensuring the strength of the soluble gasket, the delay time can be extended or shortened according to the on-site construction conditions by adjusting the number of water-soluble capsules to control the concentration of the salt solution; when the wellbore test is under medium pressure, the bursting disc assembly can be opened, which can effectively reduce the starting pressure of the bursting disc and meet the pressure requirements of the entire wellbore; at the same time, since the delay time is controlled by the soluble metal, the well depth has little effect on it. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings in the following description are only for the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0022] Figure 1 It is a structural schematic diagram of the initial state of an embodiment of the utility model;

[0023] Figure 2 This is a schematic diagram of the structure of the embodiment of the utility model after the sliding sleeve moves;

[0024] Figure 3 For the utility model embodiment Figure 1 Enlarge the structural diagram at A;

[0025] Figure 4 For the utility model embodiment Figure 1 Zoom in on the schematic diagram at B.

[0026] The markings in the figure are:

[0027] 1. Center pipe; 2. Fracturing inner hole; 3. Opening sleeve; 4. Sliding sleeve; 5. Liquid cylinder; 6. Fracturing outer hole; 7. First sealed space; 8. Second sealed space; 9. Third sealed space; 10. Water-soluble capsule; 11. Delay valve sleeve; 12. Delay valve body; 13. Through hole; 14. Perforated plug; 15. Soluble gasket; 16. Threaded through hole; 17. Rupture seat; 18. Rupture disk. DETAILED DESCRIPTION

[0028] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with specific embodiments.

[0029] It should be noted that, unless otherwise defined, the technical terms or scientific terms used in the present invention should be understood by people with ordinary skills in the field to which the present invention belongs. The words "first", "second" and similar words used in the present invention do not indicate any order, quantity or importance, but are only used to distinguish different components. "Include" or "comprise" and similar words mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.

[0030] like Figure 1 and Figure 4As shown, a toe-end sliding sleeve with a delay function comprises a central tube 1, a plurality of fracturing inner holes 2 are provided in the middle of the central tube 1, an opening sleeve 3, a sliding sleeve 4 and a liquid cylinder 5 are sleeved on the central tube 1, a plurality of fracturing outer holes 6 corresponding to all the fracturing inner holes 2 are provided on the opening sleeve 3, one end of the liquid cylinder 5 is threadedly connected to a portion of the central tube 1 at the lower end, and a delay mechanism is connected between the other end and the opening sleeve 3, a first sealed space 7 is formed between the liquid cylinder 5, the central tube 1 and the delay valve sleeve 11, a second sealed space 8 is formed between the delay mechanism, the sliding sleeve 4 and the opening sleeve 3, a third sealed space 9 is formed between the opening sleeve 3 and the central tube 1, the sliding sleeve 4 is movably arranged in the third sealed space 9, at least two water-soluble capsules 10 are arranged in the first sealed space 7, a bursting disc assembly is arranged at a portion of the central tube 1 close to the first sealed space 7, and the first sealed space 7 and the second sealed hole are connected by starting the delay mechanism;

[0031] In the initial state, the sleeve 4 is located in the middle of the central pipe 1, and is used to close the fracturing inner hole 2 and the fracturing outer hole 6, so that the first sealed space 7, the second sealed space 8 and the third sealed space 9 are in a sealed state.

[0032] As an optional embodiment, the delay mechanism includes:

[0033] A time-delay valve sleeve 11, one end of which is sleeved on the opening sleeve 3, and the other end of which is sleeved on the central tube 1, and the two ends of the time-delay valve sleeve 11 are respectively threadedly connected to the outer wall of the opening sleeve 3 and the inner wall of the liquid cylinder 5;

[0034] A time-delay valve body 12 is arranged at one end of the time-delay valve sleeve 11 close to the first sealed space 7, and a through hole 13 is provided inside the time-delay valve body 12 for connecting the first sealed space 7 and the second sealed space 8;

[0035] The soluble component is arranged inside the through hole 13 .

[0036] As an optional embodiment, the soluble part includes:

[0037] A plug with a hole 14, threadedly connected and arranged in the through hole 13;

[0038] The soluble gasket 15 is placed at one end of the perforated plug 14 close to the first sealing space 7 by interference fit.

[0039] As an optional embodiment, the soluble gasket 15 is provided with a countersunk hole of a fixed depth.

[0040] As an optional embodiment, the interior of the water-soluble capsule 10 is solid sodium chloride.

[0041] As an optional embodiment, the bursting disc assembly includes:

[0042] A threaded through hole 16 is provided on the central tube 1;

[0043] A rupture seat 17, threadedly connected and arranged in the threaded through hole 16;

[0044] The rupture disk 18 is clamped inside the rupture seat 17 .

[0045] For example, the toe end sliding sleeve 4 is connected to the production casing and lowered into the well together with the casing, and is preset at the toe end of the well. The central pipe 1, the hydraulic cylinder 5 and the delay valve sleeve 11 form a first sealing space 7, and the delay valve sleeve 11, the opening sleeve 3 and the sliding sleeve 4 form a second sealing space 8. The opening sleeve 3, the sliding sleeve 4 and the central pipe 1 form a third sealing space 9. The delay valve body 12 is provided with a through hole 13 for connecting the first sealing space 7 and the second sealing space 8. Under the premise of ensuring the strength of the soluble gasket 15, the delay time can be controlled by adjusting the number of water-soluble capsules 10 according to the on-site construction conditions. The time interval is prolonged or shortened according to the concentration of the salt solution. Before the first stage of fracturing transformation operation, a wellbore pressure test is carried out, and then the sleeve 4 is opened to communicate with the formation. When the wellbore is tested at low pressure, the pressure does not reach the breakdown pressure of the rupture disk 18, and the rupture disk 18 will not rupture; when the wellbore is tested at medium pressure, the rupture disk 18 ruptures, and the pressure is transmitted to the delay mechanism and isolated. During the time when the delay gasket dissolves, the sleeve 4 will not open. During this time, the wellbore can be tested at medium pressure and high pressure; after the soluble gasket 15 dissolves, the pressure is transmitted to the end of the sleeve 4 through the through hole 13 inside the delay valve body 12, pushing the sleeve 4 open, and opening the channel for communication between the wellbore and the formation.

[0046] Those skilled in the art should understand that the discussion of any of the above embodiments is only exemplary and is not intended to imply that the scope of the present invention is limited to these examples; under the concept of the present invention, the technical features in the above embodiments or different embodiments can also be combined, the steps can be implemented in any order, and there are many other changes in different aspects of the present invention as described above, which are not provided in detail for the sake of simplicity. Any omissions, modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. A toe end sliding sleeve with a time delay function, comprising a central tube (1), wherein a plurality of fracturing inner holes (2) are provided in the middle of the central tube (1), characterized in that: The central tube (1) is sleeved with an opening sleeve (3), a sliding sleeve (4) and a fluid cylinder (5); the opening sleeve (3) is provided with a plurality of fracturing outer holes (6) corresponding one-to-one to all the fracturing inner holes (2); one end of the fluid cylinder (5) is threadedly connected to a point at the lower end of the central tube (1); a delay mechanism is connected between the other end and the opening sleeve (3); a first sealed space (7) is formed between the fluid cylinder (5), the central tube (1) and the delay valve sleeve (11); the delay mechanism, the sliding sleeve and the fluid cylinder (5) are connected to the central tube (1) and the delay valve sleeve (11); A second sealed space (8) is formed between the opening sleeve (4) and the opening sleeve (3), a third sealed space (9) is formed between the opening sleeve (3) and the central tube (1), the sliding sleeve (4) is movably arranged in the third sealed space (9), at least two water-soluble capsules (10) are arranged in the first sealed space (7), a bursting disc assembly is arranged at a location of the central tube (1) close to the first sealed space (7), and the first sealed space (7) and the second sealed hole are started and communicated through a delay mechanism; In the initial state, the sliding sleeve (4) is located in the middle of the central tube (1) and is used to close the fracturing inner hole (2) and the fracturing outer hole (6), so that the first sealing space (7), the second sealing space (8) and the third sealing space (9) are in a sealed state.

2. A toe-end sliding sleeve with a time-delay function according to claim 1, characterized in that: The time delay mechanism comprises: A time-delay valve sleeve (11), one end of which is sleeved on the opening sleeve (3) and the other end of which is sleeved on the central tube (1), and the two ends of the time-delay valve sleeve (11) are respectively threadedly connected to the outer wall of the opening sleeve (3) and the inner wall of the liquid cylinder (5); A time-delay valve body (12) is arranged at one end of the time-delay valve sleeve (11) close to the first sealed space (7), and a through hole (13) is provided inside the time-delay valve body (12) for connecting the first sealed space (7) and the second sealed space (8); The soluble component is arranged inside the through hole (13).

3. A toe-end sliding sleeve with a time-delay function according to claim 2, characterized in that: The soluble part comprises: A plug with a hole (14), threadedly connected and arranged in the through hole (13); The soluble gasket (15) is placed at one end of the perforated plug (14) close to the first sealing space (7) through interference fit.

4. The toe-end sliding sleeve with a time-delay function according to claim 3, characterized in that: The soluble gasket (15) is provided with a countersunk hole of a fixed depth.

5. The toe-end sliding sleeve with a time-delay function according to claim 1, characterized in that: The interior of the water-soluble capsule (10) is solid sodium chloride.

6. The toe end sliding sleeve with delay function according to claim 1, characterized in that: The bursting disc assembly comprises: A threaded through hole (16) is provided on the central tube (1); A rupture seat (17) threadedly connected and arranged in the threaded through hole (16); The rupture disk (18) is clamped inside the rupture seat (17).