Tunnel concrete construction anti-seepage structure
By using a combination design of rubber water stops, waterproof components and sealing paste in cable tunnel construction, the problem of water flow leakage at tunnel construction joints is solved, and more efficient waterproofing effect is achieved, simplifying the construction process and reducing construction period.
Patent Information
- Application Number
- CN202420871728.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-25
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-04-25
AI Technical Summary
In the construction of cable tunnels, the prior art is difficult to effectively prevent water flow from penetrating into the tunnel, resulting in leakage problems at the tunnel construction joints.
Designed with a combination of rubber water stops, waterproof components and sealing paste, including spraying waterproof coatings on concrete walls, laying waterproof rolls, and sealing with sealing paste and filler plates at the construction joints, combined with rubber water stops To improve waterproof performance.
Effectively prevent water flow from penetration, improve the overall waterproof performance of construction joints, ensure the internal dryness of the tunnel, and the construction operation is simple, saving labor and shortening construction period.
Smart Images

Figure CN222045805U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of concrete anti-seepage, in particular to an anti-seepage structure for tunnel concrete construction. Background Art
[0002] During the construction of the cable tunnel, in order to ensure that the power tunnel does not leak and to ensure the normal operation of the power equipment, it is necessary to carry out anti-seepage treatment at the construction joint. The usual practice is to place a rubber waterstop in the middle of the construction joint and then pour the construction joint with concrete. This method makes it easy for the construction joint on the water-facing side of the tunnel to be penetrated by water flow, and the water flows in along the gap between the concrete in the construction joint. After a long period of water flow, the water flow will extend along the gap between the rubber waterstop and the concrete, so that the water flow will flow into the tunnel and cause leakage. Utility Model Content
[0003] The utility model aims to provide a tunnel concrete construction anti-seepage structure to solve the problems raised in the above background technology.
[0004] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a tunnel concrete construction anti-seepage structure, including a rubber waterstop, concrete walls are respectively arranged on both sides of the rubber waterstop, tensioning wires for tightening the rubber waterstop are respectively arranged at both ends of the rubber waterstop, a waterproof component for waterproofing the water facing surface is arranged at the top of the rubber waterstop, the waterproof component includes a waterproof coating and a waterproof membrane, filling plates for filling construction joints are respectively arranged at the top and bottom ends of the rubber waterstop, and a sealing paste for sealing the construction joints is arranged at the bottom end of the waterproof coating.
[0005] Preferably, a fixed steel bar for fixing the position of the rubber waterstop is provided inside the concrete wall, and one end of the tensioning steel wire is fixedly connected to one end of the rubber waterstop.
[0006] Preferably, the center line of the rubber waterstop coincides with the center line of the construction joint in the vertical direction.
[0007] Preferably, the fixing steel bar is concave-shaped.
[0008] Preferably, the thickness of the waterproof coating is greater than 1 mm.
[0009] Preferably, a concrete filling layer for covering construction joints is provided on one side of the concrete wall.
[0010] Technical effects and advantages of the utility model:
[0011] The utility model utilizes the design of rubber waterstop, sealing paste and waterproof components, sprays waterproof coating on the water-facing surface of concrete wall, and then lays waterproof membrane, so as to achieve waterproofing of the water-facing surface, fills the construction joint with sealing paste at one end of waterproof membrane close to the construction joint, so as to achieve detailed waterproofing of the construction joint, and combines with the rubber waterstop to improve the overall waterproofing performance of the construction joint. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 It is a schematic diagram of the cross-sectional structure of the construction joint of the utility model.
[0013] In the figure: 1. Rubber waterstop; 2. Concrete wall; 3. Waterproof coating; 4. Waterproof membrane; 5. Sealant; 6. Filling plate; 7. Fixed steel bars; 8. Tensioning wire; 9. Concrete filling layer. DETAILED DESCRIPTION
[0014] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0015] The utility model provides Figure 1 A tunnel concrete construction anti-seepage structure shown in the figure includes a rubber waterstop 1, concrete walls 2 are respectively arranged on both sides of the rubber waterstop 1, tensioning wires 8 for tightening the rubber waterstop 1 are respectively arranged at both ends of the rubber waterstop 1, a waterproof component for waterproofing the water facing surface is arranged at the top of the rubber waterstop 1, the waterproof component includes a waterproof coating 3 and a waterproof membrane 4, filling plates 6 for filling construction joints are respectively arranged at the top and bottom ends of the rubber waterstop 1, and a sealing paste 5 for sealing the construction joints is arranged at the bottom end of the waterproof coating 3.
[0016] Specifically, there are two concrete walls 2, and the opposite sides of the two concrete walls 2 are the locations of construction joints. The rubber waterstop 1 is an existing embedded rubber waterstop.
[0017] Specifically, a fixed steel bar 7 for fixing the position of the rubber waterstop 1 is provided inside the concrete wall 2, one end of the tensioning wire 8 is fixedly connected to one end of the rubber waterstop 1, the center line of the rubber waterstop 1 coincides with the center line of the construction joint in the vertical direction, and the fixed steel bar 7 is concave in shape.
[0018] Furthermore, in the steel bar tying stage, the fixed steel bar 7 and the structural steel bar are tied to each other to fix the fixed steel bar 7, and the end of the rubber waterstop 1 is inserted into the recessed part of the fixed steel bar 7, so that the rubber waterstop 1 will not be displaced under the restriction of the fixed steel bar 7. A plurality of fixed steel bars 7 are arranged inside the concrete wall 2, and the plurality of fixed steel bars 7 are arranged at equal intervals. The tensioning wire 8 is made of galvanized steel wire. Two tensioning wires 8 are arranged at one end of the rubber waterstop 1, and the two tensioning wires 8 are arranged in an eight-shaped shape. A circular hole is opened in the part of the rubber waterstop 1 where a hole can be opened, and one end of the tensioning wire 8 passes through the circular hole, and the other end of the tensioning wire 8 is respectively tied to the structural steel bar, so that the two ends of the rubber waterstop 1 are tightened, so that the rubber waterstop 1 can be laid flat without bending or stacking.
[0019] Specifically, the thickness of the waterproof coating 3 is greater than 1 mm, and a concrete filling layer 9 for covering the construction joint is provided on one side of the concrete wall 2 .
[0020] Furthermore, the top and bottom ends of the rubber water stop 1 in the construction joint are filled with a filling plate 6 respectively, and the filling plate 6 is made of a polystyrene foam plastic plate. The top of the rubber water stop 1 is filled with a sealing paste 5, and the sealing paste 5 is made of a polyurethane sealing paste. The end of the construction joint close to the water-facing surface is sealed, and the filling thickness of the sealing paste 5 is 20 mm. Then, the waterproof coating 3 is first sprayed on the water-facing surface of the concrete wall 2, and the waterproof coating 3 is made of a polyurethane waterproof coating. Then, the waterproof membrane 4 is laid, and the waterproof membrane 4 is fixed to the outer wall of the concrete wall 2 by a hot melt method. The waterproof membrane 4 is made of The specification of the roll material is 43.5*150*6mm. The waterproof roll material 4 is made of three layers of multiple roll materials laid on each other. The material of the concrete filling layer 9 is the same as that of the concrete wall 2. After the construction of the waterproof structure is completed, the concrete filling layer 9 is applied to the bottom end of the filling plate 6 at the bottom end of the rubber waterstop 1 to cover the construction joint. Through the waterproof coating 3 and waterproof roll material 4 on the water-facing surface of the concrete wall 2, the sealing paste 5 of the construction joint details and the rubber waterstop 1 of the construction joint itself, multi-level waterproofing is achieved, and the anti-seepage performance of the construction joint is improved. This method is simple to operate, saves labor, and can shorten the construction period.
[0021] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A tunnel concrete construction anti-seepage structure, comprising a rubber water stop (1), wherein concrete walls (2) are respectively arranged on both sides of the rubber water stop (1), It is characterized in that Both ends of the rubber waterstop (1) are provided with tensioning wires (8) for tightening the rubber waterstop (1), the top end of the rubber waterstop (1) is provided with a waterproof component for waterproofing the water-facing surface, the waterproof component includes a waterproof coating (3) and a waterproof coiled material (4), the top and bottom ends of the rubber waterstop (1) are provided with filling plates (6) for filling construction joints, and the bottom end of the waterproof coating (3) is provided with a sealing paste (5) for sealing the construction joints.
2. A tunnel concrete construction anti-seepage structure according to claim 1, It is characterized in that A fixing steel bar (7) for fixing the position of the rubber water stop (1) is arranged inside the concrete wall (2), and one end of the tensioning steel wire (8) is fixedly connected to one end of the rubber water stop (1).
3. A tunnel concrete construction anti-seepage structure according to claim 2, It is characterized in that The center line of the rubber water stop (1) coincides with the center line of the construction joint in the vertical direction.
4. A tunnel concrete construction anti-seepage structure according to claim 2, It is characterized in that The fixing steel bar (7) is in a concave shape.
5. The tunnel concrete construction anti-seepage structure according to claim 1, It is characterized in that The thickness of the waterproof coating (3) is greater than 1 mm.
6. The tunnel concrete construction anti-seepage structure according to claim 1, It is characterized in that A concrete filling layer (9) for covering construction joints is provided on one side of the concrete wall (2).